You are on page 1of 3

WELL CONTROL WORKSHEET

SURFACE STACK – WAIT AND WEIGHT METHOD


LSP PPSDM MIGAS

Bayu Surahman
Name: ………………. Test Number: ………… Date: ………
21-12-2022

PRE-RECORD DATA LEAK OFF TEST DATA

1. ORIGINAL FLUID 11. DRILLING FLUID DENSITY (B) 9,4


: …….. ppg
DENSITY (A) 9,5
: ……… ppg 12. SURFACE LOT PRESSURE (C) : 1190
…….. psi
2. ID CASING 6,366
: ……… inch
13. MAX. ALLOWABLE DRILLING FLUID DENSITY:
3. MD CASING
SHOE 4500
: ……… ft C
4. TVD CASING MAFD (D)  B 
0.052 x TVD
SHOE (TVDCS) 4500
: ………. ft Casing
1190
......
5. HOLE DIAMETER : ……….
6,25 inch MAFD (D)  ......
9,4   ........
14,5 ppg
6. MD HOLE 5500
: ………. ft 0.052 x 4500
......
7. TVD HOLE 5500
: ………. ft 14. INITIAL MAXIMUM ALLOWABLE ANNULAR
8. BOP STACK SURFACE PRESSURE (MAASP)
RATING 5000
: ………. psi
4360 MAASPI (E)  (D - A) x 0.052 x TVDcs
9. CASING BURST : ………. psi
10. SURFACE EQUIPMENT
MAASPI (E)  ( ...... 9,5 ) x 0.052 x ..........
14,5 - ........ 4500 .  ........
1170 psi
RATING : 2735 psi
KILL RATE PRESSURE (psi)
PUMP DATA SLOW PUMP 5500 ft
AT TVD: ………….
RATE (SPM)
0,0467 PUMP 1 PUMP 2
PUMP OUTPUT 1 (F) : …….. bbl/stk
50 300 300
0,0467
PUMP OUTPUT 2 (G) : …….. bbl/stk

LENGTH CAPACITY VOLUME PUMP TIME


SECTION
(ft) (bbl/ft) (bbls) STROKES (Min)
SURFACE LINE 2 43 0,86
DRILL PIPE 5140 0,01083 55,67 1192 23,84
HWDP 0 0 0 0 0
DRILL COLAR 360 0,00388 1,40 30 0,60
TOTAL DRILL STRING (TDS) (H) 59,07 1265 25,30
DP/HWDP - HOLE 640 0,02239 14,33 307 6,14
DC - HOLE 360 0,02039 7,34 157 3,14
DP - CASING 4500 0,02381 107,15 2295 45,90
DC - CASING 0 0 0 0 0
TOTAL ANNULUS (I) (I) 128,82 2759 55.18
TOTAL WELL SYSTEM (H+I) (J) 187,89 4024 80,48
ACTIVE SURFACE VOLUME (K) 600 12848 256,96
TOTAL ACTIVE FLUID SYSTEM (J+K) (L) 787,89 16872 337,44
WELL CONTROL WORKSHEET
SURFACE STACK – WAIT AND WEIGHT METHOD
Bayu Surahman
Name: ……………………….. Test Number: ………… 21-12-2022
Date: ………

SHUT-IN WELL DATA DRILLING PARAMETER


15. SIDPP : 800 psi RPM : 80
16. SICP : 850 psi WOB : 10000 Lbs
17. PIT GAIN : 4,6 bbls SPM : 100

CALCULATION
20. FINAL CIRCULATING PRESSURE (FCP)
18. KILL FLUID DENSITY (KFD) KFD
FCP  KRP x
OMW
SIDPP
KFD  OMW  12,3
300 x ........  . 389
0.052 x TVD FCP  ...... ....... psi
...9,5
.....
800
......
KFD  ........
9,5   ........
12,3 . ppg
21. PRESSURE DROP/ N STROKE
0.052 x ......
5500
(N = TOTAL DRILL STRING STROKE/10)
(ICP  FCP)
19. INITIAL CIRCULATING PRESSURE (ICP) P/ N stroke  x N psi/N stk
TDS Stroke
ICP  SIDPP  KRP 1100  .....
( .... 389 )
P/ ......
127 stroke  127
x .......
1265 .........
..........
ICP  ( ......
800  . ....... 1100 psi
300 )  ........
 ..........
72 ......psi/ .......
127 stk

SIDPP SICP

Casing
Shoe
Depth

0 127 254 381 508 635 762 889 1016 1143 1265
1100 1028 956 884 812 740 668 596 524 452 389
TD
0 2,54 5,08 7,62 10,16 12,7 15,24 17,78 20,32 22,86 25,3 Hole
NOTES:

You might also like