PENGADAAN JASA PLTP ORGANIC RANKINE CYCLE 500 kW PGE

AREA LAHENDONG

Document Title : INSPECTION TEST PLAN FOR INSTRUMENT WORK Contract No : 3900509140
Document No. : LHD-BTP-E-QAC-REP-0 Rev : 0
Subject : Load Test Page : of
Form ITP No. : INT-QAC-00 Date :

INST. NAME Load Test ORC unit


MODEL NO.
MANUFACTURER Package Kaishan INPUT
SERIAL NO. OUTPUT
MFG. DATE Test Equipment
TAG NO.

Description Check List Result Pass/Fail Remarks

Load Test Unit ORC

1 Load 15% 15 Minutes hold Form Chek List


2 Load 20% 15 Minutes hold Form Chek List
3 Load 25% 30 Minutes hold Form Chek List
4 Load 50% 30 Minutes hold Form Chek List
5 Load 75% 30 Minutes hold Form Chek List
Load 100% 30 Minutes hold Form Chek List

REFERENCE Doc LHD‐BTP‐V‐UMB‐DOC‐018_Operating and Maintenance Manual

NOTES :

Prepared & Inspected by, Witnessed & Reviewed by, Approved by,

PT YOKOGAWA INDONESIA PT PGE (JPH) PT PERTAMINA GEOTHERMAL ENERGY

Signature

Name

Title

Date