CONSULTANT GOVERNMENT OF KHYBER PAKHTUNKHWA SMALL

DAMS IRRIGATION DEPARTMENT PESHAWAR w CONTRATOR

l�HC_L\<)- BAZ ALI DAM PROJECT DISTRICT KURRAM EDGE ENTERPRISEE


io-1-A
PVT. LTD.

Jv of RHC,
CASCADE & ETA

Drilling and Grouting


S.No. Date RD Bore Depth/Stage Cement Bentonite Total Remarks
Hole Bags/Kgs Bags/Kgs Bags/Kgs
No.

1 9/5/2023 0+355.30 8 15 4 0 4 Complete


2 9/5/2023 0+385.30 9 10.19 1 0 1 Complete
3 9/5/2023 0+390.30 10 10.61 1 0 1 Complete
4 10/5/2023 0+395.30 11 14 0.5 0 0.5 Complete
5 10/5/2023 0+400.30 12 14 1 0 1 Complete
6 10/5/2023 0+405.30 13 15 1 0 1 Complete
7 11/5/2023 0+410.30 14 16 1.5 0 1.5 Complete
8 11/5/2023 0+415.30 15 18.26 1.5 0 1.5 Complete
9 12/5/2023 0+420.30 16 18.42 1.5 0 1.5 Complete
10 13/5/2023 0+435.30 17 20 1 0 1 Complete
11 14/5/2023 0+440.30 18 20 2 0 2 Complete --
12 15/5/2023 0+445.30 19 23 1.5 0 1.5 Complete
'
13 16/5/2023 0+450.30 20 23 5 0 5 Complete
14 16/5/2023 0+425.30 21 11 1 0 1 Complete
15 17/5/2023 0+430.30 22 11 0.5 0 0.5 Complete
Total Cement Bags Used in Grouting of Bore Holes (A) 24 Complete
Total Cement Bags Used in Back Filling of bore Holes (B) 9 Complete
Total Cement Bags Used (A+B) 33 Complete


$.�u
��
Geologist Geologist Resi ent Engineer
M/S Edge M/S Rehman Habib M/5 Rehman Habib
Enterpirses Pvt Ltd. Consultants (Pvt) Ltd (JV) Consultants (Pvt) Ltd (JV)
RHC
Consultant

L\�)1 a-
. ..'-=rr::�.
GOVERNMENT OF KHYBER PAKHTUNKHWA SMALL DAMS IRRIGATION DEPARTMENT PESHAWAR
Bore Hole
NO
---
i uG
Contractor

i
CONSTRUCTION OF BAZ ALI SMALL DAM DISTRICT KURRAM
Jv or RHC, CASCADE & ETA 8 MIS Edge Enterprises (pvr) Ltd
WATER PRESSURE TEST EVALUATION SHEET AT RD~ 0+355.30
Top ofTest
Section (m): I 3
Location: Left Trench Test No: I
Bottom of casing (m)

Bottom of
Test Section (m): I 15
Nothing (m): 3724704.2 Date: I 0/05/2023
Initial GWL (m): 0

Length of Easting (m): 612980.88 Supervised By: Tausif Javed


15 Packer Pressure: 1.0342
Test Section (m):
Center of Elevation (m): 1131.18 Inclination (Degree): 75 Guage Height Above
9 0.6
Test Section(m): Aea(m)·
BOH atTime I Packer Type; Mechanical Rock Type: Limestone & Shale Diameter of Hole inTest
15 72
ofTest (m): Area (mm)·

Stage I Time(min) 0 Liters 5 Liters 10 Liters IS


Average Flow Total Head
Lugeon
Guage Flowmeter (q) Lit/min. (m)
4.9122 4.9645 4.9877 5.6789
Pressure P Reading (Lit).
Water take
1.0342 0.0523 0.0232 0.7812 0.2859 11.8 0.01
l<Lil)
Stage 2 Tirne (min)
Average Flow Total Head
Lugeon
Guage Flowmeter (q) Lit/min. (m)
Pressure P Reading (Lit).
Water take
(Litl

Stage 3 Time (min)


Average Flow Total Head
Lugeon
Guage Flowmeter (q) Lit/min. (m)
Pressure P Reading (Lit).
Water take
(Lit)
Stage 4 Time(min)
Average Flow Total Head
Lugeon
Guage Flowmeter (q) Litimin (m)
Pressure P Reading (Lit).
Water take
(Lit)

Stage 5 Time (min)


Average Flow Total Heaci
Lugeon
Guage Flow-meter (q) Lit/min. (m)
Pressure P Rea(ling (Lit).
Water take
(Lit)

Summary of Lu�con
Values
Approximalc Pcrmcabililics, cm/s -�
Max. Lu= I 0.01 Max. k = lxlO:·(-'.?J
�Geologist �
G
ogs
�es�
MIS Edge Enterprises (pvt) Ltd Mis Rehman Habib Consultants (Pvt) Mis Rehman Habib Consultants (Pvt) Ltd
Min. Lu o.nt Min. k= I, 10"1-l) Ltd (N) (N)

A,·c. Lu = II.Ill A,.... k:: lx!0,.·(-2J

Remarks more Jlow and cxccssh·c prcs..�1.rc b�· lhc racker rhc water rrcssurc lest sloped
RHC
Consultant

6/'>"
V
Cj
..t: 1 0..
Jv of RHC, CASCADE & ETA
GOVERNMENT OF KHYBER PAKHTUNKHWA SMALL DAMS IRRIGATION DEPARTMENT PESHAWAR

CONSTRUCTION OF BAZ ALI SMALL DAM DISTRICT KURRAM


Bore Hole
NO.

10
-uG
Contractor

MIS Edae Enterorises <ovtl Ltd


WATER PRESSURE TEST EVALUATION SHEET AT RD- 0+390.30
Top ofTest Location: Left Trench Test No: 2
5 Bottom of casing(m)·
Section(m)·
Bottom of Nothing (m) 3724694.2 Date: I 0/05/2023
10 Initial GWL (m) 0
Test Section (m):
Length of
Test Section(m):
Center of
I 5
Easting(m): 612970.88

Elevation(m): 1134.6 l
Supervised By: Tausif Javed

Inclination(Degree): 90
Packer Pressure:

Guage Height Above


0.8487

7.5 0.6
Test Section(m): Aea(m)
BOH at Time Packer Type; Mechanical Rock Type: Shale
ofTest(m): 13
Diameter of Hole in Test
Area(mm):
72 7�
Stage l Time (min) 0 Liters 5 Liter-s 10 Lite.-s 15
Average Flow Total Head
Lugeon
Guage Flowmeter (q) Lit/min. (m)
5.4002 5.4233 5.4452 5.6789
Pressure P Reading(Lit).
Water take
0.8487 0.0231 0.0219 0.2337 0.0929 11.2 0.11
(Lil)
Stage 2 Time(min)
Average Flow Total Head
Guage Flo'wmeter Lugeon
(q) Lit/min (m)
Pressure P Reading(Lit).
Water take
(Lit)
Stage 3 Time (min)
Average Flow Total Head
Lugcon
Guage Flowmeter (q) Lit/min. (m)
Pressure P Readine (Lit).
Waler take
(Lit)
Stage 4 Time(min)
Average Flow Total Head
Guage Flowmeter Lugeon
(q) Lit/min (m)
Pressure P Reading (Lit).
Water take
(Lit)
Stage 5 Time(min)
Average Flow Total Head
Lugeon
Guage Flowmeter (q) Lit/min (m)
Pressure P Reading(Lit).
Water take
(Lit)

�r�-
I

Max.Lu=

Min.Lu
Summuy orLugeon
Values

I
I
Approximate Permeabilities, emfs

0.11 Max.k =

0.11 Min.k=
1 X 10"{-l)

1 X 10"(-1)
>-efJ Geologist
MIS Edge Enterprises(pvt) Ltd

g
.
Mis Rehman Habib Consultants(Pvt)
Ltd(N)
Mis Rehman Habib Consultants(Pvt) Ltd
(N)

A,·e.Lu= 0.11 A\'�. k = 1 X 10"(-l)

Remarks �ore llon and cxcessiYc pressure hy the 11ackcr the water pressure test stoped
RHC
Consultant

�,)
a-
....1-nA
.
GOVERNMENT OF KHYBER PAKHTUNKHWA SMALL DAMS IRRIGATION DEPARTMENT PESHAWAR

CONSTRUCTION OF BAZ ALI SMALL DAM DISTRICT KURRAM


Bore Hole
NO
----
&)(j""
Contractor

Jv of RHC, CASCADE & ETA 12 M/S Edee Enterorises (ovO Ltd


WATER PRESSURE TEST EVALUATION SHEET AT RD~0+400.30
Top of Test Location: Left Trench Test No: 3 i;,
Section(m):
3 � Bottom ofcasing(m)
Bottom of
Test Section(m)· I 14 Nothing(m): 3724684.2
Date: I 0/05/2023
Initial GWL (m)· 0
Length of Easting (m): 612960.88 Supervised By: Tausif Javed
10 Packer Pressure 1.034
Test Section(m):

H j1 ,19
0,
Center of Elevation(m): 11 37 .29 Inclination(Degree): 90 Guage Height Above
9 0.6
Test Section(m): I .... Aea(m)·
BOH at Time
ofTest (m):
I
14
Packer Type; Mechanical Rock Type: Shale Diameter of Hole in Test
Area (mm):
72 J
Stage 1 Time(min) 0 Liters 5 Liters 10 Liters 15
Average Flow Total Head
Lugeon
Guage Flowmeter (q)Lit/min . (m)
4.9122 4.9645
Pressure P Reading (Lit).
Water take
1.034 0.0523 0.0523 9.034 0.05
(Litl
Stage 2 Time(min) 0 5 10 15
Average Flow Total Head
Lugeon
Guage Flowmeter (q)Lit/min. (m)
Pressure P Reading(Lit).
Water take
/Lit)
Stage 3 Time (min) 0 5 10 15
Average Flow Total Head
Lugeon
Guage Flo\\meter (q)Lit/min. (m)
Pressure P Reading (Lit).
Water take
l(Lit)
Stage 4 Time(min) 0 5 10 15
Average Flow Total Head
Guage Flow meter Lugeon
(q)Lit/min. (m)
Pressure P Reading(Lit).
Water take I 0.0002
l(Lit)
Stage 5 Time(min) 0 5 10 15
Average Flow Total Bead
Lugeon
Guage Flowmeter (q)Lit/min. (m)
Pressure P Reading (Lit).
Water take
(Lit)

_JJ5)
I

Summary or Lugeon
Values
I Ap11roximate Permeabilities, cm/s

� ��
Max. Lu= I U.051 Max. k:::c 5.1 x 10 (-1) Geologisl Geologisl

Min. Lu I I 0.051 Min. k= 5.1 X 10 (-1)


MIS Edge Enterprises(pvt)Ltd Mis Rehman Habib Consultants(Pvt)
Ltd(JV)
Mis Rehman Habib Consultants(Pvt)Ltd
(JV)

A,·e. Lu= ! 0.051 Avl!. k = 5.1 x 10 (-1)

I
I
Remarks No hiorc flow water 11rcs.�urc sto1lCd at stage-I
RHC
---
Consultant

6./),
CJ-
.. l:: T /\.
Jv of RHC, CASCADE & ETA
GOVERNMENT OF KHYBER PAKHTUNKHWA SMALL DAMS IRRIGATION DEPARTMENT PESHAWAR

CONSTRUCTION OF BAZ ALI SMALL DAM DISTRICT KURRAM


Bore Hole
NO.

14
-.xi"
Contractor

MIS Edee Enternrises (ovt) Ltd


WATER PRESSURE TEST EVALUATION SHEET AT RD~ 0+410.30
Top ofTest Location: Left Trench Test No: 4
10 Bottom of casing(m):
Section (m):
Bottom of Nothing (m): 3724698.2 Date: 11/05/2023
IS Initial GWL(m):
Test Section(m): I 0

Length of I Easting(m) 612960.90 Supervised By: Tausif Javed


5 Packer Pressure 1.5263
Test Section(m):
Center of Elevation (m)- 1139.65 Inclination(Degree)· 90 Guage Height Above
13.S 0.6
Test Section(m): Aea(m):
BOH at Time Packer Type; Mechanical Rock Type: Shale Diameter ofHole in Test
ofTest (m):
I
15 72
Area(mm): L
Stage 1 Time(min) 0 Liters 5 Liters 10 Liters 15
Average Flow Total Bead
Lugeon
Guage Flowmete.- (q) Lit/min. (m)
2.0199 2.061 2.0728 2.0826
Pressure P Reading(Lit).
Water take
1.5263 0.0411 0.0ll8 0.0098 0.0209 10.6 0.01
(Lil)
Stage 2 Time(min)
Average Flow Total Head
Lugeon
Guage F\owmeter (q) Lit/min (m)
Pressure P Reading(Lit).
Water take
l<LiO
Stage 3 Time(min)
Average Flow Total Head
Lugeon
Guage Flowmeter (q) Lit/min. (m)
Pressure P Readine(Lit).
Water take
Irr it)
Stage 4 Time(min)
Average Flow Total Head
Guage Flowmeter Lugeon
(q) Lit/min. (m)
Pressure P Reading (Lit).
Water take
(Lit)

Stage S Time(min)
Average Flow Total Head
Lugeon
Guage Flowmeter (q) Lit/min. (m)
Pressure P Reading (Lit).
Water take
(Lit)

Max. Lu=

Min. Lu
Summary of Lugeon
Values

I
0.01

0.01
A11rrnximace Permeahililics, em/s

Max. k=

Min. k=
1 ,c 10,.,(-2)

1 X 10"(-2)

Geologist
MIS Edge Enterprises(pvt) Ltd
� Geologist
Mis Rehman Habib Consultants(Pvt)
Ltd(JV)
S�,
Mis Rehman Habib Consultants (Pvt) Ltd
(JV)
0.01
A,·c. Lu: A,·�. k = 1 X 10 ,., (-2)

Remarks nore flow and exc\!ssi\"C pressure by the packer the water pressure lest sloped
Consultant

----- Contractor

-RHC
GOVERNMENT OF KHYBER PAKHTUNKHWA SMALL DAMS IRRIGATION DEPARTMENT PESHAWAR

60 I
Cj
. .!:::TA
.. .... .. . 11 ..

CONSTRUCTION OF BAZ ALI SMALL DAM DISTRICT KURRAM


Bore Hole
NO.
uG
Jv of RHC, CASCADE & ETA 16 MIS Edge Enterprises (pvt) Ltd
WATER PRESSURE TEST EVALUATION SHEET AT RD- 0+420.30
Top of Test
Section(m): I I '.3
Location: Left Trench Test No. 5
Bottom of casing (m)

Bottom of
Test Section(m): I I
18
Nothing(m): 3724708.2 Date I I /05/2023
Initial GWL (m) 0

Length of
Test Section(m): I I
10
Easting(m): 612700.90 Supervised By: Tausif Javed
Packer Pressure 1.7538,2.6313

Center of
Test Section(m)· I I
15.5
Elevation(m): 1142.42 Inclination(Degree): 90 Guage Height Above
Aea(m):
0.6

=:i
BOH at Time I Packer Type; Mechanical Rock Type Shale Diameter of Hole in Test
18 72
of Test(m)· Area(mm)

Stage I Time(min) 0 Liters 5 Liters 10 Liters 15


Aver-age Flow Total Head
Lugeon
Guage Flowmcter (q) Lit/min. (m)
2.0955 2.1445 2.1973 2.227
Pressure P Reading(Lit).
Water take
1.7538 0.049 0.0528 0.029 0.0438 0.03
(Lit)

Stage 2 Time(min) 0 5 10 15
Average Flow Total Head
Lugeon
Guage Flowmeter (q) Lit/min. (m)
2.2392 2.2804 2.3545 2.4044
Pressure P Reading (Lit).
Water take
2.6313 0.0432 0.0741 0.0499 0.1672 12.9 0.06
(Lill

Stage 3 Time(min) I Average Flow Total Head


Lugeon
Guage Flowmeter (q) Lit/min (m)
Pressure P Reading (Lit).
Water take
16.9
(Lit)
Stage 4 Time(min)
Average Flow Total Head
Guage Flowmeter Lugeon
(q) Lit/min. (m)
Pressure P Reading(Lit).
Water take
(Lit)

Stage 5 Time(mm)
I Average Flow Total Head
Lugeon
Guage Flowmeter (q) Lit/min (m)
Pressure P Reading (Lit).

I
Water take
(Lit)

�.�
Summar)· or Lugeon
Approximate Permeabilities, emfs
Values

M.a.L Lu= I I 0.06


Max. k= 6 X 10"(-2) �' �
Min.Lu I 0.03
Min.k= 3 X 10"(-2)
M/S Edge Enterprises(pvt) Ltd M/s Rehman Habib Consultants(Pvt)
Ltd(JV)
Mis Rehman Habib Consultants(Pvt) Ltd
(JV)

A\'c. Lu=
I 0.05
A,l!:• k = S x 10"(-2)

Remarks how and excessive pressure b�· the packer the water pressure lest stof)Cd at sfaJ!
-RHC
Consultant

!>,.◊ . .tT/\.
✓ J-
- .. .. ,.,.
GOVERNMENT OF KHYBER PAKHTUNKHWA SMALL DAMS IRRIGATION DEPARTMENT PESHAWAR

CONSTRUCTION OF BAZ ALI SMALL DAM DISTRICT KURRAM


Bore Hole
NO.
---- Contractor

Jv of RHC, CASCADE & ETA 21 MIS Ede:e Enterorises(ovt) Ltd


WATER PRESSURE TEST EVALUATION SHEET AT RD-0+425.30
Top ofTest
. Section(m): I 3
Location: Left Trench Test No:6 /

Date I 6/05/2023
Bottom of casing(m):

Bottom of I I Nothing(m): 3724684 2 Initial GWL(m) 0


Test Section (m)
Length of Easting(m) 612960.88 Supervised By: Tausif Javed
8 Packer Pressure: 0.4
Test Section (m): I
Center of I Elevation(m): I 140. I 6 [nclination (Degree) 90 Guage Height Above
4 0.6
Test Section(m) Aea(m):
BOH at Time Packer Type; Mechanical Rock Type· Shale Diameter of Hole in Test
II 72
ofTest(m): Area(mm)

Stage 1 Time(min) 0 Liters 5 Liters 10 Liters 15


Average Flow Total Head
Lugeon
Guage Flowmete.- (q) Lit/min. (m)
9.8t53 9.863 9.8993 9.905
Pressure P Reading(Lit �.
Water take
0.4 0.0477 0.0363 0.0057 0.0897 7.4 0.22
(Lit)
Stage 2 Time (min) 0 5 10 15
Average Flow Total Head
Lugeon
Guage Flowmeter (q) Lit/min. (m)
Pressure P Rending(Lit).
Water take
(Lit)

Stage 3 Tinie(min) 0 5 10 15
Average Flow Total Head
Lugeon
Guage Flowmeter (q) Lit/min. (m)
Pressure P Reading {Lit).
Water take
l<Lill
Stage 4 Tirqe(min) 0 5 10 15
Average Flow Total Head
Lugeon
Guage Flowmeter (q) Lit/min. (m)
Pressure P Reading (Lit).
\-Vater take
0.0002
l(Lit)

Stage 5 Time(min) 0 5 10 15
Average Flow Total Read
Lugeon
Guage Flowmeter (q) Lit/min. (m)
Pressure P Reading (Lit).
Water take
(Lit)

MaL Lu=

Min.Lu

A,·e. Lu=
Summary of Lugeon
Values
I

I
Approximate Permeabilities, emfs

11.22 M:u.k =

n.22 Min.k =

0.22 A\'g.k =
2.2 X 10"(•1)

2.2 X 10.,...(-1)

2.2 X 10 ° (-1)
>J MIS Edge Enterprises(pvt) Ltd

Mis Rehman Habib Consultants(Pvt)
Ltd(JV)
��
Mis Rehman Habib Consultants(Pvt) Ltd
(JV)

Remarks I
Consultant Contractor

6◊
GOVERNMENT OF KHYBER PAKHTUNKHWA SMALL DAMS IRRIGATION DEPARTMENT PESHAWAR

. /�A.0-
Bore Hole

-RHC CONSTRUCTION OF BAZ ALI SMALL DAM DISTRJCT KURRAM


NO.

Jv of RBC, CASCADE & ETA 22 M/S Edoe Enternriscs(ovt) Ltd


WATER PRESSURE TEST EVALUATION SHEET AT RD-0+430.30
Top ofTest
6
Location: Left Trench TesrNo: .7 1 Bottom of casing(m)
Section(m).
Bottom of I I Nothing(m): 3724684.2 Date: I 6/05/2023
Initial GWL(m): 0
Test Section(m)·
Length of Easting(m): 612960.88 Supervised By: Tausif Javed
5 Packer Pressure: 0.2,0.4,0.6,0.4.
Test Section(m):
Center of Elevation(m): 1140.06 Inclination(Degree): 90 Guage Height Above
2_5 0.6
Test Section{m). Aea(m):
BOH at Time Packer Type; Mechanical Rock Type: Shale Diameter of Hole in Test
ofTest(m):
11
Area(mm):
72
J,
Stage I Time(min) Liters Liters 10 Liters 15
Average Flow Total Head
Lugeon
Guage Flowmete.- (q) Lit/min. (m)
9.674 9.7332 9.7585 9.7648
Pressure P Reading(Lil').
Waler- take
0.2 0.592 0.0353 0.0063 0.0673 8.2 0.33
ICLitl
Stage 2 Time(min) 0 5 10 15
Average Flow To1al Head
Lugeon
Guage Flowmeter- (q) Lit/min. (m)
9.7651 9.7717 9.775 9.7771
Pressure P Reading (Lit).
Water- take
0.4 0.0066 0.0033 0.0021 0.0393 8.4 0.09
(Lit)

Stage 3 Time(min) 0 5 10 15
Average Flow Total Head
Lugeon
Guage Flowmeter- (q) Lit/min. (m)
9.7776 9.7785 9.8007 9.811
Pressure P Reading (Lit).
Water- take
0.6 0.0009 0.0222 0.0103 0.0334 8.6 0.05
(Lit)
Stage 4 Time(min) 0 5 10 15
Average Flow Total Head
Lugcon
Guage Flowmeter- (q) Lit/min. (m)
9.811 9.8112
Pressure P Reading (Lit).
Wa1er- take
0.4 0.0002 0.0002 8.4 0.00
l(Lit)
Stage 5 Timc(min) 0 5 10 15
Aver-age Flow Total Head
Lugcon
Guage Flo� meter- (q) Lit/min. (m)
Pressure P Reading (Lit).
Water- take
0.2
(Lit)

I
Summar�· or Lu�con
Approximate Permeabilities, emfs
Values

Max:. Lu= 0.33 Max. k = Geoiogist


WS Edge Enterprises(pvt) Ltd Mis Rehman Habib Consultants(Pvt) Mis Rehman Habib Consultants(Pvt) Ltd
Min. Lu I 0 Mio. k= 0 x 10"0. Ltd(N) (N)

A\'c. Lu= 1.1 )( 10 11 (-1).

Remarks
-RHC
Consultant

6.<> a-
·- 1:: . r /\�»
Jv ofRHC, CASCADE & ETA
GOVERNMENT OF KHYBER PAKHTUNKHWA SMALL DAMS IRRIGATION DEPARTMENT PESHAWAR

CONSTRUCTION OF BAZ ALI SMALL DAM DISTRICT KURRAM


Bore Hole
NO.

18
- .:x;-
Contractor

MIS Edee Enterprises (pvt) Ltd


WATER PRESSURE TEST EVALUATION SHEET AT RD- 0+440.30
Top ofTest Location: Left Trench Test No : 8
15 Bottom ofcasing(m):
Section (m):
Bottom of
Test Section (m):
Length of
I 25
Nothing (m): 3724684.2

Easting(m): 61296�88
Date: 15/05/2023

Supervised By: TausifJaved


Initial GWL (m)

Packer Pressure
0

10 0.62,0.932,1.24,0.932,0.62
Test Section (m):
Center of
Test Section(m):
BOH at Time
5.5
Elevation(m): (l 148.87

Packer Type; Mechanical


l I '-1 lb· it Inclination (Degree): 90

Rock Type: Shale


Guage Height Above
Aca (m)
Diameter of Hole in Test
0.6
�-
25 72
ofTest (m): Area (mm):

Stage l Time(min) 0 Liters 5 Lite.-s 10 Liters 15


Average Flow Total Head
Lugeon
Guage Flowmeter (q)Lit/min. (m)
3.2932 3.3238 3.3536 3.3605
Pressure P Reading(Lit�.
Water take
0.62 0.0306 0.0298 0.0069 0.0673 20.62 O.IO
(Lit)
Stage 2 Time(min) 0 5 10 15
Average Flow Total Head
Lugeon
Guage Flowmeter (q)Lit/min. (m)
3.3609 3.3773 3.38 3.3983
Pressure P Reading(Lit).
W:1ter take
0.932 0.0164 0.0027 0.0183 0.0393 20.93 0.04
l(Lil)

Stage 3 Time(min) 0 5 10 15
Average Flow Total Read
Lugeon
Guage Flowmeter (q)Lit/min. (m)
3.3986 3.4011 3.4065 0.4093
Pressure P Refl.dine (Lit).
Water take
1.24 0.0025 0.0054 0.0028 0.0107 21.24 0.01
l(Lit)
Stage 4 Ti�te(min) 0 5 10 15
Average Flow Total Head
Lugeon
Guage Flowmeter (q)Lit/min. (m)
3.4094 3.4122 3.4166 3.4205
Pressure P Reading(Lit).
Water take
0.932 0.0028 0.0044 0.0039 0.0111 20.93 0.01
(Lil)

Stage 5 Time(min) 0 5 IO 15
Average Flow Total Head
Lugeon
Guage Flokmeter (q)Lit/min. (m)
3.4208 3.423 3.4269 3.4292
Pressure P Reading(Lit).
Water take
0.62 0.0022 0.0039 0.0023 0.0084 20.62 0.01
(Li()

_J;J \,�
Summa�· or Lugeon
Approximate Permeabilities, cm.ls
Values
'
Max. Lu= 0.1 Max. k = 1 X 10"{-2). �
g
MIS Edge Enterprises(pvt) Ltd Mis Rehman Habib Consultants (Pvt) Mis Rehman Habib Consultants (Pvt) Ltd
Ltd (JV) (JV)

I
Min. Lu 0.01 Min. k= 1 w. 10"(-1).

An. Lu = O.OH A\'g. k= 3.4 X 10''(-2).

Remarks
RHC
Consultant

�vs,}
I
Cl
.... _....... ,,
....ET/\.
GOVERNMENT OF KHYBER PAKHTUNKHWA SMALL DAMS IRRIGATION DEPARTMENT PESHAWAR

CONSTRUCTION OF BAZ ALI SMALL DAM DISTRICT KURRAM


Bore Hole
NO.
---
uCi
Contractor

Jv of RHC, CASCADE & ETA 20 M/S Edge Enterprises (pvt) Ltd


WATER PRESSURE TEST EVALUATION SHEET AT RD- 0+450.30
Top ofTest
Section (m)·
Bottom of
I 18
Location: Left Trench

Nothing (m): 3724684.2


Test No: 9

Date I 5/05/2023
Bottom of casing (m):

28 Initial GWL (m): 0


Test Section (m)
Length of Easting (m): 612960.88 Supervised By: Tausif Javed
10 Packer Pressure: 0.62,0.932,1.24,0.932,0.62
Test Section (m) I
Center of
Test Section(m):
I 5.5
Elevation (m): 1151.72 Inclination (Degree): 90 Guage Height Above
Aca (m):
0.6

':t
BOH at Time Packer Type; Mechanical Rock Type: Shale Diameter of Hole in Test
28 72
ofTest (m): Area (mm)

Stage I Time (min) 0 Liters 5 Liters 10 Liters 15


Average Flow Total Bead
Lugeon
Guage Fl{>wmeter (q)Lit/min. (ml
2.6334 2.6619 2.722 2.7706
Pressure P Reading (Lit).
Water take
0.62 0.0285 0.0601 0.0486 0, 1372 26.62 0.22
I/Lill
Stage 2 Tirne(min) 0 s 10 15
Average Flow Total Head
Lugeon
Guage FIJwmeter (q) Lit/min. (m)
2.7722 2.8279 2.866 2.9162
Pressure P Reading (Lit) .
Water take
0.932 0.0557 0.0381 0.0502 0.144 26.93 0.16
l(Lit)

Stage 3 Time(min) 0 5 10 15
Average Flow Total Head
Lugeon
Guage Flowmeter (q)Lit/min. (m)
2.9207 2.9526 2.9992 3.0557
Pressure P Re;\din2 (Lit).
Water take
1.24 0.0319 0.0466 0.0565 0.135 27.24 0.11
(Lil)
Stage 4 Tinte(min) 0 s 10 15
Average Flow Total Bead
Guage Flo�meter Lugeon
3.0565 3.0908 3.1117 3.1549 (q) Lit/min. (m)
Pressure P Reading(Lit).
Water take
0.932 0.0343 0.0209 0.0432 0.0984 26.93 0.11
(Lil)

Stage 5 Time(min) 0 5 10 15
Average Flow Total Head
Lugeon
Guage Floimeter (q)Lit/min. (m)
3.1565 3.1744 3.2027 3.2305
Pressure P Rea<ling(Lit).
Waler take
0.62 0.0179 0.0283 0.0278 0.074 26.62 0.12
(Lit)

Max. Lu=

Min. Lu
Summary or L i.;eon
Values I
I
0.22

0.11
Appr-o:timate Permeabilities, emfs

Max. k=

Min. k =
2.2 x 10"(-2).

1.1 X 10"{•1)
>.#. Geologist
MIS Edge Enterprises (pvt) Ltd
IL
Geologist
Mis Rehman Habib Consultants (Pvt)
Ltd (N)
�-
Mis Rehman Habib Consultants (Pvt) Ltd
(JV)

A,·e. Lu= 0.1-U A,•g. k = 1.44 :x 10"(-2)

Remarks I