Professional Documents
Culture Documents
volvoEC210B 16
volvoEC210B 16
Quickfit
36
PS(12-P1) P3(2-Y)
A
B 12MPa
Quickfit
36
PS(12-P1) P3(2-Y)
A
B P3 B 12MPa
A T
A B T(Return pipe t1)
PS
View A
dr3
(36-PS)
Y Py
(31-P1)
Rs1
al1
ar1
Pd
Y al2
ar2
A B Pi al3
ar3
al4
Px2
Px1
C dr1
View B Detail C
BL2
AL2
(9-S3)P T(21-Td8)
33'
A
Pd
43' (26-T2)T P(26-P2)
A
59
2 1
42
a 6
3 5 4
A2 A3
A1
12 1 T P 2
R
(31-T6)T
P1
(31-P6) P2 45 3
P3
A 43 (16-BU2) (16-AM) 60
1 2
Flow control
A B
44
45
T 41
(11-T)T b a
A(1-Pi1)
(9-S3)P P (31-P2)P T(31-T2)
T B Section S-S
S
A
dr 46 T
B
Pi
(60-3)
A A
T B
View A
A B
IN OUT
Detail A View B
T
P
30.6 3 .0 12.0 122.4
11.0
112.2
1 2 q ue
ng Tor
rati
Ope
Secondary pressure
_
_1.5 2.21+0.15
22.5+
Operating Torque
20.4 2 .0 8.0 81.6
re
su 7.1 72.1
es
pr
ary
nd
co
10.2 1 .0 Se 4.0 40.8
5.5_
+1
0.54_
+0.1
0 0 0 0
0 1 2 4 4.8 5.5
Push rod operating distance (mm)
B
0 5 10 1 2.4
Operating angle (deg.)
D A C
BR1 PR
B
AR1
E
F BR2 AR2
BR3 AR3
Fr
T P
View B
A View A a (two pump sel. valve)
Detail C
(Flow control valve)
Flow control
P
switch
T A
Hammer
pressure 2
switch 1
Two pump
select switch
Detail D
View E Detail F
(two pump sel. sol.)
Volvo Construction Equipment EC210B-16-07
Korea Ltd.
Hammer/Shear Selector Valve and Shuttle Valves
3way sel. Pi
C C
MCV al2
MCV bl2
D D (33'-Pi)
sol. A1
PLUG
4 3
pedal 1 1 2 pedal P
pedal 2 two pump
selector
H/S sol. B
H/S sol. A
sol. P
View D-D
pedal 1
59 View C-C
3 4
(46-Pi)
6 45 3 (33'-Pi)
View A 2 5 1
60
A B (2-al2) (2-bl2) 1 2
41
b a
(26-P2)P T(26-T2)
(9-S3)P T(21-Td8)
B 33'
A
A View B
Pi
56 55
G
b 180 ± 2k/40L
57 A
A
P R
at 40Lpm
150 ± 2k
B
B
T a 180 ± 2k/40L
P T C
B A
View C View A
P2
P3
T
Pi
P1
P2 P2 P3 P3 P2 P2
Pressure Switch
Pi Pi
P1 T T P1
P2
P3
P2 P2 P3
T
Pi
Pi
P1
P1 T
P2
P3
P2 P2 P3
T
Pi
Pi
P1
P1 T
P2
P3
P2 P2 P3
T
Pi
Pi
P1
P1 T
P2
T2
Pi
T1 P1
T2
P2 T1
P1
Pi
T2
T1
P2 P1
Pi
P2
T2
Pi
T1 P1
T2
T1
P2 P1
Pi
P2
T2
Pi
T1 P1
T2
T1
P2 P1
Pi
P2
T2
Pi
T1 P1
A 1 T P 2
b
pi
R a C
(3-PG)
P 51
Pi
a T A
A3
(9-S1)
A
B
a R Pi b
A P c
View A
(2nd boom valve)
(3-PG)
P 51
Pi
B
T A
View B View C
(pilot valve) (2nd boom pedal) C
A b
P A pi
R a P C
b a
X X
B
Section X-X
Pi Pump port B
Tank port
A
b
pi
b a
R a P C
Pi Pump port B
Tank port
A
b
pi
b a
R a P C
Pi Pump port B
Tank port
A
b
pi
b a
R a P C
P2 P3 P3 P2 PR
Pi Pi BR1
P1 T T' P1
(t1) (t1)
ar1
br1
AR1
Pi
R
AI1 AI2 AI
AO1 AM AO
B
SR1 SR 2 RH
B T T
(31-T2)
A SW
A P SL1 SL 1
DR
(21-Td7) (Return pipe) BI1 BI
BO1 BO
4
BD1 BD
3
BU1 BU
BU2
ENGINE
A3
B1 Dr B3
T B
TO ADV. "Pi"
FROM SHUTTLE ASSY. "BD1"
TO MCV "ar1" Dr Pi
TO FLOAT V/V "Pi"
A
PILOT BLOCK "T2"
PRESSURE
SWITCH VIEW B
SOL. V/V-FLOAT POSITION
VIEW A
A
SL1 SL
1 A
2 B
SR1 SR LH
3 C 2
AI1 AI
4 D
bl3 al3 1
AO1 AO ISO
4
4
1 3
3
2
ENGINE
Dr B1 B3 A3
(21-IN)
2 RH
BI1 BI
BO1 BO
s 1
BD1 BD
B
br1 ar1 BHL
BU1 BU 1 A
2 B 3
3 C 4
4 D
SL1 SL
A B
SR1 SR LH D C
2
AI1 AI
bl3 al3 ISO 1
AO1 AO
3
1
ENGINE
Dr B1 B3 A3
(21-IN)