You are on page 1of 6

SESSION PLAN

Sector : ELECTRICAL & ELECTRONICS


Qualification Title : ELECTRICAL INSTALLATION AND MAINTENANCE NC II
Unit of Competency : INSTALL WIRING DEVICES OF FLOOR AND WALL MOUNTED OUTLETS, LIGHTING
FIXTURE/SWITCHES AND AUXILLIARY OUTLETS
Module Title : INSTALLING WIRING DEVICES OF FLOOR AND WALL MOUNTED OUTLETS, LIGHTING
FIXTURE/SWITCHES AND AUXILLIARY OUTLETS

Learning Outcomes
1. Select wiring devices
2. Install wiring devices
3. Install lighting fixture/ switches
4. Notify completion of work

A. INTRODUCTION
This unit covers the knowledge, skills and attitudes on selecting and installing wiring devices, installing lighting fixtures/switches and
notifying completion of work of floor and wall mounted outlets and auxiliary outlets.
B. LEARNING ACTIVITIES
LO 1: Select wiring devices
Learning Content Methods Presentation Practice Feedback Resources Time
Read and interpret
electrical plan Lecture Read the CBLM
Answer Self Comparin
Modular (Self- information Pen and
check 3.1-1 g answer
paced) sheet 3.1-1 notebook
to the
Group Discussion Drawings are Performance
read and task sheet
interpreted to 3.1-1 in answer
determine job Drawings key 3.1-1 Electrica
requirements are read and l book
Evaluate
interpreted
Drawings
to determine
are read
job
and
requirement
interprete
s
d to
determin
e job
requirem
ents
Types of wiring
devices and quantity Lecture Read the CBLM
Answer Self Comparin
of consumable items Modular (Self- information Pen and
check 3.1-2 g answer
paced) sheet on 3.1-2 notebook
to the
Group Discussion Correct type answer
and quantity of key 3.1-2 Electrica
wiring devices l book
and
consumable
items are
identified in line
with job
requirements
Types of hand tools
and machine Lecture Read CBLM
Answer Self Comparin
equipment Modular (Self- information Pen and
check 3.1-3 g answer
paced) sheet 3.1-3 on to the notebook
Demonstration Tools and answer
Group Discussion equipment are Electrica
key 3.1-3
selected in line l tools
and
with job equipme
requirements nt

Types and proper


use of personal Lecture Read CBLM
Answer Self Comparin
protective Modular (Self- information Pen and
check 3.1-4 g answer
equipment paced) sheet 3.1-4 on notebook
to the
Demonstration Tools and answer
Group Discussion equipment are Electrica
key 3.1-3
selected in line l tools
with job and
requirements equipme
nt
LO 2: Install wiring devices
Safety procedures
inline to the DOLE Lecture Read CBLM
Answer Self Comparin
Department order Modular(Self-paced) information Pen and
check 3.2-1 g answer
no. 13 s. 1998 Group Discussion sheet 3.2-1 on notebook
to the
Guidelines Safety answer
Governing procedure in key 3.2-1
occupation Safety line with DOLE
and health in the Department
construction order no. 13 s.
Industry 1998
PEC Requirement
regarding Installation Lecture Read CBLM
Answer Self Comparin
of wiring devices Modular(Self-paced) information Pen and
check 3.2-2 g answer
Group Discussion sheet 3.2-2 on notebook
to the
PEC answer
Requirements key 3.2-2
Installation
procedure of lecture Read CBLM
Answer Self Comparin
various devices Actual Demonstration information Pen and
Check 3.2-3 g answer
Modular( Self- sheet on notebook
to the
paced) Different kind of Performance
answer
Group Discussion Special purpose criteria
key 3.2-3
outlet . 3.2-3 checklist
Identify Task 3.2-2 Direct
sheet on types observati
of GFCI on

LO 3: Install lighting fixture/ switches

Safety procedures
inline to the DOLE Lecture Read CBLM
Answer Self Comparin
Department order Modular (Self- information Pen and
check 3.3-1 g answer
no 13 s 19998 paced) sheet 3.3-1 notebook
to the
Guidelines Group Discussion answer
Governing
key 3.3-1
occupation Safety
and health in the
construction
Industry
PEC Requirement
regarding Lecture Read CBLM
Answer Self
Installation of Modular (Self- information Pen and
check 3.2-2
wiring devices paced) sheet 3.3-2 notebook
Group Discussion
Comparin
g answer
to the
answer
key 3.3-2

Types of lighting
fixtures and Lecture Read CBLM
Answer Self Comparin
installation Modular (Self- information check 3.3-3 g answer
technique paced) sheet 3.3-3 to the
Group Discussion answer
key 3.3-3

LO 4: Notify completion of work


Processes,
Operations, Actual Demonstration Task sheet CBLM
Performance Direct
Systems or
criteria Observati
Maintenance of
check list on
tools or Storage of
tools
Checked and
conformed the Actual Demonstration Task sheet CBLM
Performance Direct
installation based Job Sheet criteria observati
on job requirement
check list on
C. ASSESSMENT PLAN
• Written Test
• Performance Test
D. TEACHER’S SELF-REFLECTION OF THE SESSION

You might also like