Overcurrent Coordination Setting Guidelines Transformers

The information presented in this application guide is for review, approval, interpretation and application by a registered professional engineer only. SKM disclaims any responsibility
and liability resulting from the use and interpretation of this information.

Reproduction of this material is permitted provided proper acknowledgement is given to SKM Systems Analysis Inc.

Introduction

The proper selection and coordination of protective devices is mandated in article 110.10 of the National Electrical Code. To fulfill this requirement an overcurrent coordination study
is required. The electrical engineer is always responsible for this analysis. It is an unfortunate fact of life that many times the engineer who specified and purchased the equipment
will not set the devices. Therefore, compromises are inevitable.

There are three fundamental objectives to overcurrent coordination that engineers should keep in mind while selecting and setting protective devices.

• The first objective is life safety. Life safety requirements are met if protective devices are rated to carry and interrupt maximum available load currents, as well as, withstand
and interrupt maximum available fault currents. Life safety requirements are never compromised.
• The second objective is equipment protection. Protection requirements are met if overcurrent devices are set above load operating levels and below equipment damage
curves. Feeder and transformer damage curves are defined in applicable equipment standards. Motor and generator damage curves (points) are machine specific, and are
normally provided in the vendor data submittal package. Based on system operating and equipment sizing practices equipment protection is not always possible.
• The last objective is selectivity. Selectivity requirements are met if in response to a system fault or overload, the minimum area of the distribution system is removed from
service. Again, based on system operating and equipment selection practices selectivity is not always possible.

Purpose

The purpose of this guide is to provide overcurrent protective device setting guidelines for transformers to meet the objectives listed above.

MV Transformer Switchgear Feeder Unit

Industry standard overcurrent protection schemes for MV transformers fed from switchgear circuit breakers include an instantaneous overcurrent relay (device 50/51). The 50/51
relay characteristics are plotted on a phase TCC along with the transformer and feeder damage curves.

The purpose of the phase overcurrent relay is to allow for full use of the transformer, and to protect the transformer and cable from overloads and faults. To accomplish this, the
relay curve should be to the right of the transformer FLA rating and inrush point, and to the left of the transformer and cable damage curves and the cable amp rating.

Suggested margins are listed below that have historically allowed for safe operation of the transformer and cable while reducing instances of nuisance trips.

Device Function Recommendations Comments

CT Size 200% of FLA FLA on base rating.

51 Pickup 110-140% of FLA Set below the transformer damage curve.

Set at or below cable ampacity.


let-thru current @ 1.0 Set below the transformer damage curve.
Time Dial
second Set at or above low voltage main device.
200% of let-thru Set below cable damage curve.
50 Pickup or Cable damage curve must be above the
200% of inrush maximum fault current at 0.1 seconds.

Fig. 1 MV transformer switchgear feeder unit - one line

http://www.skm.com/applicationguides18.html 12/4/2014
SKM Systems Analysis, Inc. - Power System Software and Arc Flash Hazard Analysis an... Page 2 of 5

Fig. 2 MV transformer switchgear feeder unit - phase TCC


MV Transformer Fused Switch Feeder Unit

E-rated power fuses are typically used in fused switches serving MV transformers. Fuses rated 100E or less must trip in 300 seconds at currents between 200 and 240% of their E
ratings. Fuses above 100E must trip in 600 seconds at currents between 220 and 264% of their E ratings. The fuse characteristics are plotted on a phase TCC along with the
transformer and feeder damage curves.

The purpose of the fuse is to allow for full use of the transformer, and to protect the transformer and cable from faults. To accomplish this, the fuse curve should be to the right of
the transformer inrush point and to the left of the cable damage curve. Typically the fuse will cross the transformer damage curve. The secondary main device provides overcurrent
protection for the circuit.

Suggested margins are listed below that have historically allowed for safe operation of the transformer and cable while reducing instances of nuisance trips.

Device Function Recommendations Comments


FLA based on the top rating of the unit.
50 Fuse Size E-rating > FLA
Size at or below cable ampacity.
Size above transformer inrush point of 12 x
nominal FLA at 0.1 seconds.
Size above transformer inrush point of 25 x
nominal FLA at 0.01 seconds.
Cable damage curve must be above the
maximum fault current at 0.01 seconds.

Fig. 3 MV transformer fused switch feeder unit - one line

http://www.skm.com/applicationguides18.html 12/4/2014
SKM Systems Analysis, Inc. - Power System Software and Arc Flash Hazard Analysis an... Page 3 of 5

Fig. 4 MV transformer fused switch feeder unit - phase TCC

LV Transformer CB Feeder Unit

Industry standard overcurrent protection schemes for LV transformers fed from circuit breakers equipped with long-time, short-time and instantaneous functions. The circuit breaker
characteristics are plotted on a phase TCC along with the transformer and feeder damage curves.

The purpose of the circuit breaker is to allow for full use of the transformer, and to protect the transformer and cable from overloads and faults. To accomplish this, the circuit
breaker curve should be to the right of the transformer FLA rating and inrush point, and to the left of the transformer and cable damage curves and the cable amp rating.

Suggested margins are listed below that have historically allowed for safe operation of the transformer and cable while reducing instances of nuisance trips.

Device Function Recommendations Comments


Set below the transformer damage curve.
51 LTPU 100-125% of FLA
Set at or below cable ampacity.
LTD, STPU & Set to coordinate with
Set below the transformer damage curve.
STD downstream devices
Set below cable damage curve.
Cable damage curve must be above the
50 Instantaneous 200% of inrush
maximum fault current at the CB total clear
curve.

Fig. 5 LV transformer CB feeder unit - one line

http://www.skm.com/applicationguides18.html 12/4/2014
SKM Systems Analysis, Inc. - Power System Software and Arc Flash Hazard Analysis an... Page 4 of 5

Fig. 6 LV transformer CB feeder unit - phase TCC

LV Transformer Fused Switch Feeder Unit

Class J (<600A) and Class L (>600A) fuses are typically used in fused switches serving LV transformers. The fuse characteristics are plotted on a phase TCC along with the
transformer and feeder damage curves.

The purpose of the fuse is to allow for full use of the transformer, and to protect the transformer and cable from faults. To accomplish this, the fuse curve should be to the right of
the transformer inrush point and to the left of the cable damage curve. Typically the fuse will cross the transformer damage curve. The secondary main device provides overcurrent
protection for the circuit.

Suggested margins are listed below that have historically allowed for safe operation of the transformer and cable while reducing instances of nuisance trips.

Device Function Recommendations Comments


FLA based on the top rating of the unit.
Size at or below cable ampacity.
50 Fuse Size 100-125% of FLA
Size above transformer inrush point of 12 x
nominal FLA at 0.1 seconds.
Size above transformer inrush point of 25 x
nominal FLA at 0.01 seconds.
Cable damage curve must be above the
maximum fault current at 0.01 seconds.

http://www.skm.com/applicationguides18.html 12/4/2014
SKM Systems Analysis, Inc. - Power System Software and Arc Flash Hazard Analysis an... Page 5 of 5

Fig. 7 LV transformer fused switch feeder unit - one line

Fig. 8 LV transformer fused switch feeder unit - phase TCC

References

• Other Application Guides offered by SKM Systems Analysis at www.skm.com


• Electrical Transmission and Distribution Reference Book, ABB Power T&D Company, Raleigh, North Carolina, 1997
• Protective Relaying Theory and Applications, 2nd Edition, Marcel Dekker, New York, 2004

The latest revision of:

• IEEE Std 242, IEEE Recommended Practice for Protection and Coordination of Industrial and Commercial Power Systems (IEEE Buff Book)
• IEEE Std C37.91, IEEE Guide for Protective Relay Applications to Power Transformers

back to Application guides

Home Products Support Downloads Training Contact Customer Service Career Opportunities Distributors

© Copyright 2012. SKM Systems Analysis Inc. All rights reserved.

http://www.skm.com/applicationguides18.html 12/4/2014

You might also like