This document summarizes the well profile for Srikail # 04 Workover. It lists the casing and tubing strings set at various depths, including 30" casing at 30m, 20" casing at 184m, 13 3/8" casing at 1274m, 9 5/8" casing at 2647m, with a liner set at 3512m. It also notes the packer was set at 3184m and perforations between 3221-3233m.
This document summarizes the well profile for Srikail # 04 Workover. It lists the casing and tubing strings set at various depths, including 30" casing at 30m, 20" casing at 184m, 13 3/8" casing at 1274m, 9 5/8" casing at 2647m, with a liner set at 3512m. It also notes the packer was set at 3184m and perforations between 3221-3233m.
This document summarizes the well profile for Srikail # 04 Workover. It lists the casing and tubing strings set at various depths, including 30" casing at 30m, 20" casing at 184m, 13 3/8" casing at 1274m, 9 5/8" casing at 2647m, with a liner set at 3512m. It also notes the packer was set at 3184m and perforations between 3221-3233m.