You are on page 1of 2

LMI-IGSTPP-SAFETY-004-OD-OPS-SAFT-003

JOB SAFETY ANALYSES (JSA) & METHOD STATEMENTS (MS)

26.06.2023
JOB SAFETY ANALYSIS JSA NUMBER Date:

JSA DONE BY

Work Instruction / Job Plan LWC: 300155224

4 W PMU-3 CFT VAPOUR EXTRACTION FAN 2


JOB (Brief Description)

PM of HP & LP water pumps & oil pumps


Job Location Department TMD

Job Plan steps (Add Residual Risk Person Responsible


S.No rows as required) Hazards control measures (High/Medium/Low) for control measure

1 HIGH Site Supervisor

2 HIGH Site Supervisor


HIGH

3 Site Supervisor
, , / HIGH
,

Site Supervisor
4
HIGH

Site Supervisor
5
HIGH

Site Supervisor
6

Aravali Power Company Private Limited


Indira Gandhi Super Thermal Power Station, Jhajjar, Haryana Page 36 of 37
LMI-IGSTPP-SAFETY-004-OD-OPS-SAFT-003

JOB SAFETY ANALYSES (JSA) & METHOD STATEMENTS (MS)

HIGH

Site Supervisor
7
, HIGH

Site Supervisor
8 /

Safety Eye/Face Respiratory other


PPE required Helmet Shoe Gloves Protection Hearing Protection Protection PPE
Yes/No YES YES YES EYE YES YES

Additional Precautions/ control


measures, if any:
Further Precautions / Control
Measures if any:

Tool Box Talk UPL SUPERVISIOR/SITE SUPERVISIOR

SAFETY DEPARTMENT

Training to be given by

This is to certify that all work under the scope of the above Job Plan shall be undertaken by qualified competent persons with experience of the
type of work described above, and in all cases in full accordance with NTPC safety rules (E&M) and conditions of the safety document. What-If
failure scenarios have been considered like failure of tools, tackles, work equipment in this JSA.

HOS/HOD
Area Engineer Name Name

Signature Signature

Aravali Power Company Private Limited


Indira Gandhi Super Thermal Power Station, Jhajjar, Haryana Page 37 of 37