PLAN PREVENTIVE MAINTENANCE

PENGURUSAN FASILITI BAGI


BLOK E 4/5, KOMPLEKS E, PUTRAJAYA
TAHUN 2017 - 2020
JKR WP PUTRAJAYA
PREVENTIVE MAINTENANCE CHECKLIST LOCATION/LEVEL
WORK TRADE ELECTRICAL
HT ROOM
MONTH :
THURSINAR DETAILS WEEK : DATE
CORPORATION FREQ : 2 YEARLY
SDN BHD

PPM Details
Group: ELECTRICAL Location: HIGH VOLTAGE ROOM
Category: HIGH VOLTAGE SYSTEM Level:
Item No: 1.0 Specification: -

Task Description
No Description Freq Pass Fail N/A Remarks
1.4 Protection Relays
a Recalibration of over current and earth fault relays. Conduct trip 2Y
test on breaker.
b Recalibration of transformer protection and temperature control 2Y
devices. Conduct alarm and trip test.

Inspection Report

GOOD NEED RECTIFICATION NEED REPLACEMENT OTHERS

Serviced By: Check By: Verified By:


________________ ________________ ________________
(BO Chargeman) (Electrical Engineer) (Verifier)
Name: Name: Name:
Date: Date: Date: