You are on page 1of 79

EPC for Kolo Creek to Soku Gas Export

xport Pipeline

SOIL INVESTIGATION INTERPRETATIVE REPORT

K2S
K2S-NG01007551-GEN-CG6968-00006 Page 2 of 79

CHANGE RECORD PAGE

REV. N° Status Description of Revision


R01 INT Issued for Internal Review

A01 IFR Issued


ssued for Review

This document is controlled electronically and is uncontrolled when printed


EPC for Kolo Creek to Soku Gas Export
xport Pipeline

SOIL INVESTIGATION INTERPRETATIVE REPORT

K2S
K2S-NG01007551-GEN-CG6968-00006 Page 3 of 79

SUMMARY
This report details the soil characteristics and the assessment of bearing capacity and settlement for shallow
and deep foundations for Kolo Creek Manifold and Soku Gas Plant. All information and computations are
based on the Soil Investigation report by Polaris Consulting Company limited dated Aug. 2013.

This document is controlled electronically and is uncontrolled when printed


EPC for Kolo Creek to Soku Gas Export
xport Pipeline

SOIL INVESTIGATION INTERPRETATIVE REPORT

K2S
K2S-NG01007551-GEN-CG6968-00006 Page 4 of 79

CONTENTS

RESULT SUMMARY...............................................................................................................................
.........................................................................................................................
.................................................................................................................................3
1.0 PROJECT DESCRIPTION ................................................................................................
............................................... 6
1.1 Scope and Objectives ................................................................................................
................................ ...................................................... 7
1.2 Methodology……………………………………………………………………………………………………..
……………………………………………………………………………………………………..
……………………………………………………………………………………………………..7
2.0 NOTATIONS & ABBREVIATIONS................................................................
ABBREVIA .................................................................... 8
3.0 SPECIFICATIONS, CODES
CODE AND REFERENCES ................................................................
.......................................... 10
3.1 European & Other Codes ................................................................................................
............................................... 10
3.2 SPDC Specifications ................................................................................................
................................ ...................................................... 10
3.3 References……………………………………………………………………………………………………...
……………………………………………………………………………………………………...
……………………………………………………………………………………………………...10
4.0 SITE DESCRIPTION & SOIL S PROPERTIES ................................................................
.................................................. 11
4.1 Kolocreek……………………………………………………………………………………………………….
……………………………………………………………………………………………………….
……………………………………………………………………………………………………….11
4.1.1 Site Description & Geology................................................................................................
Geology ............................................. 11

4.1.2 Soil Stratigraphy................................................................................................


................................ ............................................................. 12

4.1.3 Soil Properties………………………………………………………………………………………………..


………………………………………………………………………………………………..
………………………………………………………………………………………………..12

4.1.4 Ground Water……………………………………


…………………………………………………………………………………………………
……………………………………………………………13

4.1.5 Borehole Logs & CPT Plots ................................................................................................


............................................ 14

4.2 Soku Gas Plant 19


4.2.1 Site Description & Geology................................................................................................
Geology ............................................. 19

4.2.2 Soil Stratigraphy................................................................................................


................................ ............................................................. 19

4.2.3 Soil Properties………………………………………………………………………………………………..


………………………………………………………………………………………………..
………………………………………………………………………………………………..20

4.2.4 Ground Water…………………………………………………………………………………………………


…………………………………………………………………………………………………
…………………………………………………………………………………………………21

4.2.5 Borehole Logs & CPT Plots ................................................................................................


............................................ 22

5.0 FOUNDATION CAPACITY COMPUTATIONS ................................................................


................................................ 23
5.1 Bearing Capacity Check – Shallow Foundation ................................................................
.............................................. 23
5.1.1 Kolo Creek- BH1(( Generator House Area) ................................................................
...................................................... 23

5.1.2 Kolo Creek- BH2 (Manifold Area) ................................................................


................................................................... 32

This document is controlled electronically and is uncontrolled when printed


EPC for Kolo Creek to Soku Gas Export
xport Pipeline

SOIL INVESTIGATION INTERPRETATIVE REPORT

K2S
K2S-NG01007551-GEN-CG6968-00006 Page 5 of 79

5.1.3 Soku Gas Plant – BH3 ................................................................................................


................................ ................................................... 41

5.2 Bearing Capacity Check – Continuous Flight Auger Pile .................................................................


................................ 49
5.2.1 Pile Compressive Resistance Computation for Kolo Creek-
Creek ...........................................................
................................ 51

5.2.1 Pile Compressive Resistance Computation for Soku Gas Plant-


Plant ....................................................
................................ 56

5.3 Tension Capacity For Continuous Flight Auger Pile ......................................................................


................................ 60
5.3.1 Pile Tension Resistance Computation for Kolo Creek
Creek- ...................................................................
................................ 60

5.3.2 Pile Tension Resistance Computation for Soku Gas Plant – ..........................................................
................................ 62

5.4 Lateral Capacity Computation For Continuous Flight Auger Pile .....................................................
................................ 64
5.4.1 Pile Lateral Capacity Computation for Kolo Creek – ......................................................................
................................ 64

5.4.2 Pile Lateral Capacity Computation for Soku Gas Plant –................................................................
................................ 66

5.5 Single Pile Settlement ................................................................................................


................................ .................................................... 68
5.5.1 Single Pile Settlement Computation
Comput for Kolo Creek ................................................................
........................................ 68

5.5.2 Single Pile Settlement Computation for Soku Gas Plant .................................................................
................................ 70

5.6 Pile Capacity Summary ................................................................................................


................................ .................................................. 72
6.0 DISCUSSION / RECOMMENDATION
RECOMME ................................................................
............................................................ 73
6.1 Recommendation For Deep Foundation ................................................................
......................................................... 73
6.2 Recommendationtion For Shallow Foundation ................................................................
..................................................... 74

This document is controlled electronically and is uncontrolled when printed


EPC for Kolo Creek to Soku Gas Export
xport Pipeline

SOIL INVESTIGATION INTERPRETATIVE REPORT

K2S
K2S-NG01007551-GEN-CG6968-00006 Page 6 of 79

1.0 PROJECT DESCRIPTION

The primary objective of the project is to sustain gas supplies to NLNG trains 1 to 6. The project was
conceptualized on optimisation of SPDC’s infrastructure usage by utilising spare capacity that will
become available in Soku Gas Plant as from 2014. Non Associated Gas from Kolo Creek Deep (F1
and F2 reservoirs) shall be bulked in a manifold and evacuated through approx. 20” x 40km bulkline
to Soku Gas Plant for proces
processing
sing and onward sales to NLNG trains 1 to 6. The Kolo Creek field is
situated in the southern part of OML-28
OML 28 in the seasonal flooding fresh-water
fresh swamp area, some
18km southeast of the Gbaran CPF and about 90km west of Port Harcourt. It is one of SPDC’s
Eastern
stern Division fields considered as part of the Gbaran-Ubie
Gbaran Ubie nodal development to provide feed
stock gas for the NLNG Trains 1 to 6.
The Kolo Creek to Soku project optimizes SPDC’s infrastructure usage in the short term and
maximizes ullage for both the So
Soku and Gbaran areas.
The EPC contract scope with NestOil PLC for this project is summarized as follows;

1. Four (4) flowlines from the F2 wells to the new Kolo Creek (intermediate) production
headers with the proper control, safeguarding, metering and monitoring
monito requirements.
2. Three (3) flowlines from the F1 wells to the new Kolo Creek (intermediate) production
headers with the proper control, safeguarding, metering and monitoring requirements.
3. Three (3) intermediate production headers combining the seven (7) F1 and F2 flowlines into
three (3) intermediate bulklines.
4. Three (3) intermediate bulklines with HIPPS and the proper control, safeguarding, metering
and monitoring requirements.
5. One (1) Kolo Creek manifold combining the three (3) intermediate bulklines into
i the 20-inch,
40 km long bulkline to the Soku Gas Plant.
6. 20-inch,
inch, 40 km long carbon steel pipeline (including the pig launcher and receiver and
proper control, safeguarding, metering and monitoring requirements) from Kolo Creek NAG
manifold to the Soku Gas Plant designed for evacuation of 400 MMscf/d from Kolo Creek
NAG manifold. This pipeline will traverse some communities in Niger Delta, Nigeria though
the intention of the routing was to avoid it as much as possible.
7. Slug-catcher
catcher at the Soku Gas Plant and full integration with the existing Soku Gas Plant
including definition of process control and safe guarding systems.
8. Utilities in Kolo Creek and Soku Gas Plant to ensure safe and cost effective evacuation of
400 MMscf/d from Kolo Creek to Soku.

This document is controlled electronically and is uncontrolled when printed


EPC for Kolo Creek to Soku Gas Export
xport Pipeline

SOIL INVESTIGATION INTERPRETATIVE REPORT

K2S
K2S-NG01007551-GEN-CG6968-00006 Page 7 of 79

9. Installation of hardware’s for control of facilities at Kolo Creek from Soku control room
10. Installation of a Fibre Optics Cable (FOC) along the length of the pipeline ROW for the
purpose of back-up
back up communication for Kolo Creek Instrumentation Systems.

1.1 Scope and Objectives


The objective of this interpretative report is to:

• Outline soil properties as obtained from the geotechnical investigation carried out by
Polaris in August 2013 for Soku Gas Plant and Kolo Creek.

• Compute and outline Shallow foundation and deep


deep foundation allowable capacities to
be adopted for the detailed design of all foundations in this project. The computations
are to be based on soil properties supplied by the geotechnical investigation report,
Ref: K2S-NG01007551
NG01007551-GEN-CG6968-00010

1.2 Methodology

A geotechnical investigation was carried out with the aim of obtaining geotechnical parameters for the
foundation works of the sludge-catcher
sludge catcher and other facilities at Soku for the 40km 20” bulk line between
Kolo Creek and Soku. Computations and checks were made for the proposed pile foundation sizes,
using the given soil properties and findings of the Geotechnical Investigation report to establish their
resistance capacities.

Following the procedure outlined in the codes for soil and foundation analysis,
analysi adequate resistance
capacities for compression, tension and traverse loading, have been deduced for the deep and
shallow foundations intended for use in this project.
project

The limit state design approach was used throughout. Based on the ultimate values obtained,
allowable values were obtained using the partial factors of safety as provided in EN1997

This document is controlled electronically and is uncontrolled when printed


EPC for Kolo Creek to Soku Gas Export
xport Pipeline

SOIL INVESTIGATION INTERPRETATIVE REPORT

K2S
K2S-NG01007551-GEN-CG6968-00006 Page 8 of 79

2.0 NOTATIONS & ABBREVIA


ABBREVIATIONS

The Following under listed notations shall be adopted in this interpretative report;

B: Foundation width

b: Design values of the


the factors for the inclination of the foundation base

BS EN: British Standard version of the European Normalisation Standards

Cc: Coefficient of curvature

Cu: Coefficient of uniformity

Cu: Undrained shear strength

CPT: Cone Penetration Test

d: outer
ter diameter of the pile

e: Void ratio

EI: pile stiffness modulus

EN: European Normalisation

I: The inclination factor of the load caused by horizontal load

Ka: Active Earth Pressure

Kp: Passive Earth Pressure

KPa: kilo Pascal

L: h of pile / Length of Foundation


total length

LI: Liquidity Index

LL: Liquid Limit

MPa: Mega Pascal

My: Moment
oment of resistance of the pile

N: The
he bearing capacity factors

PI: Plasticity Index

PL: Plastic Limit

Pt: traverse load on pile above ground

pu: ultimate
ltimate traverse load on pile

q’ The
he design effective overburden pressure at the level of the foundation base

This document is controlled electronically and is uncontrolled when printed


EPC for Kolo Creek to Soku Gas Export
xport Pipeline

SOIL INVESTIGATION INTERPRETATIVE REPORT

K2S
K2S-NG01007551-GEN-CG6968-00006 Page 9 of 79

SPT: Standard Penetration Test

SPT N: SPT Blow Count

S: The shape factor of the foundation base

w: Water content

γ’: The design effective weight density of the soil below the foundation base

yg: Ultimate pile deflection at ground level

γsub: Submerged weight density of the soil

This document is controlled electronically and is uncontrolled when printed


EPC for Kolo Creek to Soku Gas Export
xport Pipeline

SOIL INVESTIGATION INTERPRETATIVE REPORT

K2S
K2S-NG01007551-GEN-CG6968-00006 Page 10 of 79

3.0 SPECIFICATIONS, CODES


S AND REFERENCES

3.1 European & Other Codes

EN 1990 Basis of structural design

EN1991: 2005 Actions on Structures

EN1997 2005 Geotechnical Design

3.2 SPDC Specifications


Company requirements to be applied for the work:

DESIGN SPECIFICATIONS
Structural design and
34.00.01.30-Gen Sep 2012 engineering of onshore
structures
34.11.00.12-Gen Feb 2011 Geotechnical and foundation
engineering -onshore
34.11.00.11-Gen Feb 2003 Site preparation and
earthworks, including tank
foundation and tank farms

3.3 References

• EPC For Kolo Creek to Soku Gas Export Pipeline Geotechnical


Geotechnical Site Investigation by Polaris,
August 2013.
• Foundation Design Construction 7th ed-2001(Tomlinson)
ed

th
Elements of Soil Mechanics For Civil and Mining Engineers, 5 Edition, by G.N Smith.
• Principles of Foundation Engineering, 3rd Edition, Braja M. Da
Das

th
Pile Design and Construction Practice , 5 Edition by MJ Thomlinson

th
Smiths Element of Soil Mechanics , 8 Edition by Ian Smith & G.N. Smith.
• Foundation Analysis and Design, 5th Edition, by Joseph E. Bowles.

This document is controlled electronically and is uncontrolled when printed


EPC for Kolo Creek to Soku Gas Export
xport Pipeline

SOIL INVESTIGATION INTERPRETATIVE REPORT

K2S
K2S-NG01007551-GEN-CG6968-00006 Page 11 of 79

4.0 SITE DESCRIPTION & SOIL PROPERTIES

4.1 Kolocreek

4.1.1 Site Description & Geology

This site is situated in Kolo Creek, close to SPDC present “Kolo Creek NAG and Oil Manifold”. Kolo
Creek is in Kolokuma/Opukuma Local Government Area of Bayelsa State. Kolokuma/Opukuma Local
Government Area is one of the eight
eight Local Government Areas in Bayelsa State with headquarters at
Kaiama. The local geology of the site is composed of sediments which are characteristic of several
depositional environments as the River Niger empties her load into the Atlantic Ocean through
throu
tributaries which also merge downstream into other rivers of which the Kolo Creek is a part. The
deposit gives rise to plant growth which matures to become swamp forest. The tidal swamp forest
covers a substantial area of the delta coastline, with the exception
e of the zone adjacent to the river
plains, where they are overlain by recent deposits of river mouth sediments. The growth of plants on
the surfaces of these sediments aided further slowing down of the River flow which encouraged further
plant growth. The site area falls within one of these tidal swamp area encompassed within a water
body, the Kolo Creek. The Figure below show the location of the Boreholes and CPT points from
which the soil strata and properties were deduced

This document is controlled electronically and is uncontrolled when printed


EPC for Kolo Creek to Soku Gas Export
xport Pipeline

SOIL INVESTIGATION INTERPRETATIVE REPORT

K2S
K2S-NG01007551-GEN-CG6968-00006 Page 12 of 79

Geotechnical investigation
tion reveals that the soil depth is characterized predominantly by peaty clays,
loose, loose to medium dens
dense and medium dense sands as summarized below .

4.1.2 Soil Stratigraphy

Table 4.1 : Borehole 1 Stratigraphy

No. Layer Thickness (m) Description of soill type and Group Symbol

1 0 – 3.0 Fine sand, silty, light orange brown


2 3.0 – 7.5 Clay, very soft, dark grey
3 7.5 – 19.5 Medium to coarse sand, silty, light grey
4 19.5 – 23.8 Clay, very stiff, light grey
5 23.8 – 30.0 Fine sand, silty, light & bro
brownish grey

Table 4.2 : Borehole 2 Stratigraphy

No. Layer Thickness (m) Description of soil type and Group Symbol
1 0-4 Fine sand, silty, light orange brown
2 4 – 7.5 Clay, very soft, dark grey
3 7.5 – 27.5 Fine to medium sand, silty, light grey
4 27.5 – 30.0 Clay, very stiff, light yellow

For detailed properties of soil layers, see Section 9, Appendix A of Geotechnical Investigation Report
for Kolo Creek to Soku Gas Export Pipeline
Pipeline.

4.1.3 Soil Properties

Table 4.3 : Average Soil Properties – Peaty Clays


PROPERTIES MINIMUM MAXIMUM AVERAGE
Natural moisture content (%) 26 68 44
Liquid Limit (%) 29 81 52
Plasticity Index (%) 7 45 27

This document is controlled electronically and is uncontrolled when printed


EPC for Kolo Creek to Soku Gas Export
xport Pipeline

SOIL INVESTIGATION INTERPRETATIVE REPORT

K2S
K2S-NG01007551-GEN-CG6968-00006 Page 13 of 79

Liquidity Index (%) -1.16 0.19 -0.53


3
Bulk Unit Weight (kN/m ) 16.44 19.34 17.90
3
Dry Unit weight (kN/m ) 9.79 14.91 12.35
Plastic limit (%) 10 36 24
2
Coefficient of compressibility(m
compressibility /MN) 0.25 2.99 0.5
2
Coefficient of consolidation(m
consolidation /Yr) 0.86 8.59 3.8
Consistency index 0.81 2.16 1.53
2
Undrained Strength (kN/m ) 15 45 30

Table 4.4 : Average Soil Properties – Coarse sand

PROPERTIES MINIMUM MAXIMUM AVERAGE


2
Modulus of deformation (kN/m ) 2500 50000 18100
Angle of internal friction (⁰) 29 81 52
Bulk Unit Weight 16.44 19.34 17.90
Dry Unit weight 9.79 14.91 12.35

4.1.4 Ground Water


Groundwater was encountered at a depth stated below in the each of the boreholes

Table 4.5 : Average Soil Properties – Coarse sand


S/N Borehole Depth (m) below ground level
1 BH 1 0.30
2 BH 2 0.75

At this depth, the ground water shall create problems of excavation and slumping of excavation walls
where excavations for shallow foundations are taken deeper than these levels at the respective
locations.

This document is controlled electronically and is uncontrolled when printed


EPC for Kolo Creek to Soku Gas Export
xport Pipeline

SOIL INVESTIGATION INTERPRETATIVE REPORT

K2S
K2S-NG01007551-GEN-CG6968-00006 Page 14 of 79

4.1.5 Borehole
hole Logs & CPT Plots

This document is controlled electronically and is uncontrolled when printed


EPC for Kolo Creek to Soku Gas Export
xport Pipeline

SOIL INVESTIGATION INTERPRETATIVE REPORT

K2S
K2S-NG01007551-GEN-CG6968-00006 Page 15 of 79

This document is controlled electronically and is uncontrolled when printed


EPC for Kolo Creek to Soku Gas Export
xport Pipeline

SOIL INVESTIGATION INTERPRETATIVE REPORT

K2S
K2S-NG01007551-GEN-CG6968-00006 Page 16 of 79

This document is controlled electronically and is uncontrolled when printed


EPC for Kolo Creek to Soku Gas Export
xport Pipeline

SOIL INVESTIGATION INTERPRETATIVE REPORT

K2S
K2S-NG01007551-GEN-CG6968-00006 Page 17 of 79

This document is controlled electronically and is uncontrolled when printed


EPC for Kolo Creek to Soku Gas Export
xport Pipeline

SOIL INVESTIGATION INTERPRETATIVE REPORT

K2S
K2S-NG01007551-GEN-CG6968-00006 Page 18 of 79

This document is controlled electronically and is uncontrolled when printed


EPC for Kolo Creek to Soku Gas Export
xport Pipeline

SOIL INVESTIGATION INTERPRETATIVE REPORT

K2S
K2S-NG01007551-GEN-CG6968-00006 Page 19 of 79

4.2 Soku Gas Plant

4.2.1 Site Description & Geology

The site is situated close to the SPDC – NLNG Gas Plant at Soku community in Akuku
Akuku-Toru Local
Government Area of Rivers State
State. The Soku community is an Island community surrounded by water.
The surrounding forest is mainly mangrove swamp. The local geology of the area is primarily organic
sediments which are deposited as the surrounding waters deposit its load on Soku, the community
being an Island community.

4.2.2 Soil Stratigraphy

The
e Figure below show the location of the Boreholes and CPT points from which the soil strata and
properties were deduced

Figure : Kolo Creek Site Test Point Location

This document is controlled electronically and is uncontrolled when printed


EPC for Kolo Creek to Soku Gas Export
xport Pipeline

SOIL INVESTIGATION INTERPRETATIVE REPORT

K2S
K2S-NG01007551-GEN-CG6968-00006 Page 20 of 79

Geotechnical investigation reveals that the soil depth is characterized predominantly by peaty clays,
Fine, fine to medium sands as summarized below . The lithology of the site reveals a formation of fine
sand to a depth of 2.0m underlain by stratum of peat between 2.0 and 6.8m below the existing ground
level. From 6.8m to 21.0m depth, fine ssand
and is again observed in the explored hole. From 21.0m to the
final 30.0m depth of the investigation stiff clay is encountered which becomes sandy with depth.

Table 4.6 : Borehole 3 Stratigraphy

No. Layer Thickness (m) Description of soil type and Group Symbol

1 0 – 2.0 Fine sand, silty, dark brown


2 2.0 – 4.5
.5 Peat,, dark grey
3 4.5 – 6.8 Clay, very soft , dark grey sand, silty
4 6.8 – 21.0 Fine sand, silty, medium grey
5 21.0 – 30.0 Clay, firm, dark grey, becoming sandy

For detailed properties of soil layers, see Section 9, Appendix A of Geotechnical Investigation Report
for Kolo Creek to Soku Gas Export Pipeline.

4.2.3 Soil Properties

Table 4.7 : Average Soil Properties – Peaty Clays


PROPERTIES MINIMUM MAXIMUM AVERAGE
Natural moisture content (%) 61 68 63
Liquid Limit (%) 24 83 54
Plasticity Index (%) 8 33 21
Liquidity Index (%) -4.63 0.45 -1.86
3
Bulk Unit Weight (kN/m ) 17.95 19.43 18.06
3
Dry Unit weight (kN/m ) 9.31 12.14 11.03
Plastic limit (%) 16 50 33
2
Coefficient of compressibility(m /MN) 0.52 0.67 0.60
2
Coefficient of consolidation(m /Yr) 0.72 1.35 1.04

Consistency index 0.55 5.63 3.09


2
Undrained Strength (kN/m ) 5 35 19

This document is controlled electronically and is uncontrolled when printed


EPC for Kolo Creek to Soku Gas Export
xport Pipeline

SOIL INVESTIGATION INTERPRETATIVE REPORT

K2S
K2S-NG01007551-GEN-CG6968-00006 Page 21 of 79

Table 4.4 : Average Soil Properties – Coarse sand

PROPERTIES MINIMUM MAXIMUM AVERAGE


2
Modulus of deformation (kN/m ) 3200 11500 6480
Angle of internal friction (⁰)
( 30 40 34
Bulk Unit Weight 18.54 19.03 18.83
Dry Unit weight 11.83 14.75 12.84

4.2.4 Ground Water


Groundwater was encountered at a depth stated below in the each of the boreholes

Table 4.5 : Average Soil Prop


Properties – Coarse sand
S/N Depth (m) below ground level Date
1 0.70 24/06/13
2 2.37 25/06/13
3 0.60 26/06/13

At this depth, the ground water shall create problems of excavation and slumping of excavation walls
where excavations for shallow foundations are taken deeper than these levels at the respective
locations.

This document is controlled electronically and is uncontrolled when printed


EPC for Kolo Creek to Soku Gas Export
xport Pipeline

SOIL INVESTIGATION INTERPRETATIVE REPORT

K2S
K2S-NG01007551-GEN-CG6968-00006 Page 22 of 79

4.2.5 Borehole Logs & CPT Plots

This document is controlled electronically and is uncontrolled when printed


EPC for Kolo Creek to Soku Gas Export
xport Pipeline

SOIL INVESTIGATION INTERPRETATIVE REPORT

K2S
K2S-NG01007551-GEN-CG6968-00006 Page 23 of 79

5.0 FOUNDATION CAPACITY COMPUTATIONS

The design calculations were carried out on the information given in the geotechnical report and in
accordance with the procedures
procedures given in the reference codes and standards as well as SPDC DEP
specifications. The Limit State design approach was used. Spreadsheets were utilized for the
calculations. The bearing capacity have been computed
omputed in both the critical depth static method and the
SPT method, in order to determine
det the most efficient capacity values.

5.1 Bearing Capacity Check – Shallow Foundation

The bearing capacity of shallow foundations shall be estimated using too methods;

1. Terzaghi’s (1943) method

2. Meyerhoff’s method

The lower value of the two methods shall be adopted for the
the detailed design of all shallow
foundations (Pad & Raft Foundations)
Foundations).

5.1.1 Kolo Creek- BH1(( Generator House Area)


Terzaghi’s (1943) method

1.0 Allowable Bearing Capacity - Terzaghi's approach

Design Condition of Foundation


Width of Foundation :
Length of Foundation :
Excavation Depth of Foundation from G.L : Df

Method of Terzaghi's Formula

Ultimate Bearing Capacity

Qult = α ㆍc ㆍNc + βㆍγ 1ㆍBㆍNr + γ 2ㆍDf ㆍNq


α, β = Foundation shape factors
c = cohesion of soil
Nc, Nq, Nr = Bearing capacity factors
γ1 : Unit weight of soil under the foundation (kN/m3)

γ2 : Unit weight of soil above the foundation bottom (kN/m3)


Φ : Angle of internal friction(˚)

This document is controlled electronically and is uncontrolled when printed


EPC for Kolo Creek to Soku Gas Export
xport Pipeline

SOIL INVESTIGATION INTERPRETATIVE REPORT

K2S
K2S-NG01007551-GEN-CG6968-00006 Page 24 of 79

Terzaghi
Φ
Nc Nr Nq
0 5.7 0.0 1.0
5 7.3 0.5 1.6
10 9.6 1.2 2.7
15 12.9 2.5 4.4
20 17.7 5 7.4
25 25.1 9.7 12.7
30 37.2 19.7 22.5
32 44.0 26.9 28.5
35 57.8 42.4 41.4
40 95.7 100.4 81.3
45 172.3 297.5 173.3
48 258.3 780.1 287.9
50 347.5 1153.2 415.1

TYP E COTINUOUS
SQUA RE RECTA NGULA R CIRCULA R
FOUNDA TION
SHA P E FA CTOR

α 1.0 1.3 1+0.3B/L 1.3


β 0.5 0.4 0.5-0.1B/L 0.3

w = moisture content = 44 %
Gs = specific gravity = 2.57
2
γ w =effective unit weight of water = 9.81 kN/m
N= 0
c= cohesion = (0-3m) 0.00 kN/m2
φ = angle of internal friction (average) = 30.00 ⁰

Colour Code Allowable Bearing Capacity Value


Ultimate Bearing Capacity Value

This document is controlled electronically and is uncontrolled when printed


EPC for Kolo Creek to Soku Gas Export
E Pipeline

SOIL INVESTIGATION INTERPRETATIVE REPORT

K2S-NG01007551-GEN
GEN-CG6968-00006 Page 25 of 79

Df (m) B (m) L/B B/L γ (kN/m3) γ '(kN/m 3) α β Nq Nr Nc α*c*Nc β *γ 1*B*Nr γ 2*Df*Nq qu (KN/m2) qa(kN/m2)
1.00 1.00 18.55 8.74 1.3 0.400 22.5 19.7 37.2 0 68.87 196.65 265.52 88.51
2.00 0.50 18.55 8.74 1.15 0.450 22.5 19.7 37.2 0 77.48 196.65 274.13 91.38
1.0
3.00 0.33 18.55 8.74 1.1 0.467 22.5 19.7 37.2 0 80.35 196.65 277.00 92.33
4.00 0.25 18.55 8.74 1.075 0.475 22.5 19.7 37.2 0 81.78 196.65 278.43 92.81
1.00 1.00 18.55 8.74 1.3 0.400 22.5 19.7 37.2 0 103.31 196.65 299.96 99.99
2.00 0.50 18.55 8.74 1.15 0.450 22.5 19.7 37.2 0 116.22 196.65 312.87 104.29
1.5
3.00 0.33 18.55 8.74 1.1 0.467 22.5 19.7 37.2 0 120.52 196.65 317.17 105.72
4.00 0.25 18.55 8.74 1.075 0.475 22.5 19.7 37.2 0 122.68 196.65 319.33 106.44
1.00 1.00 18.55 8.74 1.3 0.400 22.5 19.7 37.2 0 137.74 196.65 334.39 111.46
2.00 0.50 18.55 8.74 1.15 0.450 22.5 19.7 37.2 0 154.96 196.65 351.61 117.20
2.0
3.00 0.33 18.55 8.74 1.1 0.467 22.5 19.7 37.2 0 160.70 196.65 357.35 119.12
4.00 0.25 18.55 8.74 1.075 0.475 22.5 19.7 37.2 0 163.57 196.65 360.22 120.07
1.00 1.00 18.55 8.74 1.3 0.400 22.5 19.7 37.2 0 206.61 196.65 403.26 134.42
2.00 0.50 18.55 8.74 1.15 0.450 22.5 19.7 37.2 0 232.44 196.65 429.09 143.03
3.0
3.00 0.33 18.55 8.74 1.1 0.467 22.5 19.7 37.2 0 241.05 196.65 437.70 145.90
4.00 0.25 18.55 8.74 1.075 0.475 22.5 19.7 37.2 0 245.35 196.65 442.00 147.33
1.0
1.00 1.00 18.55 8.74 1.3 0.400 22.5 19.7 37.2 0 275.48 196.65 472.13 157.38
2.00 0.50 18.55 8.74 1.15 0.450 22.5 19.7 37.2 0 309.92 196.65 506.57 168.86
4.0
3.00 0.33 18.55 8.74 1.1 0.467 22.5 19.7 37.2 0 321.40 196.65 518.05 172.68
4.00 0.25 18.55 8.74 1.075 0.475 22.5 19.7 37.2 0 327.14 196.65 523.79 174.60
1.00 1.00 18.55 8.74 1.3 0.400 22.5 19.7 37.2 0 344.36 196.65 541.01 180.34
2.00 0.50 18.55 8.74 1.15 0.450 22.5 19.7 37.2 0 387.40 196.65 584.05 194.68
5.0
3.00 0.33 18.55 8.74 1.1 0.467 22.5 19.7 37.2 0 401.75 196.65 598.40 199.47
4.00 0.25 18.55 8.74 1.075 0.475 22.5 19.7 37.2 0 408.92 196.65 605.57 201.86
1.00 1.00 18.55 8.74 1.3 0.400 22.5 19.7 37.2 0 413.23 196.65 609.88 203.29
2.00 0.50 18.55 8.74 1.15 0.450 22.5 19.7 37.2 0 464.88 196.65 661.53 220.51
6.0
3.00 0.33 18.55 8.74 1.1 0.467 22.5 19.7 37.2 0 482.10 196.65 678.75 226.25
4.00 0.25 18.55 8.74 1.075 0.475 22.5 19.7 37.2 0 490.71 196.65 687.36 229.12
1.00 1.00 18.55 8.74 1.3 0.400 22.5 19.7 37.2 0 550.97 196.65 747.62 249.21
2.00 0.50 18.55 8.74 1.15 0.450 22.5 19.7 37.2 0 619.84 196.65 816.49 272.16
8.0
3.00 0.33 18.55 8.74 1.1 0.467 22.5 19.7 37.2 0 642.80 196.65 839.45 279.82
4.00 0.25 18.55 8.74 1.075 0.475 22.5 19.7 37.2 0 654.28 196.65 850.93 283.64

This document is controlled electronically and is uncontrolled when printed


EPC for Kolo Creek to Soku Gas Export
E Pipeline

SOIL INVESTIGATION INTERPRETATIVE REPORT

K2S-NG01007551-GEN
GEN-CG6968-00006 Page 26 of 79

3
Df (m) B (m) L/B B/L γ (kN/m ) γ' (kN/m3) α β Nq Nr Nc α*c*Nc β *γ1*B*Nr γ2*Df*Nq qu (KN/m 2) qa(kN/m 2)
1.00 1.00 18.55 8.74 1.3 0.400 22.5 19.7 37.2 0 68.87 294.98 363.85 121.28
2.00 0.50 18.55 8.74 1.15 0.450 22.5 19.7 37.2 0 77.48 294.98 372.46 124.15
1.0
3.00 0.33 18.55 8.74 1.1 0.467 22.5 19.7 37.2 0 80.35 294.98 375.32 125.11
4.00 0.25 18.55 8.74 1.075 0.475 22.5 19.7 37.2 0 81.78 294.98 376.76 125.59
1.00 1.00 18.55 8.74 1.3 0.400 22.5 19.7 37.2 0 103.31 294.98 398.28 132.76
2.00 0.50 18.55 8.74 1.15 0.450 22.5 19.7 37.2 0 116.22 294.98 411.20 137.07
1.5
3.00 0.33 18.55 8.74 1.1 0.467 22.5 19.7 37.2 0 120.52 294.98 415.50 138.50
4.00 0.25 18.55 8.74 1.075 0.475 22.5 19.7 37.2 0 122.68 294.98 417.65 139.22
1.00 1.00 18.55 8.74 1.3 0.400 22.5 19.7 37.2 0 137.74 294.98 432.72 144.24
2.00 0.50 18.55 8.74 1.15 0.450 22.5 19.7 37.2 0 154.96 294.98 449.94 149.98
2.0
3.00 0.33 18.55 8.74 1.1 0.467 22.5 19.7 37.2 0 160.70 294.98 455.67 151.89
4.00 0.25 18.55 8.74 1.075 0.475 22.5 19.7 37.2 0 163.57 294.98 458.54 152.85
1.00 1.00 18.55 8.74 1.3 0.400 22.5 19.7 37.2 0 206.61 294.98 501.59 167.20
2.00 0.50 18.55 8.74 1.15 0.450 22.5 19.7 37.2 0 232.44 294.98 527.42 175.81
3.0
3.00 0.33 18.55 8.74 1.1 0.467 22.5 19.7 37.2 0 241.05 294.98 536.02 178.67
4.00 0.25 18.55 8.74 1.075 0.475 22.5 19.7 37.2 0 245.35 294.98 540.33 180.11
1.5
1.00 1.00 18.55 8.74 1.3 0.400 22.5 19.7 37.2 0 275.48 294.98 570.46 190.15
2.00 0.50 18.55 8.74 1.15 0.450 22.5 19.7 37.2 0 309.92 294.98 604.90 201.63
4.0
3.00 0.33 18.55 8.74 1.1 0.467 22.5 19.7 37.2 0 321.40 294.98 616.37 205.46
4.00 0.25 18.55 8.74 1.075 0.475 22.5 19.7 37.2 0 327.14 294.98 622.11 207.37
1.00 1.00 18.55 8.74 1.3 0.400 22.5 19.7 37.2 0 344.36 294.98 639.33 213.11
2.00 0.50 18.55 8.74 1.15 0.450 22.5 19.7 37.2 0 387.40 294.98 682.38 227.46
5.0
3.00 0.33 18.55 8.74 1.1 0.467 22.5 19.7 37.2 0 401.75 294.98 696.72 232.24
4.00 0.25 18.55 8.74 1.075 0.475 22.5 19.7 37.2 0 408.92 294.98 703.90 234.63
1.00 1.00 18.55 8.74 1.3 0.400 22.5 19.7 37.2 0 413.23 294.98 708.20 236.07
2.00 0.50 18.55 8.74 1.15 0.450 22.5 19.7 37.2 0 464.88 294.98 759.86 253.29
6.0
3.00 0.33 18.55 8.74 1.1 0.467 22.5 19.7 37.2 0 482.10 294.98 777.07 259.02
4.00 0.25 18.55 8.74 1.075 0.475 22.5 19.7 37.2 0 490.71 294.98 785.68 261.89
1.00 1.00 18.55 8.74 1.3 0.400 22.5 19.7 37.2 0 550.97 294.98 845.94 281.98
2.00 0.50 18.55 8.74 1.15 0.450 22.5 19.7 37.2 0 619.84 294.98 914.82 304.94
8.0
3.00 0.33 18.55 8.74 1.1 0.467 22.5 19.7 37.2 0 642.80 294.98 937.77 312.59
4.00 0.25 18.55 8.74 1.075 0.475 22.5 19.7 37.2 0 654.28 294.98 949.25 316.42

This document is controlled electronically and is uncontrolled when printed


EPC for Kolo Creek to Soku Gas Export
E Pipeline

SOIL INVESTIGATION INTERPRETATIVE REPORT

K2S-NG01007551-GEN
GEN-CG6968-00006 Page 27 of 79

3
D f (m) B (m) L/B B/L γ (kN/m ) γ' (kN/m3) α β Nq Nr Nc α*c*Nc β *γ1*B*Nr γ2*D f*Nq qu (KN/m 2) qa(kN/m 2)
1.00 1.00 18.55 8.74 1.3 0.400 22.5 19.7 37.2 0 68.87 393.30 462.17 154.06
2.00 0.50 18.55 8.74 1.15 0.450 22.5 19.7 37.2 0 77.48 393.30 470.78 156.93
1.0
3.00 0.33 18.55 8.74 1.1 0.467 22.5 19.7 37.2 0 80.35 393.30 473.65 157.88
4.00 0.25 18.55 8.74 1.075 0.475 22.5 19.7 37.2 0 81.78 393.30 475.08 158.36
1.00 1.00 18.55 8.74 1.3 0.400 22.5 19.7 37.2 0 103.31 393.30 496.61 165.54
2.00 0.50 18.55 8.74 1.15 0.450 22.5 19.7 37.2 0 116.22 393.30 509.52 169.84
1.5
3.00 0.33 18.55 8.74 1.1 0.467 22.5 19.7 37.2 0 120.52 393.30 513.82 171.27
4.00 0.25 18.55 8.74 1.075 0.475 22.5 19.7 37.2 0 122.68 393.30 515.98 171.99
1.00 1.00 18.55 8.74 1.3 0.400 22.5 19.7 37.2 0 137.74 393.30 531.04 177.01
2.00 0.50 18.55 8.74 1.15 0.450 22.5 19.7 37.2 0 154.96 393.30 548.26 182.75
2.0
3.00 0.33 18.55 8.74 1.1 0.467 22.5 19.7 37.2 0 160.70 393.30 554.00 184.67
4.00 0.25 18.55 8.74 1.075 0.475 22.5 19.7 37.2 0 163.57 393.30 556.87 185.62
1.00 1.00 18.55 8.74 1.3 0.400 22.5 19.7 37.2 0 206.61 393.30 599.91 199.97
2.00 0.50 18.55 8.74 1.15 0.450 22.5 19.7 37.2 0 232.44 393.30 625.74 208.58
3.0
3.00 0.33 18.55 8.74 1.1 0.467 22.5 19.7 37.2 0 241.05 393.30 634.35 211.45
4.00 0.25 18.55 8.74 1.075 0.475 22.5 19.7 37.2 0 245.35 393.30 638.65 212.88
2.0
1.00 1.00 18.55 8.74 1.3 0.400 22.5 19.7 37.2 0 275.48 393.30 668.78 222.93
2.00 0.50 18.55 8.74 1.15 0.450 22.5 19.7 37.2 0 309.92 393.30 703.22 234.41
4.0
3.00 0.33 18.55 8.74 1.1 0.467 22.5 19.7 37.2 0 321.40 393.30 714.70 238.23
4.00 0.25 18.55 8.74 1.075 0.475 22.5 19.7 37.2 0 327.14 393.30 720.44 240.15
1.00 1.00 18.55 8.74 1.3 0.400 22.5 19.7 37.2 0 344.36 393.30 737.66 245.89
2.00 0.50 18.55 8.74 1.15 0.450 22.5 19.7 37.2 0 387.40 393.30 780.70 260.23
5.0
3.00 0.33 18.55 8.74 1.1 0.467 22.5 19.7 37.2 0 401.75 393.30 795.05 265.02
4.00 0.25 18.55 8.74 1.075 0.475 22.5 19.7 37.2 0 408.92 393.30 802.22 267.41
1.00 1.00 18.55 8.74 1.3 0.400 22.5 19.7 37.2 0 413.23 393.30 806.53 268.84
2.00 0.50 18.55 8.74 1.15 0.450 22.5 19.7 37.2 0 464.88 393.30 858.18 286.06
6.0
3.00 0.33 18.55 8.74 1.1 0.467 22.5 19.7 37.2 0 482.10 393.30 875.40 291.80
4.00 0.25 18.55 8.74 1.075 0.475 22.5 19.7 37.2 0 490.71 393.30 884.01 294.67
1.00 1.00 18.55 8.74 1.3 0.400 22.5 19.7 37.2 0 550.97 393.30 944.27 314.76
2.00 0.50 18.55 8.74 1.15 0.450 22.5 19.7 37.2 0 619.84 393.30 1013.14 337.71
8.0
3.00 0.33 18.55 8.74 1.1 0.467 22.5 19.7 37.2 0 642.80 393.30 1036.10 345.37
4.00 0.25 18.55 8.74 1.075 0.475 22.5 19.7 37.2 0 654.28 393.30 1047.58 349.19

This document is controlled electronically and is uncontrolled when printed


EPC for Kolo Creek to Soku Gas Export
xport Pipeline

SOIL INVESTIGATION INTERPRETATIVE REPORT

K2S
K2S-NG01007551-GEN-CG6968-00006 Page 28 of 79

Meyerhoff’s (1963) method

Method of Meyerhof's Formula

Ultimate Bearing Capacity

Qult = c ㆍNc ㆍs c ㆍdc ㆍic + 1/2ㆍγ 1ㆍB'ㆍNrㆍs rㆍdrㆍir + q'ㆍNqㆍs qㆍdqㆍiq

where,
1) Shape factor : s c , s r , s q
sc = 1 + 0.2kp (B'/L)
s r, s q = 0 + 0.1kp (B'/L)
0.33
Kp = tan2(45+Φ/2)
Φ/2) 0.33

2) Depth factor : dc , dr , dq
dc = 1+ 0.2k p1/2*(Df /B)
dr, dq = 1+ 0.1k p1/2*(Df /B)

3) Inclination factor : ic , ir , iq
ic , iq = (1 - θ / 90) 2 = 1
2
ir = (1 - θ / φ)
φ = 1
-1
θ = (tan (Ph / P v )) 0

Meyerhof
Φ
Nc Nr Nq
0 5.14 0.0 1.0
5 6.5 0.1 1.6
10 8.3 0.4 2.5
15 11.0 1.1 3.9
20 14.8 2.9 6.4
25 20.7 6.8 10.7
30 30.1 15.7 18.4
32 35.5 22 23.2
35 46.1 37.1 33.3
40 75.3 93.7 64.2
45 133.9 262.7 134.9
50 266.9 873.7 319
w = moisture content = 44 %
Gs = specific gravity = 2.57
3
γ w =effective unit weight of water = 9.81 kN/m
c= cohesion (0-3)m = 0.00 kN/m2
φ = angle of internal friction = 30.00 ⁰
Nc = 30.1 Nq = 18.4 Nr = 15.7

This document is controlled electronically and is uncontrolled when printed


EPC for Kolo Creek to Soku Gas Export
E Pipeline

SOIL INVESTIGATION INTERPRETATIVE REPORT

K2S-NG01007551-GEN
GEN-CG6968-00006 Page 29 of 79

3
Df (m) B (m) L/B B/L γ (kN/m ) γ' (kN/m )
3
q =γ'*Df sc sr, sq dc dr, dq c*Nc*dc*sc 0.5 *γ1*B*sr*dr*Nr, q *sq*dq*Nq, qu (KN/m 2) qa(kN/m 2)
1.00 1.00 18.55 8.74 8.74 1.067 1.033 1.12 1.06 0.00 74.99 175.77 250.76 83.59
2.00 0.50 18.55 8.74 8.74 1.033 1.017 1.12 1.06 0.00 73.78 172.94 246.72 82.24
1.0
3.00 0.33 18.55 8.74 8.74 1.022 1.011 1.12 1.06 0.00 73.38 171.99 245.37 81.79
4.00 0.25 18.55 8.74 8.74 1.017 1.008 1.12 1.06 0.00 73.17 171.52 244.69 81.56
1.00 1.00 18.55 8.74 8.74 1.067 1.033 1.08 1.04 0.00 110.44 172.57 283.01 94.34
2.00 0.50 18.55 8.74 8.74 1.033 1.017 1.08 1.04 0.00 108.66 169.79 278.45 92.82
1.5
3.00 0.33 18.55 8.74 8.74 1.022 1.011 1.08 1.04 0.00 108.06 168.86 276.92 92.31
4.00 0.25 18.55 8.74 8.74 1.017 1.008 1.08 1.04 0.00 107.77 168.40 276.16 92.05
1.00 1.00 18.55 8.74 8.74 1.067 1.033 1.06 1.03 0.00 145.89 170.97 316.86 105.62
2.00 0.50 18.55 8.74 8.74 1.033 1.017 1.06 1.03 0.00 143.53 168.22 311.75 103.92
2.0
3.00 0.33 18.55 8.74 8.74 1.022 1.011 1.06 1.03 0.00 142.75 167.30 310.04 103.35
4.00 0.25 18.55 8.74 8.74 1.017 1.008 1.06 1.03 0.00 142.36 166.84 309.19 103.06
1.00 1.00 18.55 8.74 8.74 1.067 1.033 1.04 1.02 0.00 216.78 169.37 386.16 128.72
2.00 0.50 18.55 8.74 8.74 1.033 1.017 1.04 1.02 0.00 213.28 166.64 379.93 126.64
3.0
3.00 0.33 18.55 8.74 8.74 1.022 1.011 1.04 1.02 0.00 212.12 165.73 377.85 125.95
4.00 0.25 18.55 8.74 8.74 1.017 1.008 1.04 1.02 0.00 211.54 165.28 376.81 125.60
1.0
1.00 1.00 18.55 8.74 8.74 1.067 1.033 1.03 1.01 0.00 287.68 168.58 456.25 152.08
2.00 0.50 18.55 8.74 8.74 1.033 1.017 1.03 1.01 0.00 283.04 165.86 448.89 149.63
4.0
3.00 0.33 18.55 8.74 8.74 1.022 1.011 1.03 1.01 0.00 281.49 164.95 446.44 148.81
4.00 0.25 18.55 8.74 8.74 1.017 1.008 1.03 1.01 0.00 280.72 164.50 445.21 148.40
1.00 1.00 18.55 8.74 8.74 1.067 1.033 1.02 1.01 0.00 358.57 168.10 526.67 175.56
2.00 0.50 18.55 8.74 8.74 1.033 1.017 1.02 1.01 0.00 352.79 165.38 518.17 172.72
5.0
3.00 0.33 18.55 8.74 8.74 1.022 1.011 1.02 1.01 0.00 350.86 164.48 515.34 171.78
4.00 0.25 18.55 8.74 8.74 1.017 1.008 1.02 1.01 0.00 349.90 164.03 513.93 171.31
1.00 1.00 18.55 8.74 8.74 1.067 1.033 1.02 1.01 0.00 429.47 167.78 597.24 199.08
2.00 0.50 18.55 8.74 8.74 1.033 1.017 1.02 1.01 0.00 422.54 165.07 587.61 195.87
6.0
3.00 0.33 18.55 8.74 8.74 1.022 1.011 1.02 1.01 0.00 420.23 164.17 584.40 194.80
4.00 0.25 18.55 8.74 8.74 1.017 1.008 1.02 1.01 0.00 419.08 163.72 582.80 194.27
1.00 1.00 18.55 8.74 8.74 1.067 1.033 1.01 1.01 0.00 571.26 167.38 738.64 246.21
2.00 0.50 18.55 8.74 8.74 1.033 1.017 1.01 1.01 0.00 562.05 164.68 726.72 242.24
8.0
3.00 0.33 18.55 8.74 8.74 1.022 1.011 1.01 1.01 0.00 558.98 163.78 722.75 240.92
4.00 0.25 18.55 8.74 8.74 1.017 1.008 1.01 1.01 0.00 557.44 163.33 720.77 240.26

This document is controlled electronically and is uncontrolled when printed


EPC for Kolo Creek to Soku Gas Export
E Pipeline

SOIL INVESTIGATION INTERPRETATIVE REPORT

K2S-NG01007551-GEN
GEN-CG6968-00006 Page 30 of 79

3 3 2 2
Df (m) B (m) L/B B/L γ (kN/m ) γ' (kN/m ) q =γ'*Df sc sr, sq dc dr, dq c*Nc*d c*sc*ic 0.5 *γ1*B*sr*dr*ir*Nr, q *sq*dq*iq*Nq, qu (KN/m ) qa(kN/m )
1.00 1.00 18.55 8.74 13.11 1.067 1.033 1.17 1.09 0.00 77.04 270.85 347.89 115.96
2.00 0.50 18.55 8.74 13.11 1.033 1.017 1.17 1.09 0.00 75.79 266.48 342.28 114.09
1.0
3.00 0.33 18.55 8.74 13.11 1.022 1.011 1.17 1.09 0.00 75.38 265.03 340.41 113.47
4.00 0.25 18.55 8.74 13.11 1.017 1.008 1.17 1.09 0.00 75.17 264.30 339.47 113.16
1.00 1.00 18.55 8.74 13.11 1.067 1.033 1.12 1.06 0.00 112.48 263.66 376.14 125.38
2.00 0.50 18.55 8.74 13.11 1.033 1.017 1.12 1.06 0.00 110.67 259.40 370.07 123.36
1.5
3.00 0.33 18.55 8.74 13.11 1.022 1.011 1.12 1.06 0.00 110.06 257.99 368.05 122.68
4.00 0.25 18.55 8.74 13.11 1.017 1.008 1.12 1.06 0.00 109.76 257.28 367.04 122.35
1.00 1.00 18.55 8.74 13.11 1.067 1.033 1.09 1.04 0.00 147.93 260.06 407.99 136.00
2.00 0.50 18.55 8.74 13.11 1.033 1.017 1.09 1.04 0.00 145.55 255.86 401.41 133.80
2.0
3.00 0.33 18.55 8.74 13.11 1.022 1.011 1.09 1.04 0.00 144.75 254.47 399.22 133.07
4.00 0.25 18.55 8.74 13.11 1.017 1.008 1.09 1.04 0.00 144.35 253.77 398.12 132.71
1.00 1.00 18.55 8.74 13.11 1.067 1.033 1.06 1.03 0.00 218.83 256.46 475.29 158.43
2.00 0.50 18.55 8.74 13.11 1.033 1.017 1.06 1.03 0.00 215.30 252.32 467.62 155.87
3.0
3.00 0.33 18.55 8.74 13.11 1.022 1.011 1.06 1.03 0.00 214.12 250.95 465.07 155.02
4.00 0.25 18.55 8.74 13.11 1.017 1.008 1.06 1.03 0.00 213.53 250.26 463.79 154.60
1.5
1.00 1.00 18.55 8.74 13.11 1.067 1.033 1.04 1.02 0.00 289.72 254.66 544.39 181.46
2.00 0.50 18.55 8.74 13.11 1.033 1.017 1.03 1.02 0.00 285.05 250.55 535.60 178.53
4.0
3.00 0.33 18.55 8.74 13.11 1.022 1.011 1.03 1.02 0.00 283.49 249.18 532.68 177.56
4.00 0.25 18.55 8.74 13.11 1.017 1.008 1.03 1.02 0.00 282.71 248.50 531.21 177.07
1.00 1.00 18.55 8.74 13.11 1.067 1.033 1.02 1.02 0.00 360.62 253.58 614.20 204.73
2.00 0.50 18.55 8.74 13.11 1.033 1.017 1.02 1.02 0.00 354.80 249.49 604.30 201.43
5.0
3.00 0.33 18.55 8.74 13.11 1.022 1.011 1.02 1.02 0.00 352.86 248.13 600.99 200.33
4.00 0.25 18.55 8.74 13.11 1.017 1.008 1.02 1.02 0.00 351.89 247.45 599.34 199.78
1.00 1.00 18.55 8.74 13.11 1.067 1.033 1.02 1.01 0.00 431.52 252.86 684.38 228.13
2.00 0.50 18.55 8.74 13.11 1.033 1.017 1.02 1.01 0.00 424.56 248.78 673.34 224.45
6.0
3.00 0.33 18.55 8.74 13.11 1.022 1.011 1.02 1.01 0.00 422.24 247.42 669.66 223.22
4.00 0.25 18.55 8.74 13.11 1.017 1.008 1.02 1.01 0.00 421.08 246.74 667.82 222.61
1.00 1.00 18.55 8.74 13.11 1.067 1.033 1.01 1.01 0.00 573.31 251.96 825.27 275.09
2.00 0.50 18.55 8.74 13.11 1.033 1.017 1.01 1.01 0.00 564.06 247.90 811.96 270.65
8.0
3.00 0.33 18.55 8.74 13.11 1.022 1.011 1.01 1.01 0.00 560.98 246.54 807.52 269.17
4.00 0.25 18.55 8.74 13.11 1.017 1.008 1.01 1.01 0.00 559.44 245.87 805.30 268.43

This document is controlled electronically and is uncontrolled when printed


EPC for Kolo Creek to Soku Gas Export
E Pipeline

SOIL INVESTIGATION INTERPRETATIVE REPORT

K2S-NG01007551-GEN
GEN-CG6968-00006 Page 31 of 79

3 3 2 2
Df (m) B (m) L/B B/L γ (kN/m ) γ' (kN/m ) q =γ'*Df sc sr, sq dc dr, dq c*Nc*dc*sc*ic 0.5 *γ1*B*sr*dr*ir*Nr, q *sq*dq*iq*Nq, qu (KN/m ) qa(kN/m )
1.00 1.00 18.55 8.74 17.48 1.067 1.033 1.23 1.12 0.00 79.08 370.73 449.81 149.94
2.00 0.50 18.55 8.74 17.48 1.033 1.017 1.23 1.12 0.00 77.81 364.75 442.56 147.52
1.0
3.00 0.33 18.55 8.74 17.48 1.022 1.011 1.23 1.12 0.00 77.38 362.76 440.14 146.71
4.00 0.25 18.55 8.74 17.48 1.017 1.008 1.23 1.12 0.00 77.17 361.76 438.93 146.31
1.00 1.00 18.55 8.74 17.48 1.067 1.033 1.15 1.08 0.00 114.53 357.94 472.47 157.49
2.00 0.50 18.55 8.74 17.48 1.033 1.017 1.15 1.08 0.00 112.68 352.16 464.85 154.95
1.5
3.00 0.33 18.55 8.74 17.48 1.022 1.011 1.15 1.08 0.00 112.07 350.24 462.31 154.10
4.00 0.25 18.55 8.74 17.48 1.017 1.008 1.15 1.08 0.00 111.76 349.28 461.04 153.68
1.00 1.00 18.55 8.74 17.48 1.067 1.033 1.12 1.06 0.00 149.98 351.54 501.52 167.17
2.00 0.50 18.55 8.74 17.48 1.033 1.017 1.12 1.06 0.00 147.56 345.87 493.43 164.48
2.0
3.00 0.33 18.55 8.74 17.48 1.022 1.011 1.12 1.06 0.00 146.75 343.98 490.73 163.58
4.00 0.25 18.55 8.74 17.48 1.017 1.008 1.12 1.06 0.00 146.35 343.04 489.39 163.13
1.00 1.00 18.55 8.74 17.48 1.067 1.033 1.08 1.04 0.00 220.87 345.15 566.02 188.67
2.00 0.50 18.55 8.74 17.48 1.033 1.017 1.08 1.04 0.00 217.31 339.58 556.89 185.63
3.0
3.00 0.33 18.55 8.74 17.48 1.022 1.011 1.08 1.04 0.00 216.12 337.72 553.85 184.62
4.00 0.25 18.55 8.74 17.48 1.017 1.008 1.08 1.04 0.00 215.53 336.80 552.33 184.11
2.0
1.00 1.00 18.55 8.74 17.48 1.067 1.033 1.06 1.03 0.00 291.77 341.95 633.72 211.24
2.00 0.50 18.55 8.74 17.48 1.033 1.017 1.06 1.03 0.00 287.06 336.43 623.50 207.83
4.0
3.00 0.33 18.55 8.74 17.48 1.022 1.011 1.06 1.03 0.00 285.50 334.59 620.09 206.70
4.00 0.25 18.55 8.74 17.48 1.017 1.008 1.06 1.03 0.00 284.71 333.67 618.39 206.13
1.00 1.00 18.55 8.74 17.48 1.067 1.033 1.05 1.02 0.00 362.67 340.03 702.69 234.23
2.00 0.50 18.55 8.74 17.48 1.033 1.017 1.05 1.02 0.00 356.82 334.54 691.36 230.45
5.0
3.00 0.33 18.55 8.74 17.48 1.022 1.011 1.05 1.02 0.00 354.87 332.72 687.58 229.19
4.00 0.25 18.55 8.74 17.48 1.017 1.008 1.05 1.02 0.00 353.89 331.80 685.69 228.56
1.00 1.00 18.55 8.74 17.48 1.067 1.033 1.04 1.02 0.00 433.56 338.75 772.31 257.44
2.00 0.50 18.55 8.74 17.48 1.033 1.017 1.04 1.02 0.00 426.57 333.29 759.85 253.28
6.0
3.00 0.33 18.55 8.74 17.48 1.022 1.011 1.04 1.02 0.00 424.24 331.46 755.70 251.90
4.00 0.25 18.55 8.74 17.48 1.017 1.008 1.04 1.02 0.00 423.07 330.55 753.63 251.21
1.00 1.00 18.55 8.74 17.48 1.067 1.033 1.03 1.01 0.00 575.35 337.15 912.50 304.17
2.00 0.50 18.55 8.74 17.48 1.033 1.017 1.03 1.01 0.00 566.07 331.71 897.79 299.26
8.0
3.00 0.33 18.55 8.74 17.48 1.022 1.011 1.03 1.01 0.00 562.98 329.90 892.88 297.63
4.00 0.25 18.55 8.74 17.48 1.017 1.008 1.03 1.01 0.00 561.43 328.99 890.43 296.81

This document is controlled electronically and is uncontrolled when printed


EPC for Kolo Creek to Soku Gas Export
xport Pipeline

SOIL INVESTIGATION INTERPRETATIVE REPORT

K2S
K2S-NG01007551-GEN-CG6968-00006 Page 32 of 79

5.1.2 Kolo Creek- BH2 (Manifold


Manifold Area)

Terzaghi’s (1943) method

Allowable Bearing Capacity - Terzaghi's approach

Design Condition of Foundation


Width of Foundation :
Length of Foundation :
Excavation Depth of Foundation from G.L : Df

Method of Terzaghi's Formula

Ultimate Bearing Capacity

Qult = α ㆍc ㆍNc + βㆍγ 1ㆍBㆍNr + γ 2ㆍDf ㆍNq


α, β = Foundation shape factors
c = cohesion of soil
Nc, Nq, Nr = Bearing capacity factors
γ1 : Unit weight of soil under the foundation (kN/m3)

γ2 : Unit weight of soil above the foundation bottom (kN/m3)


Φ : Angle of internal friction(˚)

Terzaghi
Φ
Nc Nr Nq
0 5.7 0.0 1.0
5 7.3 0.5 1.6
10 9.6 1.2 2.7
15 12.9 2.5 4.4
20 17.7 5 7.4
25 25.1 9.7 12.7
30 37.2 19.7 22.5
32 44.0 26.9 28.5
35 57.8 42.4 41.4
40 95.7 100.4 81.3
45 172.3 297.5 173.3
48 258.3 780.1 287.9
50 347.5 1153.2 415.1

TYP E COTINUOUS
SQUA RE RECTA NGULA R CIRCULA R
FOUNDA TION
SHA P E FA CTOR

α 1.0 1.3 1+0.3B/L 1.3


β 0.5 0.4 0.5-0.1B/L 0.3

This document is controlled electronically and is uncontrolled when printed


EPC for Kolo Creek to Soku Gas Export
xport Pipeline

SOIL INVESTIGATION INTERPRETATIVE REPORT

K2S
K2S-NG01007551-GEN-CG6968-00006 Page 33 of 79

Ref: G.I Report pg 2 w = moisture content = 57 %


Gs = specific gravity = 2.57
2
γ w =effective unit weight of water = 9.81 kN/m
N= 18
c= cohesion = (0-3m) 0.00 kN/m2
φ = angle of internal friction (average) = 32 ⁰

Colour Code Allowable Bearing Capacity Value


Ultimate Bearing Capacity Value

This document is controlled electronically and is uncontrolled when printed


EPC for Kolo Creek to Soku Gas Export
E Pipeline

SOIL INVESTIGATION INTERPRETATIVE REPORT

K2S-NG01007551-GEN
GEN-CG6968-00006 Page 34 of 79

Df (m) B (m) L/B B/L γ (kN/m 3) γ '(kN/m 3) α β Nq Nr Nc α*c*Nc β *γ 1*B*Nr γ 2*Df*Nq qu (KN/m 2) qa(kN/m 2)
1.00 1.00 18.34 8.53 1.3 0.400 28.5 26.9 44 0 91.78 243.11 334.89 111.63
2.00 0.50 18.34 8.53 1.15 0.450 28.5 26.9 44 0 103.26 243.11 346.36 115.45
1.0
3.00 0.33 18.34 8.53 1.1 0.467 28.5 26.9 44 0 107.08 243.11 350.18 116.73
4.00 0.25 18.34 8.53 1.075 0.475 28.5 26.9 44 0 108.99 243.11 352.10 117.37
1.00 1.00 18.34 8.53 1.3 0.400 28.5 26.9 44 0 137.67 243.11 380.78 126.93
2.00 0.50 18.34 8.53 1.15 0.450 28.5 26.9 44 0 154.88 243.11 397.99 132.66
1.5
3.00 0.33 18.34 8.53 1.1 0.467 28.5 26.9 44 0 160.62 243.11 403.72 134.57
4.00 0.25 18.34 8.53 1.075 0.475 28.5 26.9 44 0 163.49 243.11 406.59 135.53
1.00 1.00 18.34 8.53 1.3 0.400 28.5 26.9 44 0 183.57 243.11 426.67 142.22
2.00 0.50 18.34 8.53 1.15 0.450 28.5 26.9 44 0 206.51 243.11 449.62 149.87
2.0
3.00 0.33 18.34 8.53 1.1 0.467 28.5 26.9 44 0 214.16 243.11 457.26 152.42
4.00 0.25 18.34 8.53 1.075 0.475 28.5 26.9 44 0 217.98 243.11 461.09 153.70
1.00 1.00 18.34 8.53 1.3 0.400 28.5 26.9 44 0 275.35 243.11 518.45 172.82
2.00 0.50 18.34 8.53 1.15 0.450 28.5 26.9 44 0 309.77 243.11 552.87 184.29
3.0
3.00 0.33 18.34 8.53 1.1 0.467 28.5 26.9 44 0 321.24 243.11 564.34 188.11
4.00 0.25 18.34 8.53 1.075 0.475 28.5 26.9 44 0 326.98 243.11 570.08 190.03
1.0
1.00 1.00 18.34 8.53 1.3 0.400 28.5 26.9 44 0 367.13 243.11 610.24 203.41
2.00 0.50 18.34 8.53 1.15 0.450 28.5 26.9 44 0 413.02 243.11 656.13 218.71
4.0
3.00 0.33 18.34 8.53 1.1 0.467 28.5 26.9 44 0 428.32 243.11 671.42 223.81
4.00 0.25 18.34 8.53 1.075 0.475 28.5 26.9 44 0 435.97 243.11 679.07 226.36
1.00 1.00 18.34 8.53 1.3 0.400 28.5 26.9 44 0 458.91 243.11 702.02 234.01
2.00 0.50 18.34 8.53 1.15 0.450 28.5 26.9 44 0 516.28 243.11 759.38 253.13
5.0
3.00 0.33 18.34 8.53 1.1 0.467 28.5 26.9 44 0 535.40 243.11 778.50 259.50
4.00 0.25 18.34 8.53 1.075 0.475 28.5 26.9 44 0 544.96 243.11 788.07 262.69
1.00 1.00 18.34 8.53 1.3 0.400 28.5 26.9 44 0 550.70 243.11 793.80 264.60
2.00 0.50 18.34 8.53 1.15 0.450 28.5 26.9 44 0 619.53 243.11 862.64 287.55
6.0
3.00 0.33 18.34 8.53 1.1 0.467 28.5 26.9 44 0 642.48 243.11 885.58 295.19
4.00 0.25 18.34 8.53 1.075 0.475 28.5 26.9 44 0 653.95 243.11 897.06 299.02
1.00 1.00 18.34 8.53 1.3 0.400 28.5 26.9 44 0 734.26 243.11 977.37 325.79
2.00 0.50 18.34 8.53 1.15 0.450 28.5 26.9 44 0 826.05 243.11 1069.15 356.38
8.0
3.00 0.33 18.34 8.53 1.1 0.467 28.5 26.9 44 0 856.64 243.11 1099.74 366.58
4.00 0.25 18.34 8.53 1.075 0.475 28.5 26.9 44 0 871.94 243.11 1115.04 371.68

This document is controlled electronically and is uncontrolled when printed


EPC for Kolo Creek to Soku Gas Export
E Pipeline

SOIL INVESTIGATION INTERPRETATIVE REPORT

K2S-NG01007551-GEN
GEN-CG6968-00006 Page 35 of 79

3
D f (m) B (m) L/B B/L γ (kN/m ) γ' (kN/m3) α β Nq Nr Nc α*c*Nc β *γ1*B*Nr γ2*D f*Nq qu (KN/m 2) qa(kN/m 2)
1.00 1.00 18.34 8.53 1.3 0.400 28.5 26.9 44 0 91.78 364.66 456.44 152.15
2.00 0.50 18.34 8.53 1.15 0.450 28.5 26.9 44 0 103.26 364.66 467.91 155.97
1.0
3.00 0.33 18.34 8.53 1.1 0.467 28.5 26.9 44 0 107.08 364.66 471.74 157.25
4.00 0.25 18.34 8.53 1.075 0.475 28.5 26.9 44 0 108.99 364.66 473.65 157.88
1.00 1.00 18.34 8.53 1.3 0.400 28.5 26.9 44 0 137.67 364.66 502.33 167.44
2.00 0.50 18.34 8.53 1.15 0.450 28.5 26.9 44 0 154.88 364.66 519.54 173.18
1.5
3.00 0.33 18.34 8.53 1.1 0.467 28.5 26.9 44 0 160.62 364.66 525.28 175.09
4.00 0.25 18.34 8.53 1.075 0.475 28.5 26.9 44 0 163.49 364.66 528.15 176.05
1.00 1.00 18.34 8.53 1.3 0.400 28.5 26.9 44 0 183.57 364.66 548.22 182.74
2.00 0.50 18.34 8.53 1.15 0.450 28.5 26.9 44 0 206.51 364.66 571.17 190.39
2.0
3.00 0.33 18.34 8.53 1.1 0.467 28.5 26.9 44 0 214.16 364.66 578.82 192.94
4.00 0.25 18.34 8.53 1.075 0.475 28.5 26.9 44 0 217.98 364.66 582.64 194.21
1.00 1.00 18.34 8.53 1.3 0.400 28.5 26.9 44 0 275.35 364.66 640.01 213.34
2.00 0.50 18.34 8.53 1.15 0.450 28.5 26.9 44 0 309.77 364.66 674.42 224.81
3.0
3.00 0.33 18.34 8.53 1.1 0.467 28.5 26.9 44 0 321.24 364.66 685.90 228.63
4.00 0.25 18.34 8.53 1.075 0.475 28.5 26.9 44 0 326.98 364.66 691.63 230.54
1.5
1.00 1.00 18.34 8.53 1.3 0.400 28.5 26.9 44 0 367.13 364.66 731.79 243.93
2.00 0.50 18.34 8.53 1.15 0.450 28.5 26.9 44 0 413.02 364.66 777.68 259.23
4.0
3.00 0.33 18.34 8.53 1.1 0.467 28.5 26.9 44 0 428.32 364.66 792.98 264.33
4.00 0.25 18.34 8.53 1.075 0.475 28.5 26.9 44 0 435.97 364.66 800.63 266.88
1.00 1.00 18.34 8.53 1.3 0.400 28.5 26.9 44 0 458.91 364.66 823.57 274.52
2.00 0.50 18.34 8.53 1.15 0.450 28.5 26.9 44 0 516.28 364.66 880.94 293.65
5.0
3.00 0.33 18.34 8.53 1.1 0.467 28.5 26.9 44 0 535.40 364.66 900.06 300.02
4.00 0.25 18.34 8.53 1.075 0.475 28.5 26.9 44 0 544.96 364.66 909.62 303.21
1.00 1.00 18.34 8.53 1.3 0.400 28.5 26.9 44 0 550.70 364.66 915.35 305.12
2.00 0.50 18.34 8.53 1.15 0.450 28.5 26.9 44 0 619.53 364.66 984.19 328.06
6.0
3.00 0.33 18.34 8.53 1.1 0.467 28.5 26.9 44 0 642.48 364.66 1007.14 335.71
4.00 0.25 18.34 8.53 1.075 0.475 28.5 26.9 44 0 653.95 364.66 1018.61 339.54
1.00 1.00 18.34 8.53 1.3 0.400 28.5 26.9 44 0 734.26 364.66 1098.92 366.31
2.00 0.50 18.34 8.53 1.15 0.450 28.5 26.9 44 0 826.05 364.66 1190.70 396.90
8.0
3.00 0.33 18.34 8.53 1.1 0.467 28.5 26.9 44 0 856.64 364.66 1221.30 407.10
4.00 0.25 18.34 8.53 1.075 0.475 28.5 26.9 44 0 871.94 364.66 1236.59 412.20

This document is controlled electronically and is uncontrolled when printed


EPC for Kolo Creek to Soku Gas Export
E Pipeline

SOIL INVESTIGATION INTERPRETATIVE REPORT

K2S-NG01007551-GEN
GEN-CG6968-00006 Page 36 of 79

3
Df (m) B (m) L/B B/L γ (kN/m ) γ' (kN/m3) α β Nq Nr Nc α*c*Nc β *γ1*B*Nr γ2*Df*Nq qu (KN/m2) qa(kN/m2)
1.00 1.00 18.34 8.53 1.3 0.400 28.5 26.9 44 0 91.78 486.21 577.99 192.66
2.00 0.50 18.34 8.53 1.15 0.450 28.5 26.9 44 0 103.26 486.21 589.47 196.49
1.0
3.00 0.33 18.34 8.53 1.1 0.467 28.5 26.9 44 0 107.08 486.21 593.29 197.76
4.00 0.25 18.34 8.53 1.075 0.475 28.5 26.9 44 0 108.99 486.21 595.20 198.40
1.00 1.00 18.34 8.53 1.3 0.400 28.5 26.9 44 0 137.67 486.21 623.88 207.96
2.00 0.50 18.34 8.53 1.15 0.450 28.5 26.9 44 0 154.88 486.21 641.09 213.70
1.5
3.00 0.33 18.34 8.53 1.1 0.467 28.5 26.9 44 0 160.62 486.21 646.83 215.61
4.00 0.25 18.34 8.53 1.075 0.475 28.5 26.9 44 0 163.49 486.21 649.70 216.57
1.00 1.00 18.34 8.53 1.3 0.400 28.5 26.9 44 0 183.57 486.21 669.78 223.26
2.00 0.50 18.34 8.53 1.15 0.450 28.5 26.9 44 0 206.51 486.21 692.72 230.91
2.0
3.00 0.33 18.34 8.53 1.1 0.467 28.5 26.9 44 0 214.16 486.21 700.37 233.46
4.00 0.25 18.34 8.53 1.075 0.475 28.5 26.9 44 0 217.98 486.21 704.19 234.73
1.00 1.00 18.34 8.53 1.3 0.400 28.5 26.9 44 0 275.35 486.21 761.56 253.85
2.00 0.50 18.34 8.53 1.15 0.450 28.5 26.9 44 0 309.77 486.21 795.98 265.33
3.0
3.00 0.33 18.34 8.53 1.1 0.467 28.5 26.9 44 0 321.24 486.21 807.45 269.15
4.00 0.25 18.34 8.53 1.075 0.475 28.5 26.9 44 0 326.98 486.21 813.19 271.06
2.0
1.00 1.00 18.34 8.53 1.3 0.400 28.5 26.9 44 0 367.13 486.21 853.34 284.45
2.00 0.50 18.34 8.53 1.15 0.450 28.5 26.9 44 0 413.02 486.21 899.23 299.74
4.0
3.00 0.33 18.34 8.53 1.1 0.467 28.5 26.9 44 0 428.32 486.21 914.53 304.84
4.00 0.25 18.34 8.53 1.075 0.475 28.5 26.9 44 0 435.97 486.21 922.18 307.39
1.00 1.00 18.34 8.53 1.3 0.400 28.5 26.9 44 0 458.91 486.21 945.12 315.04
2.00 0.50 18.34 8.53 1.15 0.450 28.5 26.9 44 0 516.28 486.21 1002.49 334.16
5.0
3.00 0.33 18.34 8.53 1.1 0.467 28.5 26.9 44 0 535.40 486.21 1021.61 340.54
4.00 0.25 18.34 8.53 1.075 0.475 28.5 26.9 44 0 544.96 486.21 1031.17 343.72
1.00 1.00 18.34 8.53 1.3 0.400 28.5 26.9 44 0 550.70 486.21 1036.91 345.64
2.00 0.50 18.34 8.53 1.15 0.450 28.5 26.9 44 0 619.53 486.21 1105.74 368.58
6.0
3.00 0.33 18.34 8.53 1.1 0.467 28.5 26.9 44 0 642.48 486.21 1128.69 376.23
4.00 0.25 18.34 8.53 1.075 0.475 28.5 26.9 44 0 653.95 486.21 1140.16 380.05
1.00 1.00 18.34 8.53 1.3 0.400 28.5 26.9 44 0 734.26 486.21 1220.47 406.82
2.00 0.50 18.34 8.53 1.15 0.450 28.5 26.9 44 0 826.05 486.21 1312.26 437.42
8.0
3.00 0.33 18.34 8.53 1.1 0.467 28.5 26.9 44 0 856.64 486.21 1342.85 447.62
4.00 0.25 18.34 8.53 1.075 0.475 28.5 26.9 44 0 871.94 486.21 1358.15 452.72

This document is controlled electronically and is uncontrolled when printed


EPC for Kolo Creek to Soku Gas Export
xport Pipeline

SOIL INVESTIGATION INTERPRETATIVE REPORT

K2S
K2S-NG01007551-GEN-CG6968-00006 Page 37 of 79

Meyerhoff’s (1963) method

Method of Meyerhof's Formula

Ultimate Bearing Capacity

Qult = c ㆍNc ㆍs c ㆍdc ㆍic + 1/2ㆍγ 1ㆍB'ㆍNrㆍsrㆍdrㆍir + q'ㆍNqㆍs qㆍdqㆍiq

where,
1) Shape factor : s c , s r , s q
sc = 1 + 0.2kp (B'/L)
s r, s q = 0 + 0.1kp (B'/L)
0.39
Kp = tan2(45+Φ/2) 0.39

2) Depth factor : dc , dr , dq
dc = 1+ 0.2k p1/2*(Df /B)
dr, dq = 1+ 0.1k p1/2*(Df /B)

3) Inclination factor : ic , ir , iq
ic , iq = (1 - θ / 90) 2 = 1
ir = (1 - θ / φ) 2 = 1
θ = (tan -1 (Ph / Pv 0 0

Meyerhof
Φ
Nc Nr Nq
0 5.14 0.0 1.0
5 6.5 0.1 1.6
10 8.3 0.4 2.5
15 11.0 1.1 3.9
20 14.8 2.9 6.4
25 20.7 6.8 10.7
30 30.1 15.7 18.4
32 35.5 22 23.2
35 46.1 37.1 33.3
40 75.3 93.7 64.2
45 133.9 262.7 134.9
50 266.9 873.7 319
w = moisture content = 57 %
Gs = specific gravity = 2.57
3
γ w =effective unit weight of water = 9.81 kN/m
c= cohesion (0-3)m = 0.00 kN/m2
φ = angle of internal friction = 32.00 ⁰
Nc = 35.5 Nq = 23.2 Nr = 22

This document is controlled electronically and is uncontrolled when printed


EPC for Kolo Creek to Soku Gas Export
E Pipeline

SOIL INVESTIGATION INTERPRETATIVE REPORT

K2S-NG01007551-GEN
GEN-CG6968-00006 Page 38 of 79

3
Df (m) B (m) L/B B/L γ (kN/m ) γ' (kN/m )
3
q =γ'*Df sc sr, sq dc dr, dq c*Nc*dc*sc 0.5 *γ1*B*sr*dr*Nr, q *sq*dq*Nq, qu (KN/m 2) qa(kN/m 2)
1.00 1.00 18.34 8.53 8.53 1.078 1.039 1.12 1.06 0.00 103.59 218.47 322.06 107.35
2.00 0.50 18.34 8.53 8.53 1.039 1.020 1.12 1.06 0.00 101.64 214.37 316.01 105.34
1.0
3.00 0.33 18.34 8.53 8.53 1.026 1.013 1.12 1.06 0.00 100.99 213.00 313.99 104.66
4.00 0.25 18.34 8.53 8.53 1.020 1.010 1.12 1.06 0.00 100.67 212.31 312.98 104.33
1.00 1.00 18.34 8.53 8.53 1.078 1.039 1.08 1.04 0.00 152.33 214.19 366.52 122.17
2.00 0.50 18.34 8.53 8.53 1.039 1.020 1.08 1.04 0.00 149.47 210.16 359.63 119.88
1.5
3.00 0.33 18.34 8.53 8.53 1.026 1.013 1.08 1.04 0.00 148.52 208.82 357.34 119.11
4.00 0.25 18.34 8.53 8.53 1.020 1.010 1.08 1.04 0.00 148.04 208.15 356.19 118.73
1.00 1.00 18.34 8.53 8.53 1.078 1.039 1.06 1.03 0.00 201.08 212.05 413.13 137.71
2.00 0.50 18.34 8.53 8.53 1.039 1.020 1.06 1.03 0.00 197.30 208.06 405.36 135.12
2.0
3.00 0.33 18.34 8.53 8.53 1.026 1.013 1.06 1.03 0.00 196.04 206.74 402.78 134.26
4.00 0.25 18.34 8.53 8.53 1.020 1.010 1.06 1.03 0.00 195.41 206.07 401.48 133.83
1.00 1.00 18.34 8.53 8.53 1.078 1.039 1.04 1.02 0.00 298.57 209.91 508.48 169.49
2.00 0.50 18.34 8.53 8.53 1.039 1.020 1.04 1.02 0.00 292.96 205.96 498.93 166.31
3.0
3.00 0.33 18.34 8.53 8.53 1.026 1.013 1.04 1.02 0.00 291.09 204.65 495.74 165.25
4.00 0.25 18.34 8.53 8.53 1.020 1.010 1.04 1.02 0.00 290.16 203.99 494.15 164.72
1.0
1.00 1.00 18.34 8.53 8.53 1.078 1.039 1.03 1.02 0.00 396.07 208.84 604.90 201.63
2.00 0.50 18.34 8.53 8.53 1.039 1.020 1.03 1.02 0.00 388.63 204.91 593.54 197.85
4.0
3.00 0.33 18.34 8.53 8.53 1.026 1.013 1.03 1.02 0.00 386.14 203.60 589.75 196.58
4.00 0.25 18.34 8.53 8.53 1.020 1.010 1.03 1.02 0.00 384.90 202.95 587.85 195.95
1.00 1.00 18.34 8.53 8.53 1.078 1.039 1.02 1.01 0.00 493.56 208.19 701.75 233.92
2.00 0.50 18.34 8.53 8.53 1.039 1.020 1.02 1.01 0.00 484.29 204.28 688.57 229.52
5.0
3.00 0.33 18.34 8.53 8.53 1.026 1.013 1.02 1.01 0.00 481.20 202.98 684.17 228.06
4.00 0.25 18.34 8.53 8.53 1.020 1.010 1.02 1.01 0.00 479.65 202.33 681.98 227.33
1.00 1.00 18.34 8.53 8.53 1.078 1.039 1.02 1.01 0.00 591.05 207.76 798.82 266.27
2.00 0.50 18.34 8.53 8.53 1.039 1.020 1.02 1.01 0.00 579.95 203.86 783.81 261.27
6.0
3.00 0.33 18.34 8.53 8.53 1.026 1.013 1.02 1.01 0.00 576.25 202.56 778.81 259.60
4.00 0.25 18.34 8.53 8.53 1.020 1.010 1.02 1.01 0.00 574.40 201.91 776.30 258.77
1.00 1.00 18.34 8.53 8.53 1.078 1.039 1.02 1.01 0.00 786.04 207.23 993.27 331.09
2.00 0.50 18.34 8.53 8.53 1.039 1.020 1.02 1.01 0.00 771.27 203.34 974.61 324.87
8.0
3.00 0.33 18.34 8.53 8.53 1.026 1.013 1.02 1.01 0.00 766.35 202.04 968.39 322.80
4.00 0.25 18.34 8.53 8.53 1.020 1.010 1.02 1.01 0.00 763.89 201.39 965.28 321.76

This document is controlled electronically and is uncontrolled when printed


EPC for Kolo Creek to Soku Gas Export
E Pipeline

SOIL INVESTIGATION INTERPRETATIVE REPORT

K2S-NG01007551-GEN
GEN-CG6968-00006 Page 39 of 79

3 3 2 2
Df (m) B (m) L/B B/L γ (kN/m ) γ' (kN/m ) q =γ'*Df sc sr, sq dc dr, dq c*Nc*dc*sc*ic 0.5 *γ1*B*sr*dr*ir*Nr, q *sq*dq*iq*Nq, qu (KN/m ) qa(kN/m )
1.00 1.00 18.55 8.74 13.11 1.078 1.039 1.19 1.09 0.00 109.26 345.65 454.91 151.64
2.00 0.50 18.55 8.74 13.11 1.039 1.020 1.19 1.09 0.00 107.20 339.15 446.36 148.79
1.0
3.00 0.33 18.55 8.74 13.11 1.026 1.013 1.19 1.09 0.00 106.52 336.99 443.51 147.84
4.00 0.25 18.55 8.74 13.11 1.020 1.010 1.19 1.09 0.00 106.18 335.91 442.09 147.36
1.00 1.00 18.55 8.74 13.11 1.078 1.039 1.12 1.06 0.00 159.20 335.78 494.98 164.99
2.00 0.50 18.55 8.74 13.11 1.039 1.020 1.12 1.06 0.00 156.21 329.47 485.68 161.89
1.5
3.00 0.33 18.55 8.74 13.11 1.026 1.013 1.12 1.06 0.00 155.22 327.36 482.58 160.86
4.00 0.25 18.55 8.74 13.11 1.020 1.010 1.12 1.06 0.00 154.72 326.31 481.03 160.34
1.00 1.00 18.55 8.74 13.11 1.078 1.039 1.09 1.05 0.00 209.15 330.84 539.99 180.00
2.00 0.50 18.55 8.74 13.11 1.039 1.020 1.09 1.05 0.00 205.22 324.62 529.84 176.61
2.0
3.00 0.33 18.55 8.74 13.11 1.026 1.013 1.09 1.05 0.00 203.91 322.55 526.46 175.49
4.00 0.25 18.55 8.74 13.11 1.020 1.010 1.09 1.05 0.00 203.26 321.51 524.77 174.92
1.00 1.00 18.55 8.74 13.11 1.078 1.039 1.06 1.03 0.00 309.04 325.90 634.95 211.65
2.00 0.50 18.55 8.74 13.11 1.039 1.020 1.06 1.03 0.00 303.24 319.78 623.02 207.67
3.0
3.00 0.33 18.55 8.74 13.11 1.026 1.013 1.06 1.03 0.00 301.30 317.74 619.04 206.35
4.00 0.25 18.55 8.74 13.11 1.020 1.010 1.06 1.03 0.00 300.33 316.72 617.05 205.68
1.5
1.00 1.00 18.55 8.74 13.11 1.078 1.039 1.05 1.02 0.00 408.94 323.43 732.37 244.12
2.00 0.50 18.55 8.74 13.11 1.039 1.020 1.03 1.02 0.00 401.25 317.36 718.61 239.54
4.0
3.00 0.33 18.55 8.74 13.11 1.026 1.013 1.03 1.02 0.00 398.69 315.33 714.02 238.01
4.00 0.25 18.55 8.74 13.11 1.020 1.010 1.03 1.02 0.00 397.41 314.32 711.73 237.24
1.00 1.00 18.55 8.74 13.11 1.078 1.039 1.02 1.02 0.00 508.83 321.95 830.78 276.93
2.00 0.50 18.55 8.74 13.11 1.039 1.020 1.02 1.02 0.00 499.27 315.90 815.17 271.72
5.0
3.00 0.33 18.55 8.74 13.11 1.026 1.013 1.02 1.02 0.00 496.09 313.89 809.97 269.99
4.00 0.25 18.55 8.74 13.11 1.020 1.010 1.02 1.02 0.00 494.49 312.88 807.37 269.12
1.00 1.00 18.55 8.74 13.11 1.078 1.039 1.02 1.02 0.00 608.73 320.96 929.69 309.90
2.00 0.50 18.55 8.74 13.11 1.039 1.020 1.02 1.02 0.00 597.29 314.93 912.22 304.07
6.0
3.00 0.33 18.55 8.74 13.11 1.026 1.013 1.02 1.02 0.00 593.48 312.92 906.40 302.13
4.00 0.25 18.55 8.74 13.11 1.020 1.010 1.02 1.02 0.00 591.57 311.92 903.49 301.16
1.00 1.00 18.55 8.74 13.11 1.078 1.039 1.02 1.01 0.00 808.51 319.73 1128.24 376.08
2.00 0.50 18.55 8.74 13.11 1.039 1.020 1.02 1.01 0.00 793.32 313.72 1107.05 369.02
8.0
3.00 0.33 18.55 8.74 13.11 1.026 1.013 1.02 1.01 0.00 788.26 311.72 1099.98 366.66
4.00 0.25 18.55 8.74 13.11 1.020 1.010 1.02 1.01 0.00 785.73 310.72 1096.45 365.48

This document is controlled electronically and is uncontrolled when printed


EPC for Kolo Creek to Soku Gas Export
E Pipeline

SOIL INVESTIGATION INTERPRETATIVE REPORT

K2S-NG01007551-GEN
GEN-CG6968-00006 Page 40 of 79

3 3 2 2
Df (m) B (m) L/B B/L γ (kN/m ) γ' (kN/m ) q =γ'*Df sc sr, sq dc dr, dq c*Nc*dc*sc*ic 0.5 *γ1*B*sr*dr*ir*Nr, q *sq*dq*iq*Nq, qu (KN/m ) qa(kN/m )
1.00 1.00 18.55 8.74 17.48 1.078 1.039 1.25 1.12 0.00 112.38 474.03 586.41 195.47
2.00 0.50 18.55 8.74 17.48 1.039 1.020 1.25 1.12 0.00 110.27 465.12 575.39 191.80
1.0
3.00 0.33 18.55 8.74 17.48 1.026 1.013 1.25 1.12 0.00 109.56 462.16 571.72 190.57
4.00 0.25 18.55 8.74 17.48 1.020 1.010 1.25 1.12 0.00 109.21 460.67 569.88 189.96
1.00 1.00 18.55 8.74 17.48 1.078 1.039 1.17 1.08 0.00 162.32 456.48 618.80 206.27
2.00 0.50 18.55 8.74 17.48 1.039 1.020 1.17 1.08 0.00 159.27 447.90 607.18 202.39
1.5
3.00 0.33 18.55 8.74 17.48 1.026 1.013 1.17 1.08 0.00 158.26 445.04 603.30 201.10
4.00 0.25 18.55 8.74 17.48 1.020 1.010 1.17 1.08 0.00 157.75 443.61 601.36 200.45
1.00 1.00 18.55 8.74 17.48 1.078 1.039 1.12 1.06 0.00 212.27 447.70 659.97 219.99
2.00 0.50 18.55 8.74 17.48 1.039 1.020 1.12 1.06 0.00 208.28 439.29 647.57 215.86
2.0
3.00 0.33 18.55 8.74 17.48 1.026 1.013 1.12 1.06 0.00 206.95 436.48 643.44 214.48
4.00 0.25 18.55 8.74 17.48 1.020 1.010 1.12 1.06 0.00 206.29 435.08 641.37 213.79
1.00 1.00 18.55 8.74 17.48 1.078 1.039 1.08 1.04 0.00 312.17 438.92 751.09 250.36
2.00 0.50 18.55 8.74 17.48 1.039 1.020 1.08 1.04 0.00 306.30 430.68 736.98 245.66
3.0
3.00 0.33 18.55 8.74 17.48 1.026 1.013 1.08 1.04 0.00 304.35 427.93 732.27 244.09
4.00 0.25 18.55 8.74 17.48 1.020 1.010 1.08 1.04 0.00 303.37 426.55 729.92 243.31
2.0
1.00 1.00 18.55 8.74 17.48 1.078 1.039 1.06 1.03 0.00 412.06 434.54 846.60 282.20
2.00 0.50 18.55 8.74 17.48 1.039 1.020 1.06 1.03 0.00 404.32 426.37 830.69 276.90
4.0
3.00 0.33 18.55 8.74 17.48 1.026 1.013 1.06 1.03 0.00 401.74 423.65 825.39 275.13
4.00 0.25 18.55 8.74 17.48 1.020 1.010 1.06 1.03 0.00 400.45 422.29 822.73 274.24
1.00 1.00 18.55 8.74 17.48 1.078 1.039 1.05 1.02 0.00 511.95 431.90 943.86 314.62
2.00 0.50 18.55 8.74 17.48 1.039 1.020 1.05 1.02 0.00 502.33 423.79 926.12 308.71
5.0
3.00 0.33 18.55 8.74 17.48 1.026 1.013 1.05 1.02 0.00 499.13 421.08 920.21 306.74
4.00 0.25 18.55 8.74 17.48 1.020 1.010 1.05 1.02 0.00 497.52 419.73 917.25 305.75
1.00 1.00 18.55 8.74 17.48 1.078 1.039 1.04 1.02 0.00 611.85 430.15 1041.99 347.33
2.00 0.50 18.55 8.74 17.48 1.039 1.020 1.04 1.02 0.00 600.35 422.07 1022.42 340.81
6.0
3.00 0.33 18.55 8.74 17.48 1.026 1.013 1.04 1.02 0.00 596.52 419.37 1015.89 338.63
4.00 0.25 18.55 8.74 17.48 1.020 1.010 1.04 1.02 0.00 594.60 418.02 1012.63 337.54
1.00 1.00 18.55 8.74 17.48 1.078 1.039 1.03 1.02 0.00 811.64 427.95 1239.59 413.20
2.00 0.50 18.55 8.74 17.48 1.039 1.020 1.03 1.02 0.00 796.39 419.91 1216.30 405.43
8.0
3.00 0.33 18.55 8.74 17.48 1.026 1.013 1.03 1.02 0.00 791.30 417.23 1208.53 402.84
4.00 0.25 18.55 8.74 17.48 1.020 1.010 1.03 1.02 0.00 788.76 415.89 1204.65 401.55

This document is controlled electronically and is uncontrolled when printed


EPC for Kolo Creek to Soku Gas Export
xport Pipeline

SOIL INVESTIGATION INTERPRETATIVE REPORT

K2S
K2S-NG01007551-GEN-CG6968-00006 Page 41 of 79

5.1.3 Soku Gas Plant – BH3


Terzaghi’s (1943) method
Allowable Bearing Capacity - Terzaghi's approach

Design Condition of Foundation


Width of Foundation :
Length of Foundation :
Excavation Depth of Foundation from G.L : Df

Ultimate Bearing Capacity

Qult = α ㆍc ㆍNc + βㆍγ 1ㆍBㆍNr + γ 2ㆍDf ㆍNq


α, β = Foundation shape factors
c = cohesion of soil
Nc, Nq, Nr = Bearing capacity factors
γ1 : Unit weight of soil under the foundation (kN/m3)

γ2 : Unit weight of soil above the foundation bottom (kN/m3)


Φ : Angle of interanl friction(˚)

Terzaghi
Φ
Nc Nr Nq
0 5.7 0.0 1.0
5 7.3 0.5 1.6
10 9.6 1.2 2.7
15 12.9 2.5 4.4
20 17.7 5 7.4
25 25.1 9.7 12.7
30 37.2 19.7 22.5
32 44.0 26.9 28.5
35 57.8 42.4 41.4
40 95.7 100.4 81.3
45 172.3 297.5 173.3
48 258.3 780.1 287.9
50 347.5 1153.2 415.1

TYP E COTINUOUS
SQUA RE RECTA NGULA R CIRCULA R
FOUNDA TION
SHA P E FA CTOR

α 1.0 1.3 1+0.3B/L 1.3


β 0.5 0.4 0.5-0.1B/L 0.3

Ref: G.I Report pg 2 w = moisture content = 29 %


Gs = specific gravity = 2.57
2
γ w =effective unit weight of water = 9.81 kN/m
N= 4
c= cohesion = (0-3m) 0.00 kN/m2
φ = angle of internal friction (average) = 28 ⁰

Colour Code Allowable Bearing Capacity Value


Ultimate Bearing Capacity Value

This document is controlled electronically and is uncontrolled when printed


EPC for Kolo Creek to Soku Gas Export
E Pipeline

SOIL INVESTIGATION INTERPRETATIVE REPORT

K2S-NG01007551-GEN
GEN-CG6968-00006 Page 42 of 79

Df (m) B (m) L/B B/L γ (kN/m 3) γ '(kN/m 3) α β Nq Nr Nc α*c*Nc β *γ 1*B*Nr γ 2*Df*Nq qu (KN/m 2) qa(kN/m 2)
1.00 1.00 19.03 9.22 1.3 0.400 18.6 15.7 32 0 57.90 171.49 229.39 76.46
2.00 0.50 19.03 9.22 1.15 0.450 18.6 15.7 32 0 65.14 171.49 236.63 78.88
1.0
3.00 0.33 19.03 9.22 1.1 0.467 18.6 15.7 32 0 67.55 171.49 239.04 79.68
4.00 0.25 19.03 9.22 1.075 0.475 18.6 15.7 32 0 68.76 171.49 240.25 80.08
1.00 1.00 19.03 9.22 1.3 0.400 18.6 15.7 32 0 86.85 171.49 258.34 86.11
2.00 0.50 19.03 9.22 1.15 0.450 18.6 15.7 32 0 97.71 171.49 269.20 89.73
1.5
3.00 0.33 19.03 9.22 1.1 0.467 18.6 15.7 32 0 101.33 171.49 272.82 90.94
4.00 0.25 19.03 9.22 1.075 0.475 18.6 15.7 32 0 103.14 171.49 274.63 91.54
1.00 1.00 19.03 9.22 1.3 0.400 18.6 15.7 32 0 115.80 171.49 287.30 95.77
2.00 0.50 19.03 9.22 1.15 0.450 18.6 15.7 32 0 130.28 171.49 301.77 100.59
2.0
3.00 0.33 19.03 9.22 1.1 0.467 18.6 15.7 32 0 135.10 171.49 306.60 102.20
4.00 0.25 19.03 9.22 1.075 0.475 18.6 15.7 32 0 137.52 171.49 309.01 103.00
1.00 1.00 19.03 9.22 1.3 0.400 18.6 15.7 32 0 173.70 171.49 345.20 115.07
2.00 0.50 19.03 9.22 1.15 0.450 18.6 15.7 32 0 195.42 171.49 366.91 122.30
3.0
3.00 0.33 19.03 9.22 1.1 0.467 18.6 15.7 32 0 202.66 171.49 374.15 124.72
4.00 0.25 19.03 9.22 1.075 0.475 18.6 15.7 32 0 206.27 171.49 377.77 125.92
1.0
1.00 1.00 19.03 9.22 1.3 0.400 18.6 15.7 32 0 231.61 171.49 403.10 134.37
2.00 0.50 19.03 9.22 1.15 0.450 18.6 15.7 32 0 260.56 171.49 432.05 144.02
4.0
3.00 0.33 19.03 9.22 1.1 0.467 18.6 15.7 32 0 270.21 171.49 441.70 147.23
4.00 0.25 19.03 9.22 1.075 0.475 18.6 15.7 32 0 275.03 171.49 446.52 148.84
1.00 1.00 19.03 9.22 1.3 0.400 18.6 15.7 32 0 289.51 171.49 461.00 153.67
2.00 0.50 19.03 9.22 1.15 0.450 18.6 15.7 32 0 325.70 171.49 497.19 165.73
5.0
3.00 0.33 19.03 9.22 1.1 0.467 18.6 15.7 32 0 337.76 171.49 509.25 169.75
4.00 0.25 19.03 9.22 1.075 0.475 18.6 15.7 32 0 343.79 171.49 515.28 171.76
1.00 1.00 19.03 9.22 1.3 0.400 18.6 15.7 32 0 347.41 171.49 518.90 172.97
2.00 0.50 19.03 9.22 1.15 0.450 18.6 15.7 32 0 390.84 171.49 562.33 187.44
6.0
3.00 0.33 19.03 9.22 1.1 0.467 18.6 15.7 32 0 405.31 171.49 576.80 192.27
4.00 0.25 19.03 9.22 1.075 0.475 18.6 15.7 32 0 412.55 171.49 584.04 194.68
1.00 1.00 19.03 9.22 1.3 0.400 18.6 15.7 32 0 463.21 171.49 634.70 211.57
2.00 0.50 19.03 9.22 1.15 0.450 18.6 15.7 32 0 521.11 171.49 692.61 230.87
8.0
3.00 0.33 19.03 9.22 1.1 0.467 18.6 15.7 32 0 540.41 171.49 711.91 237.30
4.00 0.25 19.03 9.22 1.075 0.475 18.6 15.7 32 0 550.07 171.49 721.56 240.52

This document is controlled electronically and is uncontrolled when printed


EPC for Kolo Creek to Soku Gas Export
E Pipeline

SOIL INVESTIGATION INTERPRETATIVE REPORT

K2S-NG01007551-GEN
GEN-CG6968-00006 Page 43 of 79

3
Df (m) B (m) L/B B/L γ (kN/m ) γ' (kN/m3) α β Nq Nr Nc α*c*Nc β *γ1*B*Nr γ2*Df*Nq qu (KN/m2) qa(kN/m2)
1.00 1.00 19.03 9.22 1.3 0.400 18.6 15.7 32 0 57.90 257.24 315.14 105.05
2.00 0.50 19.03 9.22 1.15 0.450 18.6 15.7 32 0 65.14 257.24 322.38 107.46
1.0
3.00 0.33 19.03 9.22 1.1 0.467 18.6 15.7 32 0 67.55 257.24 324.79 108.26
4.00 0.25 19.03 9.22 1.075 0.475 18.6 15.7 32 0 68.76 257.24 326.00 108.67
1.00 1.00 19.03 9.22 1.3 0.400 18.6 15.7 32 0 86.85 257.24 344.09 114.70
2.00 0.50 19.03 9.22 1.15 0.450 18.6 15.7 32 0 97.71 257.24 354.95 118.32
1.5
3.00 0.33 19.03 9.22 1.1 0.467 18.6 15.7 32 0 101.33 257.24 358.57 119.52
4.00 0.25 19.03 9.22 1.075 0.475 18.6 15.7 32 0 103.14 257.24 360.38 120.13
1.00 1.00 19.03 9.22 1.3 0.400 18.6 15.7 32 0 115.80 257.24 373.04 124.35
2.00 0.50 19.03 9.22 1.15 0.450 18.6 15.7 32 0 130.28 257.24 387.52 129.17
2.0
3.00 0.33 19.03 9.22 1.1 0.467 18.6 15.7 32 0 135.10 257.24 392.34 130.78
4.00 0.25 19.03 9.22 1.075 0.475 18.6 15.7 32 0 137.52 257.24 394.75 131.58
1.00 1.00 19.03 9.22 1.3 0.400 18.6 15.7 32 0 173.70 257.24 430.94 143.65
2.00 0.50 19.03 9.22 1.15 0.450 18.6 15.7 32 0 195.42 257.24 452.66 150.89
3.0
3.00 0.33 19.03 9.22 1.1 0.467 18.6 15.7 32 0 202.66 257.24 459.89 153.30
4.00 0.25 19.03 9.22 1.075 0.475 18.6 15.7 32 0 206.27 257.24 463.51 154.50
1.5
1.00 1.00 19.03 9.22 1.3 0.400 18.6 15.7 32 0 231.61 257.24 488.84 162.95
2.00 0.50 19.03 9.22 1.15 0.450 18.6 15.7 32 0 260.56 257.24 517.80 172.60
4.0
3.00 0.33 19.03 9.22 1.1 0.467 18.6 15.7 32 0 270.21 257.24 527.45 175.82
4.00 0.25 19.03 9.22 1.075 0.475 18.6 15.7 32 0 275.03 257.24 532.27 177.42
1.00 1.00 19.03 9.22 1.3 0.400 18.6 15.7 32 0 289.51 257.24 546.75 182.25
2.00 0.50 19.03 9.22 1.15 0.450 18.6 15.7 32 0 325.70 257.24 582.93 194.31
5.0
3.00 0.33 19.03 9.22 1.1 0.467 18.6 15.7 32 0 337.76 257.24 595.00 198.33
4.00 0.25 19.03 9.22 1.075 0.475 18.6 15.7 32 0 343.79 257.24 601.03 200.34
1.00 1.00 19.03 9.22 1.3 0.400 18.6 15.7 32 0 347.41 257.24 604.65 201.55
2.00 0.50 19.03 9.22 1.15 0.450 18.6 15.7 32 0 390.84 257.24 648.07 216.02
6.0
3.00 0.33 19.03 9.22 1.1 0.467 18.6 15.7 32 0 405.31 257.24 662.55 220.85
4.00 0.25 19.03 9.22 1.075 0.475 18.6 15.7 32 0 412.55 257.24 669.79 223.26
1.00 1.00 19.03 9.22 1.3 0.400 18.6 15.7 32 0 463.21 257.24 720.45 240.15
2.00 0.50 19.03 9.22 1.15 0.450 18.6 15.7 32 0 521.11 257.24 778.35 259.45
8.0
3.00 0.33 19.03 9.22 1.1 0.467 18.6 15.7 32 0 540.41 257.24 797.65 265.88
4.00 0.25 19.03 9.22 1.075 0.475 18.6 15.7 32 0 550.07 257.24 807.30 269.10

This document is controlled electronically and is uncontrolled when printed


EPC for Kolo Creek to Soku Gas Export
E Pipeline

SOIL INVESTIGATION INTERPRETATIVE REPORT

K2S-NG01007551-GEN
GEN-CG6968-00006 Page 44 of 79

3
D f (m) B (m) L/B B/L γ (kN/m ) γ' (kN/m3) α β Nq Nr Nc α*c*Nc β *γ1*B*Nr γ2*D f*Nq qu (KN/m 2) qa(kN/m 2)
1.00 1.00 19.03 9.22 1.3 0.400 18.6 15.7 32 0 57.90 342.98 400.89 133.63
2.00 0.50 19.03 9.22 1.15 0.450 18.6 15.7 32 0 65.14 342.98 408.12 136.04
1.0
3.00 0.33 19.03 9.22 1.1 0.467 18.6 15.7 32 0 67.55 342.98 410.54 136.85
4.00 0.25 19.03 9.22 1.075 0.475 18.6 15.7 32 0 68.76 342.98 411.74 137.25
1.00 1.00 19.03 9.22 1.3 0.400 18.6 15.7 32 0 86.85 342.98 429.84 143.28
2.00 0.50 19.03 9.22 1.15 0.450 18.6 15.7 32 0 97.71 342.98 440.69 146.90
1.5
3.00 0.33 19.03 9.22 1.1 0.467 18.6 15.7 32 0 101.33 342.98 444.31 148.10
4.00 0.25 19.03 9.22 1.075 0.475 18.6 15.7 32 0 103.14 342.98 446.12 148.71
1.00 1.00 19.03 9.22 1.3 0.400 18.6 15.7 32 0 115.80 342.98 458.79 152.93
2.00 0.50 19.03 9.22 1.15 0.450 18.6 15.7 32 0 130.28 342.98 473.26 157.75
2.0
3.00 0.33 19.03 9.22 1.1 0.467 18.6 15.7 32 0 135.10 342.98 478.09 159.36
4.00 0.25 19.03 9.22 1.075 0.475 18.6 15.7 32 0 137.52 342.98 480.50 160.17
1.00 1.00 19.03 9.22 1.3 0.400 18.6 15.7 32 0 173.70 342.98 516.69 172.23
2.00 0.50 19.03 9.22 1.15 0.450 18.6 15.7 32 0 195.42 342.98 538.40 179.47
3.0
3.00 0.33 19.03 9.22 1.1 0.467 18.6 15.7 32 0 202.66 342.98 545.64 181.88
4.00 0.25 19.03 9.22 1.075 0.475 18.6 15.7 32 0 206.27 342.98 549.26 183.09
2.0
1.00 1.00 19.03 9.22 1.3 0.400 18.6 15.7 32 0 231.61 342.98 574.59 191.53
2.00 0.50 19.03 9.22 1.15 0.450 18.6 15.7 32 0 260.56 342.98 603.54 201.18
4.0
3.00 0.33 19.03 9.22 1.1 0.467 18.6 15.7 32 0 270.21 342.98 613.19 204.40
4.00 0.25 19.03 9.22 1.075 0.475 18.6 15.7 32 0 275.03 342.98 618.02 206.01
1.00 1.00 19.03 9.22 1.3 0.400 18.6 15.7 32 0 289.51 342.98 632.49 210.83
2.00 0.50 19.03 9.22 1.15 0.450 18.6 15.7 32 0 325.70 342.98 668.68 222.89
5.0
3.00 0.33 19.03 9.22 1.1 0.467 18.6 15.7 32 0 337.76 342.98 680.74 226.91
4.00 0.25 19.03 9.22 1.075 0.475 18.6 15.7 32 0 343.79 342.98 686.77 228.92
1.00 1.00 19.03 9.22 1.3 0.400 18.6 15.7 32 0 347.41 342.98 690.39 230.13
2.00 0.50 19.03 9.22 1.15 0.450 18.6 15.7 32 0 390.84 342.98 733.82 244.61
6.0
3.00 0.33 19.03 9.22 1.1 0.467 18.6 15.7 32 0 405.31 342.98 748.30 249.43
4.00 0.25 19.03 9.22 1.075 0.475 18.6 15.7 32 0 412.55 342.98 755.53 251.84
1.00 1.00 19.03 9.22 1.3 0.400 18.6 15.7 32 0 463.21 342.98 806.20 268.73
2.00 0.50 19.03 9.22 1.15 0.450 18.6 15.7 32 0 521.11 342.98 864.10 288.03
8.0
3.00 0.33 19.03 9.22 1.1 0.467 18.6 15.7 32 0 540.41 342.98 883.40 294.47
4.00 0.25 19.03 9.22 1.075 0.475 18.6 15.7 32 0 550.07 342.98 893.05 297.68

This document is controlled electronically and is uncontrolled when printed


EPC for Kolo Creek to Soku Gas Export
xport Pipeline

SOIL INVESTIGATION INTERPRETATIVE REPORT

K2S
K2S-NG01007551-GEN-CG6968-00006 Page 45 of 79

Meyerhoff’s (1963) method

Method of Meyerhof's Formula

Ultimate Bearing Capacity

Qult = c ㆍNc ㆍs c ㆍdc ㆍic + 1/2ㆍγ 1ㆍB'ㆍNrㆍs rㆍdrㆍir + q'ㆍNqㆍs qㆍdqㆍiq

where,
1) Shape factor : s c , s r , s q
sc = 1 + 0.2kp (B'/L)
s r, s q = 0 + 0.1kp (B'/L)
0.28
Kp = tan2(45+Φ/2)
Φ/2) 0.28

2) Depth factor : dc , dr , dq
dc = 1+ 0.2k p1/2*(Df /B)
dr, dq = 1+ 0.1k p1/2*(Df /B)

3) Inclination factor : ic , ir , iq
ic , iq = 2
(1 - θ / 90) =1
ir = 2
(1 - θ / φ)
φ = 1
-1
θ = (tan (Ph / Pv 0

φ⁰ Nq Nr Nc
25 10.66 6.77 20.72
26 11.85 8.00 22.25
27 13.20 9.46 23.94
28 14.72 11.19 25.80
29 16.44 13.24 27.86
30 18.40 15.67 30.14
31 20.63 18.56 32.67
32 23.18 22.02 35.49
33 26.09 26.17 38.64
34 29.44 31.15 42.16
35 33.30 37.15 46.12
36 37.75 44.43 50.59
37 42.92 53.27 55.63
38 48.93 64.07 61.35

w = moisture content = 29 %
Gs = specific gravity = 2.57
3
γ w =effective unit weight of water = 9.81 kN/m
c= cohesion (0-3)m = 0.00 kN/m2
φ = angle of internal friction = 28.00 ⁰
Nc = 25.8 Nq = 14.72 Nr = 11.19

This document is controlled electronically and is uncontrolled when printed


EPC for Kolo Creek to Soku Gas Export
E Pipeline

SOIL INVESTIGATION INTERPRETATIVE REPORT

K2S-NG01007551-GEN
GEN-CG6968-00006 Page 46 of 79

3
Df (m) B (m) L/B B/L γ (kN/m ) γ' (kN/m )
3
q =γ'*Df sc sr, sq dc dr, dq c*Nc*dc*sc 0.5 *γ1*B*sr*dr*Nr, q *sq*dq*Nq, qu (KN/m 2) qa(kN/m 2)
1.00 1.00 19.03 9.22 9.22 1.057 1.028 1.11 1.05 0.00 55.86 146.98 202.84 67.61
2.00 0.50 19.03 9.22 9.22 1.028 1.014 1.11 1.05 0.00 55.10 144.96 200.05 66.68
1.0
3.00 0.33 19.03 9.22 9.22 1.019 1.009 1.11 1.05 0.00 54.84 144.28 199.12 66.37
4.00 0.25 19.03 9.22 9.22 1.014 1.007 1.11 1.05 0.00 54.71 143.94 198.66 66.22
1.00 1.00 19.03 9.22 9.22 1.057 1.028 1.07 1.04 0.00 82.39 144.50 226.89 75.63
2.00 0.50 19.03 9.22 9.22 1.028 1.014 1.07 1.04 0.00 81.25 142.52 223.77 74.59
1.5
3.00 0.33 19.03 9.22 9.22 1.019 1.009 1.07 1.04 0.00 80.88 141.85 222.73 74.24
4.00 0.25 19.03 9.22 9.22 1.014 1.007 1.07 1.04 0.00 80.69 141.52 222.21 74.07
1.00 1.00 19.03 9.22 9.22 1.057 1.028 1.05 1.03 0.00 108.91 143.27 252.17 84.06
2.00 0.50 19.03 9.22 9.22 1.028 1.014 1.05 1.03 0.00 107.41 141.30 248.71 82.90
2.0
3.00 0.33 19.03 9.22 9.22 1.019 1.009 1.05 1.03 0.00 106.91 140.64 247.55 82.52
4.00 0.25 19.03 9.22 9.22 1.014 1.007 1.05 1.03 0.00 106.66 140.31 246.97 82.32
1.00 1.00 19.03 9.22 9.22 1.057 1.028 1.04 1.02 0.00 161.95 142.03 303.98 101.33
2.00 0.50 19.03 9.22 9.22 1.028 1.014 1.04 1.02 0.00 159.73 140.08 299.80 99.93
3.0
3.00 0.33 19.03 9.22 9.22 1.019 1.009 1.04 1.02 0.00 158.98 139.43 298.41 99.47
4.00 0.25 19.03 9.22 9.22 1.014 1.007 1.04 1.02 0.00 158.61 139.10 297.71 99.24
1.0
1.00 1.00 19.03 9.22 9.22 1.057 1.028 1.03 1.01 0.00 215.00 141.41 356.41 118.80
2.00 0.50 19.03 9.22 9.22 1.028 1.014 1.03 1.01 0.00 212.04 139.47 351.51 117.17
4.0
3.00 0.33 19.03 9.22 9.22 1.019 1.009 1.03 1.01 0.00 211.06 138.82 349.88 116.63
4.00 0.25 19.03 9.22 9.22 1.014 1.007 1.03 1.01 0.00 210.56 138.49 349.06 116.35
1.00 1.00 19.03 9.22 9.22 1.057 1.028 1.02 1.01 0.00 268.04 141.04 409.08 136.36
2.00 0.50 19.03 9.22 9.22 1.028 1.014 1.02 1.01 0.00 264.36 139.10 403.46 134.49
5.0
3.00 0.33 19.03 9.22 9.22 1.019 1.009 1.02 1.01 0.00 263.13 138.45 401.58 133.86
4.00 0.25 19.03 9.22 9.22 1.014 1.007 1.02 1.01 0.00 262.51 138.13 400.65 133.55
1.00 1.00 19.03 9.22 9.22 1.057 1.028 1.02 1.01 0.00 321.09 140.79 461.88 153.96
2.00 0.50 19.03 9.22 9.22 1.028 1.014 1.02 1.01 0.00 316.67 138.86 455.53 151.84
6.0
3.00 0.33 19.03 9.22 9.22 1.019 1.009 1.02 1.01 0.00 315.20 138.21 453.41 151.14
4.00 0.25 19.03 9.22 9.22 1.014 1.007 1.02 1.01 0.00 314.47 137.89 452.35 150.78
1.00 1.00 19.03 9.22 9.22 1.057 1.028 1.01 1.01 0.00 427.17 140.48 567.66 189.22
2.00 0.50 19.03 9.22 9.22 1.028 1.014 1.01 1.01 0.00 421.30 138.55 559.85 186.62
8.0
3.00 0.33 19.03 9.22 9.22 1.019 1.009 1.01 1.01 0.00 419.35 137.91 557.25 185.75
4.00 0.25 19.03 9.22 9.22 1.014 1.007 1.01 1.01 0.00 418.37 137.59 555.95 185.32

This document is controlled electronically and is uncontrolled when printed


EPC for Kolo Creek to Soku Gas Export
E Pipeline

SOIL INVESTIGATION INTERPRETATIVE REPORT

K2S-NG01007551-GEN
GEN-CG6968-00006 Page 47 of 79

3 3 2 2
Df (m) B (m) L/B B/L γ (kN/m ) γ' (kN/m ) q =γ'*Df sc sr, sq dc dr, dq c*Nc*dc*sc*ic 0.5 *γ1*B*sr*dr*ir*Nr, q *sq*dq*iq*Nq, qu (KN/m ) qa(kN/m )
1.00 1.00 19.03 9.22 13.83 1.057 1.028 1.16 1.08 0.00 57.27 226.03 283.30 94.43
2.00 0.50 19.03 9.22 13.83 1.028 1.014 1.16 1.08 0.00 56.49 222.92 279.41 93.14
1.0
3.00 0.33 19.03 9.22 13.83 1.019 1.009 1.16 1.08 0.00 56.23 221.89 278.11 92.70
4.00 0.25 19.03 9.22 13.83 1.014 1.007 1.16 1.08 0.00 56.09 221.37 277.46 92.49
1.00 1.00 19.03 9.22 13.83 1.057 1.028 1.11 1.05 0.00 83.80 220.46 304.26 101.42
2.00 0.50 19.03 9.22 13.83 1.028 1.014 1.11 1.05 0.00 82.65 217.43 300.08 100.03
1.5
3.00 0.33 19.03 9.22 13.83 1.019 1.009 1.11 1.05 0.00 82.26 216.42 298.68 99.56
4.00 0.25 19.03 9.22 13.83 1.014 1.007 1.11 1.05 0.00 82.07 215.92 297.99 99.33
1.00 1.00 19.03 9.22 13.83 1.057 1.028 1.08 1.04 0.00 110.32 217.68 328.00 109.33
2.00 0.50 19.03 9.22 13.83 1.028 1.014 1.08 1.04 0.00 108.80 214.69 323.49 107.83
2.0
3.00 0.33 19.03 9.22 13.83 1.019 1.009 1.08 1.04 0.00 108.30 213.69 321.99 107.33
4.00 0.25 19.03 9.22 13.83 1.014 1.007 1.08 1.04 0.00 108.04 213.19 321.24 107.08
1.00 1.00 19.03 9.22 13.83 1.057 1.028 1.05 1.03 0.00 163.36 214.90 378.26 126.09
2.00 0.50 19.03 9.22 13.83 1.028 1.014 1.05 1.03 0.00 161.12 211.94 373.06 124.35
3.0
3.00 0.33 19.03 9.22 13.83 1.019 1.009 1.05 1.03 0.00 160.37 210.96 371.33 123.78
4.00 0.25 19.03 9.22 13.83 1.014 1.007 1.05 1.03 0.00 159.99 210.47 370.46 123.49
1.5
1.00 1.00 19.03 9.22 13.83 1.057 1.028 1.04 1.02 0.00 216.41 213.51 429.91 143.30
2.00 0.50 19.03 9.22 13.83 1.028 1.014 1.03 1.02 0.00 213.43 210.57 424.00 141.33
4.0
3.00 0.33 19.03 9.22 13.83 1.019 1.009 1.03 1.02 0.00 212.44 209.59 422.03 140.68
4.00 0.25 19.03 9.22 13.83 1.014 1.007 1.03 1.02 0.00 211.95 209.10 421.05 140.35
1.00 1.00 19.03 9.22 13.83 1.057 1.028 1.02 1.02 0.00 269.45 212.67 482.12 160.71
2.00 0.50 19.03 9.22 13.83 1.028 1.014 1.02 1.02 0.00 265.75 209.75 475.50 158.50
5.0
3.00 0.33 19.03 9.22 13.83 1.019 1.009 1.02 1.02 0.00 264.51 208.77 473.29 157.76
4.00 0.25 19.03 9.22 13.83 1.014 1.007 1.02 1.02 0.00 263.90 208.29 472.18 157.39
1.00 1.00 19.03 9.22 13.83 1.057 1.028 1.02 1.01 0.00 322.50 212.12 534.61 178.20
2.00 0.50 19.03 9.22 13.83 1.028 1.014 1.02 1.01 0.00 318.06 209.20 527.26 175.75
6.0
3.00 0.33 19.03 9.22 13.83 1.019 1.009 1.02 1.01 0.00 316.59 208.23 524.81 174.94
4.00 0.25 19.03 9.22 13.83 1.014 1.007 1.02 1.01 0.00 315.85 207.74 523.59 174.53
1.00 1.00 19.03 9.22 13.83 1.057 1.028 1.01 1.01 0.00 428.59 211.42 640.01 213.34
2.00 0.50 19.03 9.22 13.83 1.028 1.014 1.01 1.01 0.00 422.69 208.51 631.21 210.40
8.0
3.00 0.33 19.03 9.22 13.83 1.019 1.009 1.01 1.01 0.00 420.73 207.54 628.27 209.42
4.00 0.25 19.03 9.22 13.83 1.014 1.007 1.01 1.01 0.00 419.75 207.06 626.81 208.94

This document is controlled electronically and is uncontrolled when printed


EPC for Kolo Creek to Soku Gas Export
E Pipeline

SOIL INVESTIGATION INTERPRETATIVE REPORT

K2S-NG01007551-GEN
GEN-CG6968-00006 Page 48 of 79

3 3 2 2
Df (m) B (m) L/B B/L γ (kN/m ) γ' (kN/m ) q =γ'*Df sc sr, sq dc dr, dq c*Nc*dc*sc*ic 0.5 *γ1*B*sr*dr*ir*Nr, q *sq*dq*iq*Nq, qu (KN/m ) qa(kN/m )
1.00 1.00 19.03 9.22 18.44 1.057 1.028 1.21 1.11 0.00 58.69 308.79 367.48 122.49
2.00 0.50 19.03 9.22 18.44 1.028 1.014 1.21 1.11 0.00 57.88 304.55 362.43 120.81
1.0
3.00 0.33 19.03 9.22 18.44 1.019 1.009 1.21 1.11 0.00 57.61 303.13 360.74 120.25
4.00 0.25 19.03 9.22 18.44 1.014 1.007 1.21 1.11 0.00 57.48 302.42 359.90 119.97
1.00 1.00 19.03 9.22 18.44 1.057 1.028 1.14 1.07 0.00 85.21 298.90 384.11 128.04
2.00 0.50 19.03 9.22 18.44 1.028 1.014 1.14 1.07 0.00 84.04 294.79 378.83 126.28
1.5
3.00 0.33 19.03 9.22 18.44 1.019 1.009 1.14 1.07 0.00 83.65 293.42 377.07 125.69
4.00 0.25 19.03 9.22 18.44 1.014 1.007 1.14 1.07 0.00 83.45 292.73 376.18 125.39
1.00 1.00 19.03 9.22 18.44 1.057 1.028 1.11 1.05 0.00 111.73 293.95 405.68 135.23
2.00 0.50 19.03 9.22 18.44 1.028 1.014 1.11 1.05 0.00 110.19 289.91 400.10 133.37
2.0
3.00 0.33 19.03 9.22 18.44 1.019 1.009 1.11 1.05 0.00 109.68 288.56 398.24 132.75
4.00 0.25 19.03 9.22 18.44 1.014 1.007 1.11 1.05 0.00 109.43 287.89 397.32 132.44
1.00 1.00 19.03 9.22 18.44 1.057 1.028 1.07 1.04 0.00 164.77 289.00 453.78 151.26
2.00 0.50 19.03 9.22 18.44 1.028 1.014 1.07 1.04 0.00 162.51 285.03 447.54 149.18
3.0
3.00 0.33 19.03 9.22 18.44 1.019 1.009 1.07 1.04 0.00 161.75 283.71 445.46 148.49
4.00 0.25 19.03 9.22 18.44 1.014 1.007 1.07 1.04 0.00 161.38 283.04 444.42 148.14
2.0
1.00 1.00 19.03 9.22 18.44 1.057 1.028 1.05 1.03 0.00 217.82 286.53 504.35 168.12
2.00 0.50 19.03 9.22 18.44 1.028 1.014 1.05 1.03 0.00 214.82 282.59 497.42 165.81
4.0
3.00 0.33 19.03 9.22 18.44 1.019 1.009 1.05 1.03 0.00 213.83 281.28 495.10 165.03
4.00 0.25 19.03 9.22 18.44 1.014 1.007 1.05 1.03 0.00 213.33 280.62 493.95 164.65
1.00 1.00 19.03 9.22 18.44 1.057 1.028 1.04 1.02 0.00 270.86 285.05 555.91 185.30
2.00 0.50 19.03 9.22 18.44 1.028 1.014 1.04 1.02 0.00 267.14 281.13 548.27 182.76
5.0
3.00 0.33 19.03 9.22 18.44 1.019 1.009 1.04 1.02 0.00 265.90 279.82 545.72 181.91
4.00 0.25 19.03 9.22 18.44 1.014 1.007 1.04 1.02 0.00 265.28 279.17 544.45 181.48
1.00 1.00 19.03 9.22 18.44 1.057 1.028 1.04 1.02 0.00 323.91 284.06 607.96 202.65
2.00 0.50 19.03 9.22 18.44 1.028 1.014 1.04 1.02 0.00 319.45 280.15 599.61 199.87
6.0
3.00 0.33 19.03 9.22 18.44 1.019 1.009 1.04 1.02 0.00 317.97 278.85 596.82 198.94
4.00 0.25 19.03 9.22 18.44 1.014 1.007 1.04 1.02 0.00 317.23 278.20 595.43 198.48
1.00 1.00 19.03 9.22 18.44 1.057 1.028 1.03 1.01 0.00 430.00 282.82 712.82 237.61
2.00 0.50 19.03 9.22 18.44 1.028 1.014 1.03 1.01 0.00 424.08 278.93 703.02 234.34
8.0
3.00 0.33 19.03 9.22 18.44 1.019 1.009 1.03 1.01 0.00 422.11 277.64 699.75 233.25
4.00 0.25 19.03 9.22 18.44 1.014 1.007 1.03 1.01 0.00 421.13 276.99 698.12 232.71

This document is controlled electronically and is uncontrolled when printed


EPC for Kolo Creek to Soku Gas Export
xport Pipeline

SOIL INVESTIGATION INTERPRETATIVE REPORT

K2S
K2S-NG01007551-GEN-CG6968-00006 Page 49 of 79

5.2 Bearing Capacity Check – Continuous Flight Auger Pile

The Design Pile Resistance, Rc,d, of CFA piles is determined by the equation

Rc,d = Rb,d + Rs,d ............ (EN1997 Eq 7.6)

Where,

Rb;d = End bearing resistance of the pile = qb.Ab

Rs;d = skin frictional resistance of the pile = fs.As

Therefore,

Rc;d = qb.Ab + fs.As .................. (EN1997 Eq 7.9)

Where

qb = unit end bearing capacity, kPa

fs = unit skin friction, kPa


2
Ab = gross base area of pile tip, m
2
As = side surface area of pile, m

(A) End bearing resistance of the pile

The
e end bearing resistance, Rb;d, of the pile is determined as follows;

In cohesive soil, Rb;d = Nc *cu * Ab

In non-cohesive soil Rb;d = Nq* σv’* Ab

Where,

cu = characteristics undrained shear strength of the clay at the pile toe.

Nq* = bearing capacity factor


fact

σv’ = vertical effective stress at the pile toe

(B) Shaft resistance of the pile

The shaft resistance, Rs;d, of the pile is determined from the following equation;

Cohesive soil, Rs;d = α *cu * As

cohesive soil Rs;d = Ks* σv * tanδ * Ab


Non-cohesive

This document is controlled electronically and is uncontrolled when printed


EPC for Kolo Creek to Soku Gas Export
xport Pipeline

SOIL INVESTIGATION INTERPRETATIVE REPORT

K2S
K2S-NG01007551-GEN-CG6968-00006 Page 50 of 79

Where,

cu = characteristics undrained shear strength of the clay along the pile shaft

α = Adhesion Factor

σv = average effective stress on the pile shaft

Ks = lateral load factor

tanδ = mobilised friction at the pile


pile-soil interface

Formular Reference
γd = γ / (1+w)
e = (G s γ w / γ d )-1
γ sat = (G s +e)γ w / (1+e)
γ' = γ sub = γ sat - γ w

ø = 0.3N+27˚ Peck(1974)
N q* = e πtanø tan 2 (45+ø/2) Meyerhof(1963)
N c* = (N q -1)cotø when ø=0, N c *=π+2 Meyerhof(1963)
N γ* = (N q -1)tan(1.4ø) Meyerhof(1963)

This document is controlled electronically and is uncontrolled when printed


EPC for Kolo Creek to Soku Gas Export
xport Pipeline

SOIL INVESTIGATION INTERPRETATIVE REPORT

K2S
K2S-NG01007551-GEN-CG6968-00006 Page 51 of 79

Kolo Creek and Soku Soil Strata :

KOLO CREEK SOKU


Depth BH 01 BH02 BH03
1 Fine Sand, Silty Fine Sand with
Fine Sand, Silty
2 Light Orange plant Roots
Light Orange
3 Brown
Brown
4
5 Peaty Clay
Clay, Stiff Light
6 Clay, Stiff Light
Grey
7 Grey
7.5
8
9
10
11
12
13
Medium to
14 Fine Sand, Silty
Coarse Sand
15 greyish brown
16
17
Fine to Medium
18
Sand
19
19.5
20
21
22 Clay , Very Stiff
23
24
25
26 Clay , Firm
27 Fine Sand, Silty
28 greyish brown
29 Clay , Very Stiff
30

5.2.1 Pile Compressive Resistance Computation for Kolo Creek-

BH 2 has been adopted for the pile compressive capacity computation as its
it parameters and strata
arrangement appears to be more conservative when compared to BH1. The Meyerhof critical
cri Depth
approach
ch was used to compute shaft resistance to further improve the safety of the piles.

This document is controlled electronically and is uncontrolled when printed


EPC for Kolo Creek to Soku Gas Export
xport Pipeline

SOIL INVESTIGATION INTERPRETATIVE REPORT

K2S
K2S-NG01007551-GEN-CG6968-00006 Page 52 of 79

Table A : 600mm Continuous Flight Auger Pile Capacity Computation


Computation- Kolo Creek

BH 02
Soil Depth Thk. γw γ=γt w Gs cu γd e γsat γsub
Type m m kN/m3 kN/m3 % - kN/m 2 kN/m 3 - kN/m 3 kN/m 3
Fine Sand 4.00 4.00 9.81 18.34 57.00 2.57 0.00 11.68 1.16 16.95 7.14
Firm clay 7.50 3.50 9.81 18.74 35.00 2.50 26.00 13.88 0.77 18.14 8.33
Fine to Medium sand 10.00 2.50 9.81 16.58 42.00 2.60 0.00 11.68 1.18 17.00 7.19
Fine to Medium sand 15.00 5.00 9.81 18.34 43.00 2.59 0.00 12.83 0.98 17.68 7.87
Fine to Medium sand 27.50 12.50 9.81 18.54 29.00 2.57 0.00 14.37 0.75 18.59 8.78
Firm clay 30.00 2.50 9.81 18.93 27.00 2.60 58.00 14.91 0.71 18.98 9.17
< Table 1 Soil Data(1) >

BH 02
Soil Depth Thk. N ø Nq Nc Nγ
Type m m - ˚ - - -
Fine Sand 4.00 4.00 18 32.40 24.30 36.71 23.59
Firm clay 7.50 3.50 0 0.00 1.00 5.14 0.00
Fine to Medium sand 10.00 2.50 16 31.80 22.64 34.90 21.28
Fine to Medium sand 15.00 5.00 25 34.50 31.30 44.09 34.01
Fine to Medium sand 27.50 12.50 26 34.80 32.48 45.29 35.86
Firm clay 30.00 2.50 0 0.00 1.00 5.14 0.00
< Table 2 Soil Data(2) >

BH 02
Soil Depth Thk. Dia. Ap As
Type m m m m2 m2
Fine Sand 4.00 4.00 0.60 0.28 7.54
Firm clay 7.50 3.50 0.60 0.28 6.60
Fine to Medium sand 10.00 2.50 0.60 0.28 4.71
Fine to Medium sand 15.00 5.00 0.60 0.28 9.42
Fine to Medium sand 27.50 12.50 0.60 0.28 23.56
Firm clay 30.00 2.50 0.60 0.28 4.71
< Table 3 Pile Data >

This document is controlled electronically and is uncontrolled when printed


EPC for Kolo Creek to Soku Gas Export
xport Pipeline

SOIL INVESTIGATION INTERPRETATIVE REPORT

K2S
K2S-NG01007551-GEN-CG6968-00006 Page 53 of 79

CFA PILES BH02


Soil Depth Thk. α ca K σv' δ tanδ Df q'=γ'D f
Type m m - kN/m
2
- kN/m
2
˚ - m kN/m
2

Fine Sand 4 4 0.00 0.00 0.46 14.27 24.30 0.45 4.00 28.54
Firm clay 7.5 3.5 0.63 16.32 0.00 43.12 0.00 0.00 3.50 57.70
Fine to Medium sand 10 2.5 0.00 0.00 0.47 66.68 23.85 0.44 2.50 75.66
Fine to Medium sand 15 5 0.00 0.00 0.43 91.41 25.88 0.49 5.00 115.03
Fine to Medium sand 27.5 12.5 0.00 0.00 0.43 91.41 26.10 0.49 12.50 224.77
Firm clay 30 2.5 0.61 35.59 0.00 91.41 0.00 0.00 2.50 247.71
< Table 4 Critical Depth Method(1) >

CFA PILES BH02


Soil Depth Thk. ƒs Qs ΣQs qp Qp Qu
Type m m kN/m
2
kN kN kN/m
2
kN kN
Fine Sand 4.00 4.00 2.99 22.55 22.55 693.50 196.08 218.64
Firm clay 7.50 3.50 16.32 107.69 130.24 133.68 37.80 168.04
Fine to Medium sand 10.00 2.50 13.94 65.71 195.96 1712.91 484.31 680.27
Fine to Medium sand 15.00 5.00 19.22 181.18 377.13 3600.20 1017.93 1395.06
Fine to Medium sand 27.50 12.50 19.22 452.93 830.07 7300.66 2064.21 2894.28
Firm clay 30.00 2.50 35.59 167.70 997.77 298.21 84.32 1082.08

Application of Partial Resistances and Correlation factors for piled foundation - Ref: EN1997 section A3.3.3 & Table A8 & Table A.10
Table to be adopted for Approach 1 , Combination 2 : A2 + M1 + R4 (600mm CFA Pile)
Depth Qs Qp λs λb correlation factor ξ4 Qa Combined Check
Qa
m kN kN kN Qu = Qs+Qp λt ξ4
4.00 22.55 196.08 1.30 1.45 1.4 108.98 218.64 1.4 1.4 111.55
7.50 130.24 37.80 1.30 1.45 1.4 90.18 168.04 1.4 1.4 85.74
10.00 195.96 484.31 1.30 1.45 1.4 346.25 680.27 1.4 1.4 347.08
15.00 377.13 1017.93 1.30 1.45 1.4 708.66 1395.06 1.4 1.4 711.77
27.50 830.07 2064.21 1.30 1.45 1.4 1472.93 2894.28 1.4 1.4 1476.67
30.00 997.77 84.32 1.30 1.45 1.4 589.76 1082.08 1.4 1.4 552.08

Application of Partial Resistances and Correlation factors for piled foundation - Ref: EN1997 section A3.3.3 & Table A8 & Table A.10
Table to be adopted for Approach 1 , Combination 1 : A1 + M1 + R1 (600 mm CFA Pile)
Depth Qs Qp λs λb correlation factor ξ4 Qa Combined
Qa
m kN kN kN Qu = Qs+Qp λt ξ4
4.00 22.55 196.08 1.00 1.10 1.4 143.44 218.64 1.10 1.40 141.97
7.50 130.24 37.80 1.00 1.10 1.4 117.58 168.04 1.10 1.40 109.12
10.00 195.96 484.31 1.00 1.10 1.4 454.46 680.27 1.10 1.40 441.73
15.00 377.13 1017.93 1.00 1.10 1.4 930.38 1395.06 1.10 1.40 905.89
27.50 830.07 2064.21 1.00 1.10 1.4 1933.30 2894.28 1.10 1.40 1879.40
30.00 997.77 84.32 1.00 1.10 1.4 767.44 1082.08 1.10 1.40 702.65

Allowable Capacity Value to be adopted for detailed design


Allowable Capacity Values

This document is controlled electronically and is uncontrolled when printed


EPC for Kolo Creek to Soku Gas Export
xport Pipeline

SOIL INVESTIGATION INTERPRETATIVE REPORT

K2S
K2S-NG01007551-GEN-CG6968-00006 Page 54 of 79

Table B : 800mm
00mm Continuous Flight Auger Pile Cap
Capacity
acity Computation – Kolo Creek

BH 02
Soil Depth Thk. γw γ=γ t w Gs cu γd e γsat γsub
Type m m kN/m3 kN/m3 % - kN/m 2 kN/m3 - kN/m3 kN/m3
Fine Sand 4.00 4.00 9.81 18.34 57.00 2.57 0.00 11.68 1.16 16.95 7.14
Firm clay 7.50 3.50 9.81 18.74 35.00 2.50 26.00 13.88 0.77 18.14 8.33
Fine to Medium sand 10.00 2.50 9.81 16.58 42.00 2.60 0.00 11.68 1.18 17.00 7.19
Fine to Medium sand 15.00 5.00 9.81 18.34 43.00 2.59 0.00 12.83 0.98 17.68 7.87
Fine to Medium sand 27.50 12.50 9.81 18.54 29.00 2.57 0.00 14.37 0.75 18.59 8.78
Firm clay 30.00 2.50 9.81 18.93 27.00 2.60 58.00 14.91 0.71 18.98 9.17
< Table 1 Soil Data(1) >

BH 02
Soil Depth Thk. N ø Nq Nc Nγ
Type m m - ˚ - - -
Fine Sand 4.00 4.00 18 32.40 24.30 36.71 23.59
Firm clay 7.50 3.50 0 0.00 1.00 5.14 0.00
Fine to Medium sand 10.00 2.50 16 31.80 22.64 34.90 21.28
Fine to Medium sand 15.00 5.00 25 34.50 31.30 44.09 34.01
Fine to Medium sand 27.50 12.50 26 34.80 32.48 45.29 35.86
Firm clay 30.00 2.50 0 0.00 1.00 5.14 0.00
< Table 2 Soil Data(2) >

BH 02
Soil Depth Thk. Dia. Ap As
Type m m m m2 m2
Fine Sand 4.00 4.00 0.80 0.50 10.05
Firm clay 7.50 3.50 0.80 0.50 8.80
Fine to Medium sand 10.00 2.50 0.80 0.50 6.28
Fine to Medium sand 15.00 5.00 0.80 0.50 12.57
Fine to Medium sand 27.50 12.50 0.80 0.50 31.42
Firm clay 30.00 2.50 0.80 0.50 6.28
< Table 3 Pile Data >

This document is controlled electronically and is uncontrolled when printed


EPC for Kolo Creek to Soku Gas Export
xport Pipeline

SOIL INVESTIGATION INTERPRETATIVE REPORT

K2S
K2S-NG01007551-GEN-CG6968-00006 Page 55 of 79

CFA PILES BH02


Soil Depth Thk. α ca K σv' δ tanδ Df q'=γ'D f
Type 2 2 2
m m - kN/m - kN/m ˚ - m kN/m
Fine Sand 4 4 0.00 0.00 0.46 14.27 24.30 0.45 4.00 28.54
Firm clay 7.5 3.5 0.63 16.32 0.00 43.12 0.00 0.00 3.50 57.70
Fine to Medium sand 10 2.5 0.00 0.00 0.47 66.68 23.85 0.44 2.50 75.66
Fine to Medium sand 15 5 0.00 0.00 0.43 95.34 25.88 0.49 5.00 115.03
Fine to Medium sand 27.5 12.5 0.00 0.00 0.43 123.81 26.10 0.49 12.50 224.77
Firm clay 30 2.5 0.70 40.79 0.00 123.81 0.00 0.00 2.50 247.71
< Table 4 Critical Depth Method(1) >

CFA PILES BH02


Soil Depth Thk. ƒs Qs ΣQs qp Qp Qu
Type m m kN/m
2
kN kN kN/m
2
kN kN
Fine Sand 4.00 4.00 2.99 30.07 30.07 693.50 348.59 378.66
Firm clay 7.50 3.50 16.32 143.59 173.66 133.68 67.20 240.86
Fine to Medium sand 10.00 2.50 13.94 87.61 261.27 1712.91 861.00 1122.28
Fine to Medium sand 15.00 5.00 20.05 251.97 513.25 3600.20 1809.66 2322.90
Fine to Medium sand 27.50 12.50 26.04 817.98 1331.22 7300.66 3669.71 5000.93
Firm clay 30.00 2.50 40.79 256.31 1587.53 298.21 149.90 1737.43
< Table 5 Critical Depth Method(1) >

Application of Partial Resistances and Correlation factors for piled foundation - Ref: EN1997 section A3.3.3 & Table A8 & Table A.10
Table to be adopted for Approach 1 , Combination 2 : A2 + M1 + R4 (800mm CFA Pile)
Depth Qs Qp λss λb correlation factor ξ4 Qa Combined Check
Qa
m kN kN kN Qu = Qs+Qp λt ξ4
4.00 30.07 348.59 1.30 1.45 1.4 188.24 378.66 1.4 1.4 193.20
7.50 173.66 67.20 1.30 1.45 1.4 128.52 240.86 1.4 1.4 122.89
10.00 261.27 861.00 1.30 1.45 1.4 567.70 1122.28 1.4 1.4 572.59
15.00 513.25 1809.66 1.30 1.45 1.4 1173.46 2322.90 1.4 1.4 1185.16
27.50 1331.22 3669.71 1.30 1.45 1.4 2539.18 5000.93 1.4 1.4 2551.50
30.00 1587.53 149.90 1.30 1.45 1.4 946.11 1737.43 1.4 1.4 886.44

Application of Partial Resistances and Correlation factors for piled foundation - Ref: EN1997 section A3.3.3 & Table A8 & Table A.10
Table to be adopted for Approach 1 , Combination 1 : A1 + M1 + R1 (800 mm CFA Pile)
Depth Qs Qp λss λb correlation factor ξ4 Qa Combined
Qa
m kN kN kN Qu = Qs+Qp λt ξ4
4.00 30.07 348.59 1.00 1.10 1.4 247.84 378.66 1.10 1.40 245.89
7.50 173.66 67.20 1.00 1.10 1.4 167.68 240.86 1.10 1.40 156.40
10.00 261.27 861.00 1.00 1.10 1.4 745.72 1122.28 1.10 1.40 728.75
15.00 513.25 1809.66 1.00 1.10 1.4 1541.71 2322.90 1.10 1.40 1508.38
27.50 1331.22 3669.71 1.00 1.10 1.4 3333.80 5000.93 1.10 1.40 3247.36
30.00 1587.53 149.90 1.00 1.10 1.4 1231.29 1737.43 1.10 1.40 1128.20

This document is controlled electronically and is uncontrolled when printed


EPC for Kolo Creek to Soku Gas Export
xport Pipeline

SOIL INVESTIGATION INTERPRETATIVE REPORT

K2S
K2S-NG01007551-GEN-CG6968-00006 Page 56 of 79

Allowable Capacity Value to be adopted for detailed design


Allowable Capacity Values

5.2.1 Pile Compressive Resistance Computation for Soku Gas Plant-

Table C: 600mm Continuous Flight Auger Pile Capacity Computation-


Computation Soku Gas Plant

BH 03
Soil Depth Thk. γw γ=γt w Gs cu γd e γsat γsub
Type m m kN/m
3
kN/m
3
% - kN/m
2
kN/m
3
- kN/m
3
kN/m
3

Fine Sand 2.00 2.00 9.81 19.03 29.00 2.57 0.00 14.75 0.71 18.82 9.01
Firm clay 6.80 4.80 9.81 17.95 61.00 2.50 5.00 11.15 1.20 16.50 6.69
Fine to Medium sand 10.00 3.20 9.81 18.54 35.00 2.60 0.00 13.73 0.86 18.26 8.45
Fine to Medium sand 15.00 5.00 9.81 18.54 35.00 2.59 0.00 13.73 0.85 18.24 8.43
Fine to Medium sand 21.00 6.00 9.81 18.54 41.00 2.57 0.00 13.15 0.92 17.84 8.03
Firm clay 30.00 9.00 9.81 16.48 60.00 2.60 35.00 10.30 1.48 16.15 6.34
< Table 1 Soil Data(1) >

BH 03
Soil Depth Thk. N ø Nq Nc Nγ
Type m m - ˚ - - -
Fine Sand 2.00 2.00 4 28.20 15.05 26.20 11.57
Firm clay 6.80 4.80 0 0.00 1.00 5.14 0.00
Fine to Medium sand 10.00 3.20 8 29.40 17.20 28.74 14.16
Fine to Medium sand 15.00 5.00 27 35.10 33.71 46.55 37.82
Fine to Medium sand 21.00 6.00 30 36.00 37.75 50.59 44.43
Firm clay 30.00 9.00 0 0.00 1.00 5.14 0.00
< Table 2 Soil Data(2) >

This document is controlled electronically and is uncontrolled when printed


EPC for Kolo Creek to Soku Gas Export
xport Pipeline

SOIL INVESTIGATION INTERPRETATIVE REPORT

K2S
K2S-NG01007551-GEN-CG6968-00006 Page 57 of 79

BH 03
Soil Depth Thk. Dia. Ap As
Type m m m m 2
m2
Fine Sand 2.00 2.00 0.60 0.28 3.77
Firm clay 6.80 4.80 0.60 0.28 9.05
Fine to Medium sand 10.00 3.20 0.60 0.28 6.03
Fine to Medium sand 15.00 5.00 0.60 0.28 9.42
Fine to Medium sand 21.00 6.00 0.60 0.28 11.31
Firm clay 30.00 9.00 0.60 0.28 16.96
< Table 3 Pile Data >

CFA PILES BH03


Soil Depth Thk. α ca K σv' δ Df q'=γ'D f
Type m m - kN/m
2
- kN/m
2
˚ m kN/m
2

Fine Sand 2 2 0.00 0.00 0.53 9.01 21.15 2.00 18.02


Firm clay 6.8 4.8 1.19 5.93 0.00 34.08 0.00 4.80 50.13
Fine to Medium sand 10 3.2 0.00 0.00 0.51 63.66 22.05 3.20 77.18
Fine to Medium sand 15 5 0.00 0.00 0.42 94.04 26.33 5.00 119.33
Fine to Medium sand 21 6 0.00 0.00 0.41 94.04 27.00 6.00 167.53
Firm clay 30 9 0.78 27.30 0.00 94.04 0.00 9.00 224.57
< Table 4 Critical Depth Method(1) >

CFA PILES BH03


Soil Depth Thk. ƒs Qs ΣQs qp Qp Qu
Type m m kN/m
2
kN kN kN/m
2
kN kN
Fine Sand 2.00 2.00 1.84 6.93 6.93 271.21 76.68 83.62
Firm clay 6.80 4.80 5.93 53.65 60.58 25.71 7.27 67.85
Fine to Medium sand 10.00 3.20 13.13 79.17 139.76 1327.17 375.25 515.00
Fine to Medium sand 15.00 5.00 19.77 186.37 326.12 4023.03 1137.49 1463.61
Fine to Medium sand 21.00 6.00 19.75 223.38 549.51 6324.58 1788.23 2337.74
Firm clay 30.00 9.00 27.30 463.17 1012.67 179.96 50.88 1063.56
< Table 5 Static Method(2) >

This document is controlled electronically and is uncontrolled when printed


EPC for Kolo Creek to Soku Gas Export
xport Pipeline

SOIL INVESTIGATION INTERPRETATIVE REPORT

K2S
K2S-NG01007551-GEN-CG6968-00006 Page 58 of 79

Application of Partial Resistances and Correlation factors for piled foundation - Ref: EN1997 section A3.3.3 & Table A8 & Table A.10
Table to be adopted for Approach 1 , Combination 2 : A2 + M1 + R4 (600mm CFA Pile)
Depth Qs Qp λs λb correlation factor ξ4 Qa Combined Check
Qa
m kN kN kN Qu = Qs+Qp λt ξ4
2.00 6.93 76.68 1.30 1.45 1.4 41.58 83.62 1.4 1.4 42.66
6.80 60.58 7.27 1.30 1.45 1.4 36.87 67.85 1.4 1.4 34.62
10.00 139.76 375.25 1.30 1.45 1.4 261.64 515.00 1.4 1.4 262.76
15.00 326.12 1137.49 1.30 1.45 1.4 739.53 1463.61 1.4 1.4 746.74
21.00 549.51 1788.23 1.30 1.45 1.4 1182.83 2337.74 1.4 1.4 1192.72
30.00 1012.67 50.88 1.30 1.45 1.4 581.48 1063.56 1.4 1.4 542.63

Application of Partial Resistances and Correlation factors for piled foundation - Ref: EN1997 section A3.3.3 & Table A8 & Table A.10
Table to be adopted for Approach 1 , Combination 1 : A1 + M1 + R1 (600 mm CFA Pile)
Depth Qs Qp λs λb correlation factor ξ4 Qa Combined
Qa
m kN kN kN Qu = Qs+Qp λt ξ4
2.00 6.93 76.68 1.00 1.10 1.4 54.75 83.62 1.10 1.40 54.30
6.80 60.58 7.27 1.00 1.10 1.4 47.99 67.85 1.10 1.40 44.06
10.00 139.76 375.25 1.00 1.10 1.4 343.49 515.00 1.10 1.40 334.42
15.00 326.12 1137.49 1.00 1.10 1.4 971.57 1463.61 1.10 1.40 950.40
21.00 549.51 1788.23 1.00 1.10 1.4 1553.69 2337.74 1.10 1.40 1518.01
30.00 1012.67 50.88 1.00 1.10 1.4 756.38 1063.56 1.10 1.40 690.62

Table D: 800mm
00mm Continuous Flight Auger Pile Capacity Computation-
Computation Soku Gas Plant

BH 03
Soil Depth Thk. γw γ =γ t w Gs cu γd e γ sat γ sub
Type m m kN/m 3
kN/m 3
% - kN/m 2
kN/m 3
- kN/m 3
kN/m 3
Fine Sand 2.00 2.00 9.81 19.03 29.00 2.57 0.00 14.75 0.71 18.82 9.01
Firm clay 6.80 4.80 9.81 17.95 61.00 2.50 5.00 11.15 1.20 16.50 6.69
Fine to Medium sand 10.00 3.20 9.81 18.54 35.00 2.60 0.00 13.73 0.86 18.26 8.45
Fine to Medium sand 15.00 5.00 9.81 18.54 35.00 2.59 0.00 13.73 0.85 18.24 8.43
Fine to Medium sand 21.00 6.00 9.81 18.54 41.00 2.57 0.00 13.15 0.92 17.84 8.03
Firm clay 30.00 9.00 9.81 16.48 60.00 2.60 35.00 10.30 1.48 16.15 6.34

BH 03
Soil Depth Thk. N ø Nq Nc Nγ
Type m m - ˚ - - -
Fine Sand 2.00 2.00 4 28.20 15.05 26.20 11.57
Firm clay 6.80 4.80 0 0.00 1.00 5.14 0.00
Fine to Medium sand 10.00 3.20 8 29.40 17.20 28.74 14.16
Fine to Medium sand 15.00 5.00 27 35.10 33.71 46.55 37.82
Fine to Medium sand 21.00 6.00 30 36.00 37.75 50.59 44.43
Firm clay 30.00 9.00 0 0.00 1.00 5.14 0.00

This document is controlled electronically and is uncontrolled when printed


EPC for Kolo Creek to Soku Gas Export
xport Pipeline

SOIL INVESTIGATION INTERPRETATIVE REPORT

K2S
K2S-NG01007551-GEN-CG6968-00006 Page 59 of 79

BH 03
Soil Depth Thk. Dia. Ap As
Type m m m m2 m2
Fine Sand 2.00 2.00 0.80 0.50 5.03
Firm clay 6.80 4.80 0.80 0.50 12.06
Fine to Medium sand 10.00 3.20 0.80 0.50 8.04
Fine to Medium sand 15.00 5.00 0.80 0.50 12.57
Fine to Medium sand 21.00 6.00 0.80 0.50 15.08
Firm clay 30.00 9.00 0.80 0.50 22.62
< Table 3 Pile Data >

CFA PILES BH03


Soil Depth Thk. α ca K σv' δ tanδ Df
Type 2 2
m m - kN/m - kN/m ˚ - m
Fine Sand 2 2 0.00 0.00 0.53 9.01 21.15 0.39 2.00
Firm clay 6.8 4.8 1.19 5.93 0.00 34.08 0.00 0.00 4.80
Fine to Medium sand 10 3.2 0.00 0.00 0.51 63.66 22.05 0.41 3.20
Fine to Medium sand 15 5 0.00 0.00 0.42 98.25 26.33 0.49 5.00
Fine to Medium sand 21 6 0.00 0.00 0.41 127.36 27.00 0.51 6.00
Firm clay 30 9 0.89 31.30 0.00 127.36 0.00 0.00 9.00

CFA PILES BH03


Soil Depth Thk. ƒs Qs ΣQs qp Qp Qu
Type m m kN/m
2
kN kN kN/m
2
kN kN
Fine Sand 2.00 2.00 1.84 9.24 9.24 271.21 136.33 145.57
Firm clay 6.80 4.80 5.93 71.53 80.78 25.71 12.92 93.70
Fine to Medium sand 10.00 3.20 13.13 105.57 186.34 1327.17 667.11 853.45
Fine to Medium sand 15.00 5.00 20.66 259.63 445.97 4023.03 2022.20 2468.17
Fine to Medium sand 21.00 6.00 26.75 403.39 849.36 6324.58 3179.08 4028.44
Firm clay 30.00 9.00 31.30 707.88 1557.24 179.96 90.46 1647.70

Application of Partial Resistances and Correlation factors for piled foundation - Ref: EN1997 section A3.3.3 & Table A8 & Table A.10
Table to be adopted for Approach 1 , Combination 2 : A2 + M1 + R4 (800mm CFA Pile)
Depth Qs Qp λss λb correlation factor ξ4 Qa Combined Check
Qa
m kN kN kN Qu = Qs+Qp λt ξ4
2.00 9.24 136.33 1.30 1.45 1.4 72.23 145.57 1.4 1.4 74.27
6.80 80.78 12.92 1.30 1.45 1.4 50.75 93.70 1.4 1.4 47.80
10.00 186.34 667.11 1.30 1.45 1.4 431.01 853.45 1.4 1.4 435.43
15.00 445.97 2022.20 1.30 1.45 1.4 1241.19 2468.17 1.4 1.4 1259.27
21.00 849.36 3179.08 1.30 1.45 1.4 2032.73 4028.44 1.4 1.4 2055.33
30.00 1557.24 90.46 1.30 1.45 1.4 900.19 1647.70 1.4 1.4 840.66

This document is controlled electronically and is uncontrolled when printed


EPC for Kolo Creek to Soku Gas Export
xport Pipeline

SOIL INVESTIGATION INTERPRETATIVE REPORT

K2S
K2S-NG01007551-GEN-CG6968-00006 Page 60 of 79

Application of Partial Resistances and Correlation factors for piled foundation - Ref: EN1997 section A3.3.3 & Table A8 & Table A.10
Table to be adopted for Approach 1 , Combination 1 : A1 + M1 + R1 (800 mm CFA Pile)
Depth Qs Qp λ
λs λb correlation factor ξ4 Qa Combined
Qa
m kN kN kN Qu = Qs+Qp λt ξ4
2.00 9.24 136.33 1.00 1.10 1.4 95.13 145.57 1.10 1.40 94.53
6.80 80.78 12.92 1.00 1.10 1.4 66.09 93.70 1.10 1.40 60.84
10.00 186.34 667.11 1.00 1.10 1.4 566.29 853.45 1.10 1.40 554.19
15.00 445.97 2022.20 1.00 1.10 1.4 1631.67 2468.17 1.10 1.40 1602.71
21.00 849.36 3179.08 1.00 1.10 1.4 2671.02 4028.44 1.10 1.40 2615.87
30.00 1557.24 90.46 1.00 1.10 1.4 1171.06 1647.70 1.10 1.40 1069.94

Allowable Capacity Value to be adopted for detailed design


Allowable Capacity Values

5.3 Tension Capacity For Continuous Flight Auger Pile

5.3.1 Pile Tension Resistance Computation for Kolo Creek-

600mm Continuous Flight Auger Pile Tension Capacity Computation-


Computation Kolo Creek

This document is controlled electronically and is uncontrolled when printed


EPC for Kolo Creek to Soku Gas Export
xport Pipeline

SOIL INVESTIGATION INTERPRETATIVE REPORT

K2S
K2S-NG01007551-GEN-CG6968-00006 Page 61 of 79

T ug = T un +W

where T ug = = Qs
gross uplift capacity
T un = net uplift capacity
W = effective weight of the pile

T ag = T ug / g s;t(EN1997; Table A.16)


M.J Thomlinson proposes a 50% reduction also.
BH02

Soil Depth Thk. Tun ΣTun γcon'c Wc W Tug g s;t Tag


Type m m kN kN kN/m
3
kN kN kN kN
Fine Sand 4.00 4.00 22.55 22.55 24 27.14 27.14 49.70 1.40 17.75
Firm clay 7.50 3.50 107.69 130.24 24 50.89 50.89 181.14 1.40 64.69
Fine to Medium sand 10.00 2.50 65.71 195.96 24 67.86 67.86 263.81 1.40 94.22
Fine to Medium sand 15.00 5.00 181.18 377.13 24 101.79 101.79 478.92 1.40 171.04
Fine to Medium sand 27.50 12.50 452.93 830.07 24 186.61 186.61 1016.68 1.40 363.10
Firm clay 30.00 2.50 167.70 997.77 24 203.58 203.58 1201.34 1.40 429.05

800mm
00mm Continuous Flight Auger Pile Tension Capacity Computation-
Computation Kolo Creek

This document is controlled electronically and is uncontrolled when printed


EPC for Kolo Creek to Soku Gas Export
xport Pipeline

SOIL INVESTIGATION INTERPRETATIVE REPORT

K2S
K2S-NG01007551-GEN-CG6968-00006 Page 62 of 79

T ug = T un +W

where T ug = gross uplift capacity = Qs


T un = net uplift capacity
W = effective weight of the pile

T ag = T ug / g s;t (EN1997; Table A.16)


M.J Thomlinson proposes a 50% reduction also.
BH02

Soil Depth Thk. T un ΣTun γ con'c Wc W T ug g s;t Tag


Type m m kN kN kN/m
3
kN kN kN kN
Fine Sand 4.00 4.00 30.07 30.07 24 48.25 48.25 78.33 1.4 27.97
Firm clay 7.50 3.50 143.59 173.66 24 90.48 90.48 264.14 1.4 94.33
Fine to Medium sand 10.00 2.50 87.61 261.27 24 120.64 120.64 381.91 1.4 136.40
Fine to Medium sand 15.00 5.00 251.97 513.25 24 180.96 180.96 694.20 1.4 247.93
Fine to Medium sand 27.50 12.50 817.98 1331.22 24 331.75 331.75 1662.97 1.4 593.92
Firm clay 30.00 2.50 256.31 1587.53 24 361.91 361.91 1949.45 1.4 696.23

5.3.2 Pile Tension Resistance Computation for Soku Gas Plant –

600mm Continuous Flight Auger Pile Tension Capacity Computation-


Computation Soku Gas Plant

T ug = T un +W

where T ug = = Qs
gross uplift capacity
T un = net uplift capacity
W = effective weight of the pile

T ag = T ug / g s;t(EN1997; Table A.16)


M.J Thomlinson proposes a 50% reduction also.
BH03

Soil Depth Thk. Tun ΣTun γ con'c Wc W Tug g s;t Tag


Type m m kN kN kN/m
3
kN kN kN kN
Fine Sand 2.00 2.00 6.93 6.93 24 13.57 13.57 20.50 1.40 7.32
Firm clay 6.80 4.80 53.65 60.58 24 46.14 46.14 106.73 1.40 38.12
Fine to Medium sand 10.00 3.20 79.17 139.76 24 67.86 67.86 207.61 1.40 74.15
Fine to Medium sand 15.00 5.00 186.37 326.12 24 101.79 101.79 427.91 1.40 152.83
Fine to Medium sand 21.00 6.00 223.38 549.51 24 142.50 142.50 692.01 1.40 247.15
Firm clay 30.00 9.00 463.17 1012.67 24 203.58 203.58 1216.25 1.40 434.37
< Table 8 Pullout Resistance of Piles >

800mm
00mm Continuous Flight Auger Pile Tension Capacity Computation-
Computation Soku Gas Plant

This document is controlled electronically and is uncontrolled when printed


EPC for Kolo Creek to Soku Gas Export
xport Pipeline

SOIL INVESTIGATION INTERPRETATIVE REPORT

K2S
K2S-NG01007551-GEN-CG6968-00006 Page 63 of 79

Pullout Resistance of Piles

T ug = T un +W

where T ug = gross uplift capacity = Qs


T un = net uplift capacity
W = effective weight of the pile

T ag = T ug / g s;t (EN1997; Table A.16)


M.J Thomlinson proposes a 50% reduction also.
BH03

Soil Depth Thk. Tun ΣTun γ con'c Wc W Tug g s;t Tag


Type m m kN kN kN/m
3
kN kN kN kN
Fine Sand 2.00 2.00 9.24 9.24 24 24.13 24.13 33.37 1.4 11.92
Firm clay 6.80 4.80 71.53 80.78 24 82.03 82.03 162.81 1.4 58.15
Fine to Medium sand 10.00 3.20 105.57 186.34 24 120.64 120.64 306.98 1.4 109.64
Fine to Medium sand 15.00 5.00 259.63 445.97 24 180.96 180.96 626.93 1.4 223.90
Fine to Medium sand 21.00 6.00 403.39 849.36 24 253.34 253.34 1102.70 1.4 393.82
Firm clay 30.00 9.00 707.88 1557.24 24 361.91 361.91 1919.16 1.4 685.41

This document is controlled electronically and is uncontrolled when printed


EPC for Kolo Creek to Soku Gas Export
xport Pipeline

SOIL INVESTIGATION INTERPRETATIVE REPORT

K2S
K2S-NG01007551-GEN-CG6968-00006 Page 64 of 79

5.4 Lateral Capacity Computation For Continuous Flight Auger Pile

5.4.1 Pile Lateral Capacity Computation for Kolo Creek –

600mm
00mm Continuous Flight Auger Pile Lateral Capacity Computation-- Kolocreek

Laterally Loaded Piles


Pile Design

Ultimate Lateral Load on Fixed-Headed pile and Construction Practice

H u = 2M u / (e+z f ) = 47.17 kN (from Equation 6.19)


Ha = 15.72 kN
where M u = ultimate Moment
= σmaxZ = 106 kNm
σmax = P/A = 5000 kN/m 2
Z = π(D 4 ) / 32D = 0.0212058 m 3

Ultimate Lateral Load on Free-Headed pile


H u = M u / (e+z f ) = 23.59 kN (from Equation 6.19)
Ha = 7.86 kN
where M u = ultimate Moment
= σmaxZ = 106 kNm
σmax = P/A = 5000 kN/m 2
Z = π(D 4 ) / 32D = 0.0212058 m 3

e = exposed pile length = 1 m


z f = Depth to point of fixity
= 1.8T = 3.495 m (from Equation 6.51)
T = (EI / n h ) 0.2 = 2 m (from Equation 6.13)
E = 21700000 kN/m 2
I = π(D 4 ) / 64 = 0.0063617 m 4
nh = 5000 kN/m 3 (from Figure 6.20)

Deflection at Head of Fixed-Headed pile


y = H u (e+z f ) 3 / 12EI (from Equation 6.21)

Hu = y12EI / (e+z f ) 3 = 364.7 kN


Ha = 121.6 kN > 15.7244 kN

Design Lateral Load H = 15.7244 kN

Deflection at Head of Free-Headed pile


y = H u (e+z f ) 3 / 3EI (from Equation 6.22)

Hu = y3EI / (e+z f ) 3 = 91.18 kN


Ha = 30.39 kN > 7.86 kN

Design Lateral Load H = 7.86 kN

This document is controlled electronically and is uncontrolled when printed


EPC for Kolo Creek to Soku Gas Export
xport Pipeline

SOIL INVESTIGATION INTERPRETATIVE REPORT

K2S
K2S-NG01007551-GEN-CG6968-00006 Page 65 of 79

800mm
00mm Continuous Flight Auger Pile Lateral Capacity Computation-- Kolocreek

Laterally Loaded Piles


Pile Design

Ultimate Lateral Load on Fixed-Headed pile and Construction Practice

H u = 2M u / (e+z f ) = 93 kN (from Equation 6.19)


Ha = 31.03 kN
where M u = ultimate Moment
= σmaxZ = 251 kNm
σmax = P/A = 5000 kN/m 2
Z = π(D 4 ) / 32D = 0.0502655 m3

Ultimate Lateral Load on Free-Headed pile


H u = M u / (e+z f ) = 47 kN (from Equation 6.19)
Ha = 15.51 kN
where M u = ultimate Moment
= σmaxZ = 251 kNm
σmax = P/A = 5000 kN/m 2
Z = π(D 4 -d 4 ) / 32D = 0.0502655 m3

e = exposed pile length = 1 m


z f = Depth to point of fixity
= 1.8T = 4.4 m (from Equation 6.51)
T = (EI / n h ) 0.2 = 2 m (from Equation 6.13)
E = 21700000 kN/m 2
4
I = π(D ) / 64 = 0.0201062 m4
nh = 5000 kN/m 3 (from Figure 6.20)

Deflection at Head of Fixed-Headed pile


y = H u (e+z f ) 3 / 12EI (from Equation 6.21)

Hu = y12EI / (e+z f ) 3 = 665 kN


Ha = 221.7 kN > 31.029 kN

Design Lateral Load H = 31.029 kN

Deflection at Head of Free-Headed pile


y = H u (e+z f ) 3 / 3EI (from Equation 6.22)

Hu = y3EI / (e+z f ) 3 = 166 kN


Ha = 55.42 kN > 15.51 kN

Design Lateral Load H = 15.51 kN


Pile Design

This document is controlled electronically and is uncontrolled when printed


EPC for Kolo Creek to Soku Gas Export
xport Pipeline

SOIL INVESTIGATION INTERPRETATIVE REPORT

K2S
K2S-NG01007551-GEN-CG6968-00006 Page 66 of 79

5.4.2 Pile Lateral Capacity Computation for Soku Gas Plant –

600mm
00mm Continuous Flight Auger Pile Lateral Capacity Computation-- Soku Gas Plant

Laterally Loaded Piles


Pile Design

Ultimate Lateral Load on Fixed-Headed pile and Construction Practice

H u = 2M u / (e+z f ) = 47 kN (from Equation 6.19)


Ha = 15.72 kN
where M u = ultimate Moment
= σmaxZ = 106 kNm
σmax = P/A = 5000 kN/m 2
4
Z = π(D ) / 32D = 0.0212058 m 3

Ultimate Lateral Load on Free-Headed pile


H u = M u / (e+z f ) = 24 kN (from Equation 6.19)
Ha = 7.86 kN
where M u = ultimate Moment
= σmaxZ = 106 kNm
σmax = P/A = 5000 kN/m 2
Z = π(D 4 ) / 32D = 0.0212058 m 3

e = exposed pile length = 1 m


z f = Depth to point of fixity
= 1.8T = 3.5 m (from Equation 6.51)
T = (EI / n h ) 0.2 = 2 m (from Equation 6.13)
E = 21700000 kN/m 2
4
I = π(D ) / 64 = 0.0063617 m 4
3
nh = 5000 kN/m (from Figure 6.20)

Deflection at Head of Fixed-Headed pile


y = H u (e+z f ) 3 / 12EI (from Equation 6.21)

Hu = y12EI / (e+z f ) 3 = 365 kN


Ha = 121.6 kN > 15.7244 kN

Design Lateral Load H = 15.7244 kN

Deflection at Head of Free-Headed pile


y = H u (e+z f ) 3 / 3EI (from Equation 6.22)

Hu = y3EI / (e+z f ) 3 = 91 kN
Ha = 30.39 kN > 7.86 kN

Design Lateral Load H = 7.86 kN

This document is controlled electronically and is uncontrolled when printed


EPC for Kolo Creek to Soku Gas Export
xport Pipeline

SOIL INVESTIGATION INTERPRETATIVE REPORT

K2S
K2S-NG01007551-GEN-CG6968-00006 Page 67 of 79

800mm
00mm Continuous Flight Auger Pile
Pil Lateral Capacity Computation-- Soku Gas Plant

Pile Design

Ultimate Lateral Load on Fixed-Headed pile and Construction Practice

H u = 2M u / (e+z f ) = 133.1 kN (from Equation 6.19)


Ha = 44.37 kN
where M u = ultimate Moment
= σmaxZ = 251.3 kNm
σmax = P/A = 5000 kN/m 2
Z = π(D 4 - ) / 32D = 0.0502655 m 3

Ultimate Lateral Load on Free-Headed pile


H u = M u / (e+z f ) = 66.56 kN (from Equation 6.19)
Ha = 22.19 kN
where M u = ultimate Moment
= σmaxZ = 251.3 kNm
σmax = P/A = 5000 kN/m 2
Z = π(D 4 ) / 32D = 0.0502655 m 3

e = exposed pile length = 1 m


z f = Depth to point of fixity
= 1.8T = 2.776 m (from Equation 6.51)
T = (EI / n h ) 0.2 = 2 m (from Equation 6.13)
E = 2170000 kN/m 2
4
I = π(D ) / 64 = 0.0201062 m 4
3
nh = 5000 kN/m (for Soft normally-consolidated clays) (from Figure 6.20)

Deflection at Head of Fixed-Headed pile


y = H u (e+z f ) 3 / 12EI (from Equation 6.21)

Hu = y12EI / (e+z f ) 3 = 194.5 kN


Ha = 64.83 kN > 44.3715 kN

Design Lateral Load H = 44.3715 kN

Deflection at Head of Free-Headed pile


y = H u (e+z f ) 3 / 3EI (from Equation 6.22)

Hu = y3EI / (e+z f ) 3 = 48.62 kN


Ha = 16.21 kN < 22.19 kN

Design Lateral Load H = 16.2064 kN


Pile Design

This document is controlled electronically and is uncontrolled when printed


EPC for Kolo Creek to Soku Gas Export
xport Pipeline

SOIL INVESTIGATION INTERPRETATIVE REPORT

K2S
K2S-NG01007551-GEN-CG6968-00006 Page 68 of 79

5.5 Single Pile Settlement

5.5.1 Single Pile Settlement Computation for Kolo Creek

600mm
00mm Continuous Flight Auger Pile Settlement – Kolo Creek

Settlement of Piles Foundation Analysis


& Design- 5th Edition
HP = H a + H Pt (from Equation 11.72)

where Hp = total pile settlement


Ha = elastic settlement of pile
H pt = Point Settlement taking Shaft into Consideration

Ha = (Q wp + Q ws )L / A p E p (from section 16-10)

where Q wp = load carried at the pile point under working load condition
Q ws = load carried by frictional (skin) resistance under working load condition
Ap = area of pile cross section
L = length of pile
Ep = modulus of elasticity of the pile material

H pt = [qD(1- μ2 )/ E s ]I F F 1 (from Equation 5-16a)

where q = ultimate point resistance of the pile


μ = Poisons ration = 0.35
D = cross sectional diameter of pile
Es = modulus of elasticity of the soil at pile tip
IF = Fox embedment factor; 0.55 if L/D<5, 1.5 if L/D > 5
F1 = Reduction Factor

Soil Depth Thk. IF Ep S1 Es F1 S2 S


Type m m - kN/m2 m m mm
Fine Sand 4.00 4.00 0.55 21700000 0.00 16500.00 0.75 0.003 2.65
Firm clay 7.50 3.50 0.50 21700000 0.00 7500.00 0.75 0.001 1.11
Fine to Medium sand 10.00 2.50 0.50 21700000 0.00 15500.00 0.75 0.006 6.73
Fine to Medium sand 15.00 5.00 0.50 21700000 0.00 20000.00 0.75 0.010 11.78
Fine to Medium sand 27.50 12.50 0.50 21700000 0.01 20500.00 0.75 0.020 26.48
Firm clay 30.00 2.50 0.50 21700000 0.00 7500.00 0.75 0.002 5.10

This document is controlled electronically and is uncontrolled when printed


EPC for Kolo Creek to Soku Gas Export
xport Pipeline

SOIL INVESTIGATION INTERPRETATIVE REPORT

K2S
K2S-NG01007551-GEN-CG6968-00006 Page 69 of 79

800mm
00mm Continuous Flight Auger Pile Settlement – Kolo Creek

Settlement of Piles Foundation Analysis


& Design- 5th Edition
HP = H a + H Pt (from Equation 11.72)

where Hp = total pile settlement


Ha = elastic settlement of pile
H pt = Point Settlement taking Shaft into Consideration

Ha = (Q wp + Q ws )L / A p E p (from section 16-10)

where Q wp = load carried at the pile point under working load condition
Q ws = load carried by frictional (skin) resistance under working load condition
Ap = area of pile cross section
L = length of pile
Ep = modulus of elasticity of the pile material

H pt = [qD(1- μ2 )/ E s ]I F F 1 (from Equation 5-16a)

where q = ultimate point resistance of the pile


μ = Poisons ration = 0.35
D = cross sectional diameter of pile
Es = modulus of elasticity of the soil at pile tip
IF = Fox embedment factor; 0.55 if L/D<5, 1.5 if L/D > 5
F1 = Reduction Factor

Soil Depth Thk. IF Ep S1 Es F1 S2 S


Type m m - kN/m2 m m mm
Fine Sand 4.00 4.00 0.55 21700000 0.00 16500.00 0.75 0.002 2.20
Firm clay 7.50 3.50 0.50 21700000 0.00 7500.00 0.75 0.003 2.74
Fine to Medium sand 10.00 2.50 0.50 21700000 0.00 15500.00 0.75 0.006 6.22
Fine to Medium sand 15.00 5.00 0.50 21700000 0.00 20000.00 0.75 0.010 10.27
Fine to Medium sand 27.50 12.50 0.50 21700000 0.00 20500.00 0.75 0.021 23.08
Firm clay 30.00 2.50 0.50 21700000 0.00 7500.00 0.75 0.020 19.67

This document is controlled electronically and is uncontrolled when printed


EPC for Kolo Creek to Soku Gas Export
xport Pipeline

SOIL INVESTIGATION INTERPRETATIVE REPORT

K2S
K2S-NG01007551-GEN-CG6968-00006 Page 70 of 79

5.5.2 Single Pile Settlement Computation for Soku Gas Plant

600mm
00mm Continuous Flight Auger Pile Settlement – Soku Gas Plant

Settlement of Piles Foundation Analysis


& Design- 5th Edition
HP = H a + H Pt (from Equation 11.72)

where Hp = total pile settlement


Ha = elastic settlement of pile
H pt = Point Settlement taking Shaft into Consideration

Ha = (Q wp + Q ws )L / A p E p (from section 16-10)

where Q wp = load carried at the pile point under working load condition
Q ws = load carried by frictional (skin) resistance under working load condition
Ap = area of pile cross section
L = length of pile
Ep = modulus of elasticity of the pile material

H pt = [qD(1- μ2 )/ E s ]I F F 1 (from Equation 5-16a)

where q = ultimate point resistance of the pile


μ = Poisons ration = 0.35
D = cross sectional diameter of pile
Es = modulus of elasticity of the soil at pile tip
IF = Fox embedment factor; 0.55 if L/D<5, 1.5 if L/D > 5
F1 = Reduction Factor

Soil Depth Thk. IF Ep Ha Es F1 Hpt Hp


Type 2
m m - kN/m m m mm
Fine Sand 4.00 4.00 0.55 21700000 0.00 9500.00 0.75 0.002 1.82
Firm clay 7.50 3.50 0.50 21700000 0.00 7500.00 0.75 0.000 0.22
Fine to Medium sand 10.00 2.50 0.50 21700000 0.00 11500.00 0.75 0.006 6.56
Fine to Medium sand 15.00 5.00 0.50 21700000 0.00 21000.00 0.75 0.011 11.17
Fine to Medium sand 27.50 12.50 0.50 21700000 0.00 22500.00 0.75 0.016 18.18
Firm clay 30.00 2.50 0.50 21700000 0.00 7500.00 0.75 0.001 1.46

This document is controlled electronically and is uncontrolled when printed


EPC for Kolo Creek to Soku Gas Export
xport Pipeline

SOIL INVESTIGATION INTERPRETATIVE REPORT

K2S
K2S-NG01007551-GEN-CG6968-00006 Page 71 of 79

800mm
00mm Continuous Flight Auger Pile Settlement – Soku Gas Plant

Settlement of Piles Foundation Analysis


& Design- 5th Edition
HP = H a + H Pt (from Equation 11.72)

where Hp = total pile settlement


Ha = elastic settlement of pile
H pt = Point Settlement taking Shaft into Consideration

Ha = (Q wp + Q ws )L / A p E p (from section 16-10)

where Q wp = load carried at the pile point under working load condition
Q ws = load carried by frictional (skin) resistance under working load condition
Ap = area of pile cross section
L = length of pile
Ep = modulus of elasticity of the pile material

H pt = [qD(1- μ2 )/ E s ]I F F 1 (from Equation 5-16a)

where q = ultimate point resistance of the pile


μ = Poisons ration = 0.35
D = cross sectional diameter of pile
Es = modulus of elasticity of the soil at pile tip
IF = Fox embedment factor; 0.55 if L/D<5, 1.5 if L/D > 5
F1 = Reduction Factor

Soil Depth Thk. IF Ep Ha Es F1 Hpt Hp


Type m m - 2 m m mm
kN/m
Fine Sand 4.00 4.00 0.55 21700000 0.00 9500.00 0.75 0.004 4.18
Firm clay 7.50 3.50 0.50 21700000 0.00 7500.00 0.75 0.000 0.49
Fine to Medium sand 10.00 2.50 0.50 21700000 0.00 11500.00 0.75 0.015 15.67
Fine to Medium sand 15.00 5.00 0.50 21700000 0.00 21000.00 0.75 0.025 27.06
Fine to Medium sand 27.50 12.50 0.50 21700000 0.01 22500.00 0.75 0.037 42.32
Firm clay 30.00 2.50 0.50 21700000 0.00 7500.00 0.75 0.003 5.65

This document is controlled electronically and is uncontrolled when printed


EPC for Kolo Creek to Soku Gas Export
xport Pipeline

SOIL INVESTIGATION INTERPRETATIVE REPORT

K2S
K2S-NG01007551-GEN-CG6968-00006 Page 72 of 79

5.6 Pile Capacity Summary

Location Kolo Creek

Compression-R1
(kN)
Pile Pile Pile Tension/Uplift Lateral/Trasverse Settlement
Depth Size Capacities (kN) (kN) (mm)
Compression R4
Compression-
(kN)

10m 600 mm diameter 441.72


CFA Pile 94.22 15.72 6.73
346.25

800 mm diameter 728.75


CFA Pile 136.40 31.03 6.22
567.70

15m 600 mm diameter 905.89


CFA Pile 171.04 15.72 11.78
708.66

800 mm diameter 1508.38


CFA Pile 247.93 31.03 10.27
1173.46

Location Soku Gas Plant

10m 600 mm diameter 334.42


CFA Pile 74.15 15.72 6.56
261.64

800 mm diameter 554.19


CFA Pile 109.64 44.37 15.67
431.01

15m 600 mm diameter 950.40


CFA Pile 152.83 15.72 11.17
739.53

800 mm diameter 1602.71


CFA Pile 223.90 44.37 27.06
1241.19

This document is controlled electronically and is uncontrolled when printed


EPC for Kolo Creek to Soku Gas Export
xport Pipeline

SOIL INVESTIGATION INTERPRETATIVE REPORT

K2S
K2S-NG01007551-GEN-CG6968-00006 Page 73 of 79

6.0 DISCUSSION / RECOMMENDATION

From the geotechnical result interpretati


interpretation and capacity computations, loose to dense sand is encountered
at a depth of 10.0m and 15m both with cone tip and SPT tests at both the Soku Gas plant site and Kolo
Creek, which seems to be convenient stratum for pile termination.. Resistance values to compressive,
co tensile,
and lateral loads at these depths have been established.

Engineering analysis carried out on shallow foundations have


ha also been made available in this report. The
capacities of both pad and raft foundations to a maximum width and length of 13 m have been established to
a satisfactory level using the Terzaghi 1956 approach and the Meyerhoff
hoff 1963 approach. Based on these
findings,, recommendations for deep and shallow
shallow foundations to be adopted for detailed engineering
computations are given in sections below.

6.1 Recommendation For Deep Foundation

The recommendation for deep foundation has been made based on availability of materials
mat in the market,
ease of construction and structural stability.
stability. For deep foundations a summary of the pile capacities
capacit to be
adopted is given in the table below;

Table 6.1: Soku Gas Plant


Pl nt Pile size Recommendation

Compression
-R1 (kN)
kN)
Pile Pile Tension/Uplift Lateral/Transverse Settlement
Depth Size Compression (kN) (kN) (mm)
-R44 (kN)

15m 800 1602.71


mm 223.90 44.37 27.06
dia. 1241.19

Table 6.1: Kolo Creek Pile size Recommendation

Compression
-R1 (kN)
Pile Pile Tension/Uplift Lateral/Transverse Settlement
Depth Size Compression (kN) (kN) (mm)
-R44 (kN)

15m 800 1508.38


mm 247.93 31.03 10.27
dia. 1173.46

This document is controlled electronically and is uncontrolled when printed


EPC for Kolo Creek to Soku Gas Export
xport Pipeline

SOIL INVESTIGATION INTERPRETATIVE REPORT

K2S
K2S-NG01007551-GEN-CG6968-00006 Page 74 of 79

For Soku, additional


dditional Factor of safety should be applied to reduce the allowable working pile capacity to a
value in which settlement shall not exceed 20mm.

6.2 Recommendation For Shallow Foundation

The bearing capacity values computed by Meyerhof’s method shall be used for shallow foundation design
generally, being more conservative than Terzaghi's.

Table 6.3: Kolo Creek Shallow Foundation


F Recommended
ed Capacities

Df (m) B (m) L/B qu (KN/m 2) qa(kN/m 2)


1.00 250.76 83.59
2.00 246.72 82.24
1.0
3.00 245.37 81.79
4.00 244.69 81.56
1.00 283.01 94.34
2.00 278.45 92.82
1.5
3.00 276.92 92.31
4.00 276.16 92.05
1.00 316.86 105.62
2.00 311.75 103.92
2.0
3.00 310.04 103.35
4.00 309.19 103.06
1.00 386.16 128.72
2.00 379.93 126.64
3.0
3.00 377.85 125.95
4.00 376.81 125.60
1.0
1.00 456.25 152.08
2.00 448.89 149.63
4.0
3.00 446.44 148.81
4.00 445.21 148.40
1.00 526.67 175.56
2.00 518.17 172.72
5.0
3.00 515.34 171.78
4.00 513.93 171.31
1.00 597.24 199.08
2.00 587.61 195.87
6.0
3.00 584.40 194.80
4.00 582.80 194.27
1.00 738.64 246.21
2.00 726.72 242.24
8.0
3.00 722.75 240.92
4.00 720.77 240.26

This document is controlled electronically and is uncontrolled when printed


EPC for Kolo Creek to Soku Gas Export
xport Pipeline

SOIL INVESTIGATION INTERPRETATIVE REPORT

K2S
K2S-NG01007551-GEN-CG6968-00006 Page 75 of 79

Df (m) B (m) L/B qu (KN/m 2) qa(kN/m 2)


1.00 347.89 115.96
2.00 342.28 114.09
1.0
3.00 340.41 113.47
4.00 339.47 113.16
1.00 376.14 125.38
2.00 370.07 123.36
1.5
3.00 368.05 122.68
4.00 367.04 122.35
1.00 407.99 136.00
2.00 401.41 133.80
2.0
3.00 399.22 133.07
4.00 398.12 132.71
1.00 475.29 158.43
2.00 467.62 155.87
3.0
3.00 465.07 155.02
4.00 463.79 154.60
1.5
1.00 544.39 181.46
2.00 535.60 178.53
4.0
3.00 532.68 177.56
4.00 531.21 177.07
1.00 614.20 204.73
2.00 604.30 201.43
5.0
3.00 600.99 200.33
4.00 599.34 199.78
1.00 684.38 228.13
2.00 673.34 224.45
6.0
3.00 669.66 223.22
4.00 667.82 222.61
1.00 825.27 275.09
2.00 811.96 270.65
8.0
3.00 807.52 269.17
4.00 805.30 268.43

This document is controlled electronically and is uncontrolled when printed


EPC for Kolo Creek to Soku Gas Export
xport Pipeline

SOIL INVESTIGATION INTERPRETATIVE REPORT

K2S
K2S-NG01007551-GEN-CG6968-00006 Page 76 of 79

Df (m) B (m) L/B qu (KN/m 2) qa(kN/m 2)


1.00 449.81 149.94
2.00 442.56 147.52
1.0
3.00 440.14 146.71
4.00 438.93 146.31
1.00 472.47 157.49
2.00 464.85 154.95
1.5
3.00 462.31 154.10
4.00 461.04 153.68
1.00 501.52 167.17
2.00 493.43 164.48
2.0
3.00 490.73 163.58
4.00 489.39 163.13
1.00 566.02 188.67
2.00 556.89 185.63
3.0
3.00 553.85 184.62
4.00 552.33 184.11
2.0
1.00 633.72 211.24
2.00 623.50 207.83
4.0
3.00 620.09 206.70
4.00 618.39 206.13
1.00 702.69 234.23
2.00 691.36 230.45
5.0
3.00 687.58 229.19
4.00 685.69 228.56
1.00 772.31 257.44
2.00 759.85 253.28
6.0
3.00 755.70 251.90
4.00 753.63 251.21
1.00 912.50 304.17
2.00 897.79 299.26
8.0
3.00 892.88 297.63
4.00 890.43 296.81

This document is controlled electronically and is uncontrolled when printed


EPC for Kolo Creek to Soku Gas Export
xport Pipeline

SOIL INVESTIGATION INTERPRETATIVE REPORT

K2S
K2S-NG01007551-GEN-CG6968-00006 Page 77 of 79

Table 6.4: Soku Gas Plant Shallow Foundation Recommended


ed Capacities

Df (m) B (m) L/B qu (KN/m 2) qa(kN/m 2)


1.00 202.84 67.61
2.00 200.05 66.68
1.0
3.00 199.12 66.37
4.00 198.66 66.22
1.00 226.89 75.63
2.00 223.77 74.59
1.5
3.00 222.73 74.24
4.00 222.21 74.07
1.00 252.17 84.06
2.00 248.71 82.90
2.0
3.00 247.55 82.52
4.00 246.97 82.32
1.00 303.98 101.33
2.00 299.80 99.93
3.0
3.00 298.41 99.47
4.00 297.71 99.24
1.0
1.00 356.41 118.80
2.00 351.51 117.17
4.0
3.00 349.88 116.63
4.00 349.06 116.35
1.00 409.08 136.36
2.00 403.46 134.49
5.0
3.00 401.58 133.86
4.00 400.65 133.55
1.00 461.88 153.96
2.00 455.53 151.84
6.0
3.00 453.41 151.14
4.00 452.35 150.78
1.00 567.66 189.22
2.00 559.85 186.62
8.0
3.00 557.25 185.75
4.00 555.95 185.32

This document is controlled electronically and is uncontrolled when printed


EPC for Kolo Creek to Soku Gas Export
xport Pipeline

SOIL INVESTIGATION INTERPRETATIVE REPORT

K2S
K2S-NG01007551-GEN-CG6968-00006 Page 78 of 79

Df (m) B (m) L/B qu (KN/m 2) qa(kN/m 2)


1.00 283.30 94.43
2.00 279.41 93.14
1.0
3.00 278.11 92.70
4.00 277.46 92.49
1.00 304.26 101.42
2.00 300.08 100.03
1.5
3.00 298.68 99.56
4.00 297.99 99.33
1.00 328.00 109.33
2.00 323.49 107.83
2.0
3.00 321.99 107.33
4.00 321.24 107.08
1.00 378.26 126.09
2.00 373.06 124.35
3.0
3.00 371.33 123.78
4.00 370.46 123.49
1.5
1.00 429.91 143.30
2.00 424.00 141.33
4.0
3.00 422.03 140.68
4.00 421.05 140.35
1.00 482.12 160.71
2.00 475.50 158.50
5.0
3.00 473.29 157.76
4.00 472.18 157.39
1.00 534.61 178.20
2.00 527.26 175.75
6.0
3.00 524.81 174.94
4.00 523.59 174.53
1.00 640.01 213.34
2.00 631.21 210.40
8.0
3.00 628.27 209.42
4.00 626.81 208.94

This document is controlled electronically and is uncontrolled when printed


EPC for Kolo Creek to Soku Gas Export
xport Pipeline

SOIL INVESTIGATION INTERPRETATIVE REPORT

K2S
K2S-NG01007551-GEN-CG6968-00006 Page 79 of 79

Df (m) B (m) L/B qu (KN/m 2) qa(kN/m 2)


1.00 367.48 122.49
2.00 362.43 120.81
1.0
3.00 360.74 120.25
4.00 359.90 119.97
1.00 384.11 128.04
2.00 378.83 126.28
1.5
3.00 377.07 125.69
4.00 376.18 125.39
1.00 405.68 135.23
2.00 400.10 133.37
2.0
3.00 398.24 132.75
4.00 397.32 132.44
1.00 453.78 151.26
2.00 447.54 149.18
3.0
3.00 445.46 148.49
4.00 444.42 148.14
2.0
1.00 504.35 168.12
2.00 497.42 165.81
4.0
3.00 495.10 165.03
4.00 493.95 164.65
1.00 555.91 185.30
2.00 548.27 182.76
5.0
3.00 545.72 181.91
4.00 544.45 181.48
1.00 607.96 202.65
2.00 599.61 199.87
6.0
3.00 596.82 198.94
4.00 595.43 198.48
1.00 712.82 237.61
2.00 703.02 234.34
8.0
3.00 699.75 233.25
4.00 698.12 232.71

This document is controlled electronically and is uncontrolled when printed