DESCRIPTION OF TASKS
Check that materials are properly stored, handled, and used on Confirm, review and verify
the project. Emergency/extra work orders claimed by
the Contractor.
QUALITY CONTROL Inspect Safety Measures Taken By the Contractor
Review with any concerned the requisitions for
Supervise/Perform sampling and testing of materials when EVALUATION
payment as submitted by the Contractor and
necessary. Promply Report Test results to those concerned forward them with recommendations to the
Check, in the company of Contractor and others concerned, Architect for disposition.
testing of plumbing, eJect'rical, air conditioning, mechanical and
other installations
Disallow the installation of any material and equipment for which shop Be alert to the various schedules of
drawings have not been duly approved by the Architect. completion date and to conditions which
Forbid the use of materials, tools and. equipment, workmanship which may cause delay in completion and report
do not conformwith the plans and specifications. same to the Architect. When the
Require ihe removal or repair of defective or faulty construction; or if construction work has been completed in
construction which could not be inspected in ·place; or the construction of a accordance with the Contract Documents,
critical item, expressly identified as such, and which was performed without advise the Architect that the work is ready
inspection.
for general inspection and acceptancE
Stop any work which is not being done in accordance with the plans and specifications and
the contract agreement between the Owner and the Contractor.
DESCRIPTION OF TASKS
PITFALLS OF PLANNING
1. Planning is too complex
2. Some plans had been proven to be unrealistic
3. No variable alternatives
4. Insufficient time given to planning
5. NO control for monitoring
6. Failure to delegate parts of the plan to concerned parties
GANTT CHART REQUIREMENTS FOR PROJECT EVALUATION REVIEW
(BIDDING REQUIREMENTS)
Graphical Representation of work against Completed Time
A. TIME OF CONSTRUCTION
shows the necessary time for each function but does not show the relationship of one B. BIDDING DOCUMENTS states the tiime must be
another completed