Weekly Schedule
Weekly Schedule
2022
quantity May Jun
Work
STA.No 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28
Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed
Weekly Weekly Weekly
Event safety
Patrol
safety
Patrol
safety
Patrol
0+693-
0+737
ATRAN BRIDGE A1
0+737-
Surcharge
0+770
0+770-
0+788
Dyke repair
Construction Volume(m3)
Remarks
1+191-
ATRAN BRIDGE A2
1+240
Surcharge
1+240-
1+280
Drainage Work(IHI)
Construction Volume(m3)
Remarks
0+480-
0+505
Surcharge
0+505-
ZATHAPYIN BRIDGE A1
Machine
move・setting
excavation
CIP Pile
Construction
Rebar Installation
Concteat Casing
Construction Volume(m3)
P2-01→04→07→02→05→08→03→06→09→12→15→10→13→16→11→14→17→20→23→18→21→24→19→22→25 →28 →31 →26 →
Remarks 29→32→27→30→33→36→39→34→37→40→35→38
1+300-
1+352
Surcharge
1+330-
1+352
Machine
move・setting
ZATHAPYIN BRIDGE A2
Excavation
CIP Pile
Construction
(MT-01)
Rebar Installation
Concteat Casing
Machine
move・setting
Excavation
CIP Pile
Construction
(MT-02)
Rebar Installation
Concteat Casing
Construction Volume(m3)
M1:P3-33→01→25→02→26→03→34→38→35→39→36→40→37→12→17→28→24→27→30→05→29→18→21→09→20→23→19→13→16
Remarks →06→10→04→22→11→14
M2:P3-08→31→07→32→15
H.W.L(m) 2.7 3.1 3.6 3.9 4.2 4.4 4.4 4.3 4.1 3.8 3.4 3.1 3.0 2.9 2.9 3.1 3.3 3.5 3.6 3.7 3.8
▼ : Engineer Inspection
▼ : Engineer Inspection with survey Team
※It is necessary to prepare for each site surcharge. ▼ : Engineer Inspection
※H.W.L 4.4(14,15/Jun) 4.6(14,15/Jul) 4.7(13,14/Aug)
Remarks(ALL) ▼ : Engineer Inspection with survey Team
Two Week Schedule Update: 23/6/2023
2022
quantity May Jun
Work
STA.No 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22
Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed
Weekly Weekly Weekly
Event safety
Patrol
safety
Patrol
safety
Patrol
Dyke repair
Construction Volume(m3)
Remarks
40bags
Sand Bag Setting Work(ST)
1+280
Surcharge ▲4.10 ▲4.25 ▲4.40
1+191-
▼4.85 ▼5.00 ▼5.15
1+280
Drainage Work(IHI)
Construction Volume(m3)
Remarks
0+505
Surcharge ▲3.95 ▲4.10 ▲4.25 ▲4.40
▼4.55 ▼4.70 ▼4.85 ▼5.00 5.15▼
0+505-
TargetEL:3.5→8.0 ( 4.5m ) 0+548
P2-07 Fabrication ▼ P2-05 Fabrication ▼
Construction Volume(m3)
Remarks
1+300-
▼5.6 ▼5.80 ▼6.162 ▼6.162
1+352
ZATHAPYIN BRIDGE A2
Surcharge
▼4.45 ▼4.60 ▼4.75 ▼4.90 ▼5.05 ▼5.20 ▼5.35 ▼5.50
1+330-
1+352
Construction Volume(m3)
M1:P3-33→01→25→02→26→03→34→38→35→39→36→40→37→12→172824273005291821092023191316061004221114
Remarks M2:P3-08→31→07→32→15
H.W.L(m) 3.5 3.3 3.1 2.8 2.6 2.4 2.5 2.7 3.1 3.6 3.9 4.2 4.4 4.4 4.3 4.1 3.8 3.4 3.1 3.0 2.9
※It is necessary to prepare for each site surcharge. ▼ : Engineer Inspection
※H.W.L 4.4(14,15/Jun) 4.6(14,15/Jul) 4.7(13,14/Aug)
Remarks(ALL) ▼ : Engineer Inspection with survey Team
Two Week Schedule Update: 23/6/2023
2022
quantity May Jun
Work
STA.No 26 27 28 29 30 31 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15
Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed
Weekly Monthly
Event safety
Patrol
safety
Patrol
Material inspection
ATRAN BRIDGE A1
bottom slope
Placing Steel Cage for bed level 62m
slope
Wooden Pile Pilling Work 110nos
slope
Laying Crushed Stone 62m
Construction Volume(m3)
Remarks
20bags 20bags
Sand Bag Filling Work(ST)
40bags
Sand Bag Setting Work(ST) 20bags
▼4.70
1+191-
1+240
▲4.70
Surcharge
1+240-
▼3.50 ▼3.65 ▼3.80 ▼4.10 ▼4.25 ▼4.40 ▼4.55 ▼4.70 ▼4.85
ATRAN BRIDGE A2
1+280
▲3.50 ▲3.65▲3.80 ▲3.95
Drainage Work(IHI)
Construction Volume(m3)
Remarks
Surcharge
0+505-
▼4.40 ▼4.55 ▼4.70 ▼4.85 ▼5.00
TargetEL:3.5→8.0 ( 4.5m ) 0+548
Back filling
Underground Drainage 0+160-
+0+200
Back filling
Perforated pipe conenection
0+240-
0+260
Construction Volume(m3)
Remarks
1+274-
1+330
ZATHAPYIN BRIDGE A2
ZAT
CIP Pile Construction (MT-02) P3-31 P3-32 P3-15
Drilling
& ▼ P3-31
Concretin
g
Construction Volume(m3)
Remarks
H.W.L(m) 2.9 3.2 3.5 3.6 3.7 3.7 3.6 3.5 3.3 3.1 2.8 2.6 2.4 2.5 2.7 3.1 3.6 3.9 4.2 4.4 4.4
※It is necessary to prepare for each site surcharge. ▼ : Engineer Inspection
※H.W.L 4.4(14,15/Jun) 4.6(14,15/Jul) 4.7(13,14/Aug)
Remarks(ALL) ▼ : Engineer Inspection with survey Team
Two Week Schedule Update: 23/6/2023
2022
quantity May Jun
Work
STA.No 19 20 21 22 23 24 25 26 27 28 29 30 31 1 2 3 4 5
Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun
Weekly Weekly
Event safety
Patrol
safety
Patrol
Underground Drainage
Excavation 0+620/0+600-0+620
▼▼
First layer and pipe 0+640/0+660-0+600/0+600/0+660
▼▼ ▼▼ ▼▼
Final Layer and water flow ▼▼ ▼▼ ▼▼ ▼▼
ATRAN BRIDGE A1
50 bags
Sand Bags Filling work
0+715- 337 ▼3.65 337 ▼3.80 309 ▼3.95 309 ▼4.10 306 ▼4.25
Surcharge
0+788.5
Construction Volume(m3)
Surcharge target EL:3.5→5.0(1.5m)
Remarks
Drainage Work(IHI)
Compaction Trial
1+320 After Material Approved ▼RFA
(Behind A2)
1+340
Dyke Repairing
ATRAN BRIDGE A2
Sand Bag Filling Work(ST) 1508 nos 44 nos 41 nos 44 nos 41 nos
85 nos 85 nos
Sand Bag Setting Work(ST)
Surcharge/Embankment 1+191.18 ▼ EL 4.25 326 ▼ EL 4.4 345 ▼ EL 4.55 345 ▼ EL 4.7 342 ▼ EL 4.85 342 ▼ EL 5.0 339 ▼ EL 5.15 339 ▼ EL 5.3 336
EL; 4.1 to 5.3(1.2m)
(ST) 1+242.74
Embankment
construction"Soil"
(Boundary area with
surcharge)
Construction Volume(m3)
Surcharge target EL:3.5→5.0(1.5m)
Remarks
Soil sampling & test
Embankment Construction "Soil"
ZATHAPYIN BRIDGE A1
0+505- 259 ▼3.95 259 ▼4.10 251 ▼4.25 251 ▼4.40 245 ▼Sand bag setting▼4.55 245 ▼4.70 238 ▼4.85
Surcharge 0+549
0+160 ▼Excavation ▼1st layer ▼2nd layerBack Filling work
Underground Drain (SD)
0+200
Construction Volume(m3)
Surcharge target EL:3.5→5.3(1.8m)
Remarks
Sand Bags Filling
Work
Sand Bags Setting
Work
for 3rd Layer
Surcharge/Embankment 1+280
ZATHAPYIN BRIDGE A2
1+330
1+330 130 ▼4.15 130 ▼4.30 Geotexile 129 ▼4.45 129 ▼4.60125 ▼4.75 125 ▼4.90 122 ▼5.05122 ▼5.20119 ▼5.35119 ▼5.50
Soil Embankment
1+360
Fabricati P3-25 P3-02 P3-26 P3-XX
on
Assembly
CIP Pile Construction (MT-01) Drilling
& P3-01 P3-25 P3-02 P3-26 P3-XX
Concretin
g
Fabricati P3-08 P3-31 P3-07
on
Assembly
CIP Pile Construction (MT-02) Drilling
& P3-08 (Day time only) P3-31 P3-07 P3-32
Concretin
g
Construction Volume(m3)
Surcharge target EL:4.0→6.1(2.1m)
Remarks
H.W.L(m) 3.8 3.4 2.9 2.5 2.3 2.3 2.6 2.9 3.2 3.5 3.6 3.7 3.7 3.6 3.5 3.3 3.1 2.8
※Install Sand Bags every 6 times(900mm) ▼ : Internal Inspection
※It is necessary to prepare for each site surcharge.
Remarks(ALL) ※H.W.L 4.4(14,15/Jun) 4.6(14,15/Jul) 4.7(13,14/Aug) ▼ : Engineer Inspection
Two Week Schedule Update: 23/6/2023
2022
quantity May
Work
STA.No 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29
Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun
Weekly Weekly
Event safety
Patrol
safety
Patrol
Construction Volume(m3)
Remarks
Drainage Work(IHI)
Embankment Protection
Work(IHI)
Compaction Trial
1+320 After Material Approved ▼RFA
(Behind A2)
1+340
ATRAN BRIDGE A2
1+600
Underground Drainage Work(ST) ▼ ▼ ▼
1+614
Sand Bag Filling Work(ST) 1508 nos
Surcharge/Embankment 1+191.5 ▼ EL 3.65 ▼ EL 3.8 ▼ EL 3.95 ▼ EL 4.1 ▼ EL 4.25 ▼ EL 4.40 ▼ EL 4.55 ▼ EL 4.70 ▼EL 4.85 ▼EL 5.00 ▼EL 5.15
EL; 3.5 to 5.0 (1.5m)
(ST) 1+242..74
Remarks
Surcharge (around A1) Geotextile ▼ ▼3.65 ▼3.80 ▼3.95 ▼4.10 ▼4.25 ▼4.40 ▼4.55
"Sand"
(0+380)
ZATHAPYIN BRIDGE A1
(0+400)
(0+460)
Underground Drainage (CWD & CD)
(0+440)
(0+200) Excavation 1st layer filter materials filling 2nd layer filter materials filling
Dyke work
Construction Volume(m3)
Remarks
Sand Bags Filling
Work
Sand Bags Setting
Work
for 3rd Layer
ZATHAPYIN BRIDGE A2
Embankment (Soil) ▼4.15 ▼4.45 ▼4.75 ▼4.90 ▼5.05 ▼5.20 ▼5.35 ▼5.50
Surcharge
1+330 Bed level ▼4.30 ▼4.60
boundary 1+360
Fabricati
on
Assembly
CIP Pile Construction (Dia 2m) Drilling
& P3-33 P3-36 P3-39 P3-34 P3-37 P3-40 P3-35 P3-38 P3-25
Concretin
g
Construction Volume(m3)
※Compaction Trial (Soil)
Remarks
H.W.L(m)
※Install Sand Bags every 6 times(900mm) ▼ : Internal Inspection
※It is necessary to prepare for each site surcharge.
Remarks(ALL) ※H.W.L 4.2(16/May) 4.4(14/Jun) ▼ : Engineer Inspection
Two Week Schedule Update: 23/6/2023
2022
quantity May
Work
STA.No 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29
Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun
Weekly Weekly
Event safety
Patrol
safety
Patrol
Construction Volume(m3)
Remarks
Drainage Work(IHI)
Surcharge/Embankment 1+191.5 ▼ EL 3.65 ▼ EL 3.8 ▼ EL 3.95 ▼ EL 4.1 ▼ EL 4.25 ▼ EL 4.40 ▼ EL 4.55 ▼ EL 4.70 ▼EL 4.85 ▼EL 5.00 ▼EL 5.15
EL; 3.5 to 5.0 (1.5m)
(ST) 1+242..74
Remarks
Surcharge (around A1) Geotextile ▼3.65 ▼3.80 ▼3.95 ▼4.1 ▼4.25 ▼4.40
"Sand"
(0+380)
ZATHAPYIN BRIDGES A1
(0+400)
(0+460)
Underground Drainage (CWD & CD)
(0+440)
(0+200) Excavation 1st layer filter materials filling 2nd layer filter materials filling
Dyke work
Construction Volume(m3)
Remarks
Sand Bags Filling
Work
Sand Bags Setting
Work
for 3rd Layer
ZATHAPYIN BRIDGES A2
Embankment (Soil) ▼4.15 ▼4.45 ▼4.75 ▼4.90 ▼5.05 ▼5.20 ▼5.35 ▼5.50
Surcharge 1+330 Bed level ▼4.30 ▼4.60
1+360
boundary
Fabricati
on
Assembly
CIP Pile Construction (Dia 2m) Drilling
& P3-33 P3-36 P3-39 P3-34 P3-37 P3-40 P3-35 P3-38 P3-25
Concretin
g
Construction Volume(m3)
※Compaction Trial (Soil)
Remarks
H.W.L(m)
※Install Sand Bags every 6 times(900mm) ▼ : Internal Inspection
※It is necessary to prepare for each site surcharge.
Remarks(ALL) ※H.W.L 4.2(16/May) 4.4(14/Jun) ▼ : Engineer Inspection
Two Week Schedule Update: 23/6/2023
2022
quantity May
Work
STA.No 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22
Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun
Weekly Weekly
Event safety
Patrol
safety
Patrol
0+600~
0+580
pipe Second Layer Back Filling work
Excavation ▼▼ First layer and ▼▼
0+580 Excavation First layer and pipeSecond Layer Back Filling work
▼▼ ▼▼
BRIDGES A1
0+540
Surcharge/Embankment 0+715 Preparation(mount up) ▼3.5 193.5 ▼3.65 193.5 ▼3.8 ▼3.95 ▼4.1
0+788.5
Construction Volume(m3)
Remarks
1+191.5 ▼3.5 135.5 ▼3.65 135.5 ▼3.8 137.5 ▼3.95 137.5 ▼4.1
ATRAN BRIDGES A2
Surcharge/Embankment
1+243
Jetty Work
1+320
Compaction Trial
(Behind A2)
1+340
Dismantling
SC-Pile Work
Construction Volume(m3)
Remarks
Surcharge/Embankment Preparation (Sand removal) Preparation (mount up) 7 Sheet ▼3.5 201 ▼3.65 201 ▼3.8 196 ▼3.95
Underground Drainage (SD) 0+529.6 First Second Layer Back Filling work
(0+380) First layer and pipe installation Second Layer Back Filling work
ZATHAPYIN BRIDGES A1
(0+460) First layer and pipe installation Second Layer Back Filling work
Underground Drainage (CWD & CD)
(0+440)
(0+200) First layer and pipe installation Second Layer Back Filling work
Underground Drainage (SD)
(0+165.68)
Catch Pit & Perforated Pipe connection work (0+240 - 0+260) First layer and pipe installation Second Layer Back Filling work
Dyke work
Construction Volume(m3)
Remarks
Sand Bags Filling
Work
Sand Bags Setting
Work
for 3rd Layer
ZATHAPYIN BRIDGES A2
Surcharge/Embankment
1+280 264.5 5.2 256.5 5.35 256.5 5.5 242 5.65 242 5.8 228.5 5.95 228.5 6.1 189
1+330
Fabricati
on
Assembly
CIP Pile Construction (Dia 2m) Drilling
& Setting Out 2 Days & 2 Night / 1pile
Concretin
g
Catch pit & Temporary Drain
Construction Volume(m3)
※Compaction Trial (Soil)
Remarks
H.W.L(m) 2.9 2.6 2.2 1.8 1.6 1.7 2.1 2.6 3.2 3.6 4.0
▼ : Internal Inspection
▼ : Engineer Inspection
※Install Sand Bags every 6 times(900mm) ▼ : Internal Inspection
※It is necessary to prepare for each site surcharge.
Remarks(ALL) ※H.W.L 4.2(16/May) 4.4(14/Jun) ▼ : Engineer Inspection
Two Week Schedule Update: 23/6/2023
2022
quantity April May
Work
STA.No 28 29 30 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15
Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun
Monthly Weekly
Event safety
Patrol
safety
Patrol
Surcharge/Embankment 0+715
Not yet Drawing Preparation(mount up) ▼ ▼3.65 ▼3.8
0+788.5
1position
ATRAN
Dyke repair
Jetty Work
Remarks
SC-Pile caping ▼
Jetty Work
Compaction Trial
Construction Volume(m3)
Remarks
Jetty work
Dyke work
Construction Volume(m3)
Remarks
Compaction Trial (Soil) ▼ Access Trial
Sand bags filling work 992nos 40nos 40nos 40nos 27nos
Jetty work
3days Until14/5
Dyke Preparation work 3days Until14/5
Construction Volume(m3) 264.5 256.5 256.5 242 242 228.5 228.5
※Compaction Trial (Soil)
Remarks
H.W.L(m) 3.0 3.3 3.5 3.6 3.6 3.5 3.2 2.9 2.6 2.2 1.8 1.6 1.7 2.1 2.6 3.2 3.6 4.0
※Install Sand Bags every 6 times(900mm) ▼ : Internal Inspection
※It is necessary to prepare for each site surcharge.
Remarks(ALL) ※H.W.L 4.2(16/May) 4.4(14/Jun) ▼ : Engineer Inspection
Two Week Schedule Update: 23/6/2023
2022
quantity April May
Work
STA.No 20 21 22 23 24 25 26 27 28 29 30 1 2 3 4 5 6 7 8
Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun
Weekly Monthly
Event safety
Patrol
safety
Patrol
Underground Drainage
Excavation 0+744
0+480
BRIDGES A1
Jetty Work
ATRAN
Dyke Work
Construction
Construction Volume(m3)
Surcharge target EL:3.5→5.0 ( 1.5 m)
Remarks
Underground Drainage
SC-Pile Dismantling
SC-Pile caping
Jetty Work
Dyke Work
Construction
Construction Volume(m3)
21.4.22 1st layer inspection sta(1+340-1+380)
※Compaction Trial (Soil)
Surcharge target EL:3.5→5.0 ( 1.5 m)
Remarks
Underground Drain
Second Layer(Side 0+300
0+360
Drain)
Underground Drain 0+320
Excavation(CD & CWD) 0+340 ▼▼
Underground Drain 0+320
First Layer(CD & CWD 0+340 ▼▼
Underground Drain 0+320
First Layer(CD & CWD 0+340
result
ZATHAPYIN BRIDGES A1
Jetty work
Remarks
1+280▼5.05 80 ▼5.20
77 ▼5.35
77 ▼5.5 73.5 ▼5.65 73.5107nos ▼5.8 70.5 ▼5.95 70.5 ▼6.1
1+300
ZATHAPYIN BRIDGES A2
Surcharge/Embankment
1+300 114 110.5 110.5 104.5 104.5 98.5 98.5
1+320
EL:4.0→6.1 ( 2.1 m) 1+320 70.5 69 69 64 64 59.5 59.5
1+330
SC-Pile caping
CIP Pile Construction(Dia 2m) Reaber Fabrication Pile construction start after test report
Jetty work
ZA
Jetty work
▼4.25
Two Week Schedule Update: 23/6/2023
2022
quantity April May
Work
STA.No 21 22 23 24 25 26 27 28 29 30 1 2 3 4 5 6 7 8
Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun
Weekly Monthly
Event safety
Patrol
safety
Patrol
Underground Drainage
0+524
Excavation 0+680 ▼▼
0+700
First layer and pipe
0+740 ▼▼
Second Layer 0+700 Sand Backfilling
▼▼
0+744
BRIDGES A1
SC-Pile caping
Jetty Work
Compaction Trial
Remarks
※Compaction Trial (Soil) Surcharge target EL:3.5→6.5
Jetty work
Remarks
Survey
SC-Pile caping
CIP Pile Construction(Dia 2m) Reaber Fabrication Pile construction start after test report
Jetty work
ZA
Jetty work
Excavation 0+744
0+480
BRIDGES A1
Jetty Work
ATRAN
Dyke Work
Construction
Construction Volume(m3)
Surcharge target EL:3.5→5.0 ( 1.5 m)
Remarks
Underground Drainage
SC-Pile caping
Jetty Work
Dyke Work
Construction
Construction Volume(m3)
14.4.22 2nd layer inspection sta (1+200-1+240)
19.4.22 inspection for excavation sta(1+340-1+380) & sta(1+510-1+620)
Surcharge target EL:3.5→5.0 ( 1.5 m)
21.4.22 1st layer inspection sta(1+340-1+380)
Remarks ※Compaction Trial (Soil)
Underground Drain
0+300
Second Layer(Side
Drain)
0+360 ▼
Underground Drain 0+320
Excavation(CD & CWD) 0+340 ▼▼
Underground Drain 0+320
First Layer(CD & CWD 0+340 ▼▼
Underground Drain 0+320
First Layer(CD & CWD 0+340
▼Sampling result
ZATHAPYIN BRIDGES A1
Jetty work
Remarks
Surcharge/Embankment
1+300 117 114 114 110.5 110.5 104.5 104.5
1+320
EL:4.0→6.1 ( 2.1 m) 1+320 72 70.5 70.5 69 69 64 64
1+330
SC-Pile caping
CIP Pile Construction(Dia 2m) Preparatiom work Reaber Fabrication Pile construction start after test report
Jetty work
ZA
Jetty work
0+744
Excavation 0+480
BRIDGES A1
Jetty Work
ATRAN
Dyke Work
Construction
Construction Volume(m3)
Underground Drainage
Catch Pitch
Jetty Work
Dyke Work
Construction
Construction Volume(m3)
8.4.22 2nd layer inspection sta(1+260-1+300) & 1st layer inspection sta(1+200-1+240)
11.4.22 2nd layer inspection sta(1+320-1+340)
14.4.22 2nd layer inspection sta (1+200-1+240) Surcharge target EL:3.5→5.0 ( 1.5 m)
Remarks 19.4.22 inspection for excavation sta(1+340-1+380) & sta(1+510-1+620)
21.4.22 1st layer inspection sta(1+340-1+380)
※Compaction Trial (Soil)
Jetty work
Remarks
Survey
Surcharge/Embankment
1+300 120.5 120.5 117 117 114 114 110.5
1+320
EL:4.0→6.1 ( 2.1 m) 1+320 73.5 73.5 72 72 70.5 70.5 69
1+330
SC-Pile
Test Pile ▼
Loading Test
Jetty work
Excavation 0+744
0+480
0+480
Jetty Work
Dyke Work
Construction
ATRAN
Construction Volume
Remarks
Underground Drainage
Catch Pitch
Jetty Work
Dyke Work
Construction
Construction Volume
8.4.22 2nd layer inspection sta(1+260-1+300) & 1st layer inspection sta(1+200-1+240)
11.4.22 2nd layer inspection sta(1+320-1+340)
14.4.22 2nd layer inspection sta (1+200-1+240)
Remarks 19.4.22 inspection for excavation sta(1+340-1+380) & sta(1+510-1+620)
21.4.22 1st layer inspection sta(1+340-1+380)
※Compaction Trial (Soil)
CWD)
Tube well drilling work Result
Surcharge/Embankment
Jetty work
Construction Volume
Remarks
Survey
Surcharge/Embankment 1+300 241 5Days Waiting 234 5Days Waiting 234 5Days Waiting
1+320
1+320 147 5Days Waiting 144 5Days Waiting 144 5Days Waiting
1+330
SC-Pile
Test Pile ▼
Loading Test
Jetty work
Survey ▼
Sand bags setting 162
5days keep 173 5days keep 167 5days keep
180 ▼ ▼ ▼
ZATHAPYIN BRIDGES A2
1+280
1+300
1+300 230 5days keep 241 5days keep 234 5days keep
1+320
Surcharge/Embankment
1+320 138 5days keep 147 5days keep 144 5days keep
1+330
Geotextile
1+280 ~ 1+330 ▼
SC-Pile SC-Pile
Jetty work
Remarks
▼ : Internal Inspection
▼ : Engineer Inspection
Weekly schedule
2022
March April
Work quantity 30 31 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17
Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun
This Week Next Week Next Week
Underground Dranage
Survey
Surcharge/Embankment
ATRAN
Geotextile
Jetty work
Construction Volume
Underground Dranage
Survey
Surcharge/Embankment
Geotextile
Jetty work
Construction Volume
Underground Dranage No.o+140 ~ No.0+400
Survey
0+505
Geotextile 0+540
Jetty work
Survey
1+280
1+300
1+280
Geotextile 1+330
SC-Pile SC-Pile
Jetty work
Remarks
▼ : Internal Inspection
▼ : Engineer Inspection
Weekly schedule
2022
March April
Work quantity 25 26 27 28 29 30 31 1 2 3 4 5 6 7 8 9 10
Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun
This Week Next Week Next Week
Survey
0+505 198
0+520
0+520 206
0+540
Surcharge/Embankment
0+505
Geotextile 0+540
▼
ZATHAPYIN BRIDGES A2
Survey
1+280
Geotextile 1+330
▼ : Internal Inspection
▼ : Engineer Inspection
1+280
1+330
▼ : Internal Inspection
▼ : Engineer Inspection
Remarks