PLAN PREVENTIVE MAINTENANCE

PENGURUSAN FASILITI BAGI


BLOK E 4/5, KOMPLEKS E, PUTRAJAYA
TAHUN 2017 - 2020
JKR WP PUTRAJAYA
PREVENTIVE MAINTENANCE CHECKLIST LOCATION/LEVEL
WORK TRADE ELECTRICAL
LV ROOM/RISER ROOM
MONTH :
THURSINAR DETAILS WEEK : DATE
CORPORATION FREQ : 2 YEARLY
SDN BHD

PPM Details
Group: ELECTRICAL Location: TNB LV ROOM, RISER ROOM
Category: LOW VOLTAGE SYSTEM Level: LEVEL B2, B1, 1, 2, 3, 4, 5, 6, 7
Item No: 2.0 Specification: Riser Room E4, Riser Room E5 (certain level)
Task Description
No Description Freq Pass Fail N/A Remark
2.2 Main Switch Board (MSB) / Sub-Switch Boards (SSB)
f Ensure cable insulation, terminations and others related connection in 2Y
good condition - repair/retighten as required
h Testing, calibration & resetting, all earth fault, Earth Leakage Relay & over 2Y
current relays inclusive of current & voltage transformer etc.
Inspection Report / Remarks

GOOD NEED RECTIFICATION NEED REPLACEMENT OTHERS

Serviced By: Check By: Verified By:

________________ ________________ ________________


(A4 Chargeman) (Electrical Engineer) (Verifier)
Name: Name: Name:
Date: Date: Date: