LOCATION:
DATE REQUESTED:
SCOPE OF WORK:
AREA/FLOOR LEVEL:
ACTUAL INSPECTION DATE/TIME:
CHECK THAT THE FOLLOWING COMPLY WITH APPROVED SUBMITTALS FOR CONSTRUCTION DRAWINGS AND TECHNICAL SPECIFICATIONS.
VOLTAGE AMPERES
DESCRIPTION REMARKS
No Load With Load With Load
1. Pump room area
Main fire pump
Jockey Pump
Disconnecting means
NEMA 3R 630AT
2. LVSG area
Automatic Transfer
Switch 1200AT
NEMA 1200AT
Notes:
Motor controller (Setting)
Jockey Pump (10Hp) 230V, 3P, 60Hz
Cut-Off - 100 psi
Cut-in - 80psi
Run time test : 30mins. Failed Passed
REMARKS:
QC
SUBMITTED BY:
__________________
Contractor
CONFIRMED BY:
_____________________
QC Engineer
QA
INSPECTED BY:
____________________
DPWH-Inspector
APPROVED BY:
____________________________
DPWH- Project Electrical Engineer