Professional Documents
Culture Documents
A PMP MS
A PMP MS
Approved
Approved As Noted
Not Approved
A-PMP-MS
Date:
Signature:
QTY: 10 UNITS
Please confirm engineering; we cannot
begin production unless your signed and
dated confirmation is marked on each page.
Date:
05.02.2022
Signage
Submittal by: F. Caffroni
Checked by: M. Fernandes
SO No.: SAL-20-0299
Assembly: A-PMP
Dwg. No.: 1
Project:
8'-9 9/16"
[105.5700]
1/4"x1/4"
Main unit South Coast Rail
1'-6 5/8"
[18.6250]
5'-0"
[60.0000]
1'-6 5/8"
[18.6250]
Phase 1
1 7/8"
[1.8750]
2'-4 1/16"
2'-0" 1'-6 1/2"
[28.0600]
[24.0000] [18.5000]
Wing
Date:
Signature:
Please confirm engineering; we cannot
8'-9 9/16"
Wing begin production unless your signed and
[105.5700] Type A PMP isometric view top
scale 1"=2'-0" dated confirmation is marked on each page.
8'-1 1/4" 2'-0"
[97.2500] [24.0000]
Date:
05.02.2022
1'-3 3/4" 1'-3 3/4"
[15.7500] [15.7500]
Wing
Main unit
7'-3 1/4"
4'-10 1/4" 4'-10 1/4"
[87.2500]
[58.2500] [58.2500]
Wing
A page 4
Date:
4'- 1/2" 4'- 1/2"
[48.5000] [48.5000] 1 1/4" 3/16"x3/16" 3/16"x3/16"
3/16"x3/16" [1.2500] 3/16"x3/16" 3/16"x3/16"
3/16"x3/16" 3/16"x3/16"
3 3/16"x3/16" Signature:
sides
Please confirm engineering; we cannot
begin production unless your signed and
dated confirmation is marked on each page.
4'- 1/2" 4'- 1/2" 4'- 1/2" 4'- 1/2"
[48.5000] [48.5000] [48.5000]
7'-3 1/4" 7'-2"
[48.5000] Date:
3 3/16"x3/16" [86.0000]
sides
[87.2500]
05.02.2022
3/16"x3/16" 3/16"x3/16"
3/16"x3/16" 3/16"x3/16" 3/16"x3/16"
3/16"x3/16"
1 1/4"
[1.2500]
9 3/4"
[9.7500]
1'-9 3/4"
3/16"x3/16"
[21.7500]
8 1/2"
1'-0" [8.5000]
[12.0000] 3/16"x3/16"
5 1/2"
[5.5000]
1/4"x1/4"
9" 2'-0" 2'-0"
2 1/2" 1/4"x1/4"
1" [9.0000] [24.0000] [24.0000] 1"
[1.0000] [2.5000] 1'-1 5/8" 5'-0" [1.0000]
[13.6250] [60.0000]
5'-0" 1'-11 5/8"
[60.0000] [23.6250]
A page 4 Main unit back elevation
scale 1"=1'-6"
Main unit front elevation
scale 1"=1'-6"
Signage
Submittal by: F. Caffroni
Checked by: M. Fernandes
SO No.: SAL-20-0299
Assembly: A-PMP
Dwg. No.: 3
11 ga.
HDG steel
Project:
perforated panel 1/16" thick
B
gasket
South Coast Rail
WT 4x6.5
HDG steel Phase 1
1/8" thick
3/16"x3/16" caulking
1'-4"
[16.0000] 3/16"x3/16" 1/4"x3" HDG
3/16"x3/16" steel bar WT 4x6.5
HDG steel
3/16"x3/16"
3/16"x3/16"
3/16"x3/16" 3/16"x3/16"
1'-4"
[16.0000]
3/16"x3/16" 3/16"x3/16" Approved
Approved As Noted
#10-3/4" long
HDG steel pin Not Approved
WT 4x6.5 #10-3/4" long 12"x4"x1/4"
HDG steel HDG steel pin HDG steel
rectangular tube
Date:
WT 4x6.5
1/8" thick HDG steel
4'- 1/2" caulking
[48.5000] 5/16"-5/16"
7'-3 1/4"
5/16"-5/16" Signature:
[87.2500]
DETAIL B Please confirm engineering; we cannot
11 ga.
1/16" thick SCALE 1"=6" HDG steel begin production unless your signed and
gasket perforated panel dated confirmation is marked on each page.
Date:
3/16"x3/16"
1" thick
HDG steel 05.02.2022
base plate
7 1/2"
F DETAIL C
[7.5000]
SCALE 1 / 6
3/16"x3/16"
7 1/4"
[7.2500]
1'- 1/2"
[12.5000]
1'-0"
[12.0000]
6 1/2"
[6.5000] 3/16"x3/16"
F
1/4" thick HDG
steel plate
1"
[1.0000]
C
1'-7 7/8"
[19.8450]
F1 H1
F1
T1
SP
F1
H1 F1
F1
F1 Approved
Approved As Noted
F1 L3
T2 Not Approved
F1
L1
F1
M1 TP
TP
Date:
CS F1
T1
L1 T2
Signature:
L2
Please confirm engineering; we cannot
begin production unless your signed and
L1
M1 dated confirmation is marked on each page.
L2
SP Date:
SP
05.02.2022
T3 H1
F2 L1
F2
F2
T4 L3
F2
SH
F2
BP
F2
HB
BP
HB F2
F2
T5 RT1
F2
T4
RT1 F2
SH
T3 SP
T4
Signage
T5
BP
Submittal by: F. Caffroni
Checked by: M. Fernandes
H1
BP
Main unit front isometric view
scale 1"=1'-0" Main unit back isometric view T4
SO No.: SAL-20-0299
scale 1"=1'-0"
Assembly: A-PMP
Dwg. No.: 5
Project:
Approved
Approved As Noted
1 1/2"
Not Approved
[1.5000]
Date:
Signature:
Please confirm engineering; we cannot
begin production unless your signed and
dated confirmation is marked on each page.
Date:
10"
[10.0000] 7"
[7.0000]
05.02.2022
1 THRU
[ 1.0000 THRU]
1 1/2"
[1.5000]
10"
[10.0000]
Signage
Submittal by: F. Caffroni
Checked by: M. Fernandes
SO No.: SAL-20-0299
Assembly: A-PMP
Dwg. No.: 6
Project:
4 3/16"
Approved
[4.1600] Approved As Noted
Not Approved
Date:
Signature:
Please confirm engineering; we cannot
3 1/16" begin production unless your signed and
[3.0600] dated confirmation is marked on each page.
Date:
4 1/16"
[4.0600] 05.02.2022
1"
[1.0000]
2 1/16" 2 1/16"
[2.0800] [2.0800]
Signage
Submittal by: F. Caffroni
Checked by: M. Fernandes
SO No.: SAL-20-0299
Assembly: A-PMP
Dwg. No.: 7
Project:
Approved
Approved As Noted
Not Approved
1/4"
[.2500]
G
1/16" 7/16" 1/16"
1/16" [.0313] [ .4375] [.0313] SECTION G-G
[.0313] SCALE 6"=1"
1/2"
[ .5000]
CS HDG steel matte black finish front elevation
scale 6"=1"
1/2"
[ .5000]
7/16"
[ .4375]
Signage
Submittal by: F. Caffroni
Checked by: M. Fernandes
SO No.: SAL-20-0299
Assembly: A-PMP
CS HDG steel matte black finish bottom plan
scale 6"=1" Dwg. No.: 8
Project:
Approved
Approved As Noted
Not Approved
Signature:
Please confirm engineering; we cannot
begin production unless your signed and
dated confirmation is marked on each page.
Date:
1 7/8"
[1.8900] 1 5/8"
[1.6400]
05.02.2022
3 1/2"
[3.4700]
Signage
Submittal by: F. Caffroni
Checked by: M. Fernandes
SO No.: SAL-20-0299
Assembly: A-PMP
Dwg. No.: 9
Project:
1'-1 1/2"
Approved
[13.5000] Approved As Noted
Not Approved
Date:
Signature:
Please confirm engineering; we cannot
3" begin production unless your signed and
[3.0000]
dated confirmation is marked on each page.
Date:
05.02.2022
Signage
Submittal by: F. Caffroni
Checked by: M. Fernandes
SO No.: SAL-20-0299
Assembly: A-PMP
Dwg. No.: 10
Project:
Approved
Approved As Noted
Not Approved
8 1/2"
[8.5000]
Date:
Signature:
Please confirm engineering; we cannot
begin production unless your signed and
dated confirmation is marked on each page.
Date:
3"
[3.0000] 05.02.2022
Signage
Submittal by: F. Caffroni
Checked by: M. Fernandes
SO No.: SAL-20-0299
Assembly: A-PMP
Dwg. No.: 11
Project:
Approved
Approved As Noted
Not Approved
Date:
4'- 1/2"
[48.5000]
Signature:
Please confirm engineering; we cannot
begin production unless your signed and
4" dated confirmation is marked on each page.
[4.0000]
Date:
05.02.2022
Signage
Submittal by: F. Caffroni
Checked by: M. Fernandes
SO No.: SAL-20-0299
Assembly: A-PMP
Dwg. No.: 12
Project:
Approved
Approved As Noted
Not Approved
Date:
Date:
05.02.2022
6 5/8" 1'-0" 1'-0" 1'-0" 1'-0" 1'-0" 1'-0" 1'-0" 6 5/8" 5/8"
[6.6250] [12.0000] [12.0000] [12.0000] [12.0000] [12.0000] [12.0000] [12.0000] [6.6250] [.6250]
2 3/4"
[2.7500]
1/4 THRU
4" 3/8 X 82.0000
[4.0000] .2210 THRU 5/8"
[ .3850 X 82.0000 ] T1 HDG steel WT4x6.5 matte black finish top plan
scale 1"=9"
[.6250]
Signage
T1 HDG steel WT4x6.5 matte black finish front elevation
scale 1"=9"
T1 HDG steel WT4x6.5 matte black finish right elevation Submittal by: F. Caffroni
scale 1"=9"
Checked by: M. Fernandes
SO No.: SAL-20-0299
Assembly: A-PMP
Dwg. No.: 13
Project:
Approved
Approved As Noted
Not Approved
Date:
Signature:
Please confirm engineering; we cannot
begin production unless your signed and
T2 HDG steel WT4x6.5 matte black finish isometric view dated confirmation is marked on each page.
scale 1"=9"
Date:
05.02.2022
6 5/8" 1'-0" 1'-0" 1'-0" 1'-0" 1'-0" 1'-0" 1'-0" 6 5/8" 5/8" 1 1/4"
4" [6.6250] [12.0000] [12.0000] [12.0000] [12.0000] [12.0000] [12.0000] [12.0000] [6.6250] [.6250] [1.2500] 1 1/2"
[4.0000] [1.5000]
2 3/4"
[2.7500]
5/8" 1 1/4"
8'-1 1/4"
[.6250] [1.2500]
[97.2500] #10-3/4" long
10-24 UNC - 2B
[10-24 UNC - 2B] HDG steel pin
4" 4"
[4.0000] [4.0000]
1/16"x1/16"
1/16"x1/16"
Signage
Submittal by: F. Caffroni
8'-1 1/4" 4"
[97.2500] [4.0000] Checked by: M. Fernandes
T2 HDG steel WT4x6.5 matte black finish front elevation
scale 1"=9"
T2 HDG steel WT4x6.5 matte black finish right elevation
scale 1"=9"
SO No.: SAL-20-0299
Assembly: A-PMP
Dwg. No.: 14
Project:
Approved
Approved As Noted
Not Approved
Date:
Signature:
Please confirm engineering; we cannot
begin production unless your signed and
dated confirmation is marked on each page.
Date:
1/4 THRU
3/8 X 82.0000
.2210 THRU
[ .3850 X 82.0000 ]
6 5/8" 1'-0" 1'-0" 1'-0" 1'-0" 1'-0" 1'-0" 1'-0" 6 5/8" 5/8" 1 1/4"
[6.6250] [12.0000] [12.0000] [12.0000] [12.0000] [12.0000] [12.0000] [12.0000] [6.6250] [.6250] [1.2500]
2 3/4" 1 1/2"
10-24 UNC - 2B
[10-24 UNC - 2B] [2.7500] [1.5000]
4"
[4.0000] 5/8" 1 1/4"
8'-1 1/4"
[.6250] [1.2500]
[97.2500]
SO No.: SAL-20-0299
T3 HDG steel WT4x6.5 matte black finish front elevation T3 HDG steel WT4x6.5 matte black finish right elevation
scale 1"=9" scale 1"=9" Assembly: A-PMP
Dwg. No.: 15
Project:
3/4"
2 1/4" 6 1/2" 6 1/2" 4 5/8"
[.7500]
[2.2500] [6.5000] [6.5000] [4.6250]
Approved
Approved As Noted
4" 2 1/2" Not Approved
[4.0000] 9/16 THRU [2.5000]
[ .5312 THRU]
Date:
3/4"
1'-7 7/8"
[.7500]
[19.8750]
Date:
05.02.2022
1'-7 7/8"
[19.8750]
1" 4"
1" [1.0000] [4.0000]
[1.0000]
4" 4"
R1" [4.0000] [4.0000]
[R1.0000]
7.6240 4"
[4.0000]
T4 HDG steel WT4x6.5 matte black finish right elevation
scale 1"=4"
SO No.: SAL-20-0299
Assembly: A-PMP
Dwg. No.: 16
Project:
Approved
Approved As Noted
3/4"
1'-7 7/8"
[19.8750]
[.7500] Not Approved
Signature:
Please confirm engineering; we cannot
begin production unless your signed and
dated confirmation is marked on each page.
Date:
05.02.2022
1'-7 7/8"
[19.8750]
1" 4"
1" [1.0000] [4.0000]
[1.0000]
4" 4"
[4.0000] [4.0000]
R1"
[R1.0000]
7.6240 4"
[4.0000]
T5 HDG steel WT4x6.5 matte black finish right elevation
T5 HDG steel WT4x6.5 matte black finish front elevation scale 1"=4" Signage
scale 1"=4"
Submittal by: F. Caffroni
Checked by: M. Fernandes
SO No.: SAL-20-0299
Assembly: A-PMP
Dwg. No.: 17
Project:
Approved
Approved As Noted
Not Approved
Date:
Signature:
4"
[4.0000] Please confirm engineering; we cannot
7/16"
[.4500] begin production unless your signed and
dated confirmation is marked on each page.
1/2 THRU
Date:
[ .5310 THRU] 7/8"
[.9000]
05.02.2022
Signage
Submittal by: F. Caffroni
Checked by: M. Fernandes
SO No.: SAL-20-0299
Assembly: A-PMP
Dwg. No.: 18
Project:
Approved
Approved As Noted
Not Approved
RT1 HDG steel rectangular tube matte black finish 12"x4" isometric view
scale 1"=1'-0" Date:
Signature:
Please confirm engineering; we cannot
begin production unless your signed and
6 5/8" 1'-0" 1'-0" 1'-0" 1'-0" 1'-0" 1'-0" 1'-0" 6 5/8" 5/8"
[6.6250] [12.0000] [12.0000] [12.0000] [12.0000] [12.0000] [12.0000] [12.0000] [6.6250] [.6250] dated confirmation is marked on each page.
4"
[4.0000] 2 3/4"
[2.7500] Date:
05.02.2022
RT1 HDG steel rectangular tube matte black finish 12"x4" top plan
5/8"
scale 1"=9"
[.6250]
1/16"x1/16"
1/16"x1/16"
8'-1 1/4"
[97.2500]
1'-0"
[12.0000]
RT1 HDG steel rectangular tube matte black finish 12"x4" front elevation RT1 HDG steel rectangular tube matte black finish 12"x4" right elevation
scale 1"=9" scale 1"=9"
2"
4" 6 5/8" 3'-6" 3'-6" 6 5/8" [2.0000]
[4.0000] [6.6250] [42.0000] [42.0000] [6.6250]
Signage
Submittal by: F. Caffroni
1 1/4 Checked by: M. Fernandes
[ 1.0000 .2500]
8'-1 1/4"
[97.2500] SO No.: SAL-20-0299
RT1 HDG steel rectangular tube matte black finish 12"x4" bottom plan
scale 1"=9"
Assembly: A-PMP
Dwg. No.: 19
Project:
Approved
Approved As Noted
Not Approved
Date:
4 1/16"
[4.0600]
Signature:
Please confirm engineering; we cannot
begin production unless your signed and
7'-2"
[86.0000] dated confirmation is marked on each page.
Date:
H1 HDG steel W4x13 matte black finish top plan
scale 1"=8" 05.02.2022
4 1/16"
[4.0600]
4 3/16" 4 3/16"
[4.1600] [4.1600]
7'-2"
[86.0000]
SO No.: SAL-20-0299
Assembly: A-PMP
Dwg. No.: 20
Project:
7 1/4"
[7.2500]
South Coast Rail
Phase 1
3/4"
[ .7500]
7 1/4" R1 1/8"
[7.2500] [R1.1250] 3/4"
[ .7500]
Approved
Approved As Noted
Not Approved
Date:
Signature:
Please confirm engineering; we cannot
begin production unless your signed and
dated confirmation is marked on each page.
Date:
05.02.2022
Signage
3/4" Submittal by: F. Caffroni
[ .7500]
Checked by: M. Fernandes
6 1/2"
[6.5000]
SO No.: SAL-20-0299
SH HDG steel 3/4" matte black finish right elevation
scale 1"=2"
SH HDG steel 3/4" matte black finish front elevation
scale 1"=2"
Assembly: A-PMP
Dwg. No.: 21
Project:
Approved
4'- 1/4" Approved As Noted
1" [48.2500]
[1.0000] Not Approved
Date:
L1 HDG steel angle 1"x1"x1/8" matte black finish top plan
scale 1"=4"
Signature:
Please confirm engineering; we cannot
begin production unless your signed and
dated confirmation is marked on each page.
Date:
05.02.2022
1"
4'- 1/4" 1" [1.0000]
[48.2500] [1.0000]
Signage
Submittal by: F. Caffroni
Checked by: M. Fernandes
SO No.: SAL-20-0299
Assembly: A-PMP
Dwg. No.: 22
Project:
Approved
Approved As Noted
Not Approved
1"
[1.0000]
Date:
3/8"
6 1/2"
[6.5000]
1'-0"
[12.0000]
1'-0"
[12.0000]
1'-0"
[12.0000]
5 3/4"
[5.7500] [.3750] Signature:
1/4 THRU
3/8 X 82.0000 Please confirm engineering; we cannot
.2210 THRU
[ .3850 X 82.0000 ] begin production unless your signed and
dated confirmation is marked on each page.
Date:
L2 HDG steel angle 1"x1"x1/8" matte black finish top plan
scale 1"=4" 05.02.2022
1/8"
[.1250]
3'-10 1/4"
[46.2500] 1"
[1.0000]
Signage
Submittal by: F. Caffroni
Checked by: M. Fernandes
SO No.: SAL-20-0299
Assembly: A-PMP
Dwg. No.: 23
Project:
1"
[1.0000]
Approved
Approved As Noted
Not Approved
Date:
05.02.2022
1"
4'- 1/4" 1"
[48.2500] [1.0000]
[1.0000]
Signage
L3 HDG steel angle 1"x1"x1/8" matte black finish front elevation Submittal by: F. Caffroni
scale 1"=4" L3 HDG steel angle 1"x1"x1/8" matte black finish right elevation
scale 1"=4" Checked by: M. Fernandes
SO No.: SAL-20-0299
Assembly: A-PMP
Dwg. No.: 24
1/4"
[.2650] Project:
1 7/8" 2'-0"
[1.8900] [24.0000]
D page 21 Approved
Approved As Noted
Not Approved
1/4x1/4
3 sides
3"
[2.9700]
Date:
Signature:
Please confirm engineering; we cannot
begin production unless your signed and
dated confirmation is marked on each page.
Date:
05.02.2022
1/4x1/4
3 sides
Signage
Submittal by: F. Caffroni
D page 21
4"
3/4" [4.0000]
[.7500]
Date:
1 1/2"x1/4"
Signature:
HDG steel
rectangular bar Please confirm engineering; we cannot
begin production unless your signed and
dated confirmation is marked on each page.
11 ga.
HDG steel
perforated panel
#10 countersunk tamperproof screw
DETAIL E
SCALE 1"=1"
SO No.: SAL-20-0299
Assembly: A-PMP
Dwg. No.: 26
L4
2'-0"
T7
Project:
[24.0000]
T6
F4
F4
Approved
Approved As Noted
Not Approved
Date:
Signature:
Please confirm engineering; we cannot
T6
begin production unless your signed and
dated confirmation is marked on each page.
Date:
4'-10 1/4"
[58.2500] 05.02.2022
Signage
Submittal by: F. Caffroni
F3 Checked by: M. Fernandes
L4
SO No.: SAL-20-0299
Assembly: A-PMP
Wing front elevation T7
scale 1"=6"
Dwg. No.: 27
Project:
Approved
Approved As Noted
Not Approved
Date:
Date:
4'-10 1/4"
[58.2500]
05.02.2022
4"
[4.0000]
4'-5 3/4"
[53.7500]
1/2" 8 3/8" 9" 9" 9" 9" 8 3/8" 1/2"
[.5000] [8.3750] [9.0000] [9.0000] [9.0000] [9.0000] [8.3750] [.5000]
2 1/4"
[2.2500]
Signage
Submittal by: F. Caffroni
10-24 UNC - 2B
[10-24 UNC - 2B] 2 1/4"
4'-10 1/4"
1 1/2"
4"
[2.2500] Checked by: M. Fernandes
[1.5000]
[58.2500] [4.0000]
SO No.: SAL-20-0299
T6 HDG steel modified WT3x6 matte black finish right elevation
T6 HDG steel modified WT3x6 matte black finish front elevation
scale 1"=6"
scale 1"=6" Assembly: A-PMP
Dwg. No.: 28
Project:
Approved
2'-0" Approved As Noted
[24.0000]
Not Approved
4"
Date:
[4.0000]
Signature:
Please confirm engineering; we cannot
T7 HDG steel modified WT3x6 matte black finish top plan begin production unless your signed and
scale 1"=4" dated confirmation is marked on each page.
Date:
05.02.2022
10-24 UNC - 2B
[10-24 UNC - 2B]
1'-7 1/2"
[19.5000]
2 1/4"
[2.2500]
2'-0" 4"
Signage
[24.0000] [4.0000]
SO No.: SAL-20-0299
Assembly: A-PMP
Dwg. No.: 29
Project:
Approved
Approved As Noted
Not Approved
Date:
1'-7 1/2"
[19.5000]
Signature:
1/2" 9 1/4" 9 1/4" 1/2" Please confirm engineering; we cannot
[.5000] [9.2500] [9.2500] [.5000] begin production unless your signed and
3/4"
[.7500] dated confirmation is marked on each page.
Date:
1/4 THRU
1 1/2" 3/8 X 82.0000 1 1/2" 05.02.2022
[1.5000] .2210 THRU [1.5000]
[ .3850 X 82.0000 ]
1'-10 1/2"
[22.5000]
F3 HDG steel 1 1/2"x1/4" flat bar matte black finish front elevation
scale 1"=2"
Signage
Submittal by: F. Caffroni
Checked by: M. Fernandes
SO No.: SAL-20-0299
Assembly: A-PMP
Dwg. No.: 30
Project:
Approved
Approved As Noted
Not Approved
Date:
Signature:
Please confirm engineering; we cannot
begin production unless your signed and
dated confirmation is marked on each page.
Date:
05.02.2022
1/2" 8 3/8" 9" 9" 9" 9" 8 3/8" 1/2"
[.5000] [8.3750] [9.0000] [9.0000] [9.0000] [9.0000] [8.3750] [.5000]
1 1/2" 3/4"
[1.5000] [.7500]
4'-8 3/4"
[56.7500]
1/4 THRU
3/8 X 82.0000
.2210 THRU
[ .3850 X 82.0000 ]
F4 HDG steel 1 1/2"x1/4" flat bar matte black finish front elevation
scale 1"=6"
Signage
Submittal by: F. Caffroni
Checked by: M. Fernandes
SO No.: SAL-20-0299
Assembly: A-PMP
Dwg. No.: 31
Project:
3 1/2"
[3.4700]
South Coast Rail
Phase 1
1 3/4"
[1.7350]
1 1/4"
[1.2500]
1 5/8"
1 7/8" 1"
[1.6400]
[1.8900] [ 1.0000]
Approved
R1/4" Approved As Noted
[R.2500]
Not Approved
3"
[2.9700]
L4 HDG steel angle 3"x3x1/4" modified matte black finish top plan
4 pieces per sign Date:
scale 1"=1"
Signature:
Please confirm engineering; we cannot
begin production unless your signed and
dated confirmation is marked on each page.
L4 HDG steel angle 3"x3x1/4" modified matte black finish isometric view
scale 1"=1" Date:
05.02.2022
3 1/2" 1 7/8"
1/4"
[3.4700] [1.8900]
[.2500]
3" 3"
[3.0000] 2 3/4" [3.0000]
[2.7500]
Signage
Submittal by: F. Caffroni
1/4" 3" 1/4"
Checked by: M. Fernandes
[.2500] [2.9700] [.2500]
L4 HDG steel angle 3"x3x1/4" modified matte black finish right elevation
scale 1"=1" SO No.: SAL-20-0299
L4 HDG steel angle 3"x3x1/4" modified matte black finish front elevation
scale 1"=1"
Assembly: A-PMP
Dwg. No.: 32