EF-1 WORKING

Exhaust Air/Gravity Shutter


type louver 36X20" 2957 CFM 2957 CFM
1575 CFM WORKING STANDBY
EF-3/A EF-3/B

10"X8"
10"X8"
10"X8"

EAD 18"X14"
14"X12" 12"X10"
IDU-03

EAD 14"X10"
24"X8"
10"X8"
VCD29
VCD30 VCD31 VCD33
26"X12" 24"X10" 18"X6"

34"X14"
24"X8"
24"X8"

24"X8"

24"X8"

24"X8"

24"X8"
IDU-04 VCD28 VCD32

10"X8"
VCD17 BDD
VCD23 VCD21 VCD19

14"X8"
VCD25

24"X8"
VCD26 FD-6

32"X10" 36X16" 46"X16" 50"X18" SAD 58"X20" 62"X20"

VCD27 VCD24

SAD 38"X14"
VCD22 VCD20 VCD18

24"X8"
24"X8"

24"X8"

24"X8"

24"X8"

62"X20"
24"X8" VCD15
DUCT HEATER 3.0KW
DUCT HEATER 6.0KW
FD-4
FD-5
S.A.D 18"X18"- 8 NOS S.A.D 18"X18"- 4NOS VCD16
VCD14 VCD35
CFM 955 EACH ( TOTAL CFM 7640) CFM 1009 EACH ( TOTAL CFM 4036) SAD 62"X20" PLENUM BOX SAD 36"X14" 36"X14"
R.A.G 20"X18" 6 NOS R.A.G 20"X18" 4 NOS 36"X12"
80"X68"X48"

12"X6"
T VCD13
VCD7
MFD-2 FD

24"X10" 30"X10" 32"X12" SAD 50"X16" SAD 54"X20" 52"X20"


18"X8" 36"X14" 42"X16" 50"X20" 48"X18" 44"X18"

68"X22"
PRD
MFD-6
VCD6 VCD5

THERMOSTAT
UP B.O.T 1500
COWL WITH FROM FFL
BIRD WIREMESH

SAD 68"X26"
3-WAY S.A.D 12"X12"- 6NOS
3-WAY S.A.D 15"X15"- 12NOS CFM 388 EACH ( TOTAL CFM 2328)

42"X18"
CFM 620 EACH ( TOTAL CFM 7440) 3-WAY R.A.D 12"X12"- 6NOS
3-WAY R.A.D 15"X15"- 12NOS

14,201 CFM
SAD 68"X22"

RAD 60"22"
THERMOSTAT

18,733 CFM
B.O.T 1500
VCD3
FROM FFL
MFD-7
VCD4
DOWN

RAD 44"X16" RAD 50"X18" 48"X18" 44"X18" 42"X16"


40"X14" 44"X14" 40"X16" 38"X14"
28"X10" 34"X12"
18"X6" 22"X10"
VCD8
T

SAD 72"X26"
RCP-1 RCP-2

15,584 CFM

21,084 CFM
MFD-5
MFD-4 MFD-3 FD-2 FD-1
MFD-1
28"X12"

42"X18"
VCD1

12,695 CFM
VCD9 VCD10

64"X22"
HVAC DB-2
SAD PLENUM BOX
52"x28"X96"
24"X8" 24"X8"
52"x28"X96" SAD PLENUM BOX 60"x30"X104" VCD2
60"x30"X96"
AHU-01 VCD34 IDU-05/B

28"X14"
21,084 CFM
28"X10"

RAD 64"X24"
AHU-02

15,555 CFM
HVAC DB-1
15,584 CFM
FD-3

RAD PLENUM BOX

22"X14"
VCD11 VCD12
52"x28"X168"

RAD PLENUM BOX


52"x24"X168" 24"X8" 24"X8"
VCD
VCD IDU-05/A

42"X20"
24"X20"
VCD-2 M
MVCD-1
FRESH AIR EF-2/B 966 CFM EF-2/A 966 CFM
2889 CFM FRESH AIR
5529 CFM WORKING WORKING
WITH GRAVITY SHUTTER (28X16") WITH GRAVITY SHUTTER (28X16")
And Accessories /installation as per And Accessories /installation as per
Manufacturer recommendation/ Manufacturer recommendation/
company requirements. company requirements.
AHU-02
GENERAL NOTES CONTRACTOR REMARKS SEC AHU-01
1 Contractor shall be responsible for dimensions of all proposed HVAC units. COMPLY SEC
2 COMPLY S.NO. GENERAL NOTES CONTRACTOR REMARKS
Revised dust size to maintain the pressure limit as per ASHRAE.
11 Provide and install auto change over switch for battery room exhaust fans. NOTED/COMPLY
3 Provide / show / install volume control damper (VCD) before each branch / air outlet. COMPLY
(Provided VCD in all Branches) 12 Select/calculate all duct & air inlet / outlet as per the ASHRAE standard to maintain velocity & noise. NOTED
4 Total air flow shall match the approved calculation. COMPLY
13 Provide and show the gas cylinder exhaust fans. COMPLY
5 Refer the flow marked and update duct/airinlet/airoutlet accordingly. COMPLY
14 Provide / show foundations details of all AHU's / HVAC equipments units. NOTED
(Provided Foundation Drawing)
6 Indicate the location of DB & DDC. COMPLY Provide / show door/transfer grill for all toilets & pantry as per note no. # 21 of tender drawing No. # 10-5-524. COMPLY
15
The location of thermostat, shown on drawing shall be considered as information only. The contractor shall coordinate COMPLY
7 Contractor shall be only responsible to coordinate other trades as per the actual site condition to avoid the duct running
at site to install as per site condition get prior approval from concerned site engineer. NOTED 16 NOTED
passing and air outlets just above / top of any electric/electronic panels / switches etc.
COMPLY
8 Indicate / show the tag for all room type mini split units and provide as per the approved calculation. 17 Contractor shall be responsible to coordinate with fire suppression Vendor/Contractor to provide pressure regulating
NOTED
damper (PRD) of approved size/dimention as per Cl # 5.12.9 of TS part VII-HVAC works (whether given/shown here or not. NOTED
9 The HVAC arrangement in UPS room is acceptable,subject to without any contractor impact. NOTED
18 All duct elbow shall have smooth radius type with turning vanes. COMPLY