PRECIPITATION IN EACH SECTION

SOUTHERN LUZON STATE


STATION RAINFALL (cm) AREA (m2) PRECIPITATION
x AREA
N UNIVERSITY
A 8.8 2 467.87 21 717.26 Ao LUCBAN, QUEZON
B 7.6 2 673.53 20 318.83
C 10.8 4 730.08 51 084.86 LOGO:
D 9.2 20 359.92 187 311.26
E 13.8 10 488.45 144 740.61
F 10.4 8 637.54 89 830.42 Bo
G 8.5 10 282.79 87 403.72
H 10.5 6 580.99 69 100.40 Co
I 11.2 6 992.29 78 313.65 COMPANY NAME:
J 9.5 14 395.91 136 761.15
JPF CONSTRUCTION COMPANY
K 7.8 4 524.43 35 290.55
L 5.2 7 403.61 38 498.77
NAME:
M 5.6 15 835.50 88 678.80 ENGR. JAMIE P. FEDERIZO
N 6.8 10 282.79 69 922.97 Do STUDENT NUMBER:
O 7.4 13 161.97 97 398.58
20L-002265
COURSE CODE/SUBJECT DESCRIPTION:
TOTAL AREA: 138 817.67 m2
SUMMATION (P x A): 1 216 371.83 Eo CVE 17
AVE. RAINFALL = SUMMATION (P x A)/TOTAL AREA F o ENGINEERING HYDROLOGY
AVE. RAINFALL = 1 216 371.83 /138 817.67 PROJECT NAME:
AVE. RAINFALL = 8.76 cm
FOREST HEIGHTS SUBDIVISION
PROJECT LOCATION:
Go
Ho BRGY. GALALAN, PANGIL,
Io LAGUNA
APPROVED BY:
K o
ENGR. MELVIN A. MAKIPAGAY
Jo
SHEET CONTENT:
Lo Mo PRECIPITATION METHODS
SHEET NUMBER/STATUS:
No

JF
2
Oo REVISIONS:

THIESSEN POLYGON METHOD


SCALE 1:5