Table No.:Q/ZJ-007
Location of Installation:
ZH EJ IA NG J UM A A MUSE M EN T EQ UI PM E N T C O . , L TD
Table No.:Q/ZJ-007
Installation Rotating
Name of product Model No. XZB(36B) Compiled:Qi Bingren Review: Approve: Date:
cups
Technique and
Inspection Manufacture A total of 5
Category Captain: Inst. technician: Page No.1
No. pages
Record
Content of Installation Technique Inspection data and
No. Date Procedure Main inst. staff Recorder/date Remark
and Inspection Record results
foundation Check construction record and
1. □
inspection inspection record
Check if foundation in line with □
drawing
diameter error of circular □
2. dimensions
foundation <50mm
foundation height error<20mm, □
ZH EJ IA NG J UM A A MUSE M EN T EQ UI PM E N T C O . , L TD
Table No.:Q/ZJ-007
ZH EJ IA NG J UM A A MUSE M EN T EQ UI PM E N T C O . , L TD
Table No.:Q/ZJ-007
Install equipment □
3. Including reducer and motor
seating
Make sure rotation-support □
ZH EJ IA NG J UM A A MUSE M EN T EQ UI PM E N T C O . , L TD
Table No.:Q/ZJ-007
bearing bolt
and reducer fixing bolt not □
loosened
Gear meshing is normal □
Measure and confirm the rotation □
support bearing
levelness error<1/1000 □
(1.25mm)
Anchor bolt M24, □
Note: 1. Concealed works must be covered after approval by the quality assurance engineer. 2. Fill in data for self-inspection and special inspection results which are
ZH EJ IA NG J UM A A MUSE M EN T EQ UI PM E N T C O . , L TD
Table No.:Q/ZJ-007
required to do so, check √ in the box □ if qualified.
Rotating
Installation Name of product Model No. XZB(36B) Compiled:Qi Bingren Review: Approve: Date:
cups
Technique and
Manufacture Total 5
Category Captain: Inst. technician: Page No.2
Inspection Record No. pages
Content of Installation Technique and Inspection data and
No. Date Procedure Main inst. staff Recorder/date Remark
Inspection Record results
Install Install rotation–support bearing bolt
5. □
rotation shaft after correct positioning of shaft
Tighten by torque wrench □
Install the □
according to the mark, without
7. following
dislocation
parts
Mainly include: □
Rotating
Installation Name of product Model No. XZB(36B) Compiled:Qi Bingren Review: Approve: Date:
cups
Technique and
Manufacture Total 5
Category Captain: Inst. technician: Page No.3
Inspection Record No. pages
Content of Installation Technique and Inspection data and
No. Date Procedure Main inst. staff Recorder/date Remark
Inspection Record results
5. Inner ring connecting beam B
□
3pcs
6.seating of small turntable □
3pcs
Connecting bolt of each position □
M16×60
Torque 188N.m □
Install floor Assemble as per marks, levelling □
8.
beams and welding
according to Pay attention to ensure that the tread □
marks of the small turntable
is parallel to the tread of the big □
turntable (upper plane)
ZH EJ IA NG J UM A A MUSE M EN T EQ UI PM E N T C O . , L TD
Table No.:Q/ZJ-007
The welding should be firm, and □
the welding seam height should be
grinded to flat
No protruding, it will impact floor □
otherwise
Install pattern plate □
ZH EJ IA NG J UM A A MUSE M EN T EQ UI PM E N T C O . , L TD
Table No.:Q/ZJ-007
ZH EJ IA NG J UM A A MUSE M EN T EQ UI PM E N T C O . , L TD
Table No.:Q/ZJ-007
Install big □
9.
turntable
Pay attention to flatness, no sharp □
Pattern plate
corners and
unevenness □
ZH EJ IA NG J UM A A MUSE M EN T EQ UI PM E N T C O . , L TD
Table No.:Q/ZJ-007
Install small □
10. 3 small turntables in total
turntable
Make sure that the top of the small □
ZH EJ IA NG J UM A A MUSE M EN T EQ UI PM E N T C O . , L TD
Table No.:Q/ZJ-007
turntable is parallel to
the top of the big turntable, □
At the same time ensure that the □
gap between the two is even,
Note: 1. Concealed works must be covered after approval by the quality assurance engineer. 2. Fill in data for self-inspection and special inspection results which are
required to do so, check √ in the box □ if qualified.
ZH EJ IA NG J UM A A MUSE M EN T EQ UI PM E N T C O . , L TD
Table No.:Q/ZJ-007
Rotating
Installation Name of product Model No. XZB(36B) Compiled:Qi Bingren Review: Approve: Date:
cups
Technique and
Manufacture Total 5
Category Captain: Inst. technician: Page No.4
Inspection Record No. pages
Content of Installation Technique Inspection data and
No. Date Procedure Main inst. staff Recorder/date Remark
and Inspection Record results
If the gap in the circumference of
□
the small turntable is too large
or uneven, □
The rotation support bearing seat □
under the small turntable can be
adjusted appropriately (small □
turntable seat)
Rotation support bearing bolt □
M16×120
Torque 188N.m □
Hand-pushing small turntable, it □
should rotate smoothly,,
Add grease to the small □
rotation-support bearing
Install small □
11. Seating’s reducer motor
turntable
Reducer fastening bolt □
M12×60
Torque 100N.m □
Check the lubrication condition □
of the reducer
12. Install central □
ZH EJ IA NG J UM A A MUSE M EN T EQ UI PM E N T C O . , L TD
Table No.:Q/ZJ-007
decoration (coffee pot) □
ZH EJ IA NG J UM A A MUSE M EN T EQ UI PM E N T C O . , L TD
Table No.:Q/ZJ-007
ZH EJ IA NG J UM A A MUSE M EN T EQ UI PM E N T C O . , L TD
Table No.:Q/ZJ-007
Install cockpit □
13. A total of 9pcs(coffee pot)
components
After correct positioning, tighten □
bottom bolt of
rotation support bearing □
M14×90
Torque 120N.m □
ZH EJ IA NG J UM A A MUSE M EN T EQ UI PM E N T C O . , L TD
Table No.:Q/ZJ-007
ZH EJ IA NG J UM A A MUSE M EN T EQ UI PM E N T C O . , L TD
Table No.:Q/ZJ-007
Rotating
Installation Name of product Model No. XZB(36B) Compiled:Qi Bingren Review: Approve: Date:
cups
Technique and
Manufacture Total 5
Category Captain: Inst. technician: Page No.5
Inspection Record No. pages
Content of Installation Technique Inspection data and
No. Date Procedure Main inst. staff Recorder/date Remark
and Inspection Record results
Install according to the mark
14. Install roof number when assembled in the □
factory,
No dislocation □
For easy installation, the roof can □
be installed
before installing the central □
decoration
□
□
□
□
□
□
□
□
□
□
□
□
ZH EJ IA NG J UM A A MUSE M EN T EQ UI PM E N T C O . , L TD
Table No.:Q/ZJ-007
□
□
Note: 1. Concealed works must be covered after approval by the quality assurance engineer. 2. Fill in data for self-inspection and special inspection results which are
required to do so, check √ in the box □ if qualified.