Professional Documents
Culture Documents
EPC-PMC HSE Management Safety Walkthrough Close Out Report.27
EPC-PMC HSE Management Safety Walkthrough Close Out Report.27
1 CMD 18/05/2023
Missing handrail & platforms on the temporary proper access was be provided with handrails.
access provided to the type 3 building./ proper
access shall be provided with complete guardrails.
CMD 18/05/2023
2
Six (6) New Residential Compounds at East-West Pump Stations 1, 3, 5, 6, 10 & PRS-1
missing guardrails on the scaffolding in type 3 Guardrails (toprail & midrails) and toeboards was
building/ Guardrail system consisting of toprails, installed.
midrails and support uprights shall be installed.
3 CMD 18/05/2023
missing guardrails on the scaffolding in type 3 Guardrails (toprail & midrails) and toeboards was
building/ Guardrail system consisting of toprails, installed.
midrails and support uprights shall be installed.
4 CMD 18/05/2023
Six (6) New Residential Compounds at East-West Pump Stations 1, 3, 5, 6, 10 & PRS-1
scaffold platform in type 3 building have gap Housekeeping was done and toeboards was
between the other platform and required to installed.
install toeboard. unnecessary materials shall be
removed.
5 CMD 18/05/2023
electrical cords found obstructing the access of the room in Electrical cables was removed and housekeeping
type 3 1st floor./electrical cords shall not create trip hazards was done.
on walking and working surfaces. Cables shall be supported
at least 2.4 meters above walkways by non-conductive
materials.
6 CMD 18/05/2023
Six (6) New Residential Compounds at East-West Pump Stations 1, 3, 5, 6, 10 & PRS-1
unprotected reinforcing steel found at the excavation area Rebar caps was provided.
beside community center./All protruding reinforcing steel
onto which employees could fall shall be guarded to
eliminate the hazard of impalement.
7
CMD 18/05/2023
Poor housekeeping has been observed in several Good housekeeping was maintained at site.
areas at site./Good housekeeping shall be proper
maintained at site.
8 CMD 18/05/2023
Six (6) New Residential Compounds at East-West Pump Stations 1, 3, 5, 6, 10 & PRS-1