FORM OF TENDER
PRELIMINARIES 1/1
DAYWORK 4/1
Dear Sirs,
Re: Schlumberger OFS San Fernando Facility Project – Phase II, La Romain, San Fernando.
We having examined the Drawings and Conditions of Contract and priced the Bills of Quantities issued
in connection with these Works and also having visited the Site and having made allowance for Bulletin
Nos ......................... do hereby offer to execute, complete and remedy any defects therein in conformity
with this Tender which includes all these documents for the firm price sum of
..................................................................................................................................................................
..................................................................................................................................................................
($ ) Trinidad & Tobago Currency, inclusive of Value Added Tax or such other
sum as may be determinable by the Conditions of Contract.
We agree to hand over the work duly completed to your entire satisfaction within three (3) months from
the date of possession.
It is understood that this offer shall remain open for acceptance for a period of ninety (90) days and that
you do not bind yourself to accept any tender nor to be responsible for any expenses incurred in
estimating any tender received.
....................................................................................................................................................................
(In Block Letters)
Address
..................................................................................................................................................................
..................................................................................................................................................................
Date ................................................
FORM OF TENDER (Cont’d)
Re: Schlumberger OFS San Fernando Facility Project – Phase II, La Romain, San Fernando.
In the event of the above Tender being accepted, we agree to provide a Performance Bond to
Schlumberger Trinidad Inc (the Employer) in the sum of ten (10) percent of the Contract Sum.
....................................................................................................................................................................
(In Block Letters)
Address
..................................................................................................................................................................
..................................................................................................................................................................
Date ................................................
Schlumberger (T’DAD) Inc. OFS San Fernando Facility Project – Phase II
Bills of Quantities
_____________________________________________________________________________________________
PRELIMINARIES
SCHLUMBERGER - OFS SAN FERNANDO FACILITY PROJECT - PHASE II November 2014
PRELIMINARIES
NAMES OF PARTIES $ ¢
A The titles and terms used in connection with this project shall have the following
meaning:-
EMPLOYER
LEAD CONSULTANT
SERVICES ENGINEER
To Collection $
1/ 1
SCHLUMBERGER - OFS SAN FERNANDO FACILITY PROJECT - PHASE II November 2014
$ ¢
PRELIMINARIES
DESCRIPTION OF WORKS
A The proposed works are for construction of Basement Structure and External
Works within the compound of Schlumberger Trinidad Inc at La Romain, San
Fernando consisting of (i) the demolition of the existing small structures,
(ii) the construction of a new two Basement structure approximately 3700 square
metres, (iii) External Works.
D The attention of the Contractor is drawn to the need to visit the site and acquaint
himself with the existing conditions and that the works are to be carried out in
such a manner and phasing as to permit on-going operations to continue
without interruption and in safety and reasonable comfort to the
Employer's workers.
E The Contractor is advised to satisfy himself as to the full extent and character
of the works, the supply of and conditions affecting local labour, the conditions
affecting supply of materials and all local conditions and restrictions
affecting the works.
To Collection $
1/ 2
SCHLUMBERGER - OFS SAN FERNANDO FACILITY PROJECT - PHASE II November 2014
PRELIMINARIES $ ¢
DESCRIPTION OF SITE
A The site of the proposed works is the existing Building at South Trunk Road,
La Romain, San Fernando.
C The Contractor is to visit, inspect and examine the site and ascertain the
nature of the works to be done, means of access and egress, the availability
and positions of essential services, conditions of the site, temporary crossings
and drainage and allow in his tender for all such factors which may affect the
execution of the works.
E The Contractor shall keep his own and any sub-contractor's work people,
materials, plant, rubbish and debris within the limits of the site handed to him
and shall take all necessary steps to prevent unauthorised movement of
workpeople.
TENDERING INFORMATION
Pricing
F Price in ink each item in the Bills of Quantities which is considered to have a
money value. If the tenderer omits to price any item it will be deemed that
either he will perform the services described free of charge or that the cost of
such services has been included against items appearing elsewhere in the
Bills. The rates inserted shall be deemed to be in Trinidad & Tobago currency.
G Items shall be priced either net (i.e. excluding profit and overheads) or gross
(i.e. including profit and overheads). If items are priced net then the Contractor
shall make his addition for profit and overheads where provided on the
Summary Page. See Summary
H Include in the tender price for handing over the Works clean, functional
and complete, fit for immediate occupation and use as intended.
To Collection $
1/ 3
SCHLUMBERGER - OFS SAN FERNANDO FACILITY PROJECT - PHASE II November 2014
PRELIMINARIES $ ¢
Pricing (Cont'd)
A The pricing inserted shall be deemed to include for the provision of all
labour, materials and plant, for transport, for deliveries to Site (where not
specifically mentioned in the description), for temporary storage of materials
and return of empties for the erection, maintenance and removal of
scaffolding, temporary stagings, plankways, protection etc and for all other
things necessary within the drawings and Bills of Quantities to the reasonable
satisfaction of the Architect.
B Items are to priced net of Value Added Tax. The Tenderer is to make his
addition for Value Added Tax where indicated on the Summary Page. See Summary
Tax Certificates
C At the time of the tender, the Tenderer will be required to furnish his Value
Added Tax, National Insurance Board and Board of Inland Revenue Clearance
Certificates.
D Allow for compliance with all Government and Local Ordinances, Orders,
Rules and Regulations in so far as is not provided for elsewhere in the Bills
of Quantities.
E Allow for compliance with any regulations made by the Police for the
temporary parking of vehicles and the loading and unloading of persons or
goods.
Performance Bond
To Collection $
1/ 4
SCHLUMBERGER - OFS SAN FERNANDO FACILITY PROJECT - PHASE II November 2014
PRELIMINARIES $ ¢
Firm Price
A The tender price shall be a firm price. The Tenderer should therefore include
in his price for any increase in labour and materials which affect the work
and which in his opinion is not covered by the payment system under the
Conditions of Contract.
Queries
C The Tenderer shall refer all queries arising out of this tender to the Lead
Consultant whose decision for the purpose of tendering shall be final. Queries
shall be raised not later than five (5) days before the closing date of tenders,
so as to permit the circularising of the replies to all tenderers, if this is
considered necessary. Such answers as are necessary shall be given as a
matter of assistance to the tenderer but they shall not be construed as
adding to or taking away from or otherwise altering the meaning and intent
of the tender documents and/or the Contractor's obligation thereunder which
can be varied only by a letter signed by the Lead Consultant.
Errors
E The Tenderer will be informed of the amount and nature of the error/s and if he
wishes to stand by his tender or to amend it to correct error/s.
To Collection $
1/ 5
SCHLUMBERGER - OFS SAN FERNANDO FACILITY PROJECT - PHASE II November 2014
PRELIMINARIES $ ¢
Errors (Cont'd)
B Where errors are discovered after acceptance of the tender, the errors will be
adjusted by either of the foregoing methods as the Tenderer would be deemed
to have stood by his tender.
C If the Tenderer amends his tender to correct the errors, the corrected
details shall either be initialed by the Tenderer in the priced Bills of Quantities
or confirmed by him in a letter which shall be conjoined with the acceptance
and the amended figured and rates in it shall be substituted for those in the
original tender.
Method of Measurement
D The Bills of Quantities has been prepared in accordance with the Fifth
Edition of the Standard Method Measurement of Building Works issued
July 1968 (Metric) qualified or modified to suit local conditions.
To Collection $
1/ 6
SCHLUMBERGER - OFS SAN FERNANDO FACILITY PROJECT - PHASE II November 2014
PRELIMINARIES $ ¢
Contract Particulars
2.0 Term
4.0 Insurances
5.0 Bonds
6.0 Notices
8.0 Invoices
9.0 Taxes
10.0 Indemnities
11.0 Guarantees
12.0 Termination
15.0 Confidentiality
16.0 Audits
To Collection $
1/ 7
SCHLUMBERGER - OFS SAN FERNANDO FACILITY PROJECT - PHASE II November 2014
PRELIMINARIES $ ¢
19.0 Miscellaneous
2.0 Definitions
1.0 Rates
5.0 Invoices
To Collection $
1/ 8
SCHLUMBERGER - OFS SAN FERNANDO FACILITY PROJECT - PHASE II November 2014
PRELIMINARIES $ ¢
10.0 Indemnities
11.0 Guarantees
To Collection $
1/ 9
SCHLUMBERGER - OFS SAN FERNANDO FACILITY PROJECT - PHASE II November 2014
PRELIMINARIES $ ¢
A Appendix
Clause Nr
Liquidated and Ascertained Annex 10.5 at the rate of half (.05) percent of
Damages the Contract Sum per day to a
maximum of ten (10) percent
of the Contract Sum
Bonus Annex "E" 10.8 at the rate of 0.2 percent per day of
the Contract Sum to a maximum of
ten (10) percent of the Contract
Sum
Percentage of certified
Value Retained Annexe "B" 10%
To Collection $
1/ 10
SCHLUMBERGER - OFS SAN FERNANDO FACILITY PROJECT - PHASE II November 2014
PRELIMINARIES $ ¢
One Document
A Read the Bills of Quantities and Drawings as one document and carry out
everything for the proper execution of the works, whether or not specifically
described or shown therein, provided the same may reasonably be inferred
therefrom.
B Items in the materials and Workmanship Section of the Bills of Quantities are
deemed to qualify and to be part of every description of the work to be done
to which they refer.
Discrepancies
Copies
D Two copies of the Bills of Quantities and all drawings shall be furnished free of
charge to the Contractor for his own use until the completion of the Contract.
They shall be accessible, at all reasonable times, to the Lead Consultant and
the Employer, to whom they shall be returned at the completion of the
Contract. Additional copies may be made but the cost of printing will be for
the Contractor's expense.
E The tenderers are required to submit with their tenders their proposed
outline programme for the Works.
To Collection $
1/ 11
SCHLUMBERGER - OFS SAN FERNANDO FACILITY PROJECT - PHASE II November 2014
PRELIMINARIES $ ¢
Copies (Cont'd)
A The Contractor shall prepare within seven (7) days of delivery of the
letter of acceptance, a revised programme and progress chart of the entire
Works, including all sub-contractor's work, for agreement with the Lead
Consultant. After such agreement, the Contractor shall produce four (4) copies
of the agreed chart for the Lead Consultant and shall display the chart on site
and record progress thereon during the execution of the Works. The
Contractor shall so programme his work as not to interfere with the free use
of any existing buildings, roads and other areas on or adjoining the site. The
Contractor shall update the programme as it becomes necessary.
B The Contractor shall keep a permanent written record on the site of the
progress of the Works. This record shall be open to the inspection of the Lead
Consultant at all reasonable times. A copy shall be furnished to the Lead
Consultant on request.
C The record shall show the dates of commencement and completion of all
trades and parts of the work coming under the Contract. It shall also include
particulars regarding daily weather conditions, excavation work, erection and
removal of formwork, pouring of concrete, etc., as well as the number of plant
equipment and employees of the various trades engaged on the Works.
D The Contractor shall prepare and submit a Cash Flow Forecast for the Works
within seven (7) days of delivery of the letter of acceptance.
Log Book
E Provide and keep on the site of the Works a suitable log book in which the
Lead Consultant may enter observations and/or confirm any verbal
instructions given.
To Collection $
1/ 12
SCHLUMBERGER - OFS SAN FERNANDO FACILITY PROJECT - PHASE II November 2014
PRELIMINARIES $ ¢
Photographs
A The Contractor shall submit monthly for the full duration of the Contract
twelve (12) glossy print photographs, size 125mm x 75mm showing four (4)
clear views of the works as selected by the Lead Consultant. Photographs
shall be taken from the same point each month in order to show the
progress of the Works.
Record Drawings
Generally
C The Lead Consultant in conjunction with the Contractor shall select areas for
all temporary buildings including areas for use by specialists sub-contractors
as may be necessary. The grounds on which temporary buildings are sited
shall be made good after removal of these buildings.
Site Visit
D Visit the site and ascertain the nature of work to be done, means of access
and egress, the availability and positions of essential services, viz. electricity,
water, etc., conditions of the site, necessity for and extent of sleeper roads,
temporary crossings and temporary drainage, working space and storage
for materials and allowance is to be made in the tender for all such factors
which may affect the execution of the Works.
To Collection $
1/ 13
SCHLUMBERGER - OFS SAN FERNANDO FACILITY PROJECT - PHASE II November 2014
PRELIMINARIES $ ¢
Maintenance of Roads
A Maintain the public and private roads, footpaths, ditches, kerbs and the like.
Keep the approaches to the site free from excavated materials, mud and debris.
The Contractor is to make good any damage caused by his own or any
sub-contractor's or supplier's transport at his own expense or pay all costs
and charges in connection therewith.
Temporary Roads
B Provide, maintain and alter as necessary all temporary roads, tracks, paths,
hard standings, pavement crossings, temporary works and the like. Reinstate
the ground and all work disturbed.
C Protect, uphold, temporarily divert and maintain all pipes, ducts, drains,
sewers, service mains, overhead cables and the like during the execution of
the works. The Contractor is to make good any damage due to any cause within
his control at his own expense or pay any costs and charges in connection
therewith. Approval shall be obtained at lease two (2) weeks in advance if
any services have to be interrupted.
Water
D Provide water for the works including that for sub-contractors and specialists,
at the various levels and positions where required including all necessary
sumps, temporary plumbing and storage and pay all charges for drawing
water off mains supply.
E Provide all necessary artificial lighting and power, including that for
sub-contractors and specialists and pay all charges for drawing off mains
supply.
To Collection $
1/ 14
SCHLUMBERGER - OFS SAN FERNANDO FACILITY PROJECT - PHASE II November 2014
PRELIMINARIES $ ¢
A Provide telephone communication with the site and a facsimile machine for
the duration of the Works and pay all charges in connection therewith.
Staff
B Provide, erect and maintain suitable office accommodation and mess room for
staff and workmen and remove on completion.
Materials Storage
C Provide, erect and maintain suitable sheds for storage of materials and
remove on completion.
Toilet Facilities
D provide sufficient temporary toilet facilities or chemical toilets for the use of
workmen and authorised visitors to the satisfaction of the Lead Consultant
and Sanitary Authorities and empty and cleanse same as and when required
and remove on completion of the Works.
E Provide, erect and maintain office accommodation for the Consultants and
Site Engineer in a location to be agreed with the Lead Consultant. The
office shall be approximately 20 square metres in area and of sound
construction with lockable doors, windows, drawing table, chairs, space for
hanging drawings, pin-up board, drinking water and toilet facilities, air
condition and electrical installation. Provide daily cleaning of the office and
remove structure on completion of the Works.
To Collection $
1/ 15
SCHLUMBERGER - OFS SAN FERNANDO FACILITY PROJECT - PHASE II November 2014
$ ¢
PRELIMINARIES
A The site of the proposed Works, shall be under the Contractor's sole
charge from the date of possession to the date of completion of the Contract.
B Provide all necessary day and night watching (including security guards if
necessary) to effectively protect the Works and materials stored on site
(including those of sub-contractors), workpeople and visitors and accept all
risks for damage or loss.
Trespass
D Prevent any trespass by unauthorised persons on the site of the Works and
any trespass on adjoining property by own employees or those of
sub-contractors and indemnify the Employer against any claims, costs or
proceedings whatsoever arising out of any trespass or alleged trespass.
Attendance
E Provide attendance upon, cut away for and make good after all trades and
in all trades performed by own workmen and own sub-contractors and
leave perfect on completion.
Protection of Works
F Case up and protect all work from any kind of injury and damage. Provide
all necessary temporary roofs, tarpaulins, screens, planking and general
protection that may be required and clear away when no longer needed
and reinstate any work which has become damaged or stained.
To Collection $
1/ 16
SCHLUMBERGER - OFS SAN FERNANDO FACILITY PROJECT - PHASE II November 2014
PRELIMINARIES $ ¢
Advertising
B Obtain the approval of the Lead Consultant to the siting of permanent spoil
disposal and of the proposed siting of materials, of temporary spoil and
rubbish deposits and of temporary buildings, temporary roads and the like.
C Provide and maintain temporary gutters, channels, drains and the like for
the disposal of surface and other water. Alter, shift and adapt from time to
time as necessary.
Hoarding
D Provide, erect, maintain, alter from time to time, strong adequate temporary
hoarding not less than three (3) metres high and lockable gates and doors for
the protection of the general public, Employer's workers and the proper execution
of the Works.
E The hoarding must be neat, strong, durable and meet in all respects the
requirements of safety. The Contractor is to dismantle and remove from
site on completion and make good any works disturbed.
Ordering of Materials
F Do not use the Bills of Quantities as a materials ordering list. Prepare own
materials ordering list based on the construction drawings issued and on
site measurements where appropriate.
To Collection $
1/ 17
SCHLUMBERGER - OFS SAN FERNANDO FACILITY PROJECT - PHASE II November 2014
PRELIMINARIES $ ¢
Best Quality
Defective Work
Apply Throughout
C Descriptions of materials and workmanship given in any one Section are to apply
throughout the Bills of Quantities unless otherwise described.
Brand Names
D Where materials are described by brand or trade names, such names are
given as indication of type, quality, etc. Allow in tendering for these particular
materials but alternatives may be used with the Lead Consultant approval. If
approval is not given the materials described herein must be provided.
Provide as Necessary
F Provide as necessary all materials required for the proper execution and
completion of the Works.
To Collection $
1/ 18
SCHLUMBERGER - OFS SAN FERNANDO FACILITY PROJECT - PHASE II November 2014
PRELIMINARIES $ ¢
Availability
A Ensure that all materials will be available from stock and if this is not the
case, make arrangements for deliveries so that no delay is occasioned due
to the non-availability of materials.
Samples
Tests
C Provide material for and pay all costs in connection with the carrying out of the
tests as specified in Materials and Workmanship Section of these Bills of
Quantities and as directed by the Lead Consultant.
D Provide provisional Sum of $10,000.00 for the carrying out of tests as and
when directed by the Lead Consultant. If the results of any tests are
unsatisfactory bear the cost of any resulting reconstruction which may be
ordered by the Lead Consultant. $ 10,000.00
LABOUR
Provide as Necessary
To Collection $
1/ 19
SCHLUMBERGER - OFS SAN FERNANDO FACILITY PROJECT - PHASE II November 2014
PRELIMINARIES $ ¢
LABOUR (Cont'd)
Availability
A Ensure that all labour will be available for the Works and allow in the tender
for the additional cost of any important of labour from other districts in
Trinidad & Tobago that may be deemed necessary.
Fringe Benefits
B Allow for all costs in respect of National Insurance, Vacation and Public Holiday,
Sick Leave, Cost of Living Allowances, subsistence allowances, travelling time
and expenses and all other emoluments and expenses payable to or in
connection with the employment of persons for the Works.
C Comply with all local regulations in force relating to the welfare of workpeople
on the site or in places where work is being prepared for incorporation into the
Works.
Overtime
PLANT
Generally
F Provide all plant necessary for the proper execution of the Works:
G Provide all instruments, temporary bench marks and labour for setting out
and levelling.
To Collection $
1/ 20
SCHLUMBERGER - OFS SAN FERNANDO FACILITY PROJECT - PHASE II November 2014
PRELIMINARIES $ ¢
PLANT (Cont'd)
General Scaffolding
A Provide all necessary temporary scaffolding for the proper execution and
completion of the contract and alter, shift and adapt from time to time as
necessary.
TRANSPORT
D Clear away all plant and temporary work unless otherwise described or
directed and make good. Clear away all existing rubbish, debris and surplus
materials as they accumulate and at completion. Clean floors, pavings,
and all external surfaces and leave the Works clean and perfect at completion.
H All employees must wear hard hats and safety boots at all times in all work
areas. It is mandatory that safety goggles and face shields be worn on
operations where eye protection is needed.
To Collection $
1/ 21
SCHLUMBERGER - OFS SAN FERNANDO FACILITY PROJECT - PHASE II November 2014
PRELIMINARIES $ ¢
A Clothing shall be appropriate for tasks being done. Coveralls as specified are
the minimum requirements.
B It is mandatory that employees report all unsafe acts, unsafe conditions and
near-miss incidents to their Safety Officer. Report all injury or damage
accidents immediately.
E Hand tools must not be used for any other purposes than they are intended.
I Guardrails consisting top rail, mid rail and toe board are required when the
platform is 2.5 metres (8'-0" feet or more) above floor level.
J Wheels and castors must be locked when personnel are working from the
scaffold.
To Collection $
1/ 22
SCHLUMBERGER - OFS SAN FERNANDO FACILITY PROJECT - PHASE II November 2014
PRELIMINARIES $ ¢
B A worker must wear a safety harness with the lanyard tied off to an
independent lifeline if (a) an independent lifeline if the stage has only two
independent suspension lines; (b) the stage if it has four independent
suspension line (two at each end).
C When exposed to the risk of falling more than 3.0 metres (10'-0") or into
operating machine, toxic substances, liquid tanks, or other hazardous
materials, a worker must wear a safety belt or safety harness with the
lanyard tied off to a fixed support.
D Safety belts, safety harness and lanyards must be CSA certified. Such
equipment will carry the CSA label.
E Safety harnesses must be snug-fitting and worn with all the hardware and
straps intact and properly fastened.
G When the lanyard is wire rope of nylon webbing, a shock absorber must be
used.
Safety Officer
H A qualified Safety Officer shall be appointed for the duration of the construction
period. Qualifications must be submitted to the Lead Consultant for
approval. The person so appointed shall be resident on site.
To Collection $
1/ 23
SCHLUMBERGER - OFS SAN FERNANDO FACILITY PROJECT - PHASE II November 2014
PRELIMINARIES $ ¢
Safety Document
B A fully stocked first-aid kit must be kept on site for the duration of the project.
To Collection $
1/ 24
SCHLUMBERGER - OFS SAN FERNANDO FACILITY PROJECT - PHASE II November 2014
PRELIMINARIES $ ¢
COLLECTION
Page Nr
1/1
1/2
1/3
1/4
1/5
1/6
1/7
1/8
1/9
1/10
1/11
1/12
1/13
1/14
1/15
1/16
1/17
1/18
1/19
To Collection $
1/ 25
SCHLUMBERGER - OFS SAN FERNANDO FACILITY PROJECT - PHASE II November 2014
PRELIMINARIES $ ¢
COLLECTION
Page Nr
1/20
1/21
1/22
1/23
1/24
PRELIMINARIES To Summary $
1/ 26
Schlumberger (T’DAD) Inc. OFS San Fernando Facility Project – Phase II
Bills of Quantities
_____________________________________________________________________________________________
MEASURED WORK
SCHLUMBERGER OFS SAN FERNANDO FACILITY PROJECT - PHASE II November, 2014
MEASURED WORK
To Collection $
2/1
SCHLUMBERGER OFS SAN FERNANDO FACILITY PROJECT - PHASE II November, 2014
MEASURED WORK
To Collection $
2/2
SCHLUMBERGER OFS SAN FERNANDO FACILITY PROJECT - PHASE II November, 2014
MEASURED WORK
PROTECTION
COLLECTION
Page Nr 2/1
Page Nr 2/2
Page Nr 2/3
To Collection
2/3
SCHLUMBERGER OFS SAN FERNANDO FACILITY PROJECT - PHASE II November, 2014
MEASURED WORK
PILING
SUNDRIES
PROTECTION
PILING TO SUMMARY $
2/4
SCHLUMBERGER OFS SAN FERNANDO FACILITY PROJECT - PHASE II November, 2014
MEASURED WORK
To Collection $
2/5
SCHLUMBERGER OFS SAN FERNANDO FACILITY PROJECT - PHASE II November, 2014
MEASURED WORK
SUBSTRUCTURE (Cont'd)
2/6
SCHLUMBERGER OFS SAN FERNANDO FACILITY PROJECT - PHASE II November, 2014
MEASURED WORK
SUBSTRUCTURE (Cont'd)
2/7
SCHLUMBERGER OFS SAN FERNANDO FACILITY PROJECT - PHASE II November, 2014
MEASURED WORK
SUBSTRUCTURE (Cont'd)
CONCRETE WORK
Concrete (14N/mm²)
To Collection $
2/8
SCHLUMBERGER OFS SAN FERNANDO FACILITY PROJECT - PHASE II November, 2014
MEASURED WORK
SUBSTRUCTURE (Cont'd)
CONCRETE WORK
2/9
SCHLUMBERGER OFS SAN FERNANDO FACILITY PROJECT - PHASE II November, 2014
MEASURED WORK
SUBSTRUCTURE (Cont'd)
CONCRETE WORK
SUNDRIES
2/10
SCHLUMBERGER OFS SAN FERNANDO FACILITY PROJECT - PHASE II November, 2014
MEASURED WORK
SUBSTRUCTURE (Cont'd)
CONCRETE WORK
SUNDRIES (Cont'd)
________________________
2/11
SCHLUMBERGER OFS SAN FERNANDO FACILITY PROJECT - PHASE II November, 2014
MEASURED WORK
SUBSTRUCTURE (Cont'd)
CONCRETE WORK
PROTECTION
COLLECTION
Page Nr 2/5
Page Nr 2/6
Page Nr 2/7
Page Nr 2/8
Page Nr 2/9
Page Nr 2/10
Page Nr 2/11
Page Nr 2/12
To Collection
SUBSTRUCTURE TO SUMMARY $
2/12
SCHLUMBERGER OFS SAN FERNANDO FACILITY PROJECT - PHASE II November, 2014
MEASURED WORK
CONCRETE WORK
To Collection $
2/13
SCHLUMBERGER OFS SAN FERNANDO FACILITY PROJECT - PHASE II November, 2014
MEASURED WORK
SUNDRIES
To Collection $
2/14
SCHLUMBERGER OFS SAN FERNANDO FACILITY PROJECT - PHASE II November, 2014
MEASURED WORK
SUNDRIES (Cont'd)
PROTECTION
To Collection $
2/15
SCHLUMBERGER OFS SAN FERNANDO FACILITY PROJECT - PHASE II November, 2014
MEASURED WORK
COLLECTION
Page Nr 2/13
Page Nr 2/14
Page Nr 2/15
2/16
SCHLUMBERGER OFS SAN FERNANDO FACILITY PROJECT - PHASE II November, 2014
MEASURED WORK
METALWORK
BALUSTRADING
__________________________
PROTECTION
To Collection $
2/18
SCHLUMBERGER OFS SAN FERNANDO FACILITY PROJECT - PHASE II November, 2014
MEASURED WORK
To Collection $
2/19
SCHLUMBERGER OFS SAN FERNANDO FACILITY PROJECT - PHASE II November, 2014
MEASURED WORK
To Sumamry $
2/20
SCHLUMBERGER OFS SAN FERNANDO FACILITY PROJECT - PHASE II November, 2014
MEASURED WORK
To Collection $
2/21
SCHLUMBERGER OFS SAN FERNANDO FACILITY PROJECT - PHASE II November, 2014
MEASURED WORK
PROTECTION
To Collection
COLLECTION
Page Nr 2/18
Page Nr 2/19
Page Nr 2/20
Page Nr 2/21
Page Nr 2/22
2/22
SCHLUMBERGER OFS SAN FERNANDO FACILITY PROJECT - PHASE II November, 2014
MEASURED WORK
ELECTRICAL INSTALLATION
To Collection $
2/23
SCHLUMBERGER OFS SAN FERNANDO FACILITY PROJECT - PHASE II November, 2014
MEASURED WORK
PROTECTION
To Collection $
COLLECTION
Page Nr 2/23
Page Nr 2/24
2/24
SCHLUMBERGER OFS SAN FERNANDO FACILITY PROJECT - PHASE II November, 2014
MEASURED WORK
INTERNAL WORK
Prepare and apply one (1) coat primer and two (2)
finishing coats emulsion on:-
__________________________
D Prepare and apply one (1) coat red oxide primer and
two (2) finishing coats oil paint on metalwork
surfaces over 100mm but not exceeding 200mm
girth 170 m
EXTERNAL WORK
E Prepare and apply one (1) coat primer and two (2)
finishing coats emulsion on fairfaced concrete
surfaces 1,442 m²
PROTECTION
EXTERNAL WORKS
SITE PREPARATION
A Cut and remove all trees and shrubs from the site
including taking up roots Item
PAVINGS
2/26
SCHLUMBERGER OFS SAN FERNANDO FACILITY PROJECT - PHASE II November, 2014
MEASURED WORK
DRAINAGE
_____________________________
2/27
SCHLUMBERGER OFS SAN FERNANDO FACILITY PROJECT - PHASE II November, 2014
MEASURED WORK
PROTECTION
COLLECTION
Page Nr 2/26
Page Nr 2/27
Page Nr 2/28
To Collection
2/28
SCHLUMBERGER OFS SAN FERNANDO FACILITY PROJECT - PHASE II November, 2014
MEASURED WORK
SUMMARY
2/29
Schlumberger (T’DAD) Inc. OFS San Fernando Facility Project – Phase II
Bills of Quantities
_____________________________________________________________________________________________
DAY WORK
SCHLUMBERGER OFS SAN FERNANDO FACILITY PROJECT - Phase II November 2014
DAYWORK
Generally
A Where work arising under a variation ordered by the Lead Consultant cannot properly be measured
and valued, the Contractor shall be paid on a daywork basis. Such payments shall be the
sum of the prime cost of such work calculated in accordance with the following
"Defination of Prime Cost of Daywork" and the percentage additions to each section of the
prime cost at the rates set out hereunder by the Contractor.
B This Definition applies solely to daywork carried out under or incidental to this building
contract but does not cover daywork ordered by the Lead Consultant to be carried out after
the date of commencement of the Defects Liability Period, which may be the subject of a
separate agreement.
C (1) The amount of wages paid at the rates applicable to workmen engaged on daywork.
D (2) The amount of wages paid at the rate applicable to workmen engaged on daywork and
operating mechanically-operated plant and transport and erecting and dismantling other
plant.
E (3) The time of principals, foreman, gangers and loading hands at the time rates for the trades
practised when actually working with their hands, unless previously otherwise authorised.
F (4) The cost of overtime, where specifically ordered or subsequently sanctioned in writing by
the Architect to be worked on daywork.
H (2) Materials supplied from the Contractor's stock at current prices plus justifiable charges for
handling and delivery to the site.
I The cost of materials referred to in paragraph (1) and (2) above is the cost less all trade discounts,
but including all discounts for cash not exceeding five (5) percent.
J Use of mechanically-operated plant and transport for the time engaed in dayworks.
K Use of scaffolding, staging, trestles, tarpaulins and other non-mechanical plant, excluding hand
tools, specially provided for daywork operation for such time as the Lead Consultant considers
reasonable.
3/1
SCHLUMBERGER OFS SAN FERNANDO FACILITY PROJECT - Phase II November 2014
DAYWORK (Cont'd)
A Overheads for the purpose of this Contract shall mean the following:-
(3) Overtime other than that allowed under Section (1) (4).
(16) All non-mechanically operated plant, erected scaffolding and staging and trestles, protective
clothing, artificial lighting, storage facilities and the like that may be in general us on site.
C Overheads as defined above and Profit shall be dealt with by means of a percentage addition to the
total of Prime Cost in each of the aforementioned Sections (1), (2) and (3) at the rate stated
hereafter:-
3/2
SCHLUMBERGER OFS SAN FERNANDO FACILITY PROJECT - Phase II November 2014
DAYWORK (Cont'd) $ ¢
LABOUR
MATERIALS
PLANT
3/3
Schlumberger (T’DAD) Inc. OFS San Fernando Facility Project – Phase II
Bills of Quantities
_____________________________________________________________________________________________
GENERAL SUMMARY
SCHLUMBERGER OFS SAN FERNANDO FACILITY PROJECT - Phase II November 2014
DAYWORK 3/03
INSURANCES
1 The Contractor shall allow for effecting insurance for All Risks and Public
Liability as Page 1/10.
GENERAL CONTINGENCY
Sub Total