You are on page 1of 1

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24

1
PART 7F PART 7G
REFER TO

11.78°
A
X=-658.489
Y=564.625
ZCFE-40063717 ZCFE-40063717 2E2.BG02 A
5000 4168 5001 5000 5002 4999 4996 5000 5001 5002 5001 4999 5000 5000 4997 5000 5000 5000 5000 4998 5000 5000 4999 5000 5000 5000 5000 10000 5000 4999 5000 5000 5000 5000 5000 5000 5000 5000 5000 5001 5000 4998 5000 5000 4999 5000 5000 5000 5000 5000 5000 5000 5000 5000 4999 5000 5000 5000 5000 5000 4997 5000 5000 5000 5000 4999 5003 4997 5012 4999 4999 4998 4999 7524 10000 10000 10000 10000 10000 10000 10000 10000 10000 10000 21000 21000 21000
B 4998 4999 4999 5000 5000 4999 4996 5000 4998 5000 5000 4999 4999 5000 4999 5000 5000 4999 5000 5000 5000 5000 5000 5000 5000 5000 4999 5000 5000 5000 4999 5000 5000 5000 5000 5000 4999 5000 5000 5001 5000 5000 5000 5000 5000 5000 5000 5000 5000 4999 5000 5001 5000 5000 5000 5001 5000 5000 5002 5000 5000 5001 5000 5000 5000 5000 5003 4998 4999 4998 3131 3000 3000

1500

1500
CL_2E2.BC04

1800

1800
REFER TO A PART 7A PART 7B PART 7C PART 7D
2E1.BG01 - PART 7 PART 7E X=48.795 1 3 5 7 9 11 13 15 16 17 X=221.604
GENERAL PLAN OF EXCAVATION (PART 7) Y=418.211 Y=382.189
B 1:900 2 4 6 8 10 12 14 B

B
1 2050 (TYP)

300 1450 300 (TYP)

(TYP)
X=-658.489 BOE +585.300
725
Y=564.625

(TYP)
BOE +584.708 BOE +585.441 BOE +585.487 BOE +585.532 BOE +585.577 BOE +585.623 BOE +585.668 BOE +585.716 BOE +585.781 BOE +585.846 BOE +585.910 BOE +585.975 BOE +586.040 BOE +586.104 BOE +586.169 BOE +586.234 BOE +586.299 BOE +586.361 BOE +586.405
BOE +584.708 BOE +584.718 BOE +584.791 BOE +584.863 BOE +584.936 BOE +585.009 BOE +585.081 BOE +585.154 BOE +585.227 BOE +585.372 725

300
B

500
C C
CL_2E2.BC04

4200

5200

5800
A

802

500
REFER TO

300
2E1.BG01 - PART 7 GL +585.008 GL +585.008 GL +585.018 GL +585.091 GL +585.163 GL +585.236 GL +585.309 GL +585.381 GL +585.454 GL +585.527 GL +585.600 GL +585.672 GL +585.741 GL +585.787 GL +585.832 GL +585.877 GL +585.923 GL +585.968 GL +586.016 GL +586.081 GL +586.146 GL +586.210 GL +586.275 GL +586.340 GL +586.404 GL +586.469 GL +586.534 GL +586.599 GL +586.661 X=-517.369
5000 4168 4998 5001 4999 5000 4999 5002 5000 4999 5000 4996 4999 5000 4996 5001 5000 5002 4998 5001 5000 4999 5000 5000 4999 5000 4999 4997 5000 Y=535.209
GL +586.705
D SECTION B-B D
B (TYP)
EXCAVATION PLAN OF PART 7A
1:150 2050 (TYP)

300 1450 300 (TYP)

(TYP)
725

(TYP)
BOE +586.450 BOE +586.494 BOE +586.539 BOE +586.583 BOE +586.629 BOE +586.674 BOE +586.719 BOE +586.765 BOE +586.808 BOE +586.837 BOE +586.866 BOE +586.895 BOE +586.924 BOE +586.954 BOE +586.985 BOE +587.015 BOE +587.046 BOE +587.076 BOE +587.107 BOE +587.137 BOE +587.169 BOE +587.200 BOE +587.232 BOE +587.263 BOE +587.295 BOE +587.327 BOE +587.358 BOE +587.390 BOE +587.420 BOE +587.441 BOE +587.462 725

300
B

500
E E
CL_2E2.BC04

4200

5200

5800
A

802

500
X=-512.474
Y=534.189

300
GL +586.750 GL +586.794 GL +586.839 GL +586.883 GL +586.929 GL +586.974 GL +587.019 GL +587.065 GL +587.108 GL +587.137 GL +587.166 GL +587.195 GL +587.224 GL +587.254 GL +587.285 GL +587.315 GL +587.346 GL +587.376 GL +587.407 GL +587.437 GL +587.469 GL +587.500 GL +587.532 GL +587.563 GL +587.595 GL +587.627 GL +587.658 GL +587.690 GL +587.720 GL +587.741
X=-365.637
4999 5000 5000 5000 5000 5000 4999 4998 5000 5000 5000 5000 5000 4999 5000 5000 5000 5000 5000 5000 5000 5000 5000 5000 5000 5000 4999 4999 5000 5000 Y=503.583

GL +587.762
SECTION B-B
F F

EXCAVATION PLAN OF PART 7B


1:150
2050 (TYP)

300 1450 300 (TYP)

(TYP)
725 BOE +587.944

(TYP)
BOE +587.482 BOE +587.503 BOE +587.523 BOE +587.544 BOE +587.564 BOE +587.584 BOE +587.605 BOE +587.624 BOE +587.641 BOE +587.657 BOE +587.673 BOE +587.689 BOE +587.705 BOE +587.721 BOE +587.737 BOE +587.753 BOE +587.770 BOE +587.785 BOE +587.801 BOE +587.817 BOE +587.833 BOE +587.849 BOE +587.865 BOE +587.881 BOE +587.897 BOE +587.913 BOE +587.929 725

300
B

500
G G
CL_2E2.BC04

4200

5200

5800
A

802

500
X=-360.742

300
Y=502.561 GL +587.782 GL +587.803 GL +587.823 GL +587.844 GL +587.864 GL +587.884 GL +587.905 GL +587.924 GL +587.941 GL +587.957 GL +587.973 GL +587.989 GL +588.005 GL +588.021 GL +588.037 GL +588.053 GL +588.070 GL +588.085 GL +588.101 GL +588.117 GL +588.133 GL +588.149 GL +588.165 GL +588.181 GL +588.197 GL +588.213 GL +588.229 X=-228.586
5000 5000 5000 4999 5000 5000 5000 5000 5000 5000 5000 5000 5000 5000 5000 4999 5001 5000 5000 5000 4998 5001 5000 5000 5000 5000 4999 Y=475.014
GL +588.244
H SECTION B-B H

EXCAVATION PLAN OF PART 7C


1:150
2050 (TYP)

300 1450 300 (TYP)

(TYP)
725
BOE +588.123

(TYP)
BOE +587.950 BOE +587.957 BOE +587.964 BOE +587.971 BOE +587.978 BOE +587.985 BOE +587.991 BOE +587.998 BOE +588.005 BOE +588.012 BOE +588.018 BOE +588.025 BOE +588.031 BOE +588.037 BOE +588.044 BOE +588.050 BOE +588.057 BOE +588.063 BOE +588.070 BOE +588.076 BOE +588.082 BOE +588.089 BOE +588.096 BOE +588.103 BOE +588.110 BOE +588.117 725

300
J B J

500
CL_2E2.BC04

4200

5200

5800
A

802
NOTES:

500
X=-223.691
Y=473.994 1. MEASUREMENT IN MILLIMETER, LEVEL IN METER

300
GL +588.250 GL +588.257 GL +588.264 GL +588.271 GL +588.278 GL +588.285 GL +588.291 GL +588.298 GL +588.305 GL +588.312 GL +588.318 GL +588.325 GL +588.331 GL +588.337 GL +588.344 GL +588.350 GL +588.357 GL +588.363 GL +588.370 GL +588.376 GL +588.382 GL +588.389 GL +588.396 GL +588.403 GL +588.410 GL +588.417 2. EXCAVATION DRAWING BASES ON SOIL INVESTIGATION
X=-96.426 3. EXCAVATION SLOPE IS DESIGNED AS 45° (1:1), UNLESS OTHERWISE NOTED. THE APPROPRIATE
5000 5000 5000 5000 5000 5000 5000 5000 5000 5000 5000 5000 5000 4999 5000 5000 5000 5001 4999 5000 5000 5000 5000 5000 5000 5001
Y=447.466 EXCAVATION SLOPE SHALL BE VERIFIED AND FINALIZED ON SITE DURING THE EXCAVATION.
K 4. THE CONTRACTOR MUST HAVE PROPER MEASURES TO PROTECT THE EXCAVATION SLOPE DURING FOUNDATION WORK. K
SECTION B-B GL +588.423 AS A RECOMMENDATION, LEAN CONCRETE (0,05M THICK) COULD BE USED TO PROTECT THE EXCAVATION SLOPE, IF
NECESSARY.
EXCAVATION PLAN OF PART 7D 5. FOR AREA WHERE THE NEW EXCAVATION IS INTERFERING WITH THE EXCAVATION AREA OF OLD, EXISTING BUILDING,
PRIOR TO CONSTRUCTION, PREVENTIVE MEASURES MUST BE CARRIED OUT TO AVOID AFFECTING TO THE EXISTING
1:150 2050 (TYP) NEARBY STRUCTURES AND EXCAVATED SOIL TO BE VERIFIED ON SITE. IF INSTEAD OF SANDSTONE, BACKFILLING
MATERIAL OF EXISTING BUILDING IS ENCOUNTERED DURING EXCAVATION, FEEDBACK OF GEOTECHNICAL SPECIALIST IS
300 1450 300 (TYP) REQUIRED BEFORE EXCAVATION WORKS CAN BE CONTINUED.
6. FIELD ENGINEER TO INSPECT BOTTOM OF EXCAVATION IN ACCORDANCE WITH SOIL CAPACITY AS GIVEN IN SOIL

(TYP)
725 INVESTIGATION REPORT.
BOE +588.302

(TYP)
BOE +588.130 BOE +588.137 BOE +588.144 BOE +588.151 BOE +588.157 BOE +588.163 BOE +588.168 BOE +588.174 BOE +588.180 BOE +588.186 BOE +588.192 BOE +588.198 BOE +588.205 BOE +588.214 BOE +588.223 BOE +588.226 BOE +588.229 BOE +588.252 BOE +588.272 BOE +588.275 BOE +588.290 BOE +588.292 725 7. WEAK OR LOOSE MATERIAL MUST BE REMOVED COMPLETELY.

300
8. DEWATERING OF THE PITS IS REQUIRED.
L B 9. FOR BACKFILLING: EXCAVATED LIMESTONE COULD BE USED IF CRUSHED ON SITE AND WELL PREPARED BY SIEVES L

500
BEFORE. THE MATERIAL IS TO BE FILLED IN LAYERS OF THICKNESS <=25CM. COMPRESSION IS TO BE CHECKED BY
STATIC/DYNAMIC PLATE LOAD TEST (>= 3 TESTS/1000M2) OR EQUIVALENT METHODS. THE COMPRESSION DEGREE WILL
CL_2E2.BC04 BE THE FOLLOWING:

4200

5200

5800
+ GENERAL FILL WITH A COMPACTION DEGREE NOT LESS THAN 90%
+ STRUCTURAL FILL (OR SOIL IMPROVEMENT UNDER FOUNDATION) WITH A COMPACTION DEGREE NOT LESS THAN 100%
A

802
+ BACKFILLING UNDER PAVEMENTS (OR COMPACTED SOIL UNDER ROAD) WITH A COMPACTION DEGREE NOT LESS THAN 95%
10. SOIL IMPROVEMENT: GRAIN SIZE DISTRIBUTION 0/45 OR 0/56; U>=7.

500
11. THE REQUIRED SOIL BEARING CAPACITY kN/M2
X=-91.532

300
- FOR PAD FOOTING 300 KN/ M2
Y=446.446 GL +588.430 GL +588.437 GL +588.444 GL +588.451 GL +588.457 GL +588.463 GL +588.468 GL +588.474 GL +588.480 GL +588.486 GL +588.492 GL +588.498 GL +588.505 GL +588.514 GL +588.523 GL +588.526 GL +588.529 GL +588.552 GL +588.572 GL +588.575 GL +588.590 GL +588.592
X=16.167
5000 5000 5000 4997 5002 5000 5000 5000 5000 5000 5001 5000 5000 4999 5000 5003 5000 4997 5000 5012 5003 4999 Y=423.997 - FOR SLEEPER 150 KN/ M2
M M
SECTION B-B GL +588.602

EXCAVATION PLAN OF PART 7E


1:150 GENERAL ABBREVIATIONS: + GL
+ TOC
TOC = TOP OF CONCRETE GL = GROUND LEVEL
BOE = BOTTOM OF EXCAVATION
TOP = TOP OF PILE + BOE
EL = ELEVATION LEVEL

N REFERENCE DRAWINGS: 61014366 N


5800 2D1-61014366
300 5200 300

2600 2600

GL.VARIOUS STRUCTURAL CONCRETE SOIL IMPROVEMENT


SEE EXCAVATION PLAN 500
100 (TYP)
BOE.VARIOUS TYP
SEE EXCAVATION PLAN LEAN CONCRETE GROUND SURFACE
P P
THYSSENKRUPP INDUSTRIAL SOLUTIONS (VIETNAM) LTD.
45°
45°

Hanoi, Vietnam

Date Name
2017
B -B Degn.
Datum Name

REVISED AS CLOUDED
1:35 Konst. 19.04 THA 1 26.05 TRN VIE NAM

Drawn FOR CONSTRUCTION


Dibujado
16.05 TRN 0 25.05 TRN VIE NAM

Ckd. FOR APPROVAL


Gepr. 17.05 VIE C 17.05 TRN VIE NAM

Appr. Vers. Grid square/reason for revision Date Dwn. Ckd. Appr.
Gen.
17.05 NAM Vers. Planquadrat/Änderungsgrund Datum Gez. Gepr. Gen.
Q Q
Client:

Kunde: YAMAMA CEMENT CO.


Codeword: Enquiry No.:
Kennwort: YAMAMACEMENT Anfrage-Nr.: D000661
ION Released

Version Id.- No. Planus

Id.- Nr. Planus


Title / Note:

UC T Freigegeben
2E2.BG01-LS OVERLAND CONVEYOR 2 - PART 7 2E2.BG01 -ZCFE

Zeichnungs - Nr.
TR

Drawing-No.
S EXCAVATION PLAN PART 7A,7B,7C,7D,7E & SECTIONS 40063716
CON
Benennung / Bemerkung:

FOR

Versión
Dept.:

Dept.:
130 1
Scale on No. of Shts. Sheet: Size:
Original Blattzahl: Blatt: Format:
A0
R / Type of drawing / Zeichnungsart: R
Maßstab
Tekla Structures

im ZCFE EXCAVATION DWG.


Original
Replaces/ Ersatz für:
1:35
10 mm 50 100 Beckum, Germany Superseded by/Ersetzt d.:
1:150 Copyright reserved (ISO 16016)

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24

You might also like