Two Week Schedule Update: 23/6/2023

2022
quantity May Jun
Work
STA.No 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28
Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed
Weekly Weekly Weekly
Event safety
Patrol
safety
Patrol
safety
Patrol

Sand Bags Filling work

Sand bags laying work

0+693-
0+737
ATRAN BRIDGE A1

0+737-
Surcharge
0+770

0+770-
0+788

Dyke repair

Construction Volume(m3)

Remarks

Sand Bag Filling Work(ST)

Sand Bag Setting Work(ST)

1+191-
ATRAN BRIDGE A2

1+240
Surcharge
1+240-
1+280

Drainage Work(IHI)

Construction Volume(m3)

Remarks

Sand Bag Filling Work(ST)

Sand Bag Setting Work(ST)

0+480-
0+505
Surcharge
0+505-
ZATHAPYIN BRIDGE A1

TargetEL:3.5→8.0 ( 4.5m ) 0+548

Machine
move・setting

excavation
CIP Pile
Construction
Rebar Installation

Concteat Casing

Construction Volume(m3)
P2-01→04→07→02→05→08→03→06→09→12→15→10→13→16→11→14→17→20→23→18→21→24→19→22→25 →28 →31 →26 →
Remarks 29→32→27→30→33→36→39→34→37→40→35→38

Sand Bag Filling Work(ST)

Sand Bag Setting Work(ST)

1+300-
1+352
Surcharge
1+330-
1+352

Machine
move・setting
ZATHAPYIN BRIDGE A2

Excavation
CIP Pile
Construction
(MT-01)
Rebar Installation

Concteat Casing

Machine
move・setting

Excavation
CIP Pile
Construction
(MT-02)
Rebar Installation

Concteat Casing

Construction Volume(m3)
M1:P3-33→01→25→02→26→03→34→38→35→39→36→40→37→12→17→28→24→27→30→05→29→18→21→09→20→23→19→13→16
Remarks    →06→10→04→22→11→14
M2:P3-08→31→07→32→15
H.W.L(m) 2.7 3.1 3.6 3.9 4.2 4.4 4.4 4.3 4.1 3.8 3.4 3.1 3.0 2.9 2.9 3.1 3.3 3.5 3.6 3.7 3.8
▼ : Engineer Inspection
▼ : Engineer Inspection with survey Team
※It is necessary to prepare for each site surcharge. ▼ : Engineer Inspection
※H.W.L 4.4(14,15/Jun) 4.6(14,15/Jul) 4.7(13,14/Aug)
Remarks(ALL) ▼ : Engineer Inspection with survey Team
Two Week Schedule Update: 23/6/2023
2022
quantity May Jun
Work
STA.No 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22
Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed
Weekly Weekly Weekly
Event safety
Patrol
safety
Patrol
safety
Patrol

50bags 50bags 50bags


Sand Bags Filling work

Sand bags laying work

▼3.80 ▼3.95 ▼4.10 ▼4.25 ▼4.40 ▼4.55


0+693-
0+737
ATRAN BRIDGE A1

▼3.95 ▼4.10 ▼4.25 ▼4.40


0+737-
Surcharge
0+770
▲4.25
▼3.95 ▼4.10 ▼4.25 ▼4.40 ▼4.55 ▼4.70
0+770-
0+788

Dyke repair

Construction Volume(m3)

Remarks

20bags 20bags 30bags 30bags 30bags 30bags


Sand Bag Filling Work(ST)

40bags
Sand Bag Setting Work(ST)

▼4.10 ▼4.25 ▼4.40 ▼4.55 ▼4.70


1+240-
ATRAN BRIDGE A2

1+280
Surcharge ▲4.10 ▲4.25 ▲4.40
1+191-
▼4.85 ▼5.00 ▼5.15
1+280

Drainage Work(IHI)

Construction Volume(m3)

Remarks

Sand Bag Filling Work(ST)

Sand Bag Setting Work(ST)

▼3.95 ▼4.10 ▼4.25 ▼4.40 ▼4.55 ▼4.70 ▼4.85 ▼5.00 5.15▼


0+480-
ZATHAPYIN BRIDGE A1

0+505
Surcharge ▲3.95 ▲4.10 ▲4.25 ▲4.40
▼4.55 ▼4.70 ▼4.85 ▼5.00 5.15▼
0+505-
TargetEL:3.5→8.0 ( 4.5m ) 0+548
P2-07 Fabrication ▼ P2-05 Fabrication ▼

CIP Pile Construction


P2-02 Fabrication ▼ P2-08 Fabrication

Construction Volume(m3)

Remarks

Sand Bag Filling Work(ST)

Sand Bag Setting Work(ST)

1+300-
▼5.6 ▼5.80 ▼6.162 ▼6.162
1+352
ZATHAPYIN BRIDGE A2

Surcharge
▼4.45 ▼4.60 ▼4.75 ▼4.90 ▼5.05 ▼5.20 ▼5.35 ▼5.50
1+330-
1+352

Fabricati ▼ P3-03 ▼ P3-34 ▼ P3-38 ▼ P3-35


on
Assembly
CIP Pile Construction (MT-01)
Drilling P3-02 P3-26 P3-03 P3-34
&
Concretin
g
Fabricati
on ▼ P3-15
Assembly
CIP Pile Construction (MT-02) P3-32
Drilling P3-7 P3-15
&
Concretin
g

Construction Volume(m3)
M1:P3-33→01→25→02→26→03→34→38→35→39→36→40→37→12→172824273005291821092023191316061004221114
Remarks M2:P3-08→31→07→32→15

H.W.L(m) 3.5 3.3 3.1 2.8 2.6 2.4 2.5 2.7 3.1 3.6 3.9 4.2 4.4 4.4 4.3 4.1 3.8 3.4 3.1 3.0 2.9
※It is necessary to prepare for each site surcharge. ▼ : Engineer Inspection
※H.W.L 4.4(14,15/Jun) 4.6(14,15/Jul) 4.7(13,14/Aug)
Remarks(ALL) ▼ : Engineer Inspection with survey Team
Two Week Schedule Update: 23/6/2023
2022
quantity May Jun
Work
STA.No 26 27 28 29 30 31 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15
Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed
Weekly Monthly
Event safety
Patrol
safety
Patrol

50bags 50bags 50bags 50bags


Sand Bags Filling work

Sand bags laying work

0+693- ▼3.50 ▼3.65 ▼3.80 ▼3.95


0+740
Surcharge
▼3.65 ▼3.80 ▼3.95 ▼4.10 ▼4.25 ▼4.40
0+740-
0+788.5
▲3.65 ▲3.80
0+600-
▼ Back
Final
Underground Drainage
0+620

Material inspection
ATRAN BRIDGE A1

bottom slope
Placing Steel Cage for bed level 62m

slope
Wooden Pile Pilling Work 110nos

slope
Laying Crushed Stone 62m

Bamboo Mesh 14nos

Gabion with steel wire mesh 62m

Sheet pile driving

Precast ring well laying work

Construction Volume(m3)

Remarks
20bags 20bags
Sand Bag Filling Work(ST)

40bags
Sand Bag Setting Work(ST) 20bags

▼4.70
1+191-
1+240
▲4.70
Surcharge
1+240-
▼3.50 ▼3.65 ▼3.80 ▼4.10 ▼4.25 ▼4.40 ▼4.55 ▼4.70 ▼4.85
ATRAN BRIDGE A2

1+280
▲3.50 ▲3.65▲3.80 ▲3.95
Drainage Work(IHI)

Construction Volume(m3)

Remarks

Sand Bag Filling Work(ST)

Sand Bag Setting Work(ST)

▼3.50 ▼ ▼3.95 ▼4.10 ▼4.25 ▼4.40 ▼4.55 ▼4.70 ▼4.85 ▼5.00


0+480-
0+505 Geotexile
▲ ▲3.65 ▲3.80
ZATHAPYIN BRIDGE A1

Surcharge
0+505-
▼4.40 ▼4.55 ▼4.70 ▼4.85 ▼5.00
TargetEL:3.5→8.0 ( 4.5m ) 0+548
Back filling
Underground Drainage 0+160-
+0+200
Back filling
Perforated pipe conenection
0+240-
0+260

Construction Volume(m3)

Remarks

Sand Bag Filling Work(ST)

Sand Bag Setting Work(ST)

1+274-
1+330
ZATHAPYIN BRIDGE A2

Surcharge Geotexile ▼5.35



P3-25 ▼4.15 ▼4.30 ▼ ▼4.45 ▼4.60 ▼4.75 ▼4.90 ▼5.05 ▼5.20 ▼5.50 ▼5.65
1+330-
1+352 ▼
Geotexile
P3-XX P3-XX
Fabricati P3-3 ▼ P3-XX
on ▼ P3-25 ▼ P3-02 ▼ P3-26
Assembly
CIP Pile Construction (MT-01)
Drilling P3-25 ▼ P3-25
P3-26 P3-03 P3-XX
&
Concretin
g
P3-31 P3-15 P3-XX
Fabricati ▼ P3-31 ▼ P3-07 ,P3-32
on
Assembly
CIP Pile Construction (MT-02) P3-31 P3-32 P3-15
P3-XX

ZAT
CIP Pile Construction (MT-02) P3-31 P3-32 P3-15
Drilling
& ▼ P3-31
Concretin
g

Construction Volume(m3)

Remarks

H.W.L(m) 2.9 3.2 3.5 3.6 3.7 3.7 3.6 3.5 3.3 3.1 2.8 2.6 2.4 2.5 2.7 3.1 3.6 3.9 4.2 4.4 4.4
※It is necessary to prepare for each site surcharge. ▼ : Engineer Inspection
※H.W.L 4.4(14,15/Jun) 4.6(14,15/Jul) 4.7(13,14/Aug)
Remarks(ALL) ▼ : Engineer Inspection with survey Team
Two Week Schedule Update: 23/6/2023
2022
quantity May Jun
Work
STA.No 19 20 21 22 23 24 25 26 27 28 29 30 31 1 2 3 4 5
Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun
Weekly Weekly
Event safety
Patrol
safety
Patrol

Underground Drainage

Excavation 0+620/0+600-0+620
▼▼
First layer and pipe 0+640/0+660-0+600/0+600/0+660
▼▼ ▼▼ ▼▼
Final Layer and water flow ▼▼ ▼▼ ▼▼ ▼▼
ATRAN BRIDGE A1

50 bags
Sand Bags Filling work

Additional sand mat filling

Check alignment stake


and levelling at sand
mat area
▼▼
Sand bags laying work

0+715- 337 ▼3.65 337 ▼3.80 309 ▼3.95 309 ▼4.10 306 ▼4.25
Surcharge
0+788.5

Precast ring well laying work

Construction Volume(m3)
Surcharge target EL:3.5→5.0(1.5m)
Remarks

Batching Plant Office

Drainage Work(IHI)

Compaction Trial
1+320 After Material Approved ▼RFA
(Behind A2)
1+340
Dyke Repairing
ATRAN BRIDGE A2

Sand Bag Filling Work(ST) 1508 nos 44 nos 41 nos 44 nos 41 nos

85 nos 85 nos
Sand Bag Setting Work(ST)

Surcharge/Embankment 1+191.18 ▼ EL 4.25 326 ▼ EL 4.4 345 ▼ EL 4.55 345 ▼ EL 4.7 342 ▼ EL 4.85 342 ▼ EL 5.0 339 ▼ EL 5.15 339 ▼ EL 5.3 336
EL; 4.1 to 5.3(1.2m)
(ST) 1+242.74
Embankment
construction"Soil"
(Boundary area with
surcharge)

Construction Volume(m3)
Surcharge target EL:3.5→5.0(1.5m)
Remarks
Soil sampling & test
Embankment Construction "Soil"
ZATHAPYIN BRIDGE A1

0+505- 259 ▼3.95 259 ▼4.10 251 ▼4.25 251 ▼4.40 245 ▼Sand bag setting▼4.55 245 ▼4.70 238 ▼4.85
Surcharge 0+549
0+160 ▼Excavation ▼1st layer ▼2nd layerBack Filling work
Underground Drain (SD)
0+200

Perforated pipe connection


0+240
0+260

Construction Volume(m3)
Surcharge target EL:3.5→5.3(1.8m)
Remarks
Sand Bags Filling
Work
Sand Bags Setting
Work
for 3rd Layer
Surcharge/Embankment 1+280
ZATHAPYIN BRIDGE A2

1+330
1+330 130 ▼4.15 130 ▼4.30 Geotexile 129 ▼4.45 129 ▼4.60125 ▼4.75 125 ▼4.90 122 ▼5.05122 ▼5.20119 ▼5.35119 ▼5.50
Soil Embankment
1+360
Fabricati P3-25 P3-02 P3-26 P3-XX
on
Assembly
CIP Pile Construction (MT-01) Drilling
& P3-01 P3-25 P3-02 P3-26 P3-XX
Concretin
g
Fabricati P3-08 P3-31 P3-07
on
Assembly
CIP Pile Construction (MT-02) Drilling
& P3-08 (Day time only) P3-31 P3-07 P3-32
Concretin
g
Construction Volume(m3)
Surcharge target EL:4.0→6.1(2.1m)
Remarks
H.W.L(m) 3.8 3.4 2.9 2.5 2.3 2.3 2.6 2.9 3.2 3.5 3.6 3.7 3.7 3.6 3.5 3.3 3.1 2.8
※Install Sand Bags every 6 times(900mm) ▼ : Internal Inspection
※It is necessary to prepare for each site surcharge.
Remarks(ALL) ※H.W.L 4.4(14,15/Jun) 4.6(14,15/Jul) 4.7(13,14/Aug) ▼ : Engineer Inspection
Two Week Schedule Update: 23/6/2023
2022
quantity May
Work
STA.No 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29
Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun
Weekly Weekly
Event safety
Patrol
safety
Patrol

0+600~ Excavation Second Layer Back Filling work


Underground Drainage ▼▼
0+640 ▼▼
First layer and pipe
Survey coordinate

Sand Filling work Additional sand filling▼▼


ATRAN BRIDGE A1

Preparation sand bags 30bag 30bag 30bag 30bag


▼3.65 ▼3.8 ▼3.95 ▼4.1 ▼4.25 ▼4.4
Surcharge 0+715
0+788.5

Construction Volume(m3)

Remarks

Batching Plant Office

Drainage Work(IHI)

Embankment Protection
Work(IHI)
Compaction Trial
1+320 After Material Approved ▼RFA
(Behind A2)
1+340
ATRAN BRIDGE A2

1+600
Underground Drainage Work(ST) ▼ ▼ ▼
1+614
Sand Bag Filling Work(ST) 1508 nos

Sand Bag Setting Work(ST)

Surcharge/Embankment 1+191.5 ▼ EL 3.65 ▼ EL 3.8 ▼ EL 3.95 ▼ EL 4.1 ▼ EL 4.25 ▼ EL 4.40 ▼ EL 4.55 ▼ EL 4.70 ▼EL 4.85 ▼EL 5.00 ▼EL 5.15
EL; 3.5 to 5.0 (1.5m)
(ST) 1+242..74

Embankment Advance Transportation of New Soil


construction"Soil" EL 4.4-4.7
(Boundary area with
surcharge) ▼ ▼ ▼ ▼ ▼
Construction Volume(m3)

Remarks

CIP Pile Construction (Dia 2m) Rebar Fabrication

Surcharge (around A1) Geotextile ▼ ▼3.65 ▼3.80 ▼3.95 ▼4.10 ▼4.25 ▼4.40 ▼4.55
"Sand"

Precast Ring Well 0+364.50

Embankment Construction "Soil" Soil transporation

(0+380)
ZATHAPYIN BRIDGE A1

Underground Drainage (CWD & CD)

(0+400)

(0+460)
Underground Drainage (CWD & CD)

(0+440)

(0+200) Excavation 1st layer filter materials filling 2nd layer filter materials filling

Underground Drainage (SD)


(0+165.68)

Catch Pit & Perforated Pipe connection work


0+240- Excavation 1st layer filter materials filling 2nd layer filter materials filling
0+260

Dyke work

Construction Volume(m3)
Remarks
Sand Bags Filling
Work
Sand Bags Setting
Work
for 3rd Layer
ZATHAPYIN BRIDGE A2

Embankment (Soil) ▼4.15 ▼4.45 ▼4.75 ▼4.90 ▼5.05 ▼5.20 ▼5.35 ▼5.50
Surcharge
1+330 Bed level ▼4.30 ▼4.60
boundary 1+360
Fabricati
on
Assembly
CIP Pile Construction (Dia 2m) Drilling
& P3-33 P3-36 P3-39 P3-34 P3-37 P3-40 P3-35 P3-38 P3-25
Concretin
g

Construction Volume(m3)
※Compaction Trial (Soil)
Remarks
H.W.L(m)
※Install Sand Bags every 6 times(900mm) ▼ : Internal Inspection
※It is necessary to prepare for each site surcharge.
Remarks(ALL) ※H.W.L 4.2(16/May) 4.4(14/Jun) ▼ : Engineer Inspection
Two Week Schedule Update: 23/6/2023
2022
quantity May
Work
STA.No 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29
Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun
Weekly Weekly
Event safety
Patrol
safety
Patrol

0+600~ Excavation Second Layer Back Filling work


Underground Drainage ▼▼
0+640 ▼▼
First layer and pipe
Survey coordinate

Sand Filling work Additional sand filling ▼▼


Preparation sand bags 30bag 30bag 30bag 30bag

Surcharge 0+715 193.5 ▼3.65 193.5 ▼3.8 ▼3.95 ▼4.1


0+788.5

Construction Volume(m3)

Remarks

Batching Plant Office

Drainage Work(IHI)

Compaction Trial 1+320 After Material Approved ▼RFA


(Behind A2) 1+340
1+600
▼ ▼ ▼
ATRAN BRIDGES A2

Underground Drainage Work(ST)


1+614
Sand Bag Filling Work(ST) 1508 nos

Sand Bag Setting Work(ST)

Surcharge/Embankment 1+191.5 ▼ EL 3.65 ▼ EL 3.8 ▼ EL 3.95 ▼ EL 4.1 ▼ EL 4.25 ▼ EL 4.40 ▼ EL 4.55 ▼ EL 4.70 ▼EL 4.85 ▼EL 5.00 ▼EL 5.15
EL; 3.5 to 5.0 (1.5m)
(ST) 1+242..74

Embankment Advance Transportation of New Soil


construction"Soil" EL 4.4-4.7
(Boundary area with
surcharge) ▼ ▼ ▼ ▼ ▼
Construction Volume(m3)

Remarks

CIP Pile Construction (Dia 2m) Rebar Fabrication

Surcharge (around A1) Geotextile ▼3.65 ▼3.80 ▼3.95 ▼4.1 ▼4.25 ▼4.40
"Sand"

Precast Ring Well 0+364.50

Embankment Construction "Soil" Soil transporation

(0+380)
ZATHAPYIN BRIDGES A1

Underground Drainage (CWD & CD)

(0+400)

(0+460)
Underground Drainage (CWD & CD)

(0+440)

(0+200) Excavation 1st layer filter materials filling 2nd layer filter materials filling

Underground Drainage (SD)


(0+165.68)

Catch Pit & Perforated Pipe connection work


0+240- Excavation 1st layer filter materials filling 2nd layer filter materials filling
0+260

Dyke work

Construction Volume(m3)
Remarks
Sand Bags Filling
Work
Sand Bags Setting
Work
for 3rd Layer
ZATHAPYIN BRIDGES A2

Embankment (Soil) ▼4.15 ▼4.45 ▼4.75 ▼4.90 ▼5.05 ▼5.20 ▼5.35 ▼5.50
Surcharge 1+330 Bed level ▼4.30 ▼4.60
1+360
boundary
Fabricati
on
Assembly
CIP Pile Construction (Dia 2m) Drilling
& P3-33 P3-36 P3-39 P3-34 P3-37 P3-40 P3-35 P3-38 P3-25
Concretin
g

Construction Volume(m3)
※Compaction Trial (Soil)
Remarks
H.W.L(m)
※Install Sand Bags every 6 times(900mm) ▼ : Internal Inspection
※It is necessary to prepare for each site surcharge.
Remarks(ALL) ※H.W.L 4.2(16/May) 4.4(14/Jun) ▼ : Engineer Inspection
Two Week Schedule Update: 23/6/2023
2022
quantity May
Work
STA.No 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22
Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun
Weekly Weekly
Event safety
Patrol
safety
Patrol

Sheet pile Connection 150nos

Sheet pile Driving

0+600~
0+580
pipe Second Layer Back Filling work
Excavation ▼▼ First layer and ▼▼
0+580 Excavation First layer and pipeSecond Layer Back Filling work
▼▼ ▼▼
BRIDGES A1

0+540

Underground Drainage 0+535


0+560 ▼▼ Second Layer ▼▼ Back Filling work
0+660^ Second
▼▼ Layer Back Filling work
0+700
ATRAN

Surcharge/Embankment 0+715 Preparation(mount up) ▼3.5 193.5 ▼3.65 193.5 ▼3.8 ▼3.95 ▼4.1
0+788.5

Construction Volume(m3)

Remarks

Batching plant office

Preparation Work 44 nos 44 nos


Sand Bag Filling Work 1508 nos

Sand Bag Setting Work 88 nos

1+191.5 ▼3.5 135.5 ▼3.65 135.5 ▼3.8 137.5 ▼3.95 137.5 ▼4.1
ATRAN BRIDGES A2

Surcharge/Embankment
1+243

Jetty Work
1+320
Compaction Trial
(Behind A2)
1+340
Dismantling
SC-Pile Work

SC-Pile Capping Demobilization

Construction Volume(m3)

Remarks

CIP Pile Construction (Dia 2m) Rebar Fabrication

Surcharge/Embankment Preparation (Sand removal) Preparation (mount up) 7 Sheet ▼3.5 201 ▼3.65 201 ▼3.8 196 ▼3.95

Precast Ring Well 0+364.50

Underground Drainage (SD) 0+529.6 First Second Layer Back Filling work

(0+380) First layer and pipe installation Second Layer Back Filling work
ZATHAPYIN BRIDGES A1

Underground Drainage (CWD & CD)


(0+400)

(0+460) First layer and pipe installation Second Layer Back Filling work
Underground Drainage (CWD & CD)
(0+440)

(0+200) First layer and pipe installation Second Layer Back Filling work
Underground Drainage (SD)
(0+165.68)

Catch Pit & Perforated Pipe connection work (0+240 - 0+260) First layer and pipe installation Second Layer Back Filling work

Dyke work

Construction Volume(m3)
Remarks
Sand Bags Filling
Work
Sand Bags Setting
Work
for 3rd Layer
ZATHAPYIN BRIDGES A2

Surcharge/Embankment
1+280 264.5 5.2 256.5 5.35 256.5 5.5 242 5.65 242 5.8 228.5 5.95 228.5 6.1 189
1+330
Fabricati
on
Assembly
CIP Pile Construction (Dia 2m) Drilling
& Setting Out 2 Days & 2 Night / 1pile
Concretin
g
Catch pit & Temporary Drain

Construction Volume(m3)
※Compaction Trial (Soil)
Remarks
H.W.L(m) 2.9 2.6 2.2 1.8 1.6 1.7 2.1 2.6 3.2 3.6 4.0
▼ : Internal Inspection
▼ : Engineer Inspection
※Install Sand Bags every 6 times(900mm) ▼ : Internal Inspection
※It is necessary to prepare for each site surcharge.
Remarks(ALL) ※H.W.L 4.2(16/May) 4.4(14/Jun) ▼ : Engineer Inspection
Two Week Schedule Update: 23/6/2023
2022
quantity April May
Work
STA.No 28 29 30 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15
Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun
Monthly Weekly
Event safety
Patrol
safety
Patrol

Sheet pile Connection 150nos

Sheet pile Driving

0+540~ Second Layer Back


▼▼ Filling work
0+480
0+660
0+680 ▼▼
0+500 ▼▼
Underground Drainage
0+700 First layer and pipe ▼▼ Second Layer
0+640
0+640^ Excavation ▼▼ First layer and pipe ▼▼ Second Layer
0+600
BRIDGES A1

0+600^ Excavation ▼▼ First layer and ▼▼


pipe Second Layer ▼▼ Back Filling work
0+520
0+744^ Back Filling work
0+700

Surcharge/Embankment 0+715
Not yet Drawing Preparation(mount up) ▼ ▼3.65 ▼3.8
0+788.5
1position
ATRAN

Precast Ring Weii

Dyke repair

Preparing Surcharge Work

River slope protect

Jetty Work

Crushed Stome Laying


Work
Construction Volume(m3)

Remarks

Batching plant office

Surcharge/Embankment 1+191.5 Preparation(Sand removal) Preparation(mount up)


Not yet Drawing ▼3.65 ▼3.8 ▼3.95 ▼4.1
1+243
ATRAN BRIDGES A2

SC-Pile Work ▼ Demobilization SC pile

SC-Pile caping ▼
Jetty Work

Compaction Trial

Construction Volume(m3)

Remarks

▼ Back Filling work


0+320
0+340
0+460 Excavation ▼▼ First layer and pipe ▼▼ Second Layer
▼▼ Back Filling
0+440
Underground Drain
0+400 Excavation ▼▼ First layer and pipe ▼▼ Second Layer
▼▼ Back Filling
0+380
ZATHAPYIN BRIDGES A1

0+410.5 Excavation ▼▼ First layer and pipe ▼▼ Second Layer


▼▼ Back Filling
Surcharge/Embankment 0+505 Preparation(Sand removal) Preparation(mount up)
Not yet Drawing 7Seet ▼ ▼3.65
0+524

Jetty work

Dyke work

CIP Pile Construction Rebar Fabrication 2 Days & 2 Night / 1pile

Precast Ring Well 1position

Construction Volume(m3)
Remarks
Compaction Trial (Soil) ▼ Access Trial
Sand bags filling work 992nos 40nos 40nos 40nos 27nos

Sand bags setting 107nos


1+280 80 ▼5.20 77 ▼5.35
77 ▼5.5 73.5 ▼5.65 73.5 ▼5.8 70.5 ▼5.95 70.5
1+300
ZATHAPYIN BRIDGES A2

Surcharge/Embankment 1+300 114 110.5 110.5 104.5 104.5 98.5 98.5


1+320
EL:4.0→7.9 1+320 70.5 69 69 64 64 59.5 59.5
1+330

SC-Pile Capping Work Dismantling work

Test Pile ▼ Report


Test

Preparation work Rebar Fabrication 2 Days & 2 Night / 1pile


CIP Pile Construction(Dia 2m)

Jetty work

3days Until14/5
Dyke Preparation work 3days Until14/5
Construction Volume(m3) 264.5 256.5 256.5 242 242 228.5 228.5
※Compaction Trial (Soil)
Remarks
H.W.L(m) 3.0 3.3 3.5 3.6 3.6 3.5 3.2 2.9 2.6 2.2 1.8 1.6 1.7 2.1 2.6 3.2 3.6 4.0
※Install Sand Bags every 6 times(900mm) ▼ : Internal Inspection
※It is necessary to prepare for each site surcharge.
Remarks(ALL) ※H.W.L 4.2(16/May) 4.4(14/Jun) ▼ : Engineer Inspection
Two Week Schedule Update: 23/6/2023
2022
quantity April May
Work
STA.No 20 21 22 23 24 25 26 27 28 29 30 1 2 3 4 5 6 7 8
Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun
Weekly Monthly
Event safety
Patrol
safety
Patrol

Sheet pile Connection

Sheet pile Driving

Underground Drainage

Excavation 0+744
0+480
BRIDGES A1

First layer and pipe 0+744


0+480

Final Layer and water flow


0+744
0+480

Jetty Work
ATRAN

Dyke Work
Construction

Construction Volume(m3)
Surcharge target EL:3.5→5.0 ( 1.5 m)
Remarks

Batching plant office

Underground Drainage

Sand Bag Filling

Sand bags setting 107nos


ATRAN BRIDGES A2

SC-Pile Dismantling

SC-Pile caping

Jetty Work

Dyke Work
Construction
Construction Volume(m3)
21.4.22 1st layer inspection sta(1+340-1+380)
※Compaction Trial (Soil)
Surcharge target EL:3.5→5.0 ( 1.5 m)
Remarks

Underground Drain
Second Layer(Side 0+300
0+360
Drain)
Underground Drain 0+320
Excavation(CD & CWD) 0+340 ▼▼
Underground Drain 0+320
First Layer(CD & CWD 0+340 ▼▼
Underground Drain 0+320
First Layer(CD & CWD 0+340

result
ZATHAPYIN BRIDGES A1

Tube well drilling work

Sand bags filling work 1165nos 40nos 40nos 40nos 36nos

Sand bags setting 156nos


0+505 Preparation 98 ▼3.65 98 ▼3.8 96 ▼3.95 96 ▼4.1 92
0+520
Surcharge/Embankment
0+520 Not yet approve Preparation 103 103 100 100 96.5
EL:3.5→5.3 ( 1.8 m) 0+540
Drawing of Geotextile
Geotextile 0+506 7Seet
0+539

CIP Pile Construction Rebar Fabrication

Jetty work

Dyke Preparation work 2days Until14/5


Construction Volume(m3)

Remarks

Survey ▼Sand bags 3nd layer location


Sand bags filling work 992nos 40nos 40nos 27nos

Sand bags setting

1+280▼5.05 80 ▼5.20
77 ▼5.35
77 ▼5.5 73.5 ▼5.65 73.5107nos ▼5.8 70.5 ▼5.95 70.5 ▼6.1
1+300
ZATHAPYIN BRIDGES A2

Surcharge/Embankment
1+300 114 110.5 110.5 104.5 104.5 98.5 98.5
1+320
EL:4.0→6.1 ( 2.1 m) 1+320 70.5 69 69 64 64 59.5 59.5
1+330

SC-Pile caping

Test Pile ▼Loading Test Test Report

CIP Pile Construction(Dia 2m) Reaber Fabrication Pile construction start after test report

Jetty work
ZA
Jetty work

Dyke Preparation work 3days Until14/5


Construction Volume(m3) 264.5 256.5 256.5 242 242 228.5 228.5
※Compaction Trial (Soil)
Remarks
H.W.L(m) 3.6 3.2 2.6 2.1 1.8 2.0 2.2 2.7 3.0 3.3 3.5 3.6 3.6 3.5 3.2 2.9 2.6 2.2
※Install Sand Bags every 6 times(900mm) ▼ : Internal Inspection
※It is necessary to prepare for each site surcharge.
Remarks(ALL) ※H.W.L 4.2(16/May) 4.4(14/Jun) ▼ : Engineer Inspection
9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31

▼4.25
Two Week Schedule Update: 23/6/2023
2022
quantity April May
Work
STA.No 21 22 23 24 25 26 27 28 29 30 1 2 3 4 5 6 7 8
Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun
Weekly Monthly
Event safety
Patrol
safety
Patrol

Sheet pile Connection 150nos

Sheet pile Driving 15nos/day

Underground Drainage

0+524
Excavation 0+680 ▼▼
0+700
First layer and pipe
0+740 ▼▼
Second Layer 0+700 Sand Backfilling
▼▼
0+744
BRIDGES A1

River slope protect

Precast Ring Weii 2position

Sand Bag Filling 40nos 40nos 40nos 40nos 22nos


182nos
ATRAN

Sand bags setting

Preparing Surcharge Work


0+715 Preparation 193.5 ▼3.65 193.5
0+788.5

Drainage Work 0+820


0+900

Jetty Work Brick work Concrete Casting


Crushed Stome Laying
Work
Construction Volume(m3) 193.5 193.5
Surcharge target EL:3.5→6.5
Remarks

Batching plant office

0+510 Second Layer


Underground Drainage 0+600 ▼▼
0+340 Excavation First Layer Second Layer
Underground Drainage
0+380 ▼▼ ▼▼ ▼▼
Sand Bag Filling Preparation 44nos 44nos
ATRAN BRIDGES A2

Sand bags setting 88nos

Surcharge/Embankment 1+191.5 135.5 ▼3.65 135.5 ▼3.8 137.5 ▼3.95 137.5


1+243

SC-Pile Work Dismantling

SC-Pile caping

Jetty Work

Compaction Trial

Construction Volume(m3) 135.5 135.5 137.5 137.5

Remarks
※Compaction Trial (Soil) Surcharge target EL:3.5→6.5

Underground Drain 0+320 Excavation


▼▼ First Layer ▼▼ Second Layer ▼▼
0+340

Underground Drain 0+320 Second Layer


0+340

Precast Ring Weii 4position

Tube well drilling work result


ZATHAPYIN BRIDGES A1

Sand bags filling work 1165nos 40nos 40nos 40nos 36nos

Sand bags setting 156nos


0+505 Preparation 98 ▼3.65 98 ▼3.8 96 ▼3.95 96 ▼4.1 92
0+520
Surcharge/Embankment
0+520 Preparation 103 103 100 100 96.5
EL:3.5→8.0 0+540

Geotextile 0+506 7Seet


0+539

CIP Pile Construction Rebar Fabrication

Jetty work

Dyke Preparation work 2days Until14/5


Construction Volume(m3) 201 201 196 196 188.5

Remarks
Survey

Sand bags filling work 992nos 40nos 40nos 40nos 27nos

Sand bags setting 107nos


1+280 ▼5.05 80 ▼5.20 77 ▼5.35
77 ▼5.5 73.5 ▼5.65 73.5 ▼5.8 70.5 ▼5.95 70.5
1+300
ZATHAPYIN BRIDGES A2

Surcharge/Embankment 1+300 114 110.5 110.5 104.5 104.5 98.5 98.5


1+320
EL:4.0→7.9 1+320 70.5 69 69 64 64 59.5 59.5
1+330

SC-Pile caping

Test Pile ▼Loading Test Test Report

CIP Pile Construction(Dia 2m) Reaber Fabrication Pile construction start after test report

Jetty work
ZA
Jetty work

Dyke Preparation work 3days Until14/5


Construction Volume(m3) 264.5 256.5 256.5 242 242 228.5 228.5
※Compaction Trial (Soil)
Remarks
H.W.L(m) 3.6 3.2 2.6 2.1 1.8 2.0 2.2 2.7 3.0 3.3 3.5 3.6 3.6 3.5 3.2 2.9 2.6 2.2
※Install Sand Bags every 6 times(900mm) ▼ : Internal Inspection
※It is necessary to prepare for each site surcharge.
Remarks(ALL) ※H.W.L 4.2(16/May) 4.4(14/Jun) ▼ : Engineer Inspection
Two Week Schedule Update: 23/6/2023
2022
quantity April May
Work
STA.No 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 1
Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun
Weekly Weekly
Event safety
Patrol
safety
Patrol

Sheet pile Connection

Sheet pile Driving သင်္ကြ န်


Underground Drainage

Excavation 0+744
0+480
BRIDGES A1

First layer and pipe 0+744


0+480

Final Layer and water flow


0+744
0+480

Jetty Work
ATRAN

Dyke Work
Construction

Construction Volume(m3)
Surcharge target EL:3.5→5.0 ( 1.5 m)
Remarks

Batching plant office

Underground Drainage

Sand Bag Filling


ATRAN BRIDGES A2

SC-Pile assembly Dismantling

SC-Pile caping

Jetty Work

Dyke Work
Construction
Construction Volume(m3)
14.4.22 2nd layer inspection sta (1+200-1+240)
19.4.22 inspection for excavation sta(1+340-1+380) & sta(1+510-1+620)
Surcharge target EL:3.5→5.0 ( 1.5 m)
21.4.22 1st layer inspection sta(1+340-1+380)
Remarks ※Compaction Trial (Soil)

Underground Drain
0+300
Second Layer(Side
Drain)
0+360 ▼
Underground Drain 0+320
Excavation(CD & CWD) 0+340 ▼▼
Underground Drain 0+320
First Layer(CD & CWD 0+340 ▼▼
Underground Drain 0+320
First Layer(CD & CWD 0+340

▼Sampling result
ZATHAPYIN BRIDGES A1

Tube well drilling work

Sand bags filling work 1165nos 40nos 40nos 40nos 36nos

Sand bags setting 156nos


0+505 Preparation 98 ▼3.65 98 ▼3.8 96 ▼3.95 96 ▼4.1 92
0+520
Surcharge/Embankment
0+520 Not yet approve Preparation 103 103 100 100 96.5
EL:3.5→5.3 ( 1.8 m) 0+540
Drawing of Geotextile
Geotextile 0+506 7Seet
0+539

CIP Pile Construction Rebar Fabrication

Jetty work

Dyke Preparation work 2days Until14/5


Construction Volume(m3)

Remarks

Survey ▼Sand bags 2nd layer location

Sand bags filling work 992nos 161nos 40nos 40nos 27nos

Sand bags setting 161nos


1+280 ▼4.75 83.5▼4.90 80 ▼5.05
80 ▼5.20
77 ▼5.35
77 ▼5.5 73.5 ▼5.65 73.5
1+300
ZATHAPYIN BRIDGES A2

Surcharge/Embankment
1+300 117 114 114 110.5 110.5 104.5 104.5
1+320
EL:4.0→6.1 ( 2.1 m) 1+320 72 70.5 70.5 69 69 64 64
1+330

SC-Pile caping

Test Pile ▼Loading Test Test Report

CIP Pile Construction(Dia 2m) Preparatiom work Reaber Fabrication Pile construction start after test report

Jetty work
ZA
Jetty work

Dyke Preparation work 3days Until14/5


Construction Volume(m3) 272.5 272.5 272.5 256.5 256.5 242 242
※Compaction Trial (Soil)
Remarks
H.W.L(m) 2.2 2.7 3.2 3.6 3.8 3.9 3.8 3.6 3.2 2.6 2.1 1.8 2.0 2.2 2.7 3.0 3.3 3.5 3.6
※Install Sand Bags every 6 times(900mm) ▼ : Internal Inspection
※It is necessary to prepare for each site surcharge.
Remarks(ALL) ※H.W.L 4.2(16/May) 4.4(14/Jun) ▼ : Engineer Inspection
Two Week Schedule
Update: 23/6/2023
2022
April
Work quantity 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24
STA.No
Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun
This Week Next Week Next Week

Sheet pile Connection

Sheet pile Driving သင်္ကြ န်


Underground Drainage

0+744
Excavation 0+480
BRIDGES A1

First layer and pipe 0+744


0+480

Final Layer and water flow


0+744
0+480

Jetty Work
ATRAN

Dyke Work
Construction

Construction Volume(m3)

Remarks Surcharge target EL:3.5→5.0 ( 1.5 m)

Batching plant office

Underground Drainage

Sheet pile connection

Sand Bag Filling


ATRAN BRIDGES A2

Crushed Stone Laying

Spun Pile Driving

Catch Pitch

Jetty Work

Dyke Work
Construction
Construction Volume(m3)
8.4.22 2nd layer inspection sta(1+260-1+300) & 1st layer inspection sta(1+200-1+240)
11.4.22 2nd layer inspection sta(1+320-1+340)
14.4.22 2nd layer inspection sta (1+200-1+240) Surcharge target EL:3.5→5.0 ( 1.5 m)
Remarks 19.4.22 inspection for excavation sta(1+340-1+380) & sta(1+510-1+620)
21.4.22 1st layer inspection sta(1+340-1+380)
※Compaction Trial (Soil)

Underground Drain 0+300


First Layer(Side
Drain) 0+360 ▼▼
Underground Drain 0+300
Second Layer(Side
Drain)
0+360 ▼▼
Underground Drain 0+320
Excavation(CD & CWD) 0+340 ▼▼
Underground Drain 0+320
First Layer(CD & CWD 0+340 ▼▼
Underground Drain 0+320
Second Layer(CD &
CWD) 0+340 ▼
Result
ZATHAPYIN BRIDGES A1

Tube well drilling work

Sand bags filling work 1165nos 40nos 40nos 40nos 36nos

Sand bags setting 156nos


0+505 98 ▼3.65
0+520
Surcharge/Embankment
0+520 103
EL:3.5→5.3 ( 1.8 m) 0+540

Geotextile 0+506 7Seet


0+539

CIP Pile Construction

Jetty work

Dyke Preparation work

Construction Volume(m3) 201

Remarks

Survey

Sand bags filling work 992nos 41nos 41nos 40nos 39nos

Sand bags setting 161nos


1+280 86.5 ▼4.45
86.5 ▼4.60 83.5 ▼4.75 83.5▼4.90 80 ▼5.05
80 ▼5.20
77 ▼5.35
1+300
ZATHAPYIN BRIDGES A2

Surcharge/Embankment
1+300 120.5 120.5 117 117 114 114 110.5
1+320
EL:4.0→6.1 ( 2.1 m) 1+320 73.5 73.5 72 72 70.5 70.5 69
1+330

SC-Pile

Test Pile ▼
Loading Test

CIP Pile Construction(Dia 2m) Reaber Fabrication


ZATH
Reaber Fabrication

Jetty work

Dyke Preparation work ▼


Construction Volume(m3) 280.5 280.5 272.5 272.5 272.5 272.5 256.5
※Compaction Trial (Soil)
Remarks
※Install Sand Bags every 6 times(900mm) ▼ : Internal Inspection
※It is necessary to prepare for each site surcharge.
Remarks(ALL) ▼ : Engineer Inspection
Two Week Schedule
2022
April
Work quantity 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24
STA.No
Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun
This Week Next Week Next Week

Sheet pile Connection

Sheet pile Driving


သင်္ကြ န်
Underground Drainage

Excavation 0+744
0+480

First layer and pipe 0+744


BRIDGES A1

0+480

Final Layer and water flow


0+744
0+480

Jetty Work

Dyke Work
Construction
ATRAN

Construction Volume

Remarks

Batching plant office

Underground Drainage

Sheet pile connection

Sand Bag Filling


ATRAN BRIDGES A2

Crushed Stone Laying

Spun Pile Driving

Catch Pitch

Jetty Work

Dyke Work
Construction
Construction Volume
8.4.22 2nd layer inspection sta(1+260-1+300) & 1st layer inspection sta(1+200-1+240)
11.4.22 2nd layer inspection sta(1+320-1+340)
14.4.22 2nd layer inspection sta (1+200-1+240)
Remarks 19.4.22 inspection for excavation sta(1+340-1+380) & sta(1+510-1+620)
21.4.22 1st layer inspection sta(1+340-1+380)
※Compaction Trial (Soil)

Underground Drain 0+300


First Layer(Side
Drain) 0+360 ▼▼
Underground Drain 0+300
Second Layer(Side
Drain) 0+360 ▼▼
Underground Drain 0+320
Excavation(CD & CWD) 0+340 ▼▼
Underground Drain 0+320
First Layer(CD & CWD 0+340 ▼▼
Underground Drain
0+320
Second Layer(CD &
0+340 ▼
ZATHAPYIN BRIDGES A1

CWD)
Tube well drilling work Result

Surcharge/Embankment

CIP Pile Construction

Geotextile 0+506 7Seet


0+539

Jetty work

Dyke Preparation work

Construction Volume

Remarks

Sand bags filling work 992nos 41nos 41nos 40os 39nos

Survey

Sand bags setting 161nos


1+280 173 ▼ 5Days Waiting 167 ▼ 5Days Waiting 167 ▼ 5Days Waiting
1+300 2nd layer 3nd layer 4nd layer
ZATHAPYIN BRIDGES A2

Surcharge/Embankment 1+300 241 5Days Waiting 234 5Days Waiting 234 5Days Waiting
1+320

1+320 147 5Days Waiting 144 5Days Waiting 144 5Days Waiting
1+330

SC-Pile

Test Pile ▼
Loading Test

CIP Pile Construction(Dia 2m) Reaber Fabrication


ZATH
Reaber Fabrication

Jetty work

Dyke Preparation work ▼


Construction Volume(m3) 561 545 545
※Compaction Trial (Soil)
Remarks
※Install Sand Bags every 3 times(900mm)
※It is necessary to prepare for each site surcharge.
Remarks(ALL)
▼ : Internal Inspection
▼ : Engineer Inspection
Weekly schedule
2022
March April
Work quantity 30 31 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17
Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun
This Week Next Week Next Week

Sand bags filling work 992nos

Survey ▼
Sand bags setting 162
5days keep 173 5days keep 167 5days keep
180 ▼ ▼ ▼
ZATHAPYIN BRIDGES A2

1+280
1+300

1+300 230 5days keep 241 5days keep 234 5days keep
1+320
Surcharge/Embankment
1+320 138 5days keep 147 5days keep 144 5days keep
1+330

Geotextile
1+280 ~ 1+330 ▼

SC-Pile SC-Pile

Dyke Preparation work

Jetty work

Construction Volume 548 561 545


※Install Sand Bags every 3 times(900mm)

Remarks
▼ : Internal Inspection
▼ : Engineer Inspection
Weekly schedule
2022
March April
Work quantity 30 31 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17
Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun
This Week Next Week Next Week

Underground Dranage

Sand bags filling work

Survey

Sand bags setting


BRIDGES A1

Surcharge/Embankment
ATRAN

Geotextile

Dyke Preparation work

Jetty work

Construction Volume
Underground Dranage

Sand bags filling work

Survey

Sand bags setting


ATRAN BRIDGES A2

Surcharge/Embankment

Geotextile

Dyke Preparation work

Jetty work

Construction Volume
Underground Dranage No.o+140 ~ No.0+400

Sand bags filling work

Survey

Sand bags setting 1Layer(158nos) あ


ZATHAPYIN BRIDGES A1

0+505 198 6 days keep 192


0+520

0+520 206 6 days keep 200


0+540
Surcharge/Embankment

0+505
Geotextile 0+540

SC-Pile SC-Pile Footing

Dyke Preparation work

Jetty work

Construction Volume 404 392

Sand bags filling work 992nos

Survey

Sand bags setting 162


180 6 days keep 173 6 days keep 167
ZATHAPYIN BRIDGES A2

1+280
1+300

1+300 230 6 days keep 241 6 days keep 234


1+320
Surcharge/Embankment
1+320 138 6 days keep 147 6 days keep 144
1+330

1+280
Geotextile 1+330

SC-Pile SC-Pile

Dyke Preparation work

Jetty work

Construction Volume 548 561 545


※Install Sand Bags every 3 times(900mm)

Remarks
▼ : Internal Inspection
▼ : Engineer Inspection
Weekly schedule
2022
March April
Work quantity 25 26 27 28 29 30 31 1 2 3 4 5 6 7 8 9 10
Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun
This Week Next Week Next Week

Underground Dranage No.o+140 ~ No.0+400

Sand bags filling work


ZATHAPYIN BRIDGES A1

Survey

Sand bags setting

0+505 198
0+520

0+520 206
0+540
Surcharge/Embankment

0+505
Geotextile 0+540

Sand bags filling work 992nos


ZATHAPYIN BRIDGES A2

Survey

Sand bags setting

1+280 180 173


1+300

1+300 230 241


1+320
Surcharge/Embankment
1+320 138 147
1+330

1+280
Geotextile 1+330

▼ : Internal Inspection
▼ : Engineer Inspection
1+280
1+330

▼ : Internal Inspection
▼ : Engineer Inspection
Remarks