POWER SYSTEM TEST

Doc. Code: DPWH-TF-C003


DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS Revision No. 1
Date 03FEB.2016
Page No. 1 of 1
POWER SYSTEM TEST (PST) Hold Point, WPs: as initialed by DPWH
CONTRACT ID:
CONTRACT NAME: CONTRACT
CONTRACT ID:
ID:

LOCATION:

DATE REQUESTED:

ET Control No.: PST -

SCOPE OF WORK:
AREA/FLOOR LEVEL:
ACTUAL INSPECTION DATE/TIME:

Attach Drawings/Key Plan

CHECK THAT THE FOLLOWING COMPLY WITH APPROVED SUBMITTALS FOR CONSTRUCTION DRAWINGS AND TECHNICAL SPECIFICATIONS.

Meralco (Normal Power Supply)


Time Started : _______ Time Ended: _______

VOLTAGE AMPERES
DESCRIPTION REMARKS
No Load With Load With Load
1. Pump room area
Main fire pump
Jockey Pump
Disconnecting means
NEMA 3R 630AT

2. LVSG area
Automatic Transfer
Switch 1200AT
NEMA 1200AT

Notes:
Motor controller (Setting)
Jockey Pump (10Hp) 230V, 3P, 60Hz
Cut-Off - 100 psi
Cut-in - 80psi
Run time test : 30mins. Failed Passed

Fire pump (100Hp), 230V, 3P, 60Hz


Cut-in - 50psi
Run time test : 30mins. Failed Passed

REMARKS:
QC
SUBMITTED BY:

__________________
Contractor
CONFIRMED BY:

_____________________
QC Engineer

QA
INSPECTED BY:

____________________
DPWH-Inspector
APPROVED BY:

____________________________
DPWH- Project Electrical Engineer

DISTRIBUTION: Contractor QC Engineer Inspector Project Engineer