You are on page 1of 2

PLAN PREVENTIVE MAINTENANCE

PENGURUSAN FASILITI BAGI


BLOK E 4/5, KOMPLEKS E, PUTRAJAYA
TAHUN 2017 - 2020
JKR WP PUTRAJAYA
PREVENTIVE MAINTENANCE CHECKLIST LOCATION/LEVEL
WORK TRADE ELECTRICAL
LV ROOM/RISER ROOM
MONTH :
THURSINAR DETAILS WEEK : DATE
CORPORATION FREQ : 3 MONTHLY
SDN BHD

PPM Details
Group: ELECTRICAL Location: TNB LV ROOM, RISER ROOM
Category: LOW VOLTAGE SYSTEM Level: LEVEL B2, B1, 1, 2, 3, 4, 5, 6, 7
Item No: 2.0 Specification: Riser Room E4, Riser Room E5 (certain level)
Task Description
No Description Freq Pass Fail N/A Remark
2.6 Moulded Case Circuit Breaker (MCCB)
a Ensure the usability of switch handle. 3M
2.7 Distribution Boards (DB)
a Ensure all distribution board are in good condition - replace if damage 3M
b Ensure that "danger" sign, labeling, schematic and layout diagram are 3M
available and readable/ visible
c Inspect and ensure spares ways available in DB. 3M
e Tripping test for MCB - ensure working perfectly - replace if faulty 3M
2.9.5 Feeder pillars
d Check, clean and test all the equipment/ accessories/ components at the 3M
feeder pillar and restore in working condition if necessary
e Check and retighten all connections and terminations and cable lug - 3M
repair if necessary
f Check for rust, damage, leakage and repaint if necessary 3M
g Apply lubricating grease for hinges and locks 3M
h Check functionality/operation of padlock. - change if necessary 3M
i Keep clean of all grass/ shrubs/ rubbish for an area around 1m of feeder 3M
pillar
j Ensure no destructive pest and use chemical repellent if necessary 3M
Inspection Report / Remarks

GOOD NEED RECTIFICATION NEED REPLACEMENT OTHERS


Serviced By: Check By: Verified By:

________________ ________________ ________________


(A4 Chargeman) (Electrical Engineer) (Verifier)
Name: Name: Name:
Date: Date: Date:

You might also like