You are on page 1of 5

Six (6) New Residential Compounds at East-West Pump Stations 1, 3, 5, 6, 10 & PRS-1

EPC/PMC Weekly Safety Walk-through Closeout Report


Date: 09/05/2023 Time: 10:00 AM Location: PS#01 Site
Sn Findings & Recommendations Corrective Actions Responsible Due date Status/Remarks
Worker found not wearing full body harness at instructed worker to wear FBH at heights
heights./ instructed worker to wear FBH at
heights and issued warning.

1 CMD 11/05/2023

Portable grinder in use without guard & handle Provided standard powertool and instructed the
and color code inspection in musallah worker not to remove parts of portable grinder.
building./remove the substandard powertool and
conduct inspection with record.

CMD 11/05/2023
2 
Six (6) New Residential Compounds at East-West Pump Stations 1, 3, 5, 6, 10 & PRS-1

substandard handtool was utilized at site. Substandard handtool was removed at site and
(hammer)./ Jobmade tools shall not be used at provided good condition handtool.
site. Provide manufacture standard tool.

3 CMD 11/05/2023 

compressor found without fire extinguisher in Provided with fire extinguisher.


type 3 building./ provide fire extinguisher in all
equipments/machine.

4 CMD 11/05/2023 
Six (6) New Residential Compounds at East-West Pump Stations 1, 3, 5, 6, 10 & PRS-1

Unattended pipe material near access area to the Unattended material was moved to material
site found./ all unused materials shall be stored laydown.
properly in designated laydown area.

5 CMD 11/05/2023 

accumulation of cement bags causing poor Conducted housekeeping in front of type 3 building.
housekeeping in front of type 3 building./ empty
cement bags shall not be allowed to accumulate
in the work area

6 CMD 11/05/2023 
Six (6) New Residential Compounds at East-West Pump Stations 1, 3, 5, 6, 10 & PRS-1

Poor housekeeping in musallah building./ Conducted housekeeping in musallah building


cleaning of the entire site, including identifying
areas where each subcontractor is responsible for
the cleaning.

7
CMD 11/05/2023 

Scattered unused materials at the ground causing Conducted housekeeping in musallah building
untidy workplace./ regular housekeeping shall be
done before, during and after the work.

8 CMD 11/05/2023 
Six (6) New Residential Compounds at East-West Pump Stations 1, 3, 5, 6, 10 & PRS-1