You are on page 1of 2

PLAN PREVENTIVE MAINTENANCE

PENGURUSAN FASILITI BAGI


BLOK E 4/5, KOMPLEKS E, PUTRAJAYA
TAHUN 2017 - 2020
JKR WP PUTRAJAYA
PREVENTIVE MAINTENANCE CHECKLIST LOCATION/LEVEL
WORK TRADE ELECTRICAL
LV ROOM/RISER ROOM
MONTH :
THURSINAR DETAILS WEEK : DATE
CORPORATION FREQ : DAILY
SDN BHD

PPM Details
Group: ELECTRICAL Location: TNB LV ROOM, RISER ROOM
Category: LOW VOLTAGE SYSTEM Level: Level B2, B1, L1, 2, 3, 4, 5, 6, 7
Item No: 2.0 Specification: Riser Room E4, Riser Room E5 (certain level)
Task Description Date :
Day :
No Status Freq Status
2.2 Main Switch Board (MSB) / Sub-Switch Boards (SSB)
a Ensure all indicator light, selector switches heater and thermostat, D
voltmeter, ammeter, power factor meter and binary regulator are
working properly - replace if faulty (refer Template 2.1a/1)
DISTRIBUTION BOARD (MSB/SSB) (All Unit)
NO LEVEL GW GE GP GU GC GS STATUS
1 B2 N/A N/A N/A N/A
2 B1 N/A N/A N/A N/A
3 L1 N/A N/A
4 L2, E4 N/A N/A
5 L2, E5 N/A N/A
6 L3, E4 N/A N/A
7 L3, E5 N/A N/A
8 L4, E4 N/A N/A
9 L4, E5 N/A
10 L5, E4 N/A
11 L5, E5 N/A
12 L6, E4 N/A
13 L6, E5 N/A
14 L7, E4 N/A N/A N/A N/A N/A
15 L7, E5 N/A N/A N/A N/A N/A

Inspection Report

GOOD NEED RECTIFICATION NEED REPLACEMENT OTHERS

Serviced By: Check By: Verified By:

________________ ________________ ________________


(A4 Chargeman) (Electrical Engineer) (Verifier)
Name: Name: Name:
Date: Date: Date:

Voltage Ampere VoltageD.C D.C Ampere


Date/ R Y B R Y B Date/
p.f. RKwh Y (V) B (A) R Y B p.f. Kwh Remark
Month Month
22 22
23 23
24 24
25 25
26 26
27 27
28 28
29 29
30 30
31* 31*
1 1
2 2
3 3
4 4
5 5
6 6
7 7
8 8
9 9
10 10
11 11
12 12
13 13
14 14
15 15
16 16
17 17
18 18
19 19
20 20
21 21
L.V 1 L.V 2
Template 2.1a/1