EPC-PMC HSE Management Safety Walkthrough Close Out Report.26
EPC-PMC HSE Management Safety Walkthrough Close Out Report.26
1 CMD 11/05/2023
Portable grinder in use without guard & handle Provided standard powertool and instructed the
and color code inspection in musallah worker not to remove parts of portable grinder.
building./remove the substandard powertool and
conduct inspection with record.
CMD 11/05/2023
2
Six (6) New Residential Compounds at East-West Pump Stations 1, 3, 5, 6, 10 & PRS-1
substandard handtool was utilized at site. Substandard handtool was removed at site and
(hammer)./ Jobmade tools shall not be used at provided good condition handtool.
site. Provide manufacture standard tool.
3 CMD 11/05/2023
4 CMD 11/05/2023
Six (6) New Residential Compounds at East-West Pump Stations 1, 3, 5, 6, 10 & PRS-1
Unattended pipe material near access area to the Unattended material was moved to material
site found./ all unused materials shall be stored laydown.
properly in designated laydown area.
5 CMD 11/05/2023
accumulation of cement bags causing poor Conducted housekeeping in front of type 3 building.
housekeeping in front of type 3 building./ empty
cement bags shall not be allowed to accumulate
in the work area
6 CMD 11/05/2023
Six (6) New Residential Compounds at East-West Pump Stations 1, 3, 5, 6, 10 & PRS-1
7
CMD 11/05/2023
Scattered unused materials at the ground causing Conducted housekeeping in musallah building
untidy workplace./ regular housekeeping shall be
done before, during and after the work.
8 CMD 11/05/2023
Six (6) New Residential Compounds at East-West Pump Stations 1, 3, 5, 6, 10 & PRS-1