FACULTY OF ENGINEERING
BUILDING AND CONSTRUCTION ENGINEERING
Prepared by:
Under Supervision of : Mahmoud Abd EL Aziz Abuo Ammo
i
Introduction I
Group 3 Concrete project 2019
Part 1: (VILLA)
Contents : Page
sss:
chapter1 : INTRODUCTION ........................................................................................................ 1.4
1.1 Villa Consists of ............................................................................................................... 1.4
1.2 Material Properties Used ................................................................................................ 1.4
1.3 Cover Thickness .............................................................................................................. 1.4
1.4 Loads Used ..................................................................................................................... 1.4
1.5 Design Method ............................................................................................................... 1.5
1.6 Computer Programs Used in Analysis............................................................................... 1.5
1.7 Design Code .................................................................................................................... 1.5
chapter2: DESIGN OF SLABS ...................................................................................................... 1.6
2.1 Basement Slab: (Flat Slab System) .................................................................................. 1.6
2.1.1 Check for Short Term Deflection ................................................................................... 1.9
2.1.2 Check for Long Term Deflection .................................................................................... 1.9
2.2 Ground Slab (Flat Slab System) ........................................................................................ 1.10
2.2.1 Check for Short Term Deflection ................................................................................... 1.13
2.2.2 Check for Long Term Deflection .................................................................................... 1.13
2.3 Typical Slab (Flat Slab System) ........................................................................................ 1.14
2.3.1 Check for Short Term Deflection .................................................................................. 1.17
2.3.2 Check for Long Term Deflection ................................................................................... 1.17
2.4 Check of Punching Shear: (Basement Roof) .................................................................... 1.18
2.4.1 Edge Column (C1=30*60) on ( – د1 ) Axis ..................................................................... 1.18
2.4.2 Interior Column (C3 = 30*100) on ( – ب5 ) Axis ............................................................ 1.19
Chapter3 : Design of Stairs (Two Flight Stair Axis (ه – و............................................................ 1.20
3.1 Manual Solution ............................................................................................................. 1.20
3.2 Using SAP program ........................................................................................................ 1.23
3.3 Design of supporting beam () كمرة نصف الدور.................................................................. 1.24
3.3.1 Check of Shear on Beam Section ................................................................................. 1.25
3.4 Design of beam using SAP program ............................................................................... 1.25
i
Table of Contents
Group 3 Concrete project 2019
i
Table of Contents
Group 3 Concrete project 2019
Figure 1.2 Additional Reinforcement in X-Direction (Lower)
Figure 1.3 Additional Reinforcement in X-Direction (Upper)
Figure 1.4 Additional Reinforcement in Y-Direction (Lower)
Figure 1.5 Additional Reinforcement in Y-Direction (Upper)
Figure 1.6 Short Term Deflection
Figure 1.7 Long Term Deflection
Figure 1.8 Statical System of Ground Roof
Figure 1.9 Additional Reinforcement in X-Direction (Lower)
Figure 1.10 Additional Reinforcement in X-Direction (Upper)
Figure 1.11 Additional Reinforcement in Y-Direction (Lower)
Figure 1.12 Additional Reinforcement in Y-Direction (Upper)
Figure 1.13 Short Term Deflection
Figure 1.14 Long Term Deflection
Figure 1.15 Statical System of Ground Roof
Figure 1.16 Additional Reinforcement in X-Direction (Lower)
Figure 1.17 Additional Reinforcement in X-Direction (Upper)
Figure 1.18 Additional Reinforcement in Y-Direction (Lower)
Figure 1.19 Additional Reinforcement in Y-Direction (Upper)
Figure 1.20 Short Term Deflection
Figure 1.21 Long Term Deflection
Figure 1.22 Stair Cross Section
Figure 1.23 Strip (1) of Stair
Figure 1.24 Strip (2) of Stair
Figure 1.24 Stair 3D
Figure 1.25 Bending moment in X-direction
Figure 1.26 Bending moment in Y-direction
Figure 1.27 Beam Loads
Figure 1.28 Maximum positive moment on beam
i
Table of Contents
Group 3 Concrete project 2019
Figure 1.37 Shear on Basement Roof Beams
Figure 1.38 Shear on Ground Roof Beams
Figure 1.39 Shear on Typical Floor Beams
Figure 1.40 Axis of columns
Figure 1.41 Column Cross Section
Figure 1.42 Column Cross Section
Figure 1.43 Columns reactions (Ultimate)
Figure 1.44 Columns reactions (Working)
Figure 1.45 Sections of Moment of 3ق
Figure 1.46 Check of Punch
Figure 1.47 Check of Shear of 3 ق
Figure 1.48 Check of Bond
Figure 1.49 Foundations
Figure 1.50 Section of Retaining wall
Figure 1.51 Reinforcement of R.W , strip footing
Figure 1.52 Elevation of Hollow block slab
Figure 1.53 Section of Hollow block slab
Figure 1.54 Arrangement of blocks
Figure 1.55 Reinforcement of H.B
i
Table of Contents
Group 3 Concrete project 2019
i
Table of Contents
Group 3 Concrete project 2019
i
Table of Contents
Group 3 Concrete project 2019
i
Table of Contents
Group 3 Concrete project 2019
i
Table of Contents
Group 3 Concrete projct 2019
Table of Contents IX
Group 3 Concrete project 2019
Contents : Page
sss:
chapter1: INTRODUCTION ....................................................................................................... 4.2
1.1 Elevated circular tank consists of ......................................................................... 4.2
1.2 Material Properties Used ..................................................................................... 4.2
1.3 Cover Thickness ………………………………………………………………………………………………… 4.2
1.4 Loads Used........................................................................................................... 4.2
1.5 Design Method .................................................................................................... 4.2
chapter 2: Dimensions............................................................................................................. 4.3
2.1 Upper Tank................................................................................................………… 4.3
2.2 Lower Tank .......................................................................................................... 4.4
chapter 3: Design..................................................................................................................... 4.5
3.1 Upper tank .......................................................................................................... 4.5
3.1.1 Covering Floor.................................................................................................. 4.5
3.1.2 Posts................................................................................................................. 4.5
3.1.3 Dry Cone .......................................................................................................... 4.6
3.1.4 Design of Ring beam......................................................................................... 4.8
3.1.5 Design of Wall................................................................................................... 4.9
3.1.6 Design of Wet Cone .......................................................................................... 4.12
3.1.7 Design of Ring beam......................................................................................... 4.14
3.2 Design of Floor with circular hole ……………………………………………………………………… 4.15
3.3 Lower Tank ......................................................................................................... 4.18
3.3.1 Dry Cone ........................................................................................................... 4.18
3.3.2 Design of Ring beam.......................................................................................... 4.20
3.3.3 Design of Wall.................................................................................................... 4.21
3.3.4 Design of Wet Cone ........................................................................................... 4.24
3.3.5 Design of Ring beam.......................................................................................... 4.26
Chapter 4: Effect of Earthquakes on Tank ................................................................................ 4..27
Chapter 5: Design of Shaft ....................................................................................................... 4.34
Chapter 6 : Design of Foundations............................................................................................ 4.36
Table of Contents X
Group 3 Concrete project 2019
Table of Contents XI
Group 3 Concrete project 2019
PART 1: (VILLA)
VILLA 1.1
Group 3 Concrete project 2019
VILLA 1.2
Group 3 Concrete project 2019
VILLA 1.3
Group 3 Concrete project 2019
Introduction
Slabs Cover = 2 cm
Beams Cover = 2 cm
Columns Cover = 2.5 cm
Foundations Cover = 5 cm
Stairs Cover = 2 cm
Ramp Cover = 2 cm
Tie , Semell Cover = 2.5 cm
VILLA 1.4
Group 3 Concrete project 2019
VILLA 1.5
Group 3 Concrete project 2019
VILLA 1.6
Group 3 Concrete project 2019
In X-Direction: (Lower):
In X-Direction: (Upper):
VILLA 1.7
Group 3 Concrete project 2019
In Y-Direction (Lower):
In Y-Direction (Upper):
VILLA 1.8
Group 3 Concrete project 2019
VILLA 1.9
Group 3 Concrete project 2019
𝐌𝐮
𝑨𝒔 = 𝐅𝐲∗𝐉∗𝐝
𝛑∗(𝟏.𝟔)𝟐
Mu = As * Fy * J *d = 8*( 𝟒 ) ∗ 𝟑𝟔𝟎𝟎 ∗. 𝟔𝟗𝟓 ∗ 𝟐𝟑 ∗ (𝟏𝟎)−𝟓
M(r) = 8.85 t.m ⇛ Use 8 ∯ 12 / m in each Direction
- Additional RFT ( 8 ∯ 12 /m) lower & (8 ∯ 12 / m) upper
VILLA 1.10
Group 3 Concrete project 2019
In X-Direction: (Lower):
In X-Direction: (Upper) :
VILLA 1.11
Group 3 Concrete project 2019
In Y-Direction: (Lower)
In Y-Direction: (Upper)
VILLA 1.12
Group 3 Concrete project 2019
VILLA 1.13
Group 3 Concrete project 2019
VILLA 1.14
Group 3 Concrete project 2019
In X-Direction: (Lower)
In X-Direction: (Upper)
VILLA 1.15
Group 3 Concrete project 2019
In Y-Direction: (Lower)
In Y-Direction: (Upper)
VILLA 1.16
Group 3 Concrete project 2019
VILLA 1.17
Group 3 Concrete project 2019
Pcol
𝑄𝑝𝑢 = = 31 ton
6
Ap =( 𝒃𝟎 * d ) =
𝒅
⌊𝟐 (𝑪𝟏 + ) + (𝑪𝟐 + 𝟐𝟑𝟎)⌋* d
𝟐
𝟐𝟑𝟎
⌊𝟐 (𝟔𝟎𝟎 + ) + (𝟑𝟎𝟎 + 𝟐𝟑𝟎)⌋*230
𝟐
= 450800 mm2
𝑄𝑝𝑢
𝒒𝒑𝒖 = *B
𝑨𝒑
𝟑𝟏𝟎𝟎𝟎𝟎
= ∗ 𝟏. 𝟑 = . 𝟖𝟗𝟑 𝑵⁄𝒎𝒎𝟐
𝟒𝟓𝟎𝟖𝟎
𝐅𝐜𝐮 𝟐𝟓
. 𝟑𝟏𝟔√ =. 𝟑𝟏𝟔√ = 𝟏. 𝟑 𝐍⁄
𝛄𝐜 𝟏.𝟓 𝐦𝐦𝟐
𝐚 𝐅𝐜𝐮 𝟑𝟎𝟎 𝟐𝟓
. 𝟑𝟏𝟔 (𝐛 +. 𝟓) ∗ √ 𝛄𝐜 =. 𝟑𝟏𝟔 (𝟔𝟎𝟎 +. 𝟓) ∗ √𝟏.𝟓 = 𝟏. 𝟐𝟗 𝐍⁄
𝐦𝐦𝟐
1.6 𝐍⁄
𝐦𝐦𝟐
OK safe punching
VILLA 1.18
Group 3 Concrete project 2019
296
𝑄𝑝𝑢 = = 49.33 ton
6
Ap =( 𝒃𝟎 * d ) =
= 809600 mm2
𝑄𝑝𝑢
𝒒𝒑𝒖 = *B
𝑨𝒑
𝟒𝟗𝟑𝟑𝟎𝟎
= ∗ 𝟏. 𝟒 = . 𝟖𝟓𝟑 𝑵⁄𝒎𝒎𝟐
𝟖𝟎𝟗𝟔𝟎𝟎
𝐅𝐜𝐮 𝟐𝟓
. 𝟑𝟏𝟔√ =. 𝟑𝟏𝟔√ = 𝟏. 𝟑 𝐍⁄
𝛄𝐜 𝟏.𝟓 𝐦𝐦𝟐
𝐚 𝐅𝐜𝐮 𝟑𝟎𝟎 𝟐𝟓
. 𝟑𝟏𝟔 (𝐛 +. 𝟓) ∗ √ 𝛄𝐜 =. 𝟑𝟏𝟔 (𝟏𝟎𝟎𝟎 +. 𝟓) ∗ √𝟏.𝟓 = 𝟏. 𝟎𝟑 𝐍⁄
𝐦𝐦𝟐
1.6 𝐍⁄
𝐦𝐦𝟐
OK safe punching
VILLA 1.19
Group 3 Concrete project 2019
2.3.1 Dimensions:
𝑆𝑝𝑎𝑛 428
𝑡𝑠 = 24∶30 = 24:30 = 0.20 𝑚
𝐻Story= 3.00 𝑚
𝑅𝑖𝑠𝑒 = 0.15 𝑚
𝐺𝑜𝑖𝑛𝑔 = 0.30 𝑚
0.15
𝜃= tan−1 ( ) = 26.5 °
0.30
2.3.2 Loads:
For Landing (S1)
Ws = 1.4 D.L + 1.6 L.L
VILLA 1.20
Group 3 Concrete project 2019
𝑠𝑡𝑒𝑝 20 15
tave = t’ + = 𝐶𝑜𝑠 (26.56) + = 29.85 cm
2 2
0.56∗ 106
180 = c1 * √ 25∗1000
c1 = 38.03 ⇛ J = 0.826
𝑀𝑢 0.56∗106
As = 𝐹𝑦∗𝐽∗𝑑
= 360∗0.826∗180 = 10.46 mm2
Use AS ⇛ 5 ∯ 10 / m
VILLA 1.21
Group 3 Concrete project 2019
For Flight (S2)
∑ M@ Rs3 = 0
Rs2*4.53 = 14.46*1*(0.5+2.70+0.83)+17.30*2.70*2.70*(1.35+0.83)
+14.46*0.83*0.415
Rs2 = 36.5 KN/m
Rs3 = 36.78 KN/m
1 2.70 2.70 2.70
Mu2 = 63.5*2.35 - (14.46*1)*(2 + 2 ) – 17.34 *( 2 + 4 ) = 24.00 KN.m
24∗ 106
180 = c1 * √25∗1000
c1 = 5.80 ⇛ J = 0.826
𝑀𝑢 24.00∗106
As = 𝐹𝑦∗𝐽∗𝑑
= 360∗0.826∗180 = 448.39 mm2
Use AS ⇛ 5 ∯ 16 / m
VILLA 1.22
Group 3 Concrete project 2019
1.3.2 Using SAP program
VILLA 1.23
Group 3 Concrete project 2019
1.3.3 Design of supporting beam (( كمرة نصف الدور
b = 25 cm , t = 75 cm
Loads
O.W = 25*0.25*0.75=4.68 KN/m`
Rs3 = 36.78 KN/m`
Wwall = 0.12*1.1*1.5+0.05*2.1*1.1 = 0.32 t = 3.2 KN/m`
Design of section
M = 38.71 KN.m
d = t-cover = 750-20 = 730 mm = 73 cm
𝑀𝑢
d = c1 * √𝐹𝑐𝑢∗𝑏
38.71∗ 106
730= c1 * √ 25∗250
c1 = 6.08 ⇛ J = 0.826
𝑀𝑢 38.71∗106
As = 𝐹𝑦∗𝐽∗𝑑 = 360∗0.826∗730 = 178.32 mm2
Use 4 ∯ 12
As`=0.1As Use 2 ∯ 12
VILLA 1.24
Group 3 Concrete project 2019
1.3.3.1 Check of Shear on Beam Section:
𝐹𝑐𝑢 25
Qcu = 0.24√ 𝛾𝑐 = 0.24 √1.5 = 0.98 N/mm2
𝐹𝑐𝑢 25
qmax = 0.7 √ = 0.7 √ = 2.86 N/mm2
𝛾𝑐 1.5
9.994∗104
qu = 𝑄𝑚𝑎𝑥
𝑏∗𝑑
=
250∗730
= 0.59 N/mm2
qcu > qu
Use Stirrups 5 ∯ 8 / m as minimum
VILLA 1.25
Group 3 Concrete project 2019
VILLA 1.26
Group 3 Concrete project 2019
VILLA 1.27
Group 3 Concrete project 2019
Concrete dimensions
Assume b = 25 cm
𝒍 𝟓.𝟕𝟎
t = 𝟏𝟐 = 𝟏𝟐 = .47 = 50 cm
t > 3ts ts = 25 cm t = 75 cm
Loads on beams
1) Own weight
2) Load from slab
3) Load from wall
𝑨𝒔= 𝑴𝒖
𝑭𝒚∗𝒋∗𝒅
VILLA 1.28
Group 3 Concrete project 2019
VILLA 1.29
Group 3 Concrete project 2019
VILLA 1.30
Group 3 Concrete project 2019
VILLA 1.31
Group 3 Concrete project 2019
𝒒 𝑭𝒄𝒖 𝟐𝟓
𝑪𝑼= .𝟐𝟒√ 𝜸𝒄 = .𝟐𝟒√𝟏.𝟓= .𝟗𝟖 𝐍⁄𝐦𝐦𝟐
𝒒 𝑭𝒄𝒖 𝟐𝟓
𝑴𝒂𝒙= .𝟕√ 𝜸𝒄 = .𝟕√𝟏.𝟓= 𝟐.𝟖𝟔 𝐍⁄𝐦𝐦𝟐
𝑸𝑴𝒂𝒙 𝟏𝟏.𝟑𝟔𝟓∗𝟏𝟎𝟒
𝒒𝒖= = =. 𝟓 𝐍⁄𝐦𝐦𝟐
𝒃∗𝒅 𝟐𝟓𝟎∗𝟗𝟎𝟎
VILLA 1.32
Group 3 Concrete project 2019
VILLA 1.33
Group 3 Concrete project 2019
𝟐𝟎
𝒍
=
𝟑𝟎𝟎
𝟏𝟓
=15cm
𝟏𝟓
𝒉
=
𝟑𝟎𝟎
𝟏𝟓
=20cm
𝟑𝟎𝒄𝒎
Use b=30
Pu actual=1420252*1.1=157 ton
157*10^3=.35*Ac*250+.67*3600*0.01Ac
𝑨𝑪
T= =60 cm
𝒃
In short direction
𝒌∗𝑯𝒐 .𝟕𝟓∗𝟑
𝜆= = = 7.5 < 15 short column
𝒃 .𝟑
In long direction
𝒌∗𝑯𝒐 .𝟕𝟓∗𝟑
𝜆= = =3.75 < 15 short coulmn
𝒃 .𝟔
VILLA 1.34
Group 3 Concrete project 2019
𝟐𝟎
𝒍
=
𝟑𝟎𝟎
𝟏𝟓
=15cm
𝒉
𝟏𝟓
=
𝟑𝟎𝟎
𝟏𝟓
=20cm
𝟑𝟎𝒄𝒎
Use b=30
Pu actual=225.976*1.1=249 ton
249*10^3=.35*Ac*250+.67*3600*0.01Ac
Ac= 2230.78cm2
𝑨𝑪
T= =80 cm
𝒃
In short direction
𝒌∗𝑯𝒐 .𝟕𝟓∗𝟑
𝜆= = =7.5 < 15 short column
𝒃 .𝟑
In long direction
𝒌∗𝑯𝒐 .𝟕𝟓∗𝟑
𝜆= = =2.81 < 15 short coulmn
𝒃 .𝟖
VILLA 1.35
Group 3 Concrete project 2019
VILLA 1.36
Group 3 Concrete project 2019
VILLA 1.37
Group 3 Concrete project 2019
VILLA 1.38
Group 3 Concrete project 2019
VILLA 1.39
Group 3 Concrete project 2019
1) For ( 2 ) ق
1.1 Input Data :
Column Working Load = 160 ton
Column Dimension a = 80 cm
b = 30 cm
Plain Concrete Depth = 0.30 m
Plain Concrete Extension = 0.30 m
VILLA 1.40
Group 3 Concrete project 2019
For Sec ( 1-1)
0.9
M1-1 = 29.30*0.9*2.10* 2 = 24.91 t.m
For Sec (2-2)
0.9
M2-2 = 29.30*0.9*2.60* 2 = 30.85 t.m
assume t = 70 cm , d = t-cover = 65 cm
As1
d = K1√(M1/B1)
65 = K1 √(24.91 ∗ 105 /210)
K1 = 0.6 , K2 = 1832
As1= M1-1/(K2*d) = 20.92 cm2
0.2
As min = µ Ac = *100*65 = 13 cm2 < As1
100
20.92
As1/m = 2.10
= 9.96 cm2/m (5Φ16/m)
As2
d = K1√(M1/B1)
65 = K1 √(30.85 ∗ 105 /260)
K1 = 0.6 , K2 = 1832
As1= M2-2/(K2*d) = 25.9 cm2
0.2
As min = µ Ac = 100 *100*65 = 13 cm2 < As1
25.9
As1/m = = 9.96 cm2/m (5Φ16/m)
2.60
VILLA 1.41
Group 3 Concrete project 2019
1.4 Check of Punching
𝑃𝑐𝑜𝑙
qp = 2( (𝑎+𝑑)+(𝑏+𝑑))∗𝑑
160∗103
= 2( (80+65)+(30+65))∗65 = 5.12 kg/cm2 = 51 t/m2 < 80 t/m2 OK . Safe
VILLA 1.42
Group 3 Concrete project 2019
1.6 Check of Bond
VILLA 1.43
Group 3 Concrete project 2019
VILLA 1.44
Group 3 Concrete project 2019
1.7.1 Loads
Thickness of wall: 30 cm
Use Fill sand ∅𝟑𝟎
𝛾𝑠𝑜𝑖𝑙 = 1.8 t/𝑚3
1−sin ∅
𝐾𝑎 = = 0.33
1+sin ∅
𝑞( 𝑠𝑢𝑟 𝑐ℎ𝑎𝑟𝑔𝑒 ) = 0.1 t/𝑚2
𝑞 ∗ 𝐾𝑎 = 0.033 t/𝑚2
𝛾 ∗ ℎ ∗ 𝐾𝑎 = 1.8 * 2.4 * 0.33 = 1.4256 t/𝑚2
@
𝑃1 = 0.1 * 0.33 * 2.4 = 0.0792 t/𝑚2 → 1.2 m
2.4 @
𝑃2 = 1.8 * 0.33 * 2.4 * 2
= 1.71 t/𝑚2 → 0.8 m
VILLA 1.45
Group 3 Concrete project 2019
H = 2.6+0.8=3.4 m
B = 0.4H → 0.7H = 1.80 m
1.8.2 Loads
1.8.2 Loads
Pwall = (2.5*0.3*2.6)+(1.8*2.4*0.775)+(1.8*0.2*0.775)+(2.5*0.8*1.85) = 9.277 t/m`
𝑃𝑤𝑎𝑙𝑙 9.277
qact = 𝐵 𝑟.𝑐 = 1.80 = 5.015 t/m` < B.C = 20 t/m2 OK Safe
1.8.3 Moment
𝑥2 0.7752
Mmax = q * 2
= 5.015 * 2
= 1.51 t.m/m`
𝑀𝑚𝑎𝑥
d= K1*√
𝑏
d = t –cover = 80-5 = 75 cm
1.51∗ 105
75 = K1* √
100
K1 = 1.93 , K2 = 1832
𝑀𝑚𝑎𝑥 1.51∗ 105
As/m` = = = 1.1 cm2 → Use min 6Φ12
𝑘2∗𝑑 1832∗75
VILLA 1.46
Group 3 Concrete project 2019
VILLA 1.47
Group 3 Concrete project 2019
1.8.3 Layout and arrangement
1) Short Direction
Between 2 - 2 and 3 - 3
B3
420 = S + 2
+ n*40 + (n-1)*10
assume B3 = 100 cm
S = 25 cm
n = 8 blocks
Between 1 - 1 and 2 - 2
B3 B3
366 = 2
+ 2
+n*40 *(n-1)*10
assume B5 = 100 cm
n = 6 blocks
2) Long Direction
B4 B4
420 = 2
+ 2
+ n*40 + (n-1)*10
assume B4 = 100 cm
n = 7 blocks
3) Arrangement of Cantilever
73 = S1+n*20
assume S1 = 40 cm (Loaded)
n = 2 blocks
VILLA 1.48
Group 3 Concrete project 2019
1.8.4 Loads
S1 (4.20 *4.20 )
4.20
r= = 1 < 2 (two way) → Marcus
4.20
α = 0.396 , β = 0.396
Wα = 0.3168 t/m2
Wβ = 0.3168 t/m2
S2 (3.66 *4.20 )
4.20
r= = 1.14 < 2 (two way) → Marcus
3.66
α = 0.508 , β = 0.2975
2
Wα = 0.4064 t/m
Wβ = 0.238 t/m2
VILLA 1.49
Group 3 Concrete project 2019
S3 (0.73*4.20) → Cantilever
4.20
r = 0.73 = 5.75 > 2 (one way)
Ws = 0.8 t/m2
S4 (3.66 *4.20 )
4.20
r= = 1.14 < 2 (two way) → Marcus
3.66
α = 0.508 , β = 0.2975
Wα = 0.4064 t/m2
Wβ = 0.238 t/m2
VILLA 1.50
Group 3 Concrete Project 2019
Part 2
High Rise Building
2.1
High Rise Building
Group 3 Concrete Project 2019
2.2
High Rise Building
Group 3 Concrete Project 2019
2.3
High Rise Building
Group 3 Concrete Project 2019
2.1 INTRODUCTION:
Fcu=300 kg/cm2
Fy(main steel)=3600 kg/cm2
Fy(stirrups)=2400 kg/cm2
Weight of used brick =1500 kg/m3
Bearing Capacity of Soil = 1.5 kg/m2
Slabs Cover = 2 cm
Beams Cover = 2 cm
Columns Cover = 2.5 cm
Foundations Cover = 5 cm
Stairs Cover = 2 cm
Ramp Cover = 2 cm
2.4
High Rise Building
Group 3 Concrete Project 2019
2.5
High Rise Building
Group 3 Concrete Project 2019
Slab Thickness = 25 cm
Own weight = 0.25* 2.5 = 0.625 t/m2.
Covering = 150 kg/m2 = 0.15 t/m2.
Live load = 300 kg/m2 = 0.3 t/m2 ⇛ ()سكن
Wall load = 300 kg/m
2
= 0.3 t/m2.
2.6
High Rise Building
Group 3 Concrete Project 2019
𝜋∗(1.2)2
- Mu = As * Fy *J *d = 7*( ) ∗ 3600 ∗ 0.695 ∗ 23 ∗ (10)−5
4
In X-Direction: (Upper)
2.7
High Rise Building
Group 3 Concrete Project 2019
In X-Direction: (Lower)
In Y-Direction (Upper):
2.8
High Rise Building
Group 3 Concrete Project 2019
In Y-Direction (Lower):
2.9
High Rise Building
Group 3 Concrete Project 2019
For Slab :
For Capoly :
2.10
High Rise Building
Group 3 Concrete Project 2019
For Slab:
For Capoly:
2.11
High Rise Building
Group 3 Concrete Project 2019
Slab Thickness = 25 cm
Own weight = 0.25* 2.5 = 0.625 t/m2.
Covering = 150 kg/m2 = 0.15 t/m2.
Live load = 300 kg/m2 = 0.3 t/m2 ⇛ ()سكن
2
Wall load = 300 kg/m = 0.3 t/m2.
2.12
High Rise Building
Group 3 Concrete Project 2019
In X-Direction: (Upper)
2.13
High Rise Building
Group 3 Concrete Project 2019
In X-Direction: (Lower)
2.14
High Rise Building
Group 3 Concrete Project 2019
In Y-Direction: (Upper)
In Y-Direction: (Lower)
2.15
High Rise Building
Group 3 Concrete Project 2019
For Slab :
For Capoly :
2.16
High Rise Building
Group 3 Concrete Project 2019
For Slab:
For Capoly:
2.17
High Rise Building
Group 3 Concrete Project 2019
Slab Thickness = 25 cm
2
Own weight = 0.25* 2.5 = 0.625 t/m .
2
Covering = 150 kg/m = 0.15 t/m2.
2
Live load = 300 kg/m = 0.3 t/m2 ⇛ ()سكن
2
Wall load = 300 kg/m = 0.3 t/m2.
2.18
High Rise Building
Group 3 Concrete Project 2019
In X-Direction: (Upper)
2.19
High Rise Building
Group 3 Concrete Project 2019
In X-Direction: (Lower)
2.20
High Rise Building
Group 3 Concrete Project 2019
In Y-Direction: (Upper)
In Y-Direction: (Lower)
2.21
High Rise Building
Group 3 Concrete Project 2019
For Slab :
For Capoly :
2.22
High Rise Building
Group 3 Concrete Project 2019
For Slab:
For Capoly:
2.23
High Rise Building
Group 3 Concrete Project 2019
𝐿1 𝑑
𝑄𝑃𝑢 = Ws ∗ [ 2 ∗ 𝐿2 − (𝐶1 + 2 ) ∗ (𝐶2 + 𝑑 )]
𝑑
𝐴𝑃 = ( 𝑏𝑜 * d ) = 2 [( 𝐶2 + 2 ) + (𝐶1 + 𝑑 )] ∗ d
220
= [2 ( 1600 + 2
) + 2( 400 + 220) ] ∗ 220
= 932000 mm2
𝑄𝑃𝑢
𝑞𝑃𝑢 = *B
𝐴𝑃
20400
= ∗ 1.3= 0.028 N/𝑚𝑚2
932000
𝑓 30
𝑞𝑃𝑐𝑢 = 0.316 √ 𝛾𝑐𝑢 = 0.316 √1.5 = 1.41 N/𝑚𝑚2
𝑐
𝛼∗𝑑 𝑓
𝑞𝑃𝑐𝑢 = 0.8 ( + 0.2) ∗ √ 𝛾𝑐𝑢 = 1.27 N/𝑚𝑚2
𝑏0 𝑐
𝑎 𝑓
𝑞𝑃𝑐𝑢 = 0.316 (0.5 + 𝑏 ) * √ 𝛾𝑐𝑢 = 1.059 N/𝑚𝑚2 (Minimum according to code)
𝑐
OK safe punching
2.24
High Rise Building
Group 3 Concrete Project 2019
𝐴𝑃 = ( 𝑏𝑜 * d ) = [2( 𝐶1 + 𝑑) + 2(𝐶2 + 𝑑 )] ∗ d
= 941600 mm2
𝑄𝑃𝑢
𝑞𝑃𝑢 = 𝐴𝑃
*B
27510
= 941600 * 1.15 = 0.03 N/𝑚𝑚2
𝑓𝑐𝑢 30
𝑞𝑃𝑐𝑢 = 0.316 √ = 0.316 √ = 1.41 N/𝑚𝑚2
𝛾𝑐 1.5
𝛼∗𝑑 𝑓
𝑞𝑃𝑐𝑢 = 0.8 ( + 0.2) ∗ √ 𝛾𝑐𝑢 = 1.45 N/𝑚𝑚2
𝑏0 𝑐
𝑎 𝑓
𝑞𝑃𝑐𝑢 = 0.316 (0.5 + 𝑏 ) * √ 𝛾𝑐𝑢 = 1.141 N/𝑚𝑚2 (Minimum according to code)
𝑐
OK safe punching
2.25
High Rise Building
Group 3 Concrete Project 2019
𝑑 𝑑
𝐴𝑃 = ( 𝑏𝑜 * d ) = [(𝐶1 + 2 ) + (𝐶2 + 2 )] ∗ d
220 220
= [( 300 + 2
) + ( 800 + 2
)] ∗ 220
= 290400 mm2
𝑄𝑃𝑢
𝑞𝑃𝑢 = 𝐴𝑃
*B
6954
= * 1.30 = 0.031 N/𝑚𝑚2
290400
𝑓 30
𝑞𝑃𝑐𝑢 = 0.316 √ 𝛾𝑐𝑢 = 0.316 √1.5 = 1.41 N/𝑚𝑚2
𝑐
𝛼∗𝑑 𝑓
𝑞𝑃𝑐𝑢 = 0.8 ( + 0.2) ∗ √ 𝑐𝑢 = 1.908 N/𝑚𝑚2
𝑏0 𝛾𝑐
𝑎 𝑓𝑐𝑢
𝑞𝑃𝑐𝑢 = 0.316 (0.5 + ) * √ = 1.236 N/𝑚𝑚2 (Minimum according to code)
𝑏 𝛾𝑐
OK safe punching
2.26
High Rise Building
Group 3 Concrete Project 2019
2.3.1 Dimensions:
𝑆𝑝𝑎𝑛 3.6
𝑡𝑠 = 24∶30 = 24:30 = 0.16 𝑚
𝐻Story= 3.04 𝑚
0.15
𝜃= tan−1 (0.30) = 29.05 °
𝑅𝑖𝑠𝑒 = 0.15 𝑚
𝐺𝑜𝑖𝑛𝑔 = 0.27 𝑚
2.27
High Rise Building
Group 3 Concrete Project 2019
2.3.2 Loads:
0.16 0.15
tav =
𝐶𝑜𝑠(29.05)
+ 2 = 0.258 𝑚
15.93∗0.54
𝑅𝑆1 = 2
= 4.30 KN
0.54 0.54 0.54
𝑀1 = 4.30*( 0.50 + 2
) - (15.93* 4 * 2
) = 2.73 KN.M
2.28
High Rise Building
Group 3 Concrete Project 2019
𝑀1 = 2.73 KN.M
𝑀
d = 𝐶1 * √𝐹
𝑐𝑢 ∗ 𝑏
2.73∗106
258 – 30 = 𝐶1 * √
30∗1000
𝐶1 = 23.5 → J = 0.826
𝑀𝑢 2.73∗106
𝐴𝑆 = 𝐹𝑦∗𝐽∗𝑑
= 360∗.826∗228
= 40.26 𝑚𝑚2
Use AS ⇛ 5 ∯ 10 / m
𝞢 𝑴 @ 𝑅 𝑆3 = 𝟎. 𝟎𝟎
1 1.62
R S2 ∗ ( 1 + 1.62 + 1) = ( 15.93 + 4.30) ∗ 1 ∗ ( + 1.62 + 1) + (15.93 ∗ 1.62 ∗ ( + 1) +
2 2
(15.93 + 4.3) ∗ 1 ∗ 0.5
So R S2 = 33.13 𝐾𝑁
So R S3 = 33.13 KN
2.29
High Rise Building
Group 3 Concrete Project 2019
𝑀2 = 28.23 KN.M
𝑀
d = 𝐶1 * √𝐹
𝑐𝑢 ∗ 𝑏
28.23∗106
258 – 30 = 𝐶1 * √ 30∗1000
𝐶1 = 7.43 → J = 0.826
𝑀𝑢 28.23∗106
𝐴𝑆 = 𝐹𝑦∗𝐽∗𝑑
= 360∗.826∗228
= 416.38 𝑚𝑚2 = 4.16 𝑐𝑚2
2.30
High Rise Building
Group 3 Concrete Project 2019
2.31
High Rise Building
Group 3 Concrete Project 2019
2.32
High Rise Building
Group 3 Concrete Project 2019
2.33
High Rise Building
Group 3 Concrete Project 2019
2.34
High Rise Building
Group 3 Concrete Project 2019
2.35
High Rise Building
Group 3 Concrete Project 2019
𝐹𝑐𝑢 30
qcu = 0.24 √ γ = 0.24 √1.5 = 1.07 N/mm2
c
𝐹𝑐𝑢 30
qmax = 0.7 √ γ = 0.7 √1.5 = 3.13 N/mm2
c
𝑞𝑐𝑢 > qu
2.36
High Rise Building
Group 3 Concrete Project 2019
𝐹𝑐𝑢 30
qcu = 0.24 √ = 0.24 √ = 1.07 N/mm2
γc 1.5
𝐹𝑐𝑢 30
qmax = 0.7 √ γ = 0.7 √1.5 = 3.13 N/mm2
c
𝑞𝑐𝑢 > qu
2.37
High Rise Building
Group 3 Concrete Project 2019
𝐹𝑐𝑢 30
qcu = 0.24 √ γ = 0.24 √1.5 = 1.07 N/mm2
c
𝐹𝑐𝑢 30
qmax = 0.7 √ γ = 0.7 √1.5 = 3.13 N/mm2
c
𝑞𝑐𝑢 > qu
2.38
High Rise Building
Group 3 Concrete Project 2019
2.39
High Rise Building
Group 3 Concrete Project 2019
b < ts (fixed-fixed)
𝐾 ∗ 𝐻0 ∗ 1.2 ∗ 3.04
λ = = =12
𝑏 .3
in Long direction
𝐾 ∗ 𝐻0 1.5 ∗ 3.04
λ = = = 5.7 < 10 ⇛ Short Column
𝑡 0.8
Design
𝛌2 ∗𝑏 𝟏𝟐2 ∗300
δ= = = 21.6 mm = .0216 m
2000 2000
𝑀𝑢 9.8∗100000
= = 0.0453
𝐹𝐶𝑢 ∗ 𝐛2 ∗ 𝑡 300∗ 𝟑𝟎2 ∗ 80
2.40
High Rise Building
Group 3 Concrete Project 2019
P= 3
As = 0.009*30*80 = 21.6 cm
Use 12 Φ 16
2.41
High Rise Building
Group 3 Concrete Project 2019
b > ts (fixed-fixed)
𝐾 ∗ 𝐻0 1.5 ∗ 3.04
λ = = = 9.12 < 10 Short column
𝑏 0.5
in Long direction
𝐾 ∗ 𝐻0 1.5 ∗ 3.04
λ = = = 4.14 < 10 Short column
𝑡 1.1
Design
Use 18 Φ 20
2.42
High Rise Building
Group 3 Concrete Project 2019
2.43
High Rise Building
Group 3 Concrete Project 2019
Case (1):
Pu = 712 t
Mux = 4.8826 t.m
Muy = 2.6792 t.m
𝑃𝑢 712∗ 104
1. Rb = = = 0.3
𝐹𝑐𝑢∗𝑏∗𝑡 30∗400∗2100
𝑀𝑢𝑥 4.8826∗107
2. 𝐹𝑐𝑢∗𝑏∗ 𝑡 2
= 30∗400∗21002 = 0.00092
𝑀𝑢𝑦 2.7∗ 107
3. 𝐹𝑐𝑢∗𝑡∗ 𝑏2
= 30∗2100∗ 4002 = 0.0026
4. p = 2
5. µ = 2*30*10−4= 0.006
6. As = 0.006*400*2100 = 5040 mm2
7. Use 26 ∯ 16
2.44
High Rise Building
Group 3 Concrete Project 2019
Case (2):
Pu = 479.68 t
Mux = 29.72 t.m
Muy = 7.85 t.m
𝑃𝑢 479.68∗ 104
Rb = 𝐹𝑐𝑢∗𝑏∗𝑡 = 30∗400∗2100 = 0.3
𝑀𝑢𝑥 29.72∗107
𝐹𝑐𝑢∗𝑏∗ 𝑡 2
= 30∗400∗21002 = 0.0056
𝑀𝑢𝑦 7.85∗ 107
𝐹𝑐𝑢∗𝑡∗ 𝑏2
= 30∗2100∗ 4002 = 0.0077
1. p = 2
2. µ = 2*30*10−4= 0.006
3. As = 0.006*250*4100 = 5040 mm2
4. Use 26 ∯ 16
2.45
High Rise Building
Group 3 Concrete Project 2019
Case (3):
Pu = 470.038 t
Mux = 122.571 t.m
Muy = 1.52 t.m
𝑃𝑢 470.038∗ 104
Rb = 𝐹𝑐𝑢∗𝑏∗𝑡 = 30∗400∗2100 = 0.3
𝑀𝑢𝑥 122.571∗107
𝐹𝑐𝑢∗𝑏∗ 𝑡 2
= 30∗400∗21002 = 0.023
𝑀𝑢𝑦 1.52∗ 107
𝐹𝑐𝑢∗𝑡∗ 𝑏2
= 30∗2100∗ 4002 = 0.0015
1. p = 2
2. µ = 2*30*10−4= 0.006
3. As = 0.006*400*2100 = 5040 mm2
4. Use 26 ∯ 16
2.46
High Rise Building
Group 3 Concrete Project 2019
2.47
High Rise Building
Group 3 Concrete Project 2019
2.48
High Rise Building
Group 3 Concrete Project 2019
Case (1):
Pu = 2721.06 t
Mux = 96.0863 t.m
Muy = 672.147 t.m
Case (2):
Pu = 1570.82 t
Mux = 4895.1 t.m
Muy = 693.011 t.m
Case (3):
Pu =1962.53 t
Mux = 480.576 t.m
Muy = 5301.31 t.m
2.49
High Rise Building
Group 3 Concrete Project 2019
Case (1):
Pu = 2002.2 t
Mux = 93.2968 t.m
Muy = 6.2793 t.m
Case (2):
Pu = 1814.62 t
Mux = 795.957 t.m
Muy = 642.057 t.m
Case (3):
Pu =1426.6 t
Mux = 4223.35 t.m
Muy = 61.2171 t.m
2.50
High Rise Building
Group 3 Concrete Project 2019
𝑊
𝐹𝑏 = 𝛿 𝑑 (𝑇1) ∗ 𝜆 ∗
𝑔
3⁄ 3⁄
𝑇1 = 𝐶𝑡 * (𝐻) 4 = 0.05 * (40) 4 = 0.795 Sec 𝐶𝑡 …. Other Structures
Seismic Zone
γ1 (Importance factor) = 1
𝜂 (damping factor) = 1
R (Reduction factor) = 5
2.5𝜂 𝑇𝑐
𝛿 𝑑 (𝑇1) = 𝑎𝑔 * γ1 * S * *( ) > 0.2 𝑎𝑔 * γ1
𝑅 𝑇1
2.5∗1 .25
𝛿 𝑑 (𝑇1) = 1.23 * 1 * 1.5 * *( ) = 0.29 ≮ 0.2 ag * 1 = 0.2*1.23*1= 0.246
5 0.795
Wi = D.L +Ψ L.L
𝑊𝑖 ∗𝑍𝑖
𝐹𝑖 = * 𝐹𝑏
𝑆𝑢𝑚 (𝑊𝑖 ∗𝑍𝑖 )
2.51
High Rise Building
Group 3 Concrete Project 2019
2.52
High Rise Building
Group 3 Concrete Project 2019
𝐼𝑋 𝑔𝑟𝑜𝑢𝑏 = 65.8871 𝑚4
𝐼𝑦 𝑔𝑟𝑜𝑢𝑏 = 265.7979 𝑚4
−14423 10311.89
𝐹1 = 12.5
− 65..8871 ∗ 3.52 = -1045.14 t/𝑚2 = -104.51 Kg/𝑐𝑚2 < 1.25 𝐹𝑐𝑎𝑙𝑙
2.53
High Rise Building
Group 3 Concrete Project 2019
2.54
High Rise Building
Group 3 Concrete Project 2019
X-Direction =0.1101
Y-Direction = 0.067
Height of Building = 40 m
𝐻 40
Allowable Displacement according to ECP = 500 = 500
= 0.08 m Working Method
Ok »»» Safe
2.55
High Rise Building
Group 3 Concrete Project 2019
2.56
High Rise Building
Group 3 Concrete Project 2019
2.57
High Rise Building
Group 3 Concrete Project 2019
2.59
High Rise Building
Group 3 Concrete Project 2019
2.60
High Rise Building
Group 3 Concrete Project 2019
Pile diameter = 60 cm
Total building weight (working method) = reactions of column , shear wall and
core + 𝑂𝑊𝑅𝑤 + 𝑂𝑊𝑟𝑎𝑓𝑡
s = 1.57 m “ s = 2.616 D “
2.61
High Rise Building
Group 3 Concrete Project 2019
2.62
High Rise Building
Group 3 Concrete Project 2019
𝑡𝑅𝑎𝑓𝑡 = 130 cm
𝑑𝑃𝑖𝑙𝑒 = 60 cm
For raft
𝜋 (2.22 )
𝑡𝑅𝑎𝑓𝑡 = 𝐴𝑆 * 𝐹𝑦 ∗ J * d = 7 * ( 4
) *3600 * .695 *125 * 10−5 = 83.22 t.m
2.63
High Rise Building
Group 3 Concrete Project 2019
In X-Direction: (Lower)
2.64
High Rise Building
Group 3 Concrete Project 2019
In X-Direction: (Upper)
2.65
High Rise Building
Group 3 Concrete Project 2019
In Y-Direction: (Lower)
2.66
High Rise Building
Group 3 Concrete Project 2019
In Y-Direction: (Upper)
2.67
High Rise Building
Group 3 Concrete Project 2019
2.68
High Rise Building
Group 3 Concrete Project 2019
2.69
High Rise Building
Group 3 Concrete Project 2019
2.70
High Rise Building
Group 3 Concrete Project 2019
2.71
High Rise Building
Group 3 Concrete Project 2019
2.72
High Rise Building
Group 3 Concrete Project 2019
2.73
High Rise Building
Group 3 Concrete Project 2019
2.74
High Rise Building
Group 3 Concrete Project 2019
2.75
High Rise Building
Group 3 Concrete Project 2019
2.76
High Rise Building
Group 3 Concrete Project 2019
2.77
High Rise Building
Group 3 Concrete Project 2019
2.78
High Rise Building
Group 3 Concrete Project 2019
𝑡𝑅𝑎𝑓𝑡 = 130 Cm
685∗ 103
= 𝟐((𝟐𝟕𝟑+𝟏𝟕𝟑)∗𝟏𝟐𝟑 = 6.24 kg/cm2
< 8 kg/cm2
Ok Safe
d pile = 60 cm
2.79
High Rise Building
Group 3 Concrete Project 2019
Thickness of wall = 30 cm
2.80
High Rise Building
Group 3 Concrete Project 2019
2.496∗105
27 = 𝐾1 √ → 𝐾1 = 0.54 𝐾1 = 1832
100
𝑀 2.496∗105
𝐴𝑠 = 𝐾2 ∗𝑑
= 1832∗27
= 5.04 𝑐𝑚2
2.81
High Rise Building
Group 3 Concrete project 2019
i
Introduction 3.1
Group 3 Concrete Project 2019
Assume t s = 10 cm
Loading
𝒘𝒖 = 1.4(𝛾𝑐 ∗ 𝑡𝑠 + 𝑐𝑜𝑣𝑒𝑟) + 1.6 ∗ 𝑙. 𝑙
𝒘𝒖 = 1.4(25 ∗ .1 + .5) + 1.6 ∗ 1
𝒘𝒖 = 𝟓. 𝟖 𝒌𝒏/𝒎𝟐
Getting A.B.C
A*b 2 = B*a 2 a=b=15cm
A=B 1
C-Aa2-Ab4/a2-6Ab2=-w/4r
C-225A-225A-6225A=-5.8/4*45
1 1
Radius of curvature = (𝑎2 + 𝑏 2 ) (152 + 152 ) = 45 m
2ℎ 2∗5
C-1800A=-.033222 2
𝑤𝑟
𝑏2𝐴 − 𝐶 =
2(𝑎2 +𝑏2 )
5.8∗45
152 𝐴 − 𝐶 =
2(152 +152 )
225A-C =-.29 3
Solving the three eqn we get
A=2.046*10-4 ,
B=2.046*10-4 , c=.336
At the edge (Y = 15 )
X 0 5 10 15
Nx -254.77 -228.5 -146.6 0
Ny 0 0 0 0
Nxy 0 -103.9 -226.4 -385.65
At the edge (X = 15 )
Y 0 5 10 15
Nx -254.77 -228.5 -146.6 0
Ny 0 0 0 0
Nxy 0 -103.9 -226.4 -385.65
1-2-Check of stresses:
1- Max NX Ny @ middle of the shell
N = - 130.48 kn/m
−130.48∗1000 .67 𝐹𝐶𝑢
F = = 1.3 MPA < = .45 Fcu = 13.5 MPA
1000∗100 𝛾𝑐
OK SAFE
2- Max NX Ny @ edge
N = - 254.77 kn/m
− 254.77 ∗1000 .67 𝐹𝐶𝑢
F = = 2.5477 MPA < = .45 Fcu = 13.5 MPA
1000∗100 𝛾𝑐
OK SAFE
3- @ corner ( shear only )
385.5 ∗1000
F = = 17.34 MPA > 1.35 UN SAFE
1000∗100
/ m
kn
. 7 2
85
8
0.
32
3 T1
T2
25
5.
9
1
T3
19
11
6.
12
T4
T5 1
/m
kn
2 1
6 1.
Get
N1 = -61.21 tension
N2 = 277.81 comp
385.7 − 61.21
𝛥= = 64.9
5
385.7 + 320.8
𝑇1 = = 353.25 𝐾𝑛 /𝑚
2
𝑇2 = 288.4 𝑘𝑛 /𝑚
𝑇3 = 223.5 kn/m
𝑇4 = 158.6 kn/m
𝑇5 =39.66 kn/m
𝑇𝑢 𝑇𝑢
𝐴𝑠 = 𝐹𝑦 𝐴𝑠 = 360
𝛾𝑠 1.15
Then an autocad2016 3D model was made using these co-ordinates. Then, this model was
exported to Sap2000 as a dxf file.
Loads added to the model :
Dead load : 50 kg/m2 As covering material
Live Load : 100 Kg/m2 As maintainance and construction load.
Then membrane forces (f11,f22) and shear force (f12) and diagonal tension(fmax) and
diagonal compression (fmin) were investigated.
This analysis showed that manual analysis give higher results than finite element analysis
(approximately twice).
,so manual design results for shell were adopted and used.
F11
F22
F12
Fmax
Axial Force
Arch B
Arch B
3-1-Design of section:
Sec (A)
M = 40 KN.m
N = 1237 KN
𝑀 110 𝑡
𝑒= = = .11 <
𝑁 1000 2
small ecc use interaction diagram
𝑷𝒖 𝟏𝟎𝟎𝟎 ∗ 𝟏𝟎𝟎𝟎
=
𝑭𝒄𝒖 ∗ 𝒃 ∗ 𝒕 𝟑𝟎 ∗ 𝟒𝟎𝟎 ∗ 𝟑𝟎𝟎
= . 𝟑𝟒𝟒
𝑴𝒖 𝟒𝟎∗𝟏𝟎𝟔
= = . 𝟎𝟐𝟕𝟖
𝑭𝒄𝒖 ∗𝒃∗𝒕𝟐 𝟑𝟎∗𝟑𝟎𝟎∗𝟒𝟎𝟎𝟐
𝜁 = .8 GET : ρ = 1 µ = 1*3*10-4
3-2-Design of Tie:
Tu = 120 ton
As =150*10000/(360/1.15) =4791 mm2
Use 10 ∅ 25
3-3-Design of Hanger:
Tu=1.5*(2.5*.3*.3*5)=1.678
As=1.678*10000/(360/1.15)=54 mm2
Use 4∅ 12
3-4-Design of columns:
Reactions of columns using sap2000
4-1-Cap No: 1
Case Ultimate Working
Mx 22 m.t 15 m.t
My 9 m.t 6 m.t
Arrangement of piles:
Assume tcap = 60 cm
Force on piles :-
Check of shear :-
Shear at x direction :
Shear at Y direction :
𝑄𝑢𝑠 = 50 𝑡𝑜𝑛
𝑄𝑢𝑠 ∗ 104
𝑞𝑢𝑠 =
𝑏∗𝑑
50 ∗ 104
𝑞𝑢𝑠 = = 1 𝑀𝑃𝐴 < 1.07 𝑜𝑘 𝑠𝑎𝑓𝑒
1000 ∗ 500
Moment at Y direction :
𝑀𝑈 23∗107
𝑑 = 𝐶1 √ 500 = 𝐶1 √
𝐹𝑐𝑢 ∗𝑏 𝐹𝑐𝑢 ∗𝑏
∴ 𝑢𝑠𝑒 8 ∅ 16 /𝑚
Final layout:
4-2-cap No :2
Case Ultimate Working
Mx 36 m.t 24 m.t
My 9 m.t 6 m.t
Number of piles :
p𝑐𝑜𝑙
n= ∗ 1.2
𝑄𝑎𝑙𝑙
n = 3 piles
Arrangement of piles :-
Assume tcap = 60 cm
The capacity of pile is 60 ton and diameter 40 cm
Pile 1 & 2
Coordinates X Y
78 24 ∗ .348 6 ∗ .6
Fb = + +
3 . 723 . 72
Fb = 42.6 ton < 60 ton ok safe
Pile 3
𝐹𝑏 = 31.8 𝑡𝑜𝑛 < 60 𝑡𝑜𝑛 𝑜𝑘 𝑠𝑎𝑓𝑒
𝛼∗𝑑 𝑓𝑐𝑢
𝑞𝑐𝑢𝑝 = .8( + .2) ∗ √ = 1.78 𝑀𝑝𝑎
𝑏0 γc
𝑎 𝑓𝑐𝑢
= .316(.5 + ( ) ∗ √ = 2.11 𝑀𝑝𝑎
𝑏 γc
𝑄𝑢𝑝
𝑞𝑢𝑝 =
𝑏0 ∗ 𝑑
𝑄𝑢𝑝 = 𝑝𝑐𝑜𝑙 − 𝑙𝑜𝑎𝑑 𝑜𝑓 𝑝𝑖𝑙𝑒𝑠 = 110 − .5 ∗ 43 = 88.5 𝑡𝑜𝑛
88.5 ∗ 104
𝑞𝑢𝑝 = = .55 𝑀𝑝𝑎 < 1.4 𝑜𝑘 𝑠𝑎𝑓𝑒
4000 ∗ 400
Calculating of stresses :
Check of shear :
Sec 1-1
88.42 ∗ 104
𝑞𝑢𝑝 = = 1.16𝑀𝑝𝑎 > 1.07 𝑢𝑛 𝑠𝑎𝑓𝑒
1900 ∗ 400
Increase depth to 60 cm
88.42 ∗ 104
𝑞𝑢𝑝 = = .93 𝑀𝑝𝑎 < 1.07 𝑜𝑘 𝑠𝑎𝑓𝑒
1900 ∗ 500
M1=43*1.5*.3-110*.2*.125-1.75*.778*.2866=16.2 m.t
Sec 2-2
M2=32*1.5*.4-110*.275*.125-1.75*.32*.37=15 m.t
Sec 3-3
M3=2*.7*43*1.5*.1-110*.275*.125-1.75*.89*.22=5 m.t
M1 > M2 > M3
i
The tank 4.1
Group 3 Concrete project 2019
Chapter 1: (INTRODUCTION)
Upper tank
Lower tank
Shaft
Fcu=300 kg/cm2
Fcall = 70 kg/cm2
Fy(stirrups)=2400 kg/cm2
444
THE TANK 4.2
Group 3 Concrete project 2019
Chapter 2: Dimensions
𝑫−𝟕 𝑫−𝟕
[ * .5 * 5 * 2 𝝅 * ( + 3.5 ) ]
𝟐 𝟒
444
THE TANK 4.3
Group 3 Concrete project 2019
D2 = 13 m
444
THE TANK 4.4
Group 3 Concrete project 2019
Chapter 3: Design
assume ts = 10 cm
L.L = 100 kg/m2 = 0.1 t/m2
Covering = 50 kg/m2 = 0.05 t/m2
P = 0.1*2.5+0.05+0.1 = 0.4 t/m2
M = coeff * P * r2 = 0.2*0.4*(3.5)2 = 0.98 t.m
(Neglect)
Use 6 Φ 10 /m
3.1.2 Posts
Height = 2 m
assume bp = 25 cm
tp = 25 cm
No, of posts = 15
𝝅∗𝟕𝟐
𝟎.𝟒∗( )
V = 𝟒
= 0.7 t/m
𝝅∗𝟕
𝝅∗𝟕
Load for Every post = 0.7 * + 2.5*0.25*0.25*2 = 1.34 ton
𝟏𝟓
𝟏.𝟑𝟒∗𝟏.𝟒∗𝟏𝟎𝟒
As = 𝟑𝟔𝟎
= 60 mm2 Use 4 Φ 12
𝟏.𝟏𝟓
444
THE TANK 4.5
Group 3 Concrete project 2019
3.1.3 Dry Cone
1. Geometrical Design
2. Loads
Assume ts = 10 cm
𝟎.𝟑𝟒 ∗ 𝟏𝟓
V (load from posts) = 𝛑∗𝟕
= 1.34 t/m
444
THE TANK 4.6
Group 3 Concrete project 2019
3. Forces (at footing of the cone)
𝑾 𝟖𝟎.𝟕𝟎
V = 𝛑∗𝑫 = 𝛑∗𝟏𝟒
= 1.83 t/m
𝑽 𝟏.𝟖𝟑
NΦ compression = 𝐒𝐢𝐧 𝚽 = 𝟎.𝟔𝟓= 2.82 t/m
𝑽 𝟏.𝟖𝟑
H = 𝐭𝐚𝐧 𝚽 = 𝟎.𝟖𝟓 = 2.15 t/m
4. Check of stresses
NΦ,Nθ
Fc = 𝐛∗𝐭
≤ Fc all = 70 kg/cm2
For NΦ
𝟐.𝟖𝟐∗𝟏𝟎𝟑
Fc = 𝟏𝟎𝟎∗𝟏𝟎
= 2.82 kg/cm2 ≤ Fc all OK
For Nθ
𝟑.𝟏𝟐∗𝟏𝟎𝟑
Fc = 𝟏𝟎𝟎∗𝟏𝟎
= 3.12 kg/cm2 ≤ Fc all OK
5. Moment at edge
(𝟎.𝟑+𝟎.𝟏)∗(𝟎.𝟕𝟔)𝟐
M= = 0.12 t.m
𝟐
Use 6 Φ 10 /m for NΦ , Nθ
444
THE TANK 4.7
Group 3 Concrete project 2019
3.1.4 Design of Ring beam
1. Check of Stresses
T 𝟏𝟓.𝟎𝟓∗𝟏𝟎𝟒
Fct = 𝐛∗𝐭 = 𝟑𝟎𝟎∗𝟔𝟎𝟎
= 0.84 N/mm2
Fct 𝟎.𝟔√𝟑𝟎
Fctr = = = = 2.2 N/mm2
𝜼 𝟏.𝟓
2. Reinforcement
𝑻 𝟏𝟓.𝟎𝟓∗𝟏.𝟒∗𝟏𝟎𝟒
As = 𝑭𝒚 = 𝟑𝟔𝟎⁄ = 673 mm2
𝜸𝒔 𝟏.𝟏𝟓
As
As/side = 𝟐
= 336.5 mm2
Use 4 Φ 12
444
THE TANK 4.8
Group 3 Concrete project 2019
3. Loads form Ring Beam to Wall
Straining actions:
1. Ring Tension (Table II)
T (duo to𝜸whw) = Coeff * * h * R = 0.385 *1 *2.5 *7
= 6.7 ton
Check of tensile stress
𝑇 6.7∗104
Fct = 𝑏∗𝑡 = 300∗1000 = 0.22 N/mm2
Fct 𝟎.𝟔√𝟑𝟎
Fctr = 𝜼
= 𝟏.𝟓
= 2.2 N/mm2
444
THE TANK 4.9
Group 3 Concrete project 2019
Reinforcement
𝑻
𝑭𝒚 𝟔.𝟕∗𝟏.𝟒∗𝟏𝟎𝟒
As = 𝜸𝒔
= 𝟎.𝟖𝟓∗𝟑𝟔𝟎 = 352.5 mm2
⁄𝟏.𝟏𝟓
As
As/side = = 176.3 mm2 Use 6 Φ 10
𝟐
3. Normal Forces
- Check of Stresses
444
THE TANK 4.10
Group 3 Concrete project 2019
Fct
Fctr = 𝜼
Fct ( N ) −0.12
tv = t (1 – Fct ( M ) ) = 300 ( 1 - 𝟎.𝟐𝟕
) = 433 mm
η = 1.65
Fct 𝟎.𝟔√𝟑𝟎
Fctr = 𝜼
= 𝟏.𝟔𝟓
= 1.99 N/mm Fct < Fctr OK . Safe
- Reinforcement
M 0.4 t
e= 𝑵
= 𝟑.𝟔
= 0.111 < 𝟐
= 0.15 (Small eccentricity)
Pu 3.6∗ (𝟏𝟎)𝟑
= 𝟑𝟎𝟎∗𝟏𝟎𝟎∗𝟑𝟎 = 0.004
𝑭𝒄𝒖∗𝒃∗𝒕
Mu 0.4∗ (𝟏𝟎) 𝟓
Fcu∗b∗t2
= 𝟑𝟎𝟎∗𝟏𝟎𝟎∗𝟑𝟎𝟎 𝟐 = 0.001
ρ=1
Use 6 Φ 16 /side
444
THE TANK 4.11
Group 3 Concrete project 2019
1. Geometrical Design
2. Loads
assume ts = 40 cm
444
THE TANK 4.12
Group 3 Concrete project 2019
3. Forces (at footing of the cone)
𝑾 𝟗𝟒𝟑
V = 𝛑∗𝑫 = 𝛑∗𝟕 = 42.88 t/m
𝑽 𝟒𝟐.𝟖𝟖
NΦ compression = 𝐒𝐢𝐧 𝚽 = 𝟎.𝟖𝟐
= 52.3 t/m
𝑽 𝟒𝟐.𝟖𝟖
H = 𝐭𝐚𝐧 𝚽 = 𝟏.𝟒𝟑
= 30 t/m
(Cause HZ force on Ring Beam)
4. Check of stresses
NΦ,Nθ
Fc = 𝐛∗𝐭
≤ Fc all = 60 kg/cm2
For NΦ
𝟓𝟐.𝟑∗𝟏𝟎𝟑
Fc = = 13.1 kg/cm2 ≤ Fc all OK
𝟏𝟎𝟎∗𝟒𝟎
For Nθ
𝟑𝟒.𝟔∗𝟏𝟎𝟑
Fc = 𝟏𝟎𝟎∗𝟒𝟎
= 0.87 kg/cm2 ≤ Fc all OK
5. Reinforcement
NΦ 𝟓𝟐.𝟑∗𝟏.𝟒∗𝟏𝟎𝟒
As = 𝑭𝒚 = 𝟑𝟔𝟎∗𝟎.𝟖𝟓 = 2752 mm2
⁄𝟏.𝟏𝟓
𝜸𝒔
As
As/side = 𝟐
= 1376 mm2
Use 8 Φ 16
444
THE TANK 4.13
Group 3 Concrete project 2019
1. Check of Stresses
T 𝟐𝟏𝟗.𝟏∗𝟏𝟎𝟒
Fct = 𝐛∗𝐭 = 𝟗𝟎𝟎∗𝟏𝟑𝟎𝟎 = 1.87 N/mm2
Fct 𝟎.𝟔√𝟑𝟎
Fctr = 𝜼
= 𝟏.𝟕
= = 1.9 N/mm2
2. Reinforcement
𝑻 𝟐𝟏𝟗.𝟏∗𝟏.𝟒∗𝟏𝟎𝟒
As = 𝑭𝒚 = 𝟑𝟔𝟎∗𝟎.𝟖𝟓 = 11528 mm2
⁄𝟏.𝟏𝟓
𝜸𝒔
As
As/side = = 5764 mm2
𝟐
Use 16 Φ 22
444
THE TANK 4.14
Group 3 Concrete project 2019
Hinged connection
Assume tf = 40 cm
Wf = O.w floor + 𝜸whw = 2.5*0.4 + 1*7.5 = 8.5 t/m2
O.w of area above floor =𝜸chw*twall*P = 2.5*8.15 *0.25*1.25*π = 20 ton
𝟐𝟎
O.w / Area of floor = 𝛑(𝟕𝟐 −𝟏𝟐 )
= 0.53 t/m2
𝟒
Straining actions
- Radial and Tangential moment
Tangential
444
THE TANK 4.15
Group 3 Concrete project 2019
- Normal forces on floor
M = 26 t.m
N = 30 ton
- Check of Stresses
Fct
Fctr = 𝜼
Fct ( N ) −0.75
tv = t (1 – Fct ( M ) ) = 300 ( 1- 𝟗.𝟕𝟓
) = 430.8 mm
η = 1.65
Fct 𝟎.𝟔√𝟑𝟎
Fctr = 𝜼
= 𝟏.𝟔𝟓
= 1.99 N/mm Fct > Fctr Unsafe
- Reinforcement
M 26
e= 𝑵
= 𝟑𝟎
= 0.87 m → Big eccentricity
53.76∗(10)7
860 = c1 √ 30∗1000
C1 = 6.42 → J = 0.826
444
THE TANK 4.16
Group 3 Concrete project 2019
𝐌𝐮𝐬 𝐍
As = 𝑭𝒚∗𝒋∗𝒅 - 𝑭𝒚
⁄𝜸𝒔
𝟎.𝟏𝟓
As min = 0.15% Ac = * 900 *1000 = 1350 𝒎𝒎𝟐
𝟏𝟎𝟎
As min > As
Use As min
Use (6 Φ 16 /side)
444
THE TANK 4.17
Group 3 Concrete project 2019
1. Geometrical Design
2. Loads
assume ts = 10 cm
444
THE TANK 4.18
Group 3 Concrete project 2019
𝑾 𝟓𝟑.𝟐𝟑
V = 𝛑∗𝑫 = 𝛑∗𝟐∗𝟔.𝟓 = 1.3 t/m
𝑽 𝟏.𝟑
NΦ compression = 𝐒𝐢𝐧 𝚽 = 𝟎.𝟕𝟎𝟖= 1.84 t/m
𝑽 𝟏.𝟑
H = 𝐭𝐚𝐧 𝚽 = 𝟏
= 1.3 t/m
Nθ compression = Pz * a = 0.26 *9.18 = 2.39 t/m
4. Check of stresses
NΦ,Nθ
Fc = 𝐛∗𝐭
≤ Fc all = 60 kg/cm2
For NΦ
𝟏.𝟖𝟒∗𝟏𝟎𝟑
Fc = = 1.84 kg/cm2 ≤ Fc all OK
𝟏𝟎𝟎∗𝟏𝟎
For Nθ
𝟐.𝟑𝟗∗𝟏𝟎𝟑
Fc = = 2.39 kg/cm2 ≤ Fc all OK
𝟏𝟎𝟎∗𝟏𝟎
5. Moment at edge
(𝟎.𝟑+𝟎.𝟏)∗(𝟎.𝟕)𝟐
M= = 0.098 t.m
𝟐
Use 6 Φ 10 /m for NΦ , Nθ
444
THE TANK 4.19
Group 3 Concrete project 2019
1. Check of Stresses
T 𝟖.𝟒𝟓∗𝟏𝟎𝟒
Fct = 𝐛∗𝐭 = 𝟑𝟎𝟎∗𝟔𝟎𝟎 = 0.47 N/mm2
Fct 𝟎.𝟔√𝟑𝟎
Fctr = = = = 2.2 N/mm2
𝜼 𝟏.𝟓
2. Reinforcement
𝑻 𝟖.𝟒𝟓∗𝟏.𝟒∗𝟏𝟎𝟒
As = 𝑭𝒚 = 𝟑𝟔𝟎⁄ = 3779.9 mm2
𝜸𝒔 𝟏.𝟏𝟓
As
As/side = 𝟐
= 188.95 mm2
Use 4 Φ 12
444
THE TANK 4.20
Group 3 Concrete project 2019
3. Loads form Ring Beam to Wall
assume tw = 30 cm
D = 13 m
𝐻2 22
Tank Coefficient = 𝐷∗𝑇𝑤 = 13∗0.3 = 1.2
Straining actions:
1. Ring Tension (Table II)
T (duo to𝜸whw) = Coeff * * h * R = 0.362 *1 *2 *6.5
= 4.706 ton
Check of tensile stress
𝑇 4.706∗104
Fct = 𝑏∗𝑡 = 300∗1000
= 0.157 N/mm2
Fct 𝟎.𝟔√𝟑𝟎
Fctr = = = 2.2 N/mm2
𝜼 𝟏.𝟓
444
THE TANK 4.21
Group 3 Concrete project 2019
Reinforcement
𝑻
𝑭𝒚 𝟒.𝟕𝟎𝟔∗𝟏.𝟒∗𝟏𝟎𝟒
As = 𝜸𝒔
= 𝟎.𝟖𝟓∗𝟑𝟔𝟎 = 247.6 mm2
⁄𝟏.𝟏𝟓
As
As/side = = 123.8 mm2 Use 6 Φ 10
𝟐
3. Normal Forces
- Check of Stresses
444
THE TANK 4.22
Group 3 Concrete project 2019
Fct ( N ) −0.093
tv = t (1 – Fct ( M ) ) = 300 ( 1- 𝟎.𝟏𝟔
) = 474.4 mm
η = 1.65
Fct 𝟎.𝟔√𝟑𝟎
Fctr = 𝜼
= 𝟏.𝟔𝟓
= 1.99 N/mm Fct < Fctr OK . Safe
- Reinforcement
M 0.4 t
e= 𝑵
= 𝟑.𝟔
= 0.111 < 𝟐
= 0.15 (Small eccentricity)
Pu 2.8∗ (𝟏𝟎)𝟑
= 𝟑𝟎𝟎∗𝟏𝟎𝟎∗𝟑𝟎 = 0.0031
𝑭𝒄𝒖∗𝒃∗𝒕
Mu 0.24∗ (𝟏𝟎) 𝟓
Fcu∗b∗t2
= 𝟑𝟎𝟎∗𝟏𝟎𝟎∗𝟑𝟎𝟎 𝟐 = 0.0009
ρ=1
Use 6 Φ 16 /side
444
THE TANK 4.23
Group 3 Concrete project 2019
1. Geometrical Design
2. Loads
assume ts = 40 cm
444
THE TANK 4.24
Group 3 Concrete project 2019
𝑾 𝟕𝟎𝟐.𝟎𝟒
V = 𝛑∗𝑫 = 𝛑∗𝟕
= 31.92 t/m
𝑽 𝟑𝟏.𝟗𝟐
NΦ compression = 𝐒𝐢𝐧 𝚽 = 𝟎.𝟖𝟓𝟖= 37.2 t/m
𝑽 𝟑𝟏.𝟗𝟐
H = 𝐭𝐚𝐧 𝚽 = 𝟏.𝟔𝟔𝟕 = 19.15 t/m
4. Check of stresses
NΦ,Nθ
Fc = 𝐛∗𝐭
≤ Fc all = 60 kg/cm2
For NΦ
𝟑𝟕.𝟐∗𝟏𝟎𝟑
Fc = 𝟏𝟎𝟎∗𝟒𝟎
= 9.3 kg/cm2 ≤ Fc all OK
For Nθ
𝟑𝟎.𝟕𝟔∗𝟏𝟎𝟑
Fc = 𝟏𝟎𝟎∗𝟒𝟎
= 7.69 kg/cm2 ≤ Fc all OK
5. Reinforcement
NΦ 𝟑𝟕.𝟐∗𝟏.𝟒∗𝟏𝟎𝟒
As = 𝑭𝒚 = 𝟑𝟔𝟎∗𝟎.𝟖𝟓 = 1957.3 mm2
⁄𝟏.𝟏𝟓
𝜸𝒔
As
As/side = 𝟐
= 978.65 mm2
Use 6 Φ 16
444
THE TANK 4.25
Group 3 Concrete project 2019
3.3.5 Design of Ring beam
1. Check of Stresses
T 𝟏𝟑𝟎.𝟐∗𝟏𝟎𝟒
Fct = 𝐛∗𝐭 = 𝟕𝟎𝟎∗𝟏𝟎𝟎𝟎 = 1.86 N/mm2
Fct 𝟎.𝟔√𝟑𝟎
Fctr = = = = 1.9 N/mm2
𝜼 𝟏.𝟕
2. Reinforcement
𝑻 𝟏𝟑𝟎.𝟐∗𝟏.𝟒∗𝟏𝟎𝟒
As = 𝑭𝒚 = 𝟑𝟔𝟎∗𝟎.𝟖𝟓 = 6850.4 mm2
⁄𝟏.𝟏𝟓
𝜸𝒔
As
As/side = = 3425.2 mm2
𝟐
Use 10 Φ 22
444
THE TANK 4.26
Group 3 Concrete project 2019
TC < TI < TD
2.5 η 𝑇𝑐
δd (T1) = ag *𝛾1 * S * 𝑅
* [ 𝑇1 ] > 0.2 ag * 𝛾1
2.5∗1 0.25
δd (T1) = 1.23 * 1.2 * 1.35 * 6
* [ 0.79 ] = 0.265 ≮ 0.2 ag * 𝛾1 = 0.2*1.23*1.2 = 0.3
= Weight of upper tank + Weight of lower tank + Weight of shaft + Weight of stairs
444
THE TANK 4.27
Group 3 Concrete project 2019
𝑾𝒊∗𝒁𝒊
Fi = 𝚺𝑾𝒊∗𝒁𝒊 * Fb
Zi Wi WiZi Fi M over
Upper Tank 39.7 1433 56890.1 53.88 --------
Lower Tank 25.25 1509 38102.25 36.1 778.6
Sum ------- ------- 94929.4 ------- 3050.6
f1,2 = −𝑁
𝐴
± 𝑀𝑥
𝐼𝑥
y
N = 2942 t
𝛑∗(𝟕𝟐 −𝟔𝟐 )
A = = 10.2 m2
4
𝛑∗(𝟕𝟒 −𝟔𝟒 )
Ix = = 54.2 m4
64
y = 3.5 m
−2042
F1,2 = = 10.2
± 3050.6
54.2
* 3.6
444
THE TANK 4.28
Group 3 Concrete project 2019
h = 7.4 m , D = 14 m
ℎ 7.4
= = 0.53
𝑑 14
444
THE TANK 4.29
Group 3 Concrete project 2019
𝑚𝑐
𝑚
= 0.45 → mc = 134.95 ton
𝑚𝑖
𝑚
= 0.55 → mi = 164.94 ton
𝐾𝑐∗ℎ
𝑚∗𝑔
= 0.75 → kc = 298.067 ton
ℎ𝑖
= 0.55 → hi = 4.07 m
ℎ
ℎ𝑖``
ℎ
= 0.25 → ℎ𝑖∗ = 1.85 m
ℎ𝑐
ℎ
= 0.525 → hc = 3.885 m
ℎ𝑐``
ℎ
= 0.55 → ℎ𝑐∗ = 4.07 m
Ci =3.5
Cc = 4.5
(Ti( حساب زمن الطول الموجي الحركي
𝑴𝒊+𝑴𝒔
Ti = 2π√
𝑲𝒔
هي قيمة الحامل كتلة الخزان مضاف لها ثلث كتلة الهيكل لهms حيث
444
THE TANK 4.30
Group 3 Concrete project 2019
1 1 1013.4 800+400
ms = 3 weight of shaft + weight of water = 3 * 9.81
+ 9.81
= 156.76 ton
𝟏𝟔𝟒.𝟗𝟒+𝟏𝟓𝟔.𝟕𝟔
Ti = 2π √ = 1.52 sec
𝟓𝟒𝟔𝟏.𝟑𝟔𝟓
Seismic Zone
444
THE TANK 4.31
Group 3 Concrete project 2019
For δd(Tc)
Tc = 4.227 sec
Tc > TD
2.5𝜼 Tc∗Td
δd (Tc) = ag *𝛾1 * S * 𝑹
*[𝑻𝒄𝟐
] > 0.2 ag * 𝛾1
2.5∗𝟏 0.25∗1.2
δd (Tc) = 1.23 * 1.2 * 1.35 * 𝟏.𝟖
*[ 𝟒.𝟐𝟐𝟕𝟐
] = 0.046 sec ≮ 0.2 ag* 𝛾1 = 0.2*1.23*1.2 = 0.295
444
THE TANK 4.32
Group 3 Concrete project 2019
Check of stresses:
𝜋(11.50)2
N = structural load + o.w raft = 2942 +2.5*1.60* 4
= 3357.48 ton
𝑊 𝑡𝑜𝑡𝑎𝑙 1.4∗3357.48
No ,of piles = (1.2 : 1.4) * 𝑃𝑖𝑙𝑒 𝑐𝑎𝑝𝑎𝑐𝑖𝑡𝑦 = 100
= = 48 piles
𝑁 3357.48
F/pile = 𝑛 = 48
= = 69.95 ton < 100 ton OK . Safe
N = 3357.48 ton
Mx = 5203.15 t.m
−𝑁 𝑀∗𝑟𝑖
f1,2 = 𝐴
± ∑(𝑟) 2 y
−3357.48 5203.15
F1 = 48
- 760.5
*4.875= -103.3 ton < qall = 1.25*100 = 125 ton
−3357.48 5203.15
F2 = 48
+ 760.5
*4.875= -36.59 ton < qall = 1.25*100 = 125 ton
444
THE TANK 4.33
Group 3 Concrete project 2019
r = 0.5 d = 3500 mm
Mu 3050.6∗ (𝟏𝟎) 𝟕
Fcu∗Ac∗r
= 𝟑𝟎𝟎∗(𝟏𝟎.𝟐𝟏∗(𝟏𝟎) 𝟔 ∗𝟑𝟓𝟎𝟎 = 0.0028
r` 3460 ri 3000
ζ= r
= 3500
= 0.989 , r
= 3500
= 0.857
444
THE TANK 4.34
Group 3 Concrete project 2019
ρ=2
Use 290 Φ 20
Internal Reinforcement
External Reinforcement
Assuming that :
- We shall use 7Φ12 /m stirrups perimeter and Asp for Φ12= 113 mm2
- Outer perimeter
- Inner perimeter
0.25
Vs min = 0.25% Ac = 100
*10.21*(10)6 *1000 = 25.53*(10)6 mm3 < Vs total OK
444
THE TANK 4.35
Group 3 Concrete project 2019
assume tf = 1.60 m
𝜋(11.50)2
W total = Wtank + O.w Foundation = 2942 +2.5*1.60* 4
= 3357.48 ton
𝑊 𝑡𝑜𝑡𝑎𝑙 1.4∗3357.48
No ,of piles = (1.2 : 1.4) * = = = 48 piles
𝑃𝑖𝑙𝑒 𝑐𝑎𝑝𝑎𝑐𝑖𝑡𝑦 100
−𝑵 𝑴∗𝒓𝒊
f1,2 =
𝒏
± ∑(𝒓) 𝟐
444
THE TANK 4.36
Group 3 Concrete project 2019
Point (1)
−3357.48 3050.6
F1 = 48
- 760.5
*4.875= -89.5 ton < qall =100 ton
−3357.48 3050.6
F2 = 48
+ 760.5
*4.875= -50.4 ton < qall =100 ton
Point (2)
−3357.48 3050.6
F1 = 48
- 760.5
*3.25= -82.98 ton < qall =100 ton
−3357.48 3050.6
F2 = + *3.25= -56.91 ton < qall =100 ton
48 760.5
Point (3)
−3357.48 3050.6
F1 = 48
- 760.5
*1.625= -76.47 ton < qall =100 ton
−3357.48 3050.6
F2 = 48
+ 760.5
*1.625= -63.43 ton < qall =100 ton
Use 14 Φ 25
𝑀 145.44∗105
As = 𝐾2∗𝑑 = 1832∗153
= 51.89 cm2
Use 14 Φ 22
444
THE TANK 4.37
Group 3 Concrete project 2019
References:
1- Yosef, A. Lectures notes on design fundamentals of reinforced
concrete
2- Yosef, A. Lectures notes on design of reinforced concrete part 1
3- Yosef, A. Lectures notes on earthquakes resistance design of
structures
4- Hamed, reinforced concrete constructions water tank
5- El-Behairy, S. reinforced concrete design handbook
6- Hilal, M. design of reinforced concrete halls
7- Ghoneim, M. & El-Mihilmy, M. design of reinforced concrete
structures
8- Egyptian code for loads
9- Egyptian code for design and construction of R/C structures
( ECP 203-2007 )
i
References I