Payment Certificate
18,278,339.99 8,352,354.04
#REF!
-4,420,482.46 #REF!
Page 2 of 100
Summary of all Works
Page 3 of 100
Civil Work Summary
Page 4 of 100
Pipe Summary
Page 5 of 100
General Item
Page 6 of 100
Main Line civil works
BILL NO. B-0.4.1 Construction of Valve chambers, crossings and Thrust & anchor blocks for pressure line
River Crossing Type OD 250mm HDPE #2
Total
Previous Current Total Unit Rate Previous Current Contract
B-04.1.0 Description Unit Quantity Executed
Quantity Quantity Quantity (Birr) Amount Amount Amount
Amount
Foumdation Excavation of (1m *1m ) width and
B-4.1.1 m3 45.0 0.0 0.0 104.0 0.0 0.0 0.0 4,680.0
depth respectively
B-4.1.2 C- 30 Concrete Casting works m3 12.5 31.5 31.5 3,899.0 0.0 122,818.5 122,818.5 48,737.5
provide ,cutt ,bend and fix of reinforcement Price
B-04.2
should include tying wires.
B-04.2 diameter 12 mm. plain bars kg 177.6 383.6 383.6 75.2 0.0 28,847.9 28,847.9 13,358.1
B-4.1.3 diameter 6mm plain bar kg 88.8 248.9 248.9 101.9 0.0 25,357.8 25,357.8 9,050.8
B-4.1.4 Blackwire kg 10.0 0.0 0.0 90.0 0.0 0.0 0.0 900.0
B-04.3 Form work m2 50.0 105.0 105.0 500.0 0.0 52,500.0 52,500.0 25,000.0
B-04.3 Back fill m3 35.0 178.5 178.5 80.0 0.0 14,280.0 14,280.0 2,800.0
Subtotal for B-04.1 one River Crossing 0.0 243,804.2 243,804.2 104,526.4
Subtotal for Two River Crossing 4.1 0.0 487,608.5 487,608.5 209,052.7
B-04.4 River Crossing Type OD 250mm HDPE #2
Foumdation Excavation of (1m *1m ) width and
B-04.6 m3 20.0 0.0 0.0 104.0 0.0 0.0 0.0 2,080.0
depth respectively
B-04.7 C- 30 Concrete Casting works m3 5.0 36.0 36.0 3,899.0 0.0 140,364.0 140,364.0 19,495.0
provide ,cutt ,bend and fix of reinforcement
B-04.8
Price should include tying wires.
B-04.9 diameter12 mm.plain bars kg 85.3 724.6 724.6 75.2 0.0 54,490.5 54,490.5 6,411.6
B-04.10 diameter 6mm plain bars kg 35.5 426.6 426.6 101.9 0.0 43,470.5 43,470.5 3,620.5
B-04.12 Form work m2 20.0 108.0 108.0 500.0 0.0 54,000.0 54,000.0 10,000.0
B-04.13 Back fill m3 14.0 216.0 216.0 80.0 0.0 17,280.0 17,280.0 1,120.0
Subtotal for B-04.2 one River Crossing 0.0 309,605.1 309,605.1 42,727.1
Subtotal for Two River Crossing 0.0 619,210.1 619,210.1 85,454.1
River Crossing Type OD 250mm HDPE #1
Foumdation Excavation of (1m *1m ) width and
B-4.1.1 m3 45.0 72.0 72.0 104.0 0.0 7,488.0 7,488.0 4,680.0
depth respectively
B-4.1.2 C- 30 Concrete Casting works m3 12.5 0.0 0.0 3,899.0 0.0 0.0 0.0 48,737.5
provide ,cutt ,bend and fix of reinforcement Price
B-04.2 0.0 0.0 0.0 0.0 0.0
should include tying wires.
B-04.2 diameter 12 mm. plain bars kg 177.6 0.0 0.0 75.2 0.0 0.0 0.0 13,358.1
B-4.1.3 diameter 6mm plain bar kg 88.8 0.0 0.0 101.9 0.0 0.0 0.0 9,050.8
B-4.1.4 Blackwire kg 10.0 0.0 0.0 90.0 0.0 0.0 0.0 900.0
B-04.3 Form work m2 50.0 0.0 0.0 500.0 0.0 0.0 0.0 25,000.0
B-04.3 Back fill m3 35.0 0.0 0.0 80.0 0.0 0.0 0.0 2,800.0
Subtotal for B-04.1 one River Crossing 0.0 7,488.0 7,488.0 104,526.4
B-04.14 Concrete Valve Chamber #4
B-4.15 Excavation in normal soil m3 27.0 0.0 0.0 104.0 0.0 0.0 0.0 2,808.0
B-4.16 Hard Core m3 5.8 0.0 0.0 203.0 0.0 0.0 0.0 1,177.4
Page 7 of 100
Main Line civil works
B-4.17 Concrete C -20 for wall m3 2.0 0.0 0.0 3,424.0 0.0 0.0 0.0 6,779.5
B-4.18 Back fill m3 3.7 0.0 0.0 80.0 0.0 0.0 0.0 296.0
B-4.19 Concrete cover slab
B-4.20 Concrete C-20 m3 1.0 0.0 0.0 3,424.0 0.0 0.0 0.0 3,314.4
B-4.21 Form Work m2 11.8 0.0 0.0 500.0 0.0 0.0 0.0 5,920.0
B-4.22 Bar kg 12.0 0.0 0.0 75.2 0.0 0.0 0.0 902.4
sub-Total 0.0 0.0 0.0 21,197.8
Total for four Concrete valve chamber 4.3 0.0 0.0 0.0 84,791.0
Grand Total for pipe civil works 0.0 1,114,306.6 1,114,306.6 483,824.2
Contractor Client
Name: Eng Abiyot Demissie Name:
Signature Signature
Date Date
Page 8 of 100
ML civil work takeoff
Page 9 of 100
Main Line Trench Excavation
BILL NO. B-03:-MAIN LINE TRENCH EXCAVATION (RAISING AND TRANSMISSION MAIN) EARTHWORK
B-03.1 FROM BH TO BOOSTER STATION 1
Contract Previous
B-03.1.1 Earth Work Unit
Quantity Quantity
site clearance cutting bushes ,tree with 2.5m width and 2,500m
B-03.1.1.1 m2 6,250 0
length for the raising mainlienes to make acces road accesible
Trench excavation in ordinary soil to a dimension
(1mx1.2mx2,421.6m )width ,depth and length respectively
B-03.1.1.2 m3 2,906 3,993
required disposal of surplus excavated material as per standard
drawing trench depth detail
Trench excavation in soft rock for pressure mains to a
B-03.1.1.3 1mx1.2mx1,480m width ,depth and length and disposal of m3 1,776 590
surplus excavated material
Trench excavation in Hard rock for pressure pipes to a
B-03.1.1.4 (1mx1.2mx1,102m) width ,depth and length and disposal of m3 1,322 153
surplus excavated material
Supply and spread 150 mm deep approved bedding material
B-03.1.1.5 m3 897 0
below the pipe in all Trench excavation,
Backfill with excavated native material above the pipe in
B-03.1.1.6 m3 2,542 0
Trench excavation, for normal soil
Page 10 of 100
Main Line Trench Excavation
Page 11 of 100
Main Line Trench Excavation
Contractor
Name: Eng Abiyot Demissie
Signature
Date
Page 12 of 100
Main Line Trench Excavation
AIN) EARTHWORK
0 0 225 0 0 0 201,852
Page 13 of 100
Main Line Trench Excavation
0 0 225 0 0 0 378,000
0 0 80 0 0 0 210,000
Page 14 of 100
Main Line Trench Excavation
Client
Name:
Signature
Date
Page 15 of 100
takeoff Trench Excavation
1 1.2 0.0
Total Volume 100.0
Trench excavation in soft rock for pressure mains to a
B-03.1.1.3 1mx1.2mx1,480m width ,depth and length and 0+256 0+340 -84 0.85 0.9 -64.3
disposal of surplus excavated material
0+689 0+875 -79 0.85 2 -134.3
3+170 3+247 -77 0.85 1.2 -78.5
3+843 4+150 -307 0.85 1.2 -313.1
Total Volume -590.2
Trench excavation in Hard rock for pressure pipes to
B-03.1.1.4 a (1mx1.2mx1,102m) width ,depth and length and 0+256 0+340 84 1 0.9 75.6
disposal of surplus excavated material
0+689 0+875 186 1 2 372.0
3+170 3+247 77 1 1.2 92.4
3+843 4+150 307 1 1.2 368.4
Page 16 of 100
takeoff Trench Excavation
Page 17 of 100
takeoff Trench Excavation
Page 18 of 100
takeoff Trench Excavation
Page 19 of 100
takeoff Trench Excavation
1,797.2 3993
1762 3327.5
1,845.0
2050 153
2,097.0 170
Page 20 of 100
takeoff Trench Excavation
5,909.0 3497.5
9,406.5
Page 21 of 100
Cooling Tank
C-06.1.1 Bulk excavation in normal soil to a depth not exceeding 1.5m m3 115.2 302.0 0.0 302.0 177.0 53,449.6 0.0 53,449.6 20,390.4
D-0.6.3 Ditto but in soft rock formation m3 76.8 78.7 0.0 78.7 331.0 26,056.3 0.0 26,056.3 25,420.8
C-06.1.2 Ditto but in hard rock formation m3 38.4 0.0 0.0 0.0 468.0 0.0 0.0 0.0 17,971.2
Cart away all excavated material, deposit to appropriate
D-0.6.4 m3 230.4 510.7 0.0 510.7 52.0 26,556.1 0.0 26,556.1 11,980.8
distance not exceeding 1 km
Provide and fill with suitable selected granular material not
C-06.1.3 m3 100.0 0.0 0.0 0.0 707.0 0.0 0.0 0.0 70,700.0
exceeding 50cm
D-0.6.5 MASSONARY WORK
construct stone massonary trapezoidal foundation wall of the
C-06.1.4 m3 124.8 73.9 0.0 73.9 523.0 38,660.2 0.0 38,660.2 65,270.4
birka with 700mm at base and 600mm at the top
construct stone massonary trapezoidal wall of the birka with
D-0.6.6 m3 230.2 0.0 234.9 234.9 1,701.0 0.0 399,564.9 399,564.9 391,570.2
600mm at base and 500mm at the top
50 cm thick basaltic or equivalent stone Hard core well
C-06.1.5 m3 126.0 143.8 0.0 143.8 189.0 27,168.8 0.0 27,168.8 23,814.0
rolled, consolidated & blinded with crushed stone
D-0.6.7 CONCRETE WORK
C-06.1.6 50mm thick lean concrete C-10 above the hard core m2 100.0 509.8 0.0 509.8 140.0 71,366.4 0.0 71,366.4 14,000.0
Reinforced concrete type C-30 filled into form work and
D-0.6.8
vibrated around reinforced bar
D-0.6.8 to base floor and grade beam m3 27.4 0.0 172.5 172.5 4,750.0 0.0 819,375.0 819,375.0 130,150.0
* to columns m3 7.0 7.0 4,750.0 0.0 33,131.3 33,131.3 0.0
* to top tie beam m3 21.6 21.6 4,750.0 0.0 102,600.0 102,600.0 0.0
* Provide and fix formworks
** to grade beam m2 76.8 76.8 500.0 0.0 38,400.0 38,400.0 0.0
** to columns m2 55.8 55.8 500.0 0.0 27,900.0 27,900.0 0.0
** to top tie beam m2 115.2 115.2 500.0 0.0 57,600.0 57,600.0 0.0
Provide, cut, bend and fix in position reinforced steel bar.
C-06.1.7 All according to structural drawing. Price should include
tying wires
D-0.6.9 Diameter 8 mm plain bar kg 100.0 446.4 72.0 518.4 64.4 28,744.9 4,636.8 33,381.7 6,440.0
C-06.1.8 Diameter 10 mm deformed bar kg 2,500.0 1,224.4 0.0 1,224.4 66.8 81,788.2 0.0 81,788.2 167,000.0
** Diameter 12 mm deformed bar kg 14,977.8 14,977.8 69.2 0.0 954,677.3 954,677.3 0.0
Page 22 of 100
Cooling Tank
Page 23 of 100
takeoff cooling tank
D-0.6.5MASSONARY WORK
C-06.1.4construct stone massonary trapezoidal
0 25 23 0.7 1.1 0 m3 foundation wall of the birka with 700mm at base
and 600mm at the top
D-0.6.6construct stone massonary trapezoidal wall
6 11.75 10.75 2.9 1.74 234.90 m3 of the birka with 600mm at base and 500mm at the
top
C-06.1.550 cm thick basaltic or equivalent stone
0 25 23 0.25 0 m3 Hard core well rolled, consolidated & blinded with
crushed stone
D-0.6.7CONCRETE WORK
C-06.1.650mm thick lean concrete C-10 above the
0 23.6 21.6 0 m2
hard core
1 25 23 0.3 172.5 m3 D-0.6.8to base floor and grade beam
9 0.5 0.5 3.1 6.975 m3 *to columns
3 25 23 0.5 0.3 21.6 m3 *to top tie beam
*Provide and fix formworks
4 25 23 0.4 76.8 m2 **to grade beam
9 0.5 0.5 3.1 4 55.8 m2 **to columns
6 25 23 0.4 115.2 m2 **to top tie beam
C-06.1.7Provide, cut, bend and fix in position
reinforced steel bar. All according to structural
drawing. Price should include tying wires
1 1386 0.395 547.47 kg D-0.6.9Diameter 8 mm plain bar
1 0 0.617 0.00 kg C-06.1.8Diameter 10 mm deformed bar
1 16866.92 0.888 14,977.8 kg Diameter 12 mm deformed bar
D-0.6.10ACCESSORIES AND FINISHING
C-06.1.9Provided and install access ladder internal
and external constructed out of 1 1/2" dia GS pipe
1 8 8 pcs
and hooked to the wall as per the drawing; including
safety cages
D-0.6.11three coats of plastering for the wall
4 11.5 10.5 3.2
internal and external
2 25 23 3.2 870.4 m2
4 11.5 10.5 483 m2 C-06.1.10floor cement screeding
2 25 23 3.2 307.2 m2 D-0.6.12rendering external wall
missed item250mm thick cemented stone pavement
around the building 1m wide, price includes
2 52 1 104 m2
excavation & all materials, including selected
material bedding
Contractor Client
Name: Eng Abiyot Demissie Name:
Signature Signature
Date Date
Page 24 of 100
Bar Schedule Cooling
Page 25 of 100
Bar Schedule Cooling
12mm
12mm
12mm
10mm
10mm
8mm
12mm
12mm
8mm 720
12mm
8mm
Page 26 of 100
200M3 UNDERGROUND TANK
C-03.1.12 Base slab m3 44.46 25.86 0.00 25.86 3,899 100,845.06 0.00 100,845.06 173,335.89
C-03.1.13 Concrete wall m3 45.64 11.88 37.48 49.37 3,899 46,338.23 146,143.65 192,481.88 177,938.66
C-03.1.14 Concrete column m3 1.66 0.00 0.00 3,899 0.00 0.00 0.00 6,484.82
C-03.1.15 Top slab m3 23.30 0.00 0.00 3,899 0.00 0.00 0.00 90,860.35
C-03.1.16 Parapet m3 2.99 0.00 0.00 3,899 0.00 0.00 0.00 11,658.01
C-03.1.17 Provide and fix formwork to
C-03.1.18 Base slab m2 47.39 12.19 0.00 12.19 500 6,094.69 0.00 6,094.69 23,696.85
C-03.1.19 Wall m2 275.34 110.60 237.76 348.36 500 55,299.88 118,877.87 174,177.75 137,671.00
C-03.1.20 Column m2 8.70 0.00 0.00 500 0.00 0.00 0.00 4,348.90
C-03.1.21 Top slab m2 88.26 0.00 0.00 500 0.00 0.00 0.00 44,129.39
C-03.1.22 Parapet m2 16.18 0.00 0.00 500 0.00 0.00 0.00 8,088.75
Provide, cut, bend and fix in position reinforced steel bar.
C-03.1.23 All according to structural drawing. Price should include
tying wires
C-03.1.24 Diameter 8 mm plain bar kg 31.2 574.1 369.9 943.98 64.4 36,970.74 23,821.33 60,792.07 2,009.28
C-03.1.25 Diameter 10 mm deformed bar kg 3,436.6 0.0 0.0 0.00 66.8 0.00 0.00 0.00 229,564.88
C-03.1.26 Diameter 12 mm deformed bar kg 3,630.0 0.0 2,252.3 2,252.31 69.2 0.00 155,860.15 155,860.15 251,196.00
C-03.1.27 Diameter 14 mm deformed bar kg 2,811.0 2,032.7 1,446.6 3,479.35 71.0 144,321.91 102,712.14 247,034.06 199,581.00
C-03.1.28 Diameter 16 mm deformed bar kg 772.7 3,708.1 0.0 3,708.1 71.0 263,274.81 0.00 263,274.81 54,862.51
Page 27 of 100
200M3 UNDERGROUND TANK
Page 28 of 100
200M3 UNDERGROUND TANK
C-03.1.54 DN 250, double flanged pipe L=1.00m No 1 0 1 1.00 5,600 0.00 5,600.00 5,600.00 5,600.00
C-03.1.55 DN 250 flanged spigot No 1 0 1 1.00 7,600 0.00 7,600.00 7,600.00 7,600.00
C-03.1.56 DN 250 express collar No 1 0 1 1.00 7,200 0.00 7,200.00 7,200.00 7,200.00
C-03.1.57 DN 250 flanged float valve No 1 0 1 1.00 12,800 0.00 12,800.00 12,800.00 12,800.00
C-03.1.58 Install outlet pipe
C-03.1.59 DN 250 suction strainer No 1 0 1 1.00 13,600 0.00 13,600.00 13,600.00 13,600.00
DN 250 double flanged pipe L=1m with centrally welded
C-03.1.60
puddle flange
No 1 0 1 1.00 4,400 0.00 4,400.00 4,400.00 4,400.00
C-03.1.61 DN 250 dismantling piece No 1 0 1 1.00 7,920 0.00 7,920.00 7,920.00 7,920.00
C-03.1.62 DN 250 flanged gate valve No 1 0 1 1.00 18,400 0.00 18,400.00 18,400.00 18,400.00
C-03.1.63 DN 250, 900 double flanged bend No 1 0 1 1.00 9,600 0.00 9,600.00 9,600.00 9,600.00
C-03.1.64 DN 250*150 double flanged reducer No 1 0 1 1.00 17,600 0.00 17,600.00 17,600.00 17,600.00
C-03.1.65 DN 250 double flanged pipe L=1m No 1 0 1 1.00 4,400 0.00 4,400.00 4,400.00 4,400.00
C-03.1.66 DN 250 flanged spigot No 1 0 1 1.00 4,400 0.00 4,400.00 4,400.00 4,400.00
C-03.1.67 DN 250 express collar No 1 0 1 1.00 7,200 0.00 7,200.00 7,200.00 7,200.00
C-03.1.68 DN 250 water meter No 1 0 1 1.00 25,000 0.00 25,000.00 25,000.00 25,000.00
C-03.1.69 Install Overflow and Drain pipes
C-03.1.70 DN 250 Flanged bell mouth No 1 0 1 1.00 9,600 0.00 9,600.00 9,600.00 9,600.00
C-03.1.71 DN 250 double flanged pipe L=180cm with puddle flange No 1 0 1 1.00 4,400 0.00 4,400.00 4,400.00 4,400.00
C-03.1.72 DN 250, 90 degree double flanged elbow No 2 0 2 2.00 9,600 0.00 19,200.00 19,200.00 19,200.00
DN 250, double flanged pipe L=1.0m with centrally welded
C-03.1.73
puddle flange
No 1 0 1 1.00 4,400 0.00 4,400.00 4,400.00 4,400.00
C-03.1.74 DN 250x250 all flanged Tee No 1 0 1 1.00 17,600 0.00 17,600.00 17,600.00 17,600.00
C-03.1.75 DN 250 flanged gate valve No 1 0 1 1.00 18,400 0.00 18,400.00 18,400.00 18,400.00
C-03.1.76 DN 250 flanged spigot No 2 0 2 2.00 4,400 0.00 8,800.00 8,800.00 8,800.00
C-03.1.77 Install level indicator Ls 1 0 1 1.00 65,000 0.00 65,000.00 65,000.00 65,000.00
Provide and install DN 50 ventillation pipe with dome, L =1.0
C-03.1.78
meters
pcs 2 0 2 2.00 6,500 0.00 13,000.00 13,000.00 13,000.00
Total Carried for BILL NO. D-02 Summary 984,043.4 1,100,364.3 2,084,407.8 2,657,289.6
Contractor Client
Name: Eng Abiyot Demissie Name:
Signature Signature
Date Date
Page 29 of 100
takeoff 200m3
0 3.14
5.850
0.00 m2
1 3.14
5.850 6.50
1
25.21 m3
1 3.14
5.850 6.50
0.5
12.60 m3
1 3.14
5.850 6.50
2.5
63.02 m3
1 0.2
0.00
100.83
100.83 m3
1 75
4 299.64 m3
0 11
0.3 0.00 m3
0 9.7
0.25
0.7854 0.00 m3
0 5.85
0.07
3.1420 0.00 m2
0 9.7 0.35
0.7854 0.00 m3
1 9.7 0.30
4.1
3.142 37.48 m3
Page 30 of 100
takeoff 200m3
0 9.7 0.40
3.142 0.00 m2
1 9.1 4.30
1 8.5 4.30
3.142 237.76 m2
943.98 kg
0.00 kg
2,252.31 kg
3,479.35 kg
3,708.10 kg
1 9.1 4.3/4.9
8.5 3.142 253.78 m2
1 9.1 4.9
3.142 140.08 m2
Page 31 of 100
takeoff 200m3
Contractor
Name: Eng Abiyot Demissie
Signature
Date
Page 32 of 100
takeoff 200m3
C-03.1.8 Provide and fill hard core with hard basaltic or equivalent
stone, well compacted and blinded with crushed stone to a finished
thickness of 25 cm under the reservoir and valve chamber
C-03.1.11 Reinforced concrete type C-30 filled into form work &
vibrated around reinforced bar mix ratio should be 1:2:3
C-03.1.12 Base slab
Page 33 of 100
takeoff 200m3
C-03.1.19 Wall
Page 34 of 100
takeoff 200m3
Client
Name:
Signature
Date
Page 35 of 100
Bar Schedule 200m3
bottom reinforcement
Base Slab
16mm@130mm c/c
D 9.63
so 0.13
cc 35 0.035
ts 350 0.35
I Di Hook Li No of bars L
0 9.63 0.63 10.26 2 20.52
1 9.63 0.63 10.26 4 41.03
2 9.62 0.63 10.25 4 40.98
3 9.60 0.63 10.23 4 40.91
4 9.57 0.63 10.20 4 40.81
5 9.54 0.63 10.17 4 40.69
6 9.50 0.63 10.13 4 40.53
7 9.46 0.63 10.09 4 40.35
8 9.40 0.63 10.03 4 40.13
9 9.34 0.63 9.97 4 39.89
10 9.27 0.63 9.90 4 39.61
11 9.20 0.63 9.83 4 39.30
12 9.11 0.63 9.74 4 38.96
13 9.02 0.63 9.65 4 38.59
14 8.92 0.63 9.55 4 38.18
15 8.80 0.63 9.43 4 37.74
16 8.69 0.63 9.32 4 37.26
17 8.56 0.63 9.19 4 36.74
18 8.42 0.63 9.05 4 36.19
19 8.27 0.63 8.90 4 35.59
20 8.11 0.63 8.74 4 34.94
21 7.93 0.63 8.56 4 34.25
22 7.75 0.63 8.38 4 33.51
23 7.55 0.63 8.18 4 32.71
24 7.33 0.63 7.96 4 31.86
25 7.11 0.63 7.74 4 30.94
26 6.86 0.63 7.49 4 29.95
27 6.59 0.63 7.22 4 28.89
28 6.30 0.63 6.93 4 27.74
29 5.99 0.63 6.62 4 26.48
30 5.65 0.63 6.28 4 25.11
31 5.27 0.63 5.90 4 23.60
32 4.85 0.63 5.48 4 21.92
33 4.37 0.63 5.00 4 20.01
34 3.82 0.63 4.45 4 17.80
35 3.15 0.63 3.78 4 15.12
36 2.26 0.63 2.89 4 11.58
37 0.44 0.63 1.07 4 4.27
1,214.69 16mm
Page 36 of 100
Bar Schedule 200m3
top reinforcement
Base Slab
14mm@130mm c.c
0 9.63 0.10 9.73 2 19.46
1 9.63 0.10 9.73 4 38.91
2 9.62 0.10 9.72 4 38.86
3 9.60 0.10 9.70 4 38.79
4 9.57 0.10 9.67 4 38.69
5 9.54 0.10 9.64 4 38.57
6 9.50 0.10 9.60 4 38.41
7 9.46 0.10 9.56 4 38.23
8 9.40 0.10 9.50 4 38.01
9 9.34 0.10 9.44 4 37.77
10 9.27 0.10 9.37 4 37.49
11 9.20 0.10 9.30 4 37.18
12 9.11 0.10 9.21 4 36.84
13 9.02 0.10 9.12 4 36.47
14 8.92 0.10 9.02 4 36.06
15 8.80 0.10 8.90 4 35.62
16 8.69 0.10 8.79 4 35.14
17 8.56 0.10 8.66 4 34.62
18 8.42 0.10 8.52 4 34.07
19 8.27 0.10 8.37 4 33.47
20 8.11 0.10 8.21 4 32.82
21 7.93 0.10 8.03 4 32.13
22 7.75 0.10 7.85 4 31.39
23 7.55 0.10 7.65 4 30.59
24 7.33 0.10 7.43 4 29.74
25 7.11 0.10 7.21 4 28.82
26 6.86 0.10 6.96 4 27.83
27 6.59 0.10 6.69 4 26.77
28 6.30 0.10 6.40 4 25.62
29 5.99 0.10 6.09 4 24.36
30 5.65 0.10 5.75 4 22.99
31 5.27 0.10 5.37 4 21.48
32 4.85 0.10 4.95 4 19.80
33 4.37 0.10 4.47 4 17.89
34 3.82 0.10 3.92 4 15.68
35 3.15 0.10 3.25 4 13.00
36 2.26 0.10 2.36 4 9.46
37 0.44 0.10 0.54 4 2.15
1,135.19 16mm
Total of Base Slab 2,349.87 16mm
Spacer 14mm 73.90 295.59 1.22 360.62 14mm
Page 37 of 100
Bar Schedule 200m3
Page 38 of 100
Chlorination Room
Page 39 of 100
Chlorination Room
Page 40 of 100
Toilet@BS
C15.3 Clearing of site to remove top soil to a depth of 200 mm m2 12.0 25.0 25.00 26.5 0.0 662.5 662.5 318.0
C.15.3 Bulk excavation in ordinary soil to depth of 1.5m m3 15.0 18.0 18.00 177.0 0.0 3,186.0 3,186.0 2,655.0
C15.4 Bulk excavation in soft rock m3 15.0 0.0 0.00 331.0 0.0 0.0 0.0 4,965.0
C.15.4 Bulk excavation in hard rock m3 12.0 18.0 18.00 468.0 0.0 8,424.0 8,424.0 5,616.0
C15.5 Curt away excavated material m3 42.0 41.0 41.00 52.0 0.0 2,132.0 2,132.0 2,184.0
C.15.5 Masonry Work
C15.6 masonar wall with 50cm at the base and 40cm at top m3 35.0 8.1 8.10 1,701.0 0.0 13,778.1 13,778.1 59,535.0
C.15.6 concerete work
Reinforced concrete septic cover C30 (Cement 1440 kg/m3) filled into
C15.7 form work and vibrated around reinforced bars, mix ratio should be 1 :2:3
in
C.15.7 Soak pit top slab m3 2.3 0.0 0.00 3,899.0 0.0 0.0 0.0 8,772.8
C15.8 Reinforcement
Provide, cut, bend and fix in position reinforced steel bar. All according to
C.15.8
structural drawing. Price shall include tying wires
C15.9 diameter 12 kg 650.0 0.0 0.00 69.2 0.0 0.0 0.0 44,980.0
C.15.9 diameter 10 kg 90.0 0.0 0.00 66.8 0.0 0.0 0.0 6,012.0
C15.10 diameter 8 kg 80.0 0.0 0.00 64.4 0.0 0.0 0.0 5,152.0
C.15.10 Miscellaneous
Supply and lay 100 mm dia. PVC pipe as shown on the drawing, price
C15.11 m 100.0 0.0 0.00 78.0 0.0 0.0 0.0 7,800.0
including excavation of earth and back filling drianage conection
C.15.11 Supply and fix 100x100 mm tee Pcs 4.0 0.0 0.00 3,500.0 0.0 0.0 0.0 14,000.0
C15.12 Supply and fix 100 mm dia. PVC ventilation pipe hood shaped covering (cowl) Pcs 2.0 0.0 0.00 2,800.0 0.0 0.0 0.0 5,600.0
C.15.12 Supply and fix 40*40cm manhole cover concrete with handling frame pcs 2.0 0.0 0.00 1,200.0 0.0 0.0 0.0 2,400.0
Sub Total for Soak Away Pit 0.00 28,182.60 28,182.60 169,989.75
CONSTRUCTION OF TOILET
C.15.13 Earth Work
C15.14 Clearing of site to remove top soil to a depth of 200 mm m2 9.0 16.0 16.00 26.5 0.0 424.0 424.0 238.5
C.15.14 Excavation for stone masonry foundation; 0.5 m width and 0.5 m depth m3 3.0 27.0 27.00 88.0 0.0 2,376.0 2,376.0 264.0
Cart away and deposit excavated surplus material to a distance not exceeding I m3
C15.15 6.0 30.2 30.20 52.0 0.0 1,570.4 1,570.4 312.0
km
C.15.15 fill for the selected material m2 3.0 0.00 50.0 0.0 0.0 0.0 150.0
C15.16 Masonry Work
Supply and place 250 mm thick hard core compacted to receive reinforced m2
C.15.16 10.0 0.0 0.00 189.0 0.0 0.0 0.0 1,890.0
floor slab
C15.17 Supply and place 500 mm thick hard core for founation wall m2 7.0 0.0 0.00 189.0 0.0 0.0 0.0 1,323.0
C.15.17 Sub-Total
C15.18 Concrete and Block Work
Reinforced concrete grade C-25 with minimum cement content 1440 kg/m3
C.15.18
cast into formwork and vibrated around reinforcement bars in
Page 41 of 100
Toilet@BS
C15.19 RC floor tie beam m3 3.0 0.0 0.00 3,592.0 0.0 0.0 0.0 10,776.0
C.15.19 RC column m3 1.3 0.0 0.00 3,592.0 0.0 0.0 0.0 4,525.9
C15.20 Mass concrete fill on floor slab (100 mm) m3 1.3 0.0 0.00 3,592.0 0.0 0.0 0.0 4,490.0
C.15.20 Lintel m3 0.1 0.0 0.00 3,592.0 0.0 0.0 0.0 179.6
C15.21 RC roof tie beams m3 2.5 0.0 0.00 3,592.0 0.0 0.0 0.0 8,980.0
Provide, fix in position, cut and bend reinforced steel bar. All according to
C.15.21
structural drawing. Price should include tying wires
C15.22 Diameter 8 mm deformed bar kg 120.0 0.0 0.00 64.4 0.0 0.0 0.0 7,728.0
C.15.22 Diameter 10 mm deformed bar kg 98.8 0.0 0.00 66.8 0.0 0.0 0.0 6,599.2
C15.23 Provide, cut, and fix formwork beam column m2 19.2 0.0 0.00 500.0 0.0 0.0 0.0 9,600.0
C.15.23 Block work
C15.24 20cm HCB block for wall No 250.0 0.0 0.00 306.0 0.0 0.0 0.0 76,500.0
C.15.24 Carpentry and Roofing
Supply, assemble and fix in position roof truss price shall include the ml
C15.25 25.0 25.0 25.00 28.9 0.0 723.7 723.7 723.7
application of three coats and external anti-termite treatment
Supply and fix purl in in zigba wood size 50 x 70 mm nailed into eucalyptus ml
C.15.25 30.0 30.0 30.00 37.1 0.0 1,111.5 1,111.5 1,111.5
truss including three coats of anti - termite external treatment
Supply and fix roof cover in G-28 mm corrugated galvanized iron sheet fixed m2
C15.26 into zigba wood purl in with dome headed galvanized nails (purlin and ridge 24.0 0.0 0.00 354.0 0.0 0.0 0.0 8,496.0
cover measured separately)
Supply and fix edge gutter formed in G- 28 flat galvanized metal sheet m
including support brackets 1 mm thick shaped steel plate spaced at a maximum
C.15.26 5.0 5.0 5.00 321.0 0.0 1,605.0 1,605.0 1,605.0
spacing of 1000 mm c/c and fixed to purl in - price includes metal primer and
two coats of synthetic eName: Eng Abiyot Demissie l paint
Supply & fix diameter 100mm down pipe in G-28 including I mm thick metal m
C15.27 support brackets fixed at a maximum interval of 1000 mm fixed to walls or 15.0 15.0 15.00 397.0 0.0 5,955.0 5,955.0 5,955.0
columns
C.15.27 Supply and fix 25x 250 mm fascia board to purl in m 9.8 9.8 9.80 167.1 0.0 1,637.2 1,637.2 1,637.2
C15.28 Supply and fix metal windows size 1x1.8m price includes lock hachs Pcs 1.8 0.0 0.00 5,040.0 0.0 0.0 0.0 9,072.0
Pcs
C.15.28 Supply and fix metal doors size 2.1 Ox1 with figured glass in upper half portion 2.1 0.0 0.00 5,880.0 0.0 0.0 0.0 12,348.0
Page 42 of 100
takeoff toilet@BS
0.0 kg diameter 12
0.0 kg diameter 10
0.0 kg diameter 8
Miscellaneous
Supply and lay 100 mm dia. PVC pipe as
shown on the drawing, price including
m
excavation of earth and back filling drianage
conection
Pcs Supply and fix 100x100 mm tee
Supply and fix 100 mm dia. PVC ventilation
Pcs
pipe hood shaped covering (cowl)
Supply and fix 40*40cm manhole cover
pcs
concrete with handling frame
CONSTRUCTION OF TOILET
Earth Work
Clearing of site to remove top soil to a depth of
1 4 4 16.0 m2
200 mm
Excavation for stone masonry foundation; 0.5
1 3 3 3 27.0 m3
m width and 0.5 m depth
Cart away and deposit excavated surplus
30.2 m3
material to a distance not exceeding I km
m2 fill for the selected material
Masonry Work
Supply and place 250 mm thick hard core
0.0 m2
compacted to receive reinforced floor slab
Supply and place 500 mm thick hard core for
0.0 m2
founation wall
Concrete and Block Work
Reinforced concrete grade C-25 with
minimum cement content 1440 kg/m3 cast
into formwork and vibrated around
reinforcement bars in
0.0 m3 RC floor tie beam
0.0 m3 RC column
0.0 m3 Mass concrete fill on floor slab (100 mm)
0.0 m3 Lintel
0.0 m3 RC roof tie beams
Page 43 of 100
takeoff toilet@BS
0.0 No
Carpentry and Roofing
Supply, assemble and fix in position roof truss
ml price shall include the application of three
coats and external anti-termite treatment
0.0 m2
Apply 3 coats of plastic paint to
0.0 m2 internal ,externalwalls and synthetic paint to
metal doors and windows
Electrical Installation
Contractor Client
Name: Eng Abiyot Demissie Name:
Signature Signature
Date Date
Page 44 of 100
toilet@BS bar schedule
No Leach
grade beam & top
4@12mm 4.0 12.6
tie beam
8mm@200mm 60 0.7
column 4@12mm 16 3.1
8mm@200mm 14 0.7
slab 10mm@200mm 30 3.3
30 3
Page 45 of 100
toilet@BS bar schedule
Ltotal
100.8
84.0
49.6
9.8
99
90
Page 46 of 100
Wet well@BH
Bill No. C- 07 Construction of Artificial Well @ 200m3 underground Booster and at 500m3 rcc ground Booster I
Total
Quan Previous Current Previous Current Total Contract
Item No Description Unit Quantity Unit Rate
tity Quantity Quantity Amount Amount Amount Amount
Page 47 of 100
Wet well@BH
Inlet Pipe & Fittings Supply for artificial well @ BS 500M3 and
C-0.7.17 0.0 0.0 0.0 0.0 0.0
at BH
C-0.7.18 DN 250DCI double cross Tee No 1 1 1.0 7,500 7,500.0 0.0 7,500.0 7,500.0
C-0.7.19 DN 250 DCI 90 deg double flanged bend No 5 5 5.0 7,500 37,500.0 0.0 37,500.0 37,500.0
C-0.7.20 DN 250 DCI double flanged pipe, L = 6 meters No 1 1 1.0 7,500 7,500.0 0.0 7,500.0 7,500.0
C-0.7.21 DN 250 DCI double flanged short pipe,L = 1.5 mm No 3 3 3.0 7,500 22,500.0 0.0 22,500.0 22,500.0
C-0.7.22 DN 250 duoble flanged gate valve No 1 1 1.0 7,500 7,500.0 0.0 7,500.0 7,500.0
C-0.7.23 DN 250 dismantling joint No 3 3 3.0 7,500 22,500.0 0.0 22,500.0 22,500.0
C-0.7.24 250 OD HDPE PE100 stub flange with backing ring No 2 2 2.0 7,500 15,000.0 0.0 15,000.0 15,000.0
C-0.7.25 DN 250Non Swing Check Valve No 1 1 1.0 7,500 7,500.0 0.0 7,500.0 7,500.0
C-0.7.26 outlet Pipe and Fittings Supply for BS PN 16 DN 250 0.0 0.0 0.0 0.0 0.0
C-0.7.27 DN 250 DCI 90 deg double flanged bend No 3 3 3.0 7,500 22,500.0 0.0 22,500.0 22,500.0
C-0.7.28 DN 250 DCI double flanged pipe, L = 6.0 meters No 1 1 1.0 7,500 7,500.0 0.0 7,500.0 7,500.0
C-0.7.29 DN 250 DCI double flanged pipe, L = 500 mm No 1 1 1.0 7,500 7,500.0 0.0 7,500.0 7,500.0
C-0.7.30 DN 250 DCI duckfoot 90 deg double flanged bend No 1 1 1.0 7,500 7,500.0 0.0 7,500.0 7,500.0
C-0.7.31 DN 250 dismantling joint No 1 1 1.0 7,500 7,500.0 0.0 7,500.0 7,500.0
C-0.7.32 DN 250 Non Swing Check Valve No 3 0.0 7,500 0.0 0.0 0.0 22,500.0
Total of Bill . Construction of Artificial Wet Well 180,000.0 81,789.6 261,789.6 536,647.5
Contractor Client
Name: Eng Abiyot Demissie Name: _________________________________________
Signature ___________________________ Signature ___________________________
Date ____________________________ Date __________________________
Page 48 of 100
takeoff wetwell
Page 49 of 100
Pipe Supply
Page 50 of 100
Main Line Welding & Laying
BILL NO. B-02 : Welding & Laying, of Main line 250mm PN16 HDPE PE100 Pipes & Components of air release valve and washout and pressure line Testing
Previous Unit Previous Current Total
Item No Description Unit Qty Current Total
Rate Amount Amount Amount
Raising mainline to booster station 1 and from
B-02.1 booster station 1 to Bike Service Reservoir pipe
Welding and Laying
HDPE PE 100 Pipes PN 16/SDR 11 OD 250 mm
B-02.1.1 WP 1,111 1,666.0 1,666 450 0 749,700 749,700
wellding points
HDPE PE 100 Pipes PN 16/SDR 11 OD 250 mm
m 10,000 9,996 9,996 45 0 449,820 449,820
laying
SUB TOTAL- B-02.1 0 1,199,520 1,199,520
B-02.2 Air Release & Washout Fittings
B-02.2 Air Valve FOR OD250 PN16
B-2.2.1 Butweld stub flange DN250 NO 2 0 0 6,500 0 0 0
B-2.2.2 Butweld tee DN250*250*110 NO 3 0 0 7,500 0 0 0
B-2.2.3 Flanged gate valve DN110 NO 10 0 0 12,000 0 0 0
B-2.2.4 Flanged Double Orfice Air Valve DN110 NO 4 0 0 18,000 0 0 0
B-02.3 WASH-OUT FOR OD 250 PN16 0
B-02.3.1 Tee DN 250X250X100 NO 3 0 0 7,500 0 0 0
B-02.3.2 Flanged gate valve DN100 NO 3 0 0 12,000 0 0 0
B-02.3.3 Flanged short pipe DN100 l=4m NO 3 0 0 21,000 0 0 0
SUB-TOTAL For B-02.2 and B-02.3 0 0 0
B-02.4 PRESSURE TESTING AND DISINFECTION
Disinfection of pipelines: flushing with clear water,
filling with water containing 0.15 g/l calcium hypo
B-02.4.1 Ls 1 0 250,000 0 0 0
chloride, left for 24 hours. This includes supply of all
necessary equipment, chemical and water
SUB TOTAL FOR B-02.4 0 0 0
Total Carried to Summary FOR BILL NO. B-02 0 1,199,520 1,199,520
Contractor Client
Name: Eng Abiyot Demissie Name:
Signature Signature
Date Date
Page 51 of 100
Main Line Welding & Laying
ne Testing
Amount
ETH
500,000
450,000
950,000
13,000
22,500
120,000
72,000
22,500
36,000
63,000
286,000
250,000
250,000
1,486,000
Page 52 of 100
Bill No. C- 05 Generator and Guard House at Borehole & Booster I
Previous
Item No Description Unit Quantity Previous Current Total Unit Rate Current Amount Total Amount Contract Amount
Amount
C-05.1 Earth Work
site clearing up to a depth of 20cm to remove top
C-05.2 m2 77 80 0 80.0 27 2,120 0 2,120 2,035
vegetative soil
Excavation of trench in foundation, minimum of
C-05.3 m3 8 8 0.0 7.5 88 660 0 660 718
0.5meter depth
C-05.4 Back filling of excavated trench m3 5 2 0 1.5 133 200 0 200 612
Excavation work up to a depth of 50 cm to reduce level
C-05.5 for placing hard core & carting away of exacted soil to m3 15 21 0.0 21.3 52 1,109 0 1,109 782
a distance not exceeding 500meter
C-05.6 Masonary
25 cm thick basaltic or equivalent stone Hard core well
C-05.7 m3 33 14 0.0 13.5 189 2,552 0 2,552 6,165
rolled, consolidated & blinded with crushed stone
Stone masonry work in cemement Sand mortar 1:3in
C-05.8 m3 16 6 0.0 6.0 1,701 10,206 0 10,206 26,366
ratio in foundation
250mm thick cemented stone pavement around the
C-05.9 building 1m wide, price includes excavation & all m3 16 0 19 19.2 523 0 10,042 10,042 8,535
materials, including selected material bedding
C-05.10 Concrete
C-05.11 10cm thick Lean concrete work above hard core m2 8.7 0 126.0 126.0 140 0 17,640 17,640 1,214
RCC work 1:2:4 vibrated in to form work around
C-05.12 m3 6.6 0 6.1 6.1 3,592 0 22,005 22,005 23,664
reinforcement in floor slab
C-05.13 Grade beam m3 12.0 0 7.0 7.0 3,592 0 25,216 25,216 43,104
C-05.14 top tei beam m3 6.0 0 3.5 3.5 3,592 0 12,608 12,608 21,552
C-05.15 in Lintels m3 1.50 0 0.4 0.4 3,592 0 1,552 1,552 5,388
in Columns m3 0.84 0 1.63 1.6 3,592 0 5,862 5,862 3,017
in footing m3 2.2 0 0 0.0 3,592 0 0 0 7,759
C-05.16 generator seat m3 3.6 0 6 6.0 3,592 0 21,552 21,552 12,931
Provide and fix formwork to
to grade beam m2 0 62.4 62.4 500 0 31,200 31,200 0
to columns m2 0 49.0 49.0 500 0 24,480 24,480 0
C-05.17 Block work
C-05.18 20cm thick hallow concrete block for wall no 1,663 0 1,607 1,607 306 0 491,880 491,880 508,725
C-05.19 Roof work
Upper & lower truss member of 10cm dia eucalyptus
C-05.20 ml 480 0 480 480 29 0 13,896 13,896 13,896
wood with 50cm c/c,well seasoned & free of defects
Vertical & Diagonal truss member of 8cm dia
C-05.21 ml 350 0 62 62 33 0 2,065 2,065 11,628
eucalyptus wood ,well seasoned & free of defects
Zigba wood purling 5cm X 7cm fixed to the truss at
C-05.22 ml 350 0 350 350 37 0 12,968 12,968 12,968
90cm C/C
C-05.23 Roofing with G-28 corrugated iron sheet m2 65 0 82 82 354 0 28,886 28,886 23,010
Galvanized sheet gutter G-30 ,150 X150mm, price
C-05.24 m 11 0 11 11 321 0 3,595 3,595 3,595
includes brackets and two coats of metal paint
C-05.25 Ditto but down pipes,120 X60mm m 10 0 10 10 78 0 796 796 796
C-05.26 supply & fix 25 X 200mm facial board m 11 0 11 11 167 0 1,871 1,871 1,871
Page 53 of 100
Bill No. C- 05 Generator and Guard House at Borehole & Booster I
Previous
Item No Description Unit Quantity Previous Current Total Unit Rate Current Amount Total Amount Contract Amount
Amount
C-05.27 Door and window
Supply & fix locally made metal window , with all
necessary iron monger locks ,mesh for protection &
C-05.28 m2 3 0 7 7 4,704 0 32,928 32,928 11,760
one coat of anti rust & two coats of metal paint as per
the drawing 1400mm X1200mm
Supply & fix locally made metal door , with all
necessary iron monger locks & one coat of anti rust &
C-05.29 no 3 0 3 3 8,400 0 25,200 25,200 25,200
two coats of metal paint as per the drawing 1500mm
X2000mm
C-05.30 Renforcement
Steel reinforcement work according to the
C-05.31 structural drawing price includes cutting, bending,
tying, & placing in a position
C-05.32 8mm kg 200 0 238 238 64 0 15,304 15,304 12,880
C-05.33 10mm kg 120 0 205 205 67 0 13,684 13,684 8,016
C-05.34 12mm kg 100 0 170 170 69 0 11,798 11,798 6,920
C-05.35 Finishing
C-05.36 Plastering in cement sand mortar for internal walls m2 166 0 118 118 114 0 13,412 13,412 18,924
C-05.37 plastering & tyrolyn render to the external surface m2 99 0 138 138 74 0 10,212 10,212 7,326
C-05.38 Cement screeding in floor m2 27 0 57 57 109 0 6,187 6,187 2,926
C-05.39 Electricity
Lights to fed through PVC sheated cable of 2 X 2.5
mm2 in thermoplastic conduit of 13.3mm in /under
C-05.40 m 4 0 0 350 0 0 0 1,400
surface including junction boxes ,screw type
connectors & flash mounted switches
Flush mounted socket outlet of 16Amp fed through
PVC sheathed cable of 3 X2.5mm2 in thermoplastic
C-05.41 no 3 0 0 250 0 0 0 750
conduit of 13.5mm in /under surface including junction
boxes ,screw type insulating caps & cover
Flouresent lamp laminar type Philips or
C-05.42 no 3 0 0 500 0 0 0 1,500
equivalent ,TMS02/240 with 1X40Watt
C-05.43 Supply and fix anchor bolt in the R.C. generator seat No 8 0 0 1,800 0 0 0 14,400
Total for BILL NO C-05 Generator and Guard House(9.32x7.6) At Borehole and At Booster I 16,845.64 856,836.61 873,682.25 852,332.00
Contractor Client
Name: Eng Abiyot Demissie Name:
Signature Signature
Date Date
Page 54 of 100
takeoff ggh @BH
Concrete
2 9 7 126 m2 10cm thick Lean concrete work above hard core
RCC work 1:2:4 vibrated in to form work around reinforcement in
1 8.2 6.2
floor slab
0.15 6.126 m3
2 9.0 7.0 Grade beam
0.3 0.3 7.02 m3
1 9.0 7.0 top tei beam
0.3 0.3 3.51 m3
1 11 0.2 0.432 m3 in Lintels
12 3.4 0.2 1.632 m3 in Columns
in footing
1 4 3 generator seat
0.5 6 m3
Provide and fix formwork to
2 9 7 to grade beam
0.4 62.4 m2
1 3.4 0.3 48.96 m2 to columns
Block work
1 18 21 3 20cm thick hallow concrete block for wall
Page 55 of 100
takeoff ggh @BH
Page 56 of 100
Bar Schedule ggh @BH
Columns
vertical 4@12mm 3.4 48 0.3 192
stirrups 8mm@300mm c/c 0.8 232 0.0 185.6
Page 57 of 100
Bar Schedule ggh @BH
10mm
10mm
8mm
12mm
8mm
Page 58 of 100
Bill No. C- 05 Generator and Guard House at Borehole & Booster I
Previous
Item No Description Unit Quantity Previous Current Total Unit Rate Current Amount Total Amount Contract Amount
Amount
C-05.1 Earth Work
site clearing up to a depth of 20cm to remove top
C-05.2 m2 77 80 80.0 27 0 2,120 2,120 2,035
vegetative soil
Excavation of trench in foundation, minimum of
C-05.3 m3 8 9.8 9.8 88 0 858 858 718
0.5meter depth
C-05.4 Back filling of excavated trench m3 5 1 0.8 133 0 106 106 612
Excavation work up to a depth of 50 cm to reduce level
C-05.5 for placing hard core & carting away of exacted soil to m3 15 25.4 25.4 52 0 1,322 1,322 782
a distance not exceeding 500meter
C-05.6 Masonary
25 cm thick basaltic or equivalent stone Hard core well
C-05.7 m3 33 15.8 15.8 189 0 2,977 2,977 6,165
rolled, consolidated & blinded with crushed stone
Stone masonry work in cemement Sand mortar 1:3in
C-05.8 m3 16 6.2 6.2 1,701 0 10,614 10,614 26,366
ratio in foundation
250mm thick cemented stone pavement around the
C-05.9 building 1m wide, price includes excavation & all m3 16 0.0 523 0 0 0 8,535
materials, including selected material bedding
C-05.10 Concrete
C-05.11 10cm thick Lean concrete work above hard core m2 8.7 63.0 63.0 140 0 8,820 8,820 1,214
RCC work 1:2:4 vibrated in to form work around
C-05.12 m3 6.6 6.8 6.8 3,592 0 24,268 24,268 23,664
reinforcement in floor slab
C-05.13 Grade beam m3 12.0 3.5 3.5 3,592 0 12,608 12,608 43,104
C-05.14 top tei beam m3 6.0 3.5 3.5 3,592 0 12,608 12,608 21,552
C-05.15 in Lintels m3 1.50 0.4 0.4 3,592 0 1,552 1,552 5,388
in Columns m3 0.84 1.63 1.6 3,592 0 5,862 5,862 3,017
in footing m3 2.2 0 0.0 3,592 0 0 0 7,759
C-05.16 generator seat m3 3.6 6 6.0 3,592 0 21,552 21,552 12,931
Provide and fix formwork to
to grade beam m2 31.2 31.2 500 0 15,600 15,600 0
to columns m2 49.0 49.0 500 0 24,480 24,480 0
C-05.17 Block work
C-05.18 20cm thick hallow concrete block for wall no 1,663 1,470 1,470 306 0 449,866 449,866 508,725
C-05.19 Roof work
Upper & lower truss member of 10cm dia eucalyptus
C-05.20 ml 480 480 480 29 0 13,896 13,896 13,896
wood with 50cm c/c,well seasoned & free of defects
Vertical & Diagonal truss member of 8cm dia
C-05.21 ml 350 62 62 33 0 2,065 2,065 11,628
eucalyptus wood ,well seasoned & free of defects
Zigba wood purling 5cm X 7cm fixed to the truss at
C-05.22 ml 350 350 350 37 0 12,968 12,968 12,968
90cm C/C
C-05.23 Roofing with G-28 corrugated iron sheet m2 65 82 82 354 0 28,886 28,886 23,010
Galvanized sheet gutter G-30 ,150 X150mm, price
C-05.24 m 11 11 11 321 0 3,595 3,595 3,595
includes brackets and two coats of metal paint
C-05.25 Ditto but down pipes,120 X60mm m 10 10 10 78 0 796 796 796
C-05.26 supply & fix 25 X 200mm facial board m 11 11 11 167 0 1,871 1,871 1,871
Page 59 of 100
Bill No. C- 05 Generator and Guard House at Borehole & Booster I
Previous
Item No Description Unit Quantity Previous Current Total Unit Rate Current Amount Total Amount Contract Amount
Amount
C-05.27 Door and window
Supply & fix locally made metal window , with all
necessary iron monger locks ,mesh for protection &
C-05.28 m2 3 4 4 4,704 0 18,816 18,816 11,760
one coat of anti rust & two coats of metal paint as per
the drawing 1400mm X1200mm
Supply & fix locally made metal door , with all
necessary iron monger locks & one coat of anti rust &
C-05.29 no 3 3 3 8,400 0 25,200 25,200 25,200
two coats of metal paint as per the drawing 1500mm
X2000mm
C-05.30 Renforcement
Steel reinforcement work according to the
C-05.31 structural drawing price includes cutting, bending,
tying, & placing in a position
C-05.32 8mm kg 200 320 320 64 0 20,595 20,595 12,880
C-05.33 10mm kg 120 102 102 67 0 6,842 6,842 8,016
C-05.34 12mm kg 100 170 170 69 0 11,798 11,798 6,920
C-05.35 Finishing
C-05.36 Plastering in cement sand mortar for internal walls m2 166 118 118 114 0 13,412 13,412 18,924
C-05.37 plastering & tyrolyn render to the external surface m2 99 138 138 74 0 10,212 10,212 7,326
C-05.38 Cement screeding in floor m2 27 57 57 109 0 6,187 6,187 2,926
C-05.39 Electricity
Lights to fed through PVC sheated cable of 2 X 2.5
mm2 in thermoplastic conduit of 13.3mm in /under
C-05.40 m 4 0 350 0 0 0 1,400
surface including junction boxes ,screw type
connectors & flash mounted switches
Flush mounted socket outlet of 16Amp fed through
PVC sheathed cable of 3 X2.5mm2 in thermoplastic
C-05.41 no 3 0 250 0 0 0 750
conduit of 13.5mm in /under surface including junction
boxes ,screw type insulating caps & cover
Flouresent lamp laminar type Philips or
C-05.42 no 3 0 500 0 0 0 1,500
equivalent ,TMS02/240 with 1X40Watt
C-05.43 Supply and fix anchor bolt in the R.C. generator seat No 8 0 1,800 0 0 0 14,400
Total for BILL NO C-05 Generator and Guard House At Booster I 0.00 772,350.80 772,350.80 852,332.00
Contractor Client
Name: Eng Abiyot Demissie Name:
Signature Signature
Date Date
Page 60 of 100
takeoff ggh@500M3
Concrete
1 9 7 63 m2 10cm thick Lean concrete work above hard core
RCC work 1:2:4 vibrated in to form work around reinforcement in
1 8.6 6.4
floor slab
0.15 6.756 m3
1 9.0 7.0 Grade beam
0.3 0.3 3.51 m3
1 9.0 7.0 top tei beam
0.3 0.3 3.51 m3
1 11 0.2 0.432 m3 in Lintels
12 3.4 0.2 1.632 m3 in Columns
in footing
1 4 3 generator seat
0.5 6.0 m3
Provide and fix formwork to
2 9 7 to grade beam
0.4 31.2 m2
48 3.4 0.3 48.96 m2 to columns
Block work
1 39 3 117 20cm thick hallow concrete block for wall
4 3.6 0.95 6.84
Page 61 of 100
takeoff ggh@500M3
Page 62 of 100
Bar Schedule ggh @500M3
Columns
vertical 4@12mm 3.4 48 0.3 192
stirrups 8mm@300mm c/c 0.8 232 0.0 185.6
Page 63 of 100
Bar Schedule ggh @500M3
10mm
10mm
8mm
12mm
8mm
Page 64 of 100
Bill No. C- 02 Construction of 500M3 @ BOOSTER I
Previous Executed Contract
Item Description Unit Quantity Previous Current Total Unit Rate Current Amount
Amount Amount Amount
C-02.1 EARTH the
Clearing WORKtop soil and unwanted material to a depth of
C-02.1.1 200mm m2 254.3 176.7 176.7 26.5 0.0 4,682.9 4,682.9 6,739.0
C-02.2 Bulk excavation in ordinary soil to depth not greater than 0.6m m3 120.0 85.9 85.9 88.0 0.0 7,557.7 7,557.7 10,560.0
C-02.1.2 Ditto but to a depth not greater than 1m m3 86.5 0.0 0.0 132.5 0.0 0.0 0.0 11,461.3
C-02.3 Extra over for bulk excavation in hard rock m3 15.0 0.0 0.0 468.0 0.0 0.0 0.0 7,020.0
Back fill around reservoir walls with selected material from off
C-02.1.3 m3 56.4 0.0 0.0 133.0 0.0 0.0 0.0 7,494.6
site and well ram in layers every 25cm interval.
Cart away all excavated material, deposit to appropriate
C-02.1.4 m3 221.5 121.2 121.2 52.0 0.0 6,303.8 6,303.8 11,518.0
distance not exceeding 1 km
C-02.5 50cm thick basaltic or equivalent stone base for foundation m2 25.0 143.1 143.1 850.5 0.0 121,739.6 121,739.6 21,262.5
C-02.1.5 50cm thick hard trachyte stone hard core filling m2 133.2 143.1 143.1 189.0 0.0 27,053.2 27,053.2 25,176.7
C-02.6 CONCRETE AND MASONRY WORK
200mm thick lean concrete with mix ratio (1:3:6) under the
C-02.1.6 m2 133.2 143.1 143.1 140.0 0.0 20,039.4 20,039.4 18,649.4
reservoir base slab
C-02.7 Masonary pavment around the reservoir wih mass concrete m3 52.7 0.0 865.4 0.0 0.0 0.0 45,606.6
Reinforced concrete type C-30 filled into form work and
C-02.1.7
vibrated around reinforced bar.with mix ratio (1:2:3)
C-02.8 In base slab( C-30) m3 50.0 47.9 47.9 3,899.0 0.0 186,749.3 186,749.3 194,950.0
C-02.1.8 In 25cm thick concrete wall(C-30) m3 57.3 29.7 29.7 3,899.0 0.0 115,753.7 115,753.7 223,412.7
C-02.9 in concrete column(C-30) m3 2.8 0.0 0.0 3,899.0 0.0 0.0 0.0 10,839.2
C-02.1.9 In top slab(C-25) m3 32.0 0.0 3,592.0 0.0 0.0 0.0 114,944.0
C-02.10 in ring and fillet(C-30) m3 21.5 0.0 3,899.0 0.0 0.0 0.0 83,672.5
C-02.1.10 Provide and fix formwork
C-02.11 In base slab m2 20.1 21.2 21.2 500.0 0.0 10,602.9 10,602.9 10,055.0
C-02.1.11 To wall m2 385.0 378.7 378.7 500.0 0.0 189,343.8 189,343.8 192,500.0
C-02.12 To column m2 26.2 0.0 0.0 500.0 0.0 0.0 0.0 13,105.0
C-02.1.12 To top slab m2 118.2 0.0 500.0 0.0 0.0 0.0 59,100.0
C-02.13 To ring and fillet m2 16.0 0.0 500.0 0.0 0.0 0.0 8,015.0
Provide, cut, bend and fix in position reinforced steel bar.
C-02.1.13 All according to structural drawing. Price should include
tying wires.
C-02.1.14 Diameter 8 mm deformed bar kg 130.7 0.0 0.0 64.4 0.0 0.0 0.0 8,417.1
C-02.15 Diameter 10 mm deformed bar kg 4,650.2 0.0 0.0 66.8 0.0 0.0 0.0 310,633.4
C-02.1.15 Diameter 12 mm deformed bar kg 6,550.6 2,430.0 2,430.0 69.2 0.0 168,153.1 168,153.1 453,301.5
C-02.16 Diameter 14 mm deformed bar kg 1,650.0 12,853.3 12,853.3 71.0 0.0 912,587.8 912,587.8 117,150.0
C-02.1.16 Diameter 16 mm deformed bar kg 360.0 0.0 0.0 71.0 0.0 0.0 0.0 25,560.0
C-02.17 Diameter 20 mm deformed bar kg 300.1 0.0 71.0 0.0 0.0 0.0 21,307.1
Provide and construct 400 mm thick pointed stone masonry
C-02.1.17 valve chamber for inlet, outlet, overflow and drain valves as per Lps 1.0 0.0 4,500.0 0.0 0.0 0.0 4,500.0
the drawing( top slab c-25)
C-02.18 ACCESSORIES & FINISHING
Page 65 of 100
Bill No. C- 02 Construction of 500M3 @ BOOSTER I
Previous Executed Contract
Item Description Unit Quantity Previous Current Total Unit Rate Current Amount
Amount Amount Amount
Provide and apply 50mm cement screed to the reservoir floor
C-02.1.18 m2 239.8 0.0 109.0 0.0 0.0 0.0 26,138.2
and roof slab and to valve chamber
Provide and apply 3 coats of plaster to internal walls, columns
C-02.19 m2 315 0 114 0 0 0 35,910
and to embeded part of external wall surface
C-02.1.19 Rendering external wall m2 157 0 74 0 0 0 11,618
Supply and install external water level indicator complete with
C-02.20 No 1 0 65,000 0 0 0 65,000
necessary accessories
Supply and fix external galvanised steel (6m) and internal
C-02.1.20 stainless steel (5.5m) ladder complete with safety cage as per the No 2 2 2 9,200 0 18,400 18,400 18,400
design to the satisfaction of the engineer.
Provide and install water stops made of natural or synthetic
C-02.21 rubber or elastometric plastic compound with basic risen m 120 120 120 750 0 90,330 90,330 90,000
polyvinyl chloride (PVC)
C-02.1.21 water proofing of internal walls m2 221.6 0.0 750.0 0.0 0.0 0.0 166,200.0
C-02.22 provide and insert plastic sheet for the base slab of the embeded part m2 124.6 0.0 135.0 0.0 0.0 0.0 16,825.1
Provide and fix 6 mm sheet metal access cover with latch and
C-02.1.22 No 4.0 0.0 3,500.0 0.0 0.0 0.0 14,000.0
lock for valve chamber and reservoir
Installation of Pipes ,Valves & Fittings Supplied by the
C-02.24
client
C-02.1.24 PIPES, VALVES AND FITTINGS
C-02.25 Install inlet pipe
C-02.1.25 DN 250mm flanged bell mouth No 1 1 1 9,600 0 9,600 9,600 9,600
C-02.26 DN 250, L=330cm double flanged pipe No 1 1 1 11,500 0 11,500 11,500 11,500
C-02.1.26 DN 250, 900 Duck foot bend No 1 1 1 16,800 0 16,800 16,800 16,800
C-02.27 DN 250, double flanged L=1m with centrally welded puddle flange No 1 1 1 13,600 0 13,600 13,600 13,600
C-02.1.27 DN 250 dismantling piece No 1 1 1 7,920 0 7,920 7,920 7,920
C-02.28 DN 250 flanged gate valve No 1 1 1 18,400 0 18,400 18,400 18,400
C-02.1.28 DN 250 double flanged pipe L=1.25 m No 1 1 1 7,600 0 7,600 7,600 7,600
C-02.29 DN250, 900 double flanged bend No 1 1 1 9,600 0 9,600 9,600 9,600
C-02.1.29 DN 250, double flanged pipe L=3.50m No 2 2 2 14,200 0 28,400 28,400 28,400
C-02.30 DN 250, double flanged pipe L=1.00m No 1 1 1 5,600 0 5,600 5,600 5,600
C-02.1.30 DN 250 flanged spigot No 1 1 1 7,600 0 7,600 7,600 7,600
C-02.31 DN 250 express collar No 1 1 1 7,200 0 7,200 7,200 7,200
C-02.1.31 DN 250 flanged float valve No 1 1 1 12,800 0 12,800 12,800 12,800
C-02.32 Pipe support with pipe clamp, wall bracket, foot plate and anchor bolts LS 1 1 1 7,500 0 7,500 7,500 7,500
C-02.1.32 Install outlet pipe
C-02.33 DN 250 suction strainer No 1 1 1 13,600 0 13,600 13,600 13,600
DN 250 double flanged pipe L=1m with centrally welded puddle
C-02.1.33 flange No 1 1 1 4,400 0 4,400 4,400 4,400
C-02.34 DN 250 dismantling piece No 1 1 1 7,920 0 7,920 7,920 7,920
Page 66 of 100
Bill No. C- 02 Construction of 500M3 @ BOOSTER I
Previous Executed Contract
Item Description Unit Quantity Previous Current Total Unit Rate Current Amount
Amount Amount Amount
C-02.1.34 DN 250 flanged gate valve No 1 1 1 18,400 0 18,400 18,400 18,400
C-02.35 DN 250, 900 double flanged bend No 1 1 1 9,600 0 9,600 9,600 9,600
C-02.1.35 DN 250*150 double flanged reducer No 1 1 1 17,600 0 17,600 17,600 17,600
C-02.36 DN 250 double flanged pipe L=1m No 1 1 1 4,400 0 4,400 4,400 4,400
C-02.1.36 DN 250 flanged spigot No 1 1 1 4,400 0 4,400 4,400 4,400
C-02.37 DN 250 express collar No 1 1 1 7,200 0 7,200 7,200 7,200
C-02.1.37 DN 250 water meter No 1 1 1 25,000 0 25,000 25,000 25,000
C-02.38 Pipe support with pipe clamp, wall bracket, foot plate and anchor bolts LS 1 1 1 7,500 0 7,500 7,500 7,500
C-02.1.38 Install Overflow and Drain pipes
C-02.39 DN 250 Flanged bell mouth No 1 1 1 9,600 0 9,600 9,600 9,600
C-02.1.39 DN 250 double flanged pipe L=180cm with puddle flange No 1 1 1 4,400 0 4,400 4,400 4,400
C-02.40 DN 250, 900 double flanged bend No 2 2 2 9,600 0 19,200 19,200 19,200
DN 250, double flanged pipe L=1.0m with centrally welded puddle
C-02.1.40 flange No 1 1 1 4,400 0 4,400 4,400 4,400
C-02.41 DN 250x250 all flanged Tee No 1 1 1 17,600 0 17,600 17,600 17,600
C-02.1.41 DN 250 flanged gate valve No 1 1 1 18,400 0 18,400 18,400 18,400
C-02.42 DN 250 flanged spigot No 2 2 2 4,400 0 8,800 8,800 8,800
C-02.1.42 Install level indicator pcs 1 0 65,000 0 0 0 65,000
C-02.43 Provide and install DN100 ventillation pipe with dome, L =1.0 meters pcs 2 0 6,500 0 0 0 13,000
C-02.1.43 Supply and istall hooper ( Staineless steel) No 1 0 1,500 0 0 0 1,500
C-02.44 Supply and Install level indicator with all its accessories ls 1 0 6,500 0 0 0 6,500
C-02.1.44 Compound Work
mesh wires fencing consists of 2.5 mm barbed wire horizontal
C-02.45 and diagonal member fixed to 2500 mm long concrete post m2 205 0 250 0 0 0 51,250
spaced every 2000mm, including all necessary material as per the
drawing
Stripping top soil from whole area surrounded by fence,
including running to spoil and sterilization to prevent vegetation
C-02.1.45 m2 1,450 0 27 0 0 0 38,425
growth
Gate, 6mm angle iron with metal sheet C/C 40 mm fixed to
60*60*3 mm RHS frame, as shown in the drawing; price
C-02.49 includes lock & latches & earth work (width 4.0m*height 2.60m) No 1 0 15,000 0 0 0 15,000
Page 67 of 100
takeoff 500m3
121.2 m3
1 0.7854 13.5 143.1 m2
1 0.7854 13.5 143.1 m2
0.0 kg
0.0 kg
2,430.0 kg
12,853.3 kg
0.0 kg
kg
Lps
m2
m2
m2
Contractor
Name: Eng Abiyot Demissie
Signature
Date
Page 68 of 100
takeoff 500m3
BOOSTER I
DESCRIPTION
EARTH WORK
Clearing the top soil and unwanted material to a depth of 200mm
Bulk excavation in ordinary soil to depth not greater than 0.6m
Ditto but to a depth not greater than 1m
Extra over for bulk excavation in hard rock
Back fill around reservoir walls with selected material from off site
and well ram in layers every 25cm interval.
Cart away all excavated material, deposit to appropriate distance not
exceeding 1 km
50cm thick basaltic or equivalent stone base for foundation
50cm thick hard trachyte stone hard core filling
CONCRETE AND MASONRY WORK
200mm thick lean concrete with mix ratio (1:3:6) under the reservoir
base slab
Masonary pavment around the reservoir wih mass concrete
Reinforced concrete type C-30 filled into form work and vibrated
around reinforced bar.with mix ratio (1:2:3)
In base slab( C-30)
In 25cm thick concrete wall(C-30)
in concrete column(C-30)
In top slab(C-25)
in ring and fillet(C-30)
Provide and fix formwork
In base slab
To wall
To column
To top slab
To ring and fillet
Provide, cut, bend and fix in position reinforced steel bar. All
according to structural drawing. Price should include tying wires.
Diameter 8 mm deformed bar
Diameter 10 mm deformed bar
Diameter 12 mm deformed bar
Diameter 14 mm deformed bar
Diameter 16 mm deformed bar
Diameter 20 mm deformed bar
Provide and construct 400 mm thick pointed stone masonry valve
chamber for inlet, outlet, overflow and drain valves as per the
drawing( top slab c-25)
ACCESSORIES & FINISHING
Provide and apply 50mm cement screed to the reservoir floor and roof
slab and to valve chamber
Provide and apply 3 coats of plaster to internal walls, columns and to
embeded part of external wall surface
Rendering external wall
Client
Name:
Signature
Date
Page 69 of 100
Bar Schedule 500m3
i Di hook overlap no lt
0 1,313.0 50 1 2 2,866.0 2,766.0
1 1,312.7 50 1 4 5,730.6 5,530.6
2 1,311.6 50 1 4 5,726.5 5,526.5
3 1,309.9 50 1 4 5,719.6 5,519.6
4 1,307.5 50 1 4 5,710.0 5,510.0
5 1,304.4 50 1 4 5,697.6 5,497.6
6 1,300.6 50 1 4 5,682.4 5,482.4
7 1,296.1 50 1 4 5,664.4 5,464.4
8 1,290.9 50 1 4 5,643.5 5,443.5
9 1,284.9 50 1 4 5,619.8 5,419.8
10 1,278.3 50 1 4 5,593.1 5,393.1
11 1,270.9 50 1 4 5,563.4 5,363.4
12 1,262.7 50 1 4 5,530.7 5,330.7
13 1,253.7 50 1 4 5,495.0 5,295.0
14 1,244.0 50 1 4 5,456.1 5,256.1
15 1,233.5 50 1 4 5,413.9 5,213.9
16 1,222.1 50 1 4 5,368.5 5,168.5
17 1,209.9 50 1 4 5,319.6 5,119.6
18 1,196.8 50 1 4 5,267.3 5,067.3
19 1,182.8 50 1 4 5,211.3 5,011.3
20 1,167.9 50 1 4 5,151.6 4,951.6
21 1,152.0 50 1 4 5,087.9 4,887.9
22 1,135.1 50 0 4 4,740.3 4,540.3
23 1,117.1 50 0 4 4,668.3 4,468.3
24 1,098.0 50 0 4 4,591.9 4,391.9
25 1,077.7 50 0 4 4,510.9 4,310.9
26 1,056.2 50 0 4 4,424.8 4,224.8
27 1,033.4 50 0 4 4,333.5 4,133.5
28 1,009.1 50 0 4 4,236.6 4,036.6
29 983.4 50 0 4 4,133.6 3,933.6
30 956.0 50 0 4 4,024.1 3,824.1
31 926.9 50 0 4 3,907.4 3,707.4
32 895.8 50 0 4 3,783.0 3,583.0
33 862.5 50 0 4 3,649.9 3,449.9
34 826.8 50 0 4 3,507.1 3,307.1
35 788.3 50 0 4 3,353.3 3,153.3
36 746.7 50 0 4 3,186.8 2,986.8
37 701.3 50 0 4 3,005.3 2,805.3
38 651.4 50 0 4 2,805.7 2,605.7
39 595.9 50 0 4 2,583.5 2,383.5
40 532.9 50 0 4 2,331.5 2,131.5
41 459.4 50 0 4 2,037.7 1,837.7
42 369.3 50 0 4 1,677.1 1,477.1
43 244.7 50 0 4 1,178.7 978.7
44
174 195,190 186,490
no Li Lt
Page 70 of 100
Bar Schedule 500m3
Page 71 of 100
Bar Schedule 500m3
14mm
Page 72 of 100
Bill No. D- 01 BOQ of 1000m3 Service Reservoirs
Previous Current Executed Contract
Item Description Unit Qtty Previous Current Total Unit Rate
Amount Amount Amount Amount
C-01.1 EARTHWORKS
Site Clearing to remove top soil to depth not
C-01.1.1 m2 314.0 314.2 314.2 26.5 0.0 8,325.2 8,325.2 8,321.0
exceeding 200mm
C-0.1.2 Excavation
Excavation shall includs from strutting ,
shuttering ,stabilising excavated surfaces and
C-01.1.2 keeping excavations free of water by bailing
out,pumping or other means. ( Excluding disposal
of excavated material )
C-0.1.1.3 Excavation for foundations
Bulk excavation in ordinary soil to depth not greater
C-01.1.3 M3 51.2 127.2 127.2 132.5 0.0 16,858.6 16,858.6 6,784.0
than 1m
Hard Rock : commencing surface 0.8m above final
C-0.1.1.4 M3 10.0 0.0 177.0 0.0 0.0 0.0 1,770.0
surface
Soft Rock : commencing surface 0.8m above final
C-01.1.4 M3 10.0 0.0 331.0 0.0 0.0 0.0 3,310.0
surface
C-0.1.1.5 General Excavation 0.0 0.0 0.0
C-0.1.1.6 Topsoil: maximum depth n.e. 0.25m M3 200.0 0.0 26.5 0.0 0.0 0.0 5,300.0
C-01.1.6 Common material; maximum depth 1.0m - 2.0m M3 400.0 152.7 152.7 184.0 0.0 28,093.4 28,093.4 73,600.0
C-0.1.1.7 Common material; maximum depth 2.0 -5m M3 440.0 0.0 303.0 0.0 0.0 0.0 133,320.0
C-01.1.7 Hard Rock ; maximum depth 2.0m - 5.0m M3 20.0 0.0 468.0 0.0 0.0 0.0 9,360.0
C-0.1.1.8 Ditto soft Rock M3 10.0 0.0 331.0 0.0 0.0 0.0 3,310.0
C-01.1.8 Disposal of Excavated Material 0.0 0.0 0.0
Approved material shall be retained for filling/
C-0.1.1.9 backfilling and unsuitabel material shall be 0.0 0.0 0.0
disposed to tip as directed by the Engineer.
C-01.1.9 Topsoil; maximum distance of haul n.e. 1 km M3 180.0 342.7 342.7 52.0 0.0 17,822.9 17,822.9 9,360.0
C-0.1.1.10 Ditto but haulage exceeding 1 km M3 20.0 0.0 52.0 0.0 0.0 0.0 1,040.0
Common material ; maximum distace to haul n.e. 1
C-01.1.10 M3 640.0 0.0 52.0 0.0 0.0 0.0 33,280.0
km
C-0.1.1.11 Ditto but haulage exceeding 1 km M3 200.0 0.0 52.0 0.0 0.0 0.0 10,400.0
C-01.1.11 Hard Rock ; maximum distance of haul n.e. 1 km M3 20.0 0.0 52.0 0.0 0.0 0.0 1,040.0
C-0.1.1.12 Soft Rock ; maximum distance of haul n.e 1 km M3 10.0 0.0 52.0 0.0 0.0 0.0 520.0
C-01.1.12 Back Filling 0.0 0.0 0.0
Include for compaction as specified and Filling to
C-0.1.1.13 0.0 0.0 0.0
Completed Structures
C-01.1.13 Filling of Excavated topsoil M3 200.0 0.0 133.0 0.0 0.0 0.0 26,600.0
C-0.1.1.14 Non- selected excavated common material M3 300.0 152.7 152.7 246.0 0.0 37,559.6 37,559.6 73,800.0
C-01.1.14 Non-selected excavated common material ( General ) M3 375.0 0.0 246.0 0.0 0.0 0.0 92,250.0
C-0.1.1.15 To stated depth or thickness 0.0 0.0 0.0
K09+000Page 73 of 100
Bill No. D- 01 BOQ of 1000m3 Service Reservoirs
Previous Current Executed Contract
Item Description Unit Qtty Previous Current Total Unit Rate
Amount Amount Amount Amount
250mm approved hardcore below blinding concrete
C-01.1.15 M3 100.0 254.5 254.5 189.0 0.0 48,094.6 48,094.6 18,900.0
level
C-0.1.1.16 Drain 0.0 0.0 0.0
Earth drain with slopes at 45 degrees , depth n.e.
C-01.1.16 M3 310.0 0.0 35.0 0.0 0.0 0.0 10,850.0
1.5m
C-01.1.17 CONCRETE WORK 0.0 0.0 0.0
300mm thick lean concrete with mix ratio (1:3:6)
C-01.1.18 M2 393.7 254.5 254.5 140.0 0.0 35,625.7 35,625.7 55,111.0
under the reservoir base slab and valve chamber
Reinforced concrete type c-30 filled into from
C-01.1.19 work and vibrated around reniforced bar mix 0.0 0.0 0.0
ratio should 1:2:3
C-01.1.20 Base slab (C-30) M3 100.4 105.2 105.2 3,899.0 0.0 410,032.3 410,032.3 391,537.6
C-01.1.21 Concrete wall (C-30) M3 82.9 79.4 79.4 3,899.0 0.0 309,580.6 309,580.6 323,305.1
C-01.1.22 Concrete column (C-30) M3 6.6 0.0 0.0 3,899.0 0.0 0.0 0.0 25,850.4
C-01.1.23 Top slab(C-25) M3 45.9 0.0 3,592.0 0.0 0.0 0.0 164,980.6
C-01.1.24 Parapet (C-25) M3 22.0 0.0 3,592.0 0.0 0.0 0.0 79,024.0
C-01.1.25 Provide and fix formwork to 0.0 0.0 0.0
C-01.1.26 Base slab M2 16.5 33.0 33.0 500.0 0.0 16,493.4 16,493.4 8,245.0
C-01.1.27 Wall M2 547.8 521.6 521.6 500.0 0.0 260,786.0 260,786.0 273,900.0
C-01.1.28 Column M2 10.1 0.0 0.0 500.0 0.0 0.0 0.0 5,025.0
C-01.1.29 Top slab M2 240.4 0.0 500.0 0.0 0.0 0.0 120,200.0
C-01.1.30 Parapet M2 150.0 0.0 500.0 0.0 0.0 0.0 75,000.0
Provide cut,bend and fix in position renifoced steel
C-01.1.31 bar.All according to structural drawing . Price 0.0 0.0 0.0
should include tying wires.
C-01.1.32 Diameter 8mm plain bar kg 650.0 0.0 0.0 64.4 0.0 0.0 0.0 41,860.0
C-01.1.33 Diameter 12mm deformed bar kg 7,705.0 2,618.2 2,618.2 69.2 0.0 181,179.2 181,179.2 533,186.0
C-01.1.34 Diameter 14mm deformed bar kg 10,849.0 17,617.5 17,617.5 71.0 0.0 1,250,843.1 1,250,843.1 770,279.0
C-01.1.35 Diameter 16mm deformed bar kg 700.0 0.0 0.0 71.0 0.0 0.0 0.0 49,700.0
C-01.1.36 Diameter 20mm deformed bar kg 450.0 0.0 0.0 71.0 0.0 0.0 0.0 31,950.0
C-01.1.37 valve chambere 0.0 0.0 0.0
C-01.1.38 Concrete 0.0 0.0 0.0
Reniforced concrete type C-25 filled into from work
C-01.1.39 and vibrated around reniforced bar mix ratio should M3 16.2 0.0 3,592.0 0.0 0.0 0.0 58,190.4
be 1:2:3: for valve chambere
C-01.1.40 Provide and fix formwork for valve chamber to 0.0 0.0 0.0
C-01.1.41 Base slab M2 9.9 0.0 500.0 0.0 0.0 0.0 4,925.0
C-01.1.42 wall M2 112.2 0.0 500.0 0.0 0.0 0.0 56,100.0
C-01.1.43 Column M2 6.1 0.0 500.0 0.0 0.0 0.0 3,065.0
C-01.1.44 Top slab M2 13.8 0.0 500.0 0.0 0.0 0.0 6,895.0
Provide cut,bend and fix in position renifoced steel
C-01.1.45 bar.All according to structural drawing . Price should 0.0 0.0 0.0
include tying wires.
K09+000Page 74 of 100
Bill No. D- 01 BOQ of 1000m3 Service Reservoirs
Previous Current Executed Contract
Item Description Unit Qtty Previous Current Total Unit Rate
Amount Amount Amount Amount
C-01.1.46 Diameter 8mm plain bar kg 797.0 0.0 64.4 0.0 0.0 0.0 51,326.8
C-01.1.47 Diameter 10mm deformed bar kg 190.0 0.0 66.8 0.0 0.0 0.0 12,692.0
C-01.1.48 Block work 0.0 0.0 0.0
Provide and construct 400mm thick pointed stone
C-01.1.49 masonary valve chamber for inlet ,outlet,overflow Lps 1.0 0.0 4,500.0 0.0 0.0 0.0 4,500.0
and drain valves as per the drawing (top slab C-25)
C-01.1.50 ACCESSEORIES AND FINISHING 0.0 0.0 0.0
Provide and apply 50cm cement screed to the
C-01.1.51 M2 256.9 0.0 109.0 0.0 0.0 0.0 28,002.1
reservoir floor and roof slab
Provide and apply 3 coats of plaster to internal walls
C-01.1.52 M2 281.5 0.0 114.0 0.0 0.0 0.0 32,085.3
columns and to embedded part of external wall
C-01.1.53 Rendering external wall M2 276.4 0.0 74.0 0.0 0.0 0.0 20,453.6
Supply and fix external galvanised steel (6m) and
internal stainless steel (5.5m) ladder complete with
C-01.1.54 NO 1.0 2.0 2.0 15,000.0 0.0 30,000.0 30,000.0 15,000.0
saftly cage as per design to satisfaction of the
Engineer
Supply and install external water level indicator
C-01.1.55 NO 1.0 0.0 65,000.0 0.0 0.0 0.0 65,000.0
complete with necessary accessories
Provide and install water stops made of natural or
C-01.1.56 synthetic rubber or elastometric plastic compound M 156.4 162.5 162.5 750.0 0.0 121,853.7 121,853.7 117,277.5
with basic risen polyvinyl chloride ( PVC)
provide and fix 6mm sheet metal access cover with
C-01.1.57 NO 3.0 0.0 3,500.0 0.0 0.0 0.0 10,500.0
latch and lock for valve chamber and reservoir
C-01.1.59 paint with water proof for the wall and floorbase M2 302.0 0.0 185.0 0.0 0.0 0.0 55,870.0
Provide and place single brick layer cover to protect
C-01.1.60 M2 52.2 0.0 570.0 0.0 0.0 0.0 29,725.5
the asphalt coat from the backfill material
PIPES, VALVES AND FITTINGS 0.0 0.0 0.0
C-01.1.61 Install inlet pipe 0.0 0.0 0.0
C-01.1.62 DN 250mm flanged bell mouth No 1 1 1 9,600 0.0 9,600.0 9,600.0 9,600
C-01.1.63 DN 250, L=330cm double flanged pipe No 1 1 1 11,500 0.0 11,500.0 11,500.0 11,500
C-01.1.64 DN 250, 900 Duck foot bend No 1 1 1 16,800 0.0 16,800.0 16,800.0 16,800
DN 250, double flanged L=1m with centrally welded
C-01.1.65 puddle flange
No 1 1 1 13,600 0.0 13,600.0 13,600.0 13,600
C-01.1.66 DN 250 dismantling piece No 1 1 1 7,920 0.0 7,920.0 7,920.0 7,920
C-01.1.67 DN 250 flanged gate valve No 1 1 1 18,400 0.0 18,400.0 18,400.0 18,400
C-01.1.68 DN 250 double flanged pipe L=1.25 m No 1 1 1 7,600 0.0 7,600.0 7,600.0 7,600
C-01.1.69 DN250, 90 degree double flanged elbow No 1 1 1 9,600 0.0 9,600.0 9,600.0 9,600
C-01.1.70 DN 250, double flanged pipe L=4.5m No 3 3 3 14,200 0.0 42,600.0 42,600.0 42,600
C-01.1.71 DN 250, double flanged pipe L=1.00m No 1 1 1 5,600 0.0 5,600.0 5,600.0 5,600
C-01.1.72 DN 250 flanged spigot No 1 1 1 7,600 0.0 7,600.0 7,600.0 7,600
C-01.1.73 DN 250 express collar No 1 1 1 7,200 0.0 7,200.0 7,200.0 7,200
C-01.1.74 DN 250 flanged float valve No 1 1 1 12,800 0.0 12,800.0 12,800.0 12,800
K09+000Page 75 of 100
Bill No. D- 01 BOQ of 1000m3 Service Reservoirs
Previous Current Executed Contract
Item Description Unit Qtty Previous Current Total Unit Rate
Amount Amount Amount Amount
Pipe support with pipe clamp, wall bracket, foot plate and
C-01.1.75 anchor bolts
LS 1 1 1 7,500 0.0 7,500.0 7,500.0 7,500
C-01.1.76 Install outlet pipe 0.0 0.0 0.0
C-01.1.77 DN 250 suction strainer No 1 1 1 13,600 0.0 13,600.0 13,600.0 13,600
DN 250 double flanged pipe L=1m with centrally welded
C-01.1.78 puddle flange
No 1 1 1 4,400 0.0 4,400.0 4,400.0 4,400
C-01.1.79 DN 250 dismantling piece No 1 1 1 7,920 0.0 7,920.0 7,920.0 7,920
C-01.1.80 DN 250 flanged gate valve No 1 1 1 18,400 0.0 18,400.0 18,400.0 18,400
C-01.1.81 DN 250, 90 degree double flanged bend No 1 1 1 9,600 0.0 9,600.0 9,600.0 9,600
C-01.1.82 DN 250 double flanged pipe L=1m No 1 1 1 4,400 0.0 4,400.0 4,400.0 4,400
C-01.1.83 DN 250 flanged spigot No 1 1 1 4,400 0.0 4,400.0 4,400.0 4,400
C-01.1.84 DN 250 express collar No 1 1 1 7,200 0.0 7,200.0 7,200.0 7,200
C-01.1.85 DN 250 water meter No 1 1 1 25,000 0.0 25,000.0 25,000.0 25,000
Pipe support with pipe clamp, wall bracket, foot plate and
C-01.1.86 anchor bolts
LS 1 1 1 7,500 0.0 7,500.0 7,500.0 7,500
C-01.1.87 Install Overflow and Drain pipes 0.0 0.0 0.0
C-01.1.88 DN 250 Flanged bell mouth No 1 1 1 9,600 0.0 9,600.0 9,600.0 9,600
C-01.1.89 DN 250 double flanged pipe L=180cm with puddle flange No 1 1 1 4,400 0.0 4,400.0 4,400.0 4,400
C-01.1.90 DN 250, 90 degree double flanged bend No 2 2 2 96,000 0.0 192,000.0 192,000.0 192,000
DN 250, double flanged pipe L=1.0m with centrally
C-01.1.91 welded puddle flange
No 1 1 1 4,400 0.0 4,400.0 4,400.0 4,400
C-01.1.92 DN 250x250 all flanged Tee No 1 1 1 17,600 0.0 17,600.0 17,600.0 17,600
C-01.1.93 DN 250 flanged gate valve No 1 1 1 18,400 0.0 18,400.0 18,400.0 18,400
C-01.1.94 DN 250 flanged spigot No 2 2 2 4,400 0.0 8,800.0 8,800.0 8,800
C-01.1.95 Install level indicator pcs 1 0 65,000 0.0 0.0 0.0 65,000
Provide and install DN 100 ventillation pipe with
C-01.1.96 No 2 0 6,500 0.0 0.0 0.0 13,000
dome, L =6meters
C-01.1.98 Compound Work 0.0 0.0 0.0
Filling and compacting of selected material excavated
C-01.1.99 M3 175 0 246 0.0 0.0 0.0 43,050
from site in layers not exceeding 20cm thickness
Construction of 200mm*300m wide and 20cm thick
C-20 reinforced concrete drian around the reservoir
C-01.1.101 wall including the drinage ditch as shown in the M3 68 0 523 0.0 0.0 0.0 35,564
drawing. The work including excavation, cart away
and selected backfill material.
K09+000Page 76 of 100
Bill No. D- 01 BOQ of 1000m3 Service Reservoirs
Previous Current Executed Contract
Item Description Unit Qtty Previous Current Total Unit Rate
Amount Amount Amount Amount
C-01.1.106 Testing, Disinfection and Commissioning Ls 1.0 0.0 7,500.0 0.0 0.0 0.0 7,500.0
C-01.1.107 Electrical Installation
Supply and install within guard house;
C-01.1.108 distribution board for flush mounting with lockl
abel door consisting of
C-01.1.109 1PC of ACD of 10A, 1-ph NO 1.0 0.0 7,334.8 0.0 0.0 0.0 7,334.8
C-01.1.110 2pc of ACB of 16A , 1-ph NO 1.0 0.0 1,504.8 0.0 0.0 0.0 1,504.8
Light points with switches, fed through Pvc insulated
C-01.1.111 NO 2.0 0.0 81.7 0.0 0.0 0.0 163.4
wire 2x2.5 mm 2 cable
Flush mounted socket outlets of 16a, 220V ,50HZ ,
C-01.1.112 fed through PVC 3x2.5mm 2 cable , laid on the roof NO 2.0 0.0 147.4 0.0 0.0 0.0 294.8
and in 16mm conduit in the wall
Light fittings type philips TMS 012/136 or equvalent
C-01.1.113 NO 2.0 0.0 501.8 0.0 0.0 0.0 1,003.6
with 1x36 W lamps
Power line of PVC conductor of 2x 4mm2 from
C-01.1.114 NO 20.0 0.0 1,400.0 0.0 0.0 0.0 28,000.0
EEPCO meter.
Supply & install sign boards as specified by the
C-01.1.118 NO 1.0 0.0 850.0 0.0 0.0 0.0 850.0
Engineer ( at gate entrance & main road)(1-3)m2
Total For BILL NO. C-01 (1000 m3) Balancing Reservoir 0.0 3,309,088.3 3,309,088.3 4,869,082.2
Contractor Client
Name: Eng Abiyot Demissie Name:
Signature Signature
Date Date
K09+000Page 77 of 100
takeoff 1000m3
1 0.7854
20
314.16 m2
1 18 0.50
0.7853981634 127.23 m3
1 18 0.60
0.7853981634 152.68 m3
1 314.16 0.20
279.92
342.75 m3
2 18
0.7854 0.30 152.68 m3
1 18
0.7854 0.25 254.47 m3
1 18
0.7854 254.47 m2
1 17.5 0.30
0.7854
6 0.4375 2.10
Page 78 of 100
takeoff 1000m3
1 17.5 0.25
3.142 2.00 105.16 m3
1 3.142 16.90
0.3 5.00 79.40 m3
1 6
0.4 0.40 0.00 m3
1 17.5 0.60
3.142 32.99 m2
16.9 5.00
1
16.3 3.14 521.57 m2
0.00 m2
0.0 kg
2,618.2 kg
17,617.5 kg
0.0 kg
0.0 kg
Contractor
Name: Eng Abiyot Demissie
Signature
Date
Page 79 of 100
takeoff 1000m3
Service Reservoir
DESCRIPTION
EARTHWORKS
C-01.1.1Site Clearing to remove top soil to depth not exceeding 200mm
r=10m, depth=20cm, Area= 314.16m2
C-0.1.2Excavation
C-01.1.2Excavation shall includs from strutting , shuttering ,stabilising
excavated surfaces and keeping excavations free of water by bailing
out,pumping or other means. ( Excluding disposal of excavated material
)
C-0.1.1.3Excavation for foundations
C-01.1.3Bulk excavation in ordinary soil to depth not greater than 1m
C-01.1.12Back Filling
C-0.1.1.13Include for compaction as specified and Filling to Completed
Structures
C-01.1.13Filling of Excavated topsoil
C-0.1.1.14Non- selected excavated common material
C-0.1.1.16Drain
C-01.1.16Earth drain with slopes at 45 degrees , depth n.e. 1.5m
C-01.1.17CONCRETE WORK
C-01.1.18300mm thick lean concrete with mix ratio (1:3:6) under the
reservoir base slab and valve chamber
diameter D = 18m, thickness t= 0.1m, A=m/4*D^2
C-01.1.19Reinforced concrete type c-30 filled into from work and
vibrated around reniforced bar mix ratio should 1:2:3
C-01.1.20Base slab (C-30)
column sump
Page 80 of 100
takeoff 1000m3
sump
C-01.1.23Top slab(C-25)
C-01.1.24Parapet (C-25)
C-01.1.25Provide and fix formwork to
C-01.1.26Base slab
C-01.1.27Wall
C-01.1.28Column
C-01.1.29Top slab
C-01.1.30Parapet
C-01.1.31Provide cut,bend and fix in position renifoced steel bar.All
according to structural drawing . Price should include tying wires.
C-01.1.32Diameter 8mm plain bar
C-01.1.33Diameter 12mm deformed bar
C-01.1.34Diameter 14mm deformed bar
C-01.1.35Diameter 16mm deformed bar
C-01.1.36Diameter 20mm deformed bar
Client
Name:
Signature
Date
Page 81 of 100
bar schedule 1000m3
BASE SLAB
Bottom mesh ϕ14@140mm 1742 spacing 14
cover 3 overlap 70
thickness 55
i Di hook overlap no bottom bar
0 1,742.0 98 1 2 3,820.0
1 1,741.8 98 1 4 7,639.1
2 1,741.1 98 1 4 7,636.4
3 1,740.0 98 1 4 7,631.9
4 1,738.4 98 1 4 7,625.6
5 1,736.4 98 1 4 7,617.5
6 1,733.9 98 1 4 7,607.5
7 1,730.9 98 1 4 7,595.8
8 1,727.5 98 1 4 7,582.2
9 1,723.7 98 1 4 7,566.7
10 1,719.3 98 1 4 7,549.4
11 1,714.6 98 1 4 7,530.2
12 1,709.3 98 1 4 7,509.2
13 1,703.5 98 1 4 7,486.2
14 1,697.3 98 1 4 7,461.3
15 1,690.6 98 1 4 7,434.4
16 1,683.4 98 1 4 7,405.6
17 1,675.7 98 1 4 7,374.8
18 1,667.5 98 1 4 7,342.0
19 1,658.8 98 1 4 7,307.1
20 1,649.5 98 1 4 7,270.1
21 1,639.8 98 1 4 7,231.0
22 1,629.5 98 1 4 7,189.8
23 1,618.6 98 1 4 7,146.4
24 1,607.2 98 1 4 7,100.7
25 1,595.2 98 1 4 7,052.7
26 1,582.6 98 1 4 7,002.3
27 1,569.4 98 1 4 6,949.6
28 1,555.6 98 1 4 6,894.4
29 1,541.2 98 1 4 6,836.7
30 1,526.1 98 1 4 6,776.4
31 1,510.3 98 1 4 6,713.4
32 1,493.9 98 1 4 6,647.6
33 1,476.7 98 1 4 6,579.0
34 1,458.9 98 1 4 6,507.4
35 1,440.2 98 1 4 6,432.8
36 1,420.7 98 1 4 6,355.0
37 1,400.5 98 1 4 6,273.8
38 1,379.3 98 1 4 6,189.2
39 1,357.2 98 1 4 6,101.0
40 1,334.2 98 1 4 6,008.9
Page 82 of 100
bar schedule 1000m3
41 1,310.2 98 1 4 5,912.9
42 1,285.1 98 1 4 5,812.6
43 1,258.9 98 1 4 5,707.8
44 1,231.6 98 1 4 5,598.2
45 1,202.9 98 1 4 5,483.6
46 1,172.9 98 0 4 5,083.5
47 1,141.4 98 0 4 4,957.4
48 1,108.3 98 0 4 4,825.0
49 1,073.4 98 0 4 4,685.6
50 1,036.6 98 0 4 4,538.4
51 997.7 98 0 4 4,382.7
52 956.4 98 0 4 4,217.4
53 912.3 98 0 4 4,041.2
54 865.1 98 0 4 3,852.5
55 814.2 98 0 4 3,648.9
56 758.9 98 0 4 3,427.6
57 698.1 98 0 4 3,184.4
58 630.2 98 0 4 2,912.9
59 552.7 98 0 4 2,602.7
60 460.6 98 0 4 2,234.5
61 342.5 98 0 4 1,762.0
62 144.5 98 0 4 969.8
63
250.0 377,822.71
no Li Lt
spacer ϕ14mm 4/sqrm 784 170 133,361 14mm
column Sump 1 ϕ14mm @140mm
52 323.5 16,822 14mm
drain Sump 2 ϕ14mm @140mm
391 275 107,513 14mm
Circumfrential 10ϕ14mm 150mm 14 cm
i Li Overlap Lt
0 5,473.36 4 5,793.4
1 5,429.38 4 5,749.4
2 5,385.39 4 5,705.4
3 5,341.40 4 5,661.4
4 5,297.41 4 5,617.4
5 5,253.42 4 5,573.4
6 5,209.44 4 5,529.4
7 5,165.45 4 5,485.4
8 5,121.46 4 5,441.5
9 5,077.47 4 5,397.5
10 5,033.48 4 5,353.5
11 4,989.50 4 5,309.5
12 4,945.51 4 5,265.5
Page 83 of 100
bar schedule 1000m3
13 4,901.52 4 5,221.5
77,104 14mm
Base Slab Total L cm Qty kg
ϕ14 1,065,944.8 12,876.6
ϕ16 0.0
Column
numbers length for one total l
vertical 8ϕ20mm 8 654 0 20mm
vertical 8ϕ16mm 40 654 0 16mm
stirrups ϕ8mm@150mm 240 180 0 8mm
Wall
vertical ϕ14mm@140mm
outer faces 379 430 163,092 14mm
inner faces 366 430 157,302 14mm
circular ϕ12mm@140mm
outer faces 27 5,610 149,599 12mm
inner faces 27 5,447 145,243 12mm
friction key ϕ14mm@140mm 379 190 72,064
Total
Diam mm Length in cm Quantity kg
ϕ8 0.0 0.0
ϕ12 294,842.0 2,618.2
ϕ14 1,458,403.1 17,617.5
ϕ16 0.0 0.0
ϕ20 0.0 0.0
Page 84 of 100
bar schedule 1000m3
Page 85 of 100
bar schedule 1000m3
5,520.9
5,420.6
5,315.8
5,206.2
5,091.6
4,691.5
4,565.4
4,433.0
4,293.6
4,146.4
3,990.7
3,825.4
3,649.2
3,460.5
3,256.9
3,035.6
2,792.4
2,520.9
2,210.7
1,842.5
1,370.0
577.8
353,322.71
Page 86 of 100
Toilet@BH&1000m3
C15.3 Clearing of site to remove top soil to a depth of 200 mm m2 12.0 20.0 20.00 26.5 0.0 530.0 530.0 318.0
C.15.3 Bulk excavation in ordinary soil to depth of 1.5m m3 15.0 18.0 18.00 177.0 0.0 3,186.0 3,186.0 2,655.0
C15.4 Bulk excavation in soft rock m3 15.0 18.0 18.00 331.0 0.0 5,958.0 5,958.0 4,965.0
C.15.4 Bulk excavation in hard rock m3 12.0 18.0 18.00 468.0 0.0 8,424.0 8,424.0 5,616.0
C15.5 Curt away excavated material m3 42.0 40.0 40.00 52.0 0.0 2,080.0 2,080.0 2,184.0
C.15.5 Masonry Work
C15.6 masonar wall with 50cm at the base and 40cm at top m3 35.0 16.2 16.20 1,701.0 0.0 27,556.2 27,556.2 59,535.0
C.15.6 concerete work
Reinforced concrete septic cover C30 (Cement 1440 kg/m3) filled into
C15.7 form work and vibrated around reinforced bars, mix ratio should be 1 :2:3
in
C.15.7 Soak pit top slab m3 2.3 2.7 2.70 3,899.0 0.0 10,527.3 10,527.3 8,772.8
C15.8 Reinforcement
Provide, cut, bend and fix in position reinforced steel bar. All according to
C.15.8
structural drawing. Price shall include tying wires
C15.9 diameter 12 kg 650.0 90.9 90.93 69.2 0.0 6,292.4 6,292.4 44,980.0
C.15.9 diameter 10 kg 90.0 116.6 116.61 66.8 0.0 7,789.7 7,789.7 6,012.0
C15.10 diameter 8 kg 80.0 20.5 20.46 64.4 0.0 1,317.7 1,317.7 5,152.0
C.15.10 Miscellaneous
Supply and lay 100 mm dia. PVC pipe as shown on the drawing, price
C15.11 m 100.0 100.0 100.00 78.0 0.0 7,800.0 7,800.0 7,800.0
including excavation of earth and back filling drianage conection
C.15.11 Supply and fix 100x100 mm tee Pcs 4.0 4.0 4.00 3,500.0 0.0 14,000.0 14,000.0 14,000.0
C15.12 Supply and fix 100 mm dia. PVC ventilation pipe hood shaped covering (cowl) Pcs 2.0 2.0 2.00 2,800.0 0.0 5,600.0 5,600.0 5,600.0
C.15.12 Supply and fix 40*40cm manhole cover concrete with handling frame pcs 2.0 2.0 2.00 1,200.0 0.0 2,400.0 2,400.0 2,400.0
Sub Total for Soak Away Pit 0.00 103,461.38 103,461.38 169,989.75
CONSTRUCTION OF TOILET
C.15.13 Earth Work
C15.14 Clearing of site to remove top soil to a depth of 200 mm m2 9.0 25.0 25.00 26.5 0.0 662.5 662.5 238.5
C.15.14 Excavation for stone masonry foundation; 0.5 m width and 0.5 m depth m3 3.0 48.0 48.00 88.0 0.0 4,224.0 4,224.0 264.0
Cart away and deposit excavated surplus material to a distance not exceeding I m3
C15.15 6.0 53.0 53.00 52.0 0.0 2,756.0 2,756.0 312.0
km
C.15.15 fill for the selected material m2 3.0 0.0 0.00 50.0 0.0 0.0 0.0 150.0
C15.16 Masonry Work
Supply and place 250 mm thick hard core compacted to receive reinforced m2
C.15.16 10.0 16.0 16.00 189.0 0.0 3,024.0 3,024.0 1,890.0
floor slab
C15.17 Supply and place 500 mm thick hard core for founation wall m2 7.0 16.0 16.00 189.0 0.0 3,024.0 3,024.0 1,323.0
C.15.17 Sub-Total
C15.18 Concrete and Block Work
Reinforced concrete grade C-25 with minimum cement content 1440 kg/m3
C.15.18
cast into formwork and vibrated around reinforcement bars in
Page 87 of 100
Toilet@BH&1000m3
C15.19 RC floor tie beam m3 3.0 0.6 0.64 3,592.0 0.0 2,298.9 2,298.9 10,776.0
C.15.19 RC column m3 1.3 0.1 0.11 3,592.0 0.0 387.9 387.9 4,525.9
C15.20 Mass concrete fill on floor slab (100 mm) m3 1.3 1.6 1.60 3,592.0 0.0 5,747.2 5,747.2 4,490.0
C.15.20 Lintel m3 0.1 0.1 0.07 3,592.0 0.0 258.6 258.6 179.6
C15.21 RC roof tie beams m3 2.5 0.6 0.64 3,592.0 0.0 2,298.9 2,298.9 8,980.0
Provide, fix in position, cut and bend reinforced steel bar. All according to
C.15.21
structural drawing. Price should include tying wires
C15.22 Diameter 8 mm deformed bar kg 120.0 48.1 48.11 64.4 0.0 3,098.3 3,098.3 7,728.0
C.15.22 Diameter 10 mm deformed bar kg 98.8 94.8 94.77 66.8 0.0 6,330.7 6,330.7 6,599.2
C15.23 Provide, cut, and fix formwork beam column m2 19.2 36.5 36.48 500.0 0.0 18,240.0 18,240.0 9,600.0
C.15.23 Block work
C15.24 20cm HCB block for wall No 250.0 467.0 466.97 306.0 0.0 142,891.3 142,891.3 76,500.0
C.15.24 Carpentry and Roofing
Supply, assemble and fix in position roof truss price shall include the ml
C15.25 25.0 25.0 25.00 28.9 0.0 723.7 723.7 723.7
application of three coats and external anti-termite treatment
Supply and fix purl in in zigba wood size 50 x 70 mm nailed into eucalyptus ml
C.15.25 30.0 30.0 30.00 37.1 0.0 1,111.5 1,111.5 1,111.5
truss including three coats of anti - termite external treatment
Supply and fix roof cover in G-28 mm corrugated galvanized iron sheet fixed m2
C15.26 into zigba wood purl in with dome headed galvanized nails (purlin and ridge 24.0 21.6 21.60 354.0 0.0 7,646.4 7,646.4 8,496.0
cover measured separately)
Supply and fix edge gutter formed in G- 28 flat galvanized metal sheet m
including support brackets 1 mm thick shaped steel plate spaced at a maximum
C.15.26 5.0 0.0 0.00 321.0 0.0 0.0 0.0 1,605.0
spacing of 1000 mm c/c and fixed to purl in - price includes metal primer and
two coats of synthetic eName: Eng Abiyot Demissie l paint
Supply & fix diameter 100mm down pipe in G-28 including I mm thick metal m
C15.27 support brackets fixed at a maximum interval of 1000 mm fixed to walls or 15.0 15.0 15.00 397.0 0.0 5,955.0 5,955.0 5,955.0
columns
C.15.27 Supply and fix 25x 250 mm fascia board to purl in m 9.8 9.8 9.80 167.1 0.0 1,637.2 1,637.2 1,637.2
C15.28 Supply and fix metal windows size 1x1.8m price includes lock hachs Pcs 1.8 1.0 1.00 5,040.0 0.0 5,040.0 5,040.0 9,072.0
Pcs
C.15.28 Supply and fix metal doors size 2.1 Ox1 with figured glass in upper half portion 2.1 1.0 1.00 5,880.0 0.0 5,880.0 5,880.0 12,348.0
Page 88 of 100
takeoff toilet@BH&1000m3
1 4 5 20 m2
1 3 4 1.5 18 m3
1 3 4 1.5 18 m3
m3
40 m3
1 3 3 0.3 2.7 m3
1 90.9312 90.9 kg
1 116.613 116.6 kg
1 20.461 20.5 kg
1 100 100 m
1 4 4 Pcs
1 2 2 Pcs
1 2 2 pcs
CONSTRUCTION OF TOILET
1 5 5 25.0 m2
1 4 4 3 48.0 m3
53.0 m3
m2
1 4 4 16.0 m2
1 4 4 0.25 16.0 m2
Page 89 of 100
takeoff toilet@BH&1000m3
54 0.70
120 0.70 48.1 kg
16 3.0
4 26.4 94.8 kg
16 2.7 0.4
2 24 0.4 36.5 m2
2 3 3 2.7 32.4
1 3 0.8 2.4
2 3 0.8 2.4
1 0.9 2.1
1 0.6 1.2 2.61 467.0 No
1 25 25.0 ml
1 30 30.0 ml
1 4 4 21.6 m2
0.0 m
0.0 m
1 3 3.0 m
1 1 1.0 Pcs
1 1 1.0 Pcs
1 4 4 2.7
1 4 0.95
1 3.6 3.6 2.7
2 4 0.95 89.7 m2
LS
Contractor Client
Name: Eng Abiyot Demissie Name:
Page 90 of 100
takeoff toilet@BH&1000m3
Signature Signature
Date Date
Page 91 of 100
takeoff toilet@BH&1000m3
DESCRIPTION
diameter 12
diameter 10
diameter 8
Miscellaneous
Supply and lay 100 mm dia. PVC pipe as
shown on the drawing, price including
excavation of earth and back filling drianage
conection
Supply and fix 100x100 mm tee
Supply and fix 100 mm dia. PVC ventilation
pipe hood shaped covering (cowl)
Supply and fix 40*40cm manhole cover
concrete with handling frame
Earth Work
Clearing of site to remove top soil to a depth of
200 mm
Excavation for stone masonry foundation; 0.5
m width and 0.5 m depth
Cart away and deposit excavated surplus
material to a distance not exceeding I km
fill for the selected material
Masonry Work
Supply and place 250 mm thick hard core
compacted to receive reinforced floor slab
Supply and place 500 mm thick hard core for
founation wall
Concrete and Block Work
Reinforced concrete grade C-25 with
minimum cement content 1440 kg/m3 cast
into formwork and vibrated around
reinforcement bars in
RC floor tie beam
RC column
Mass concrete fill on floor slab (100 mm)
Lintel
Page 92 of 100
takeoff toilet@BH&1000m3
Block work
20cm HCB block for wall
lient
ame:
Page 93 of 100
takeoff toilet@BH&1000m3
ignature
ate
Page 94 of 100
toilet@BH&1000m3 bar schedule
No Leach Ltotal
grade beam & top
4@12mm 16.0 3.3 52.8
tie beam
8mm@200mm 60 0.7 42.0
column 4@12mm 16 3.1 49.6
8mm@200mm 14 0.7 9.8
slab 10mm@200mm 30 3.3 99
30 3 90
Page 95 of 100
BILL NO.C.12.0 Solid
Item No Description Unit Quantity
C-12.2 EARTH WORK
C-12.3 Site Clearing of Top Soil up to 20cm Depth m2 900
C-12.4 Bulk excavation in normal soil to a depth not exceeding 1.5m m3 1,350
C-12.5 Ditto but in soft rock formation below 1.5m up to 2.5m m3 450
C-12.6 Ditto but in hard rock formation 1.5m m3 900
Cart away all excavated material, and deposit to
circumference of the pit asprotection embank 2m distance 2,700
C-12.7 from the pit m3
C-12.8 Provide in and out entrance for the solid waste pit m 100
C-12.9 fencing and protection
Mesh wire fencing consists of 2m heigth barbed wire with
horizontal and diagonal member fixed to 2.5m c/c angl iron 400
C-12.10 pole , including all necessary material as per the drawing m2
TOTAL
BILL NO.C.12.0 Solid waste disposal site
Previous Current Total Previous
Unit Rate Current Amount
Quantity Quantity Quantity Amount
0 0 1,200 0
0 0 250 0
0.0 514,670.0
Total Amount Contract Amount
23,850 23,850
247,800 238,950
139,020 148,950
0 421,200
104,000 140,400
0 120,000
0 100,000
514,670.0 1,193,350.0
TAKE OFF SHEET 1 of 1
Project:Bike Water Supply and Sanitation Project
Contractor: Mohammed Abdi Oumer G.C & Water Works Contractor
Client:- Somali Regional State Water Bureau
BILL NO.C.12.0 Solid waste disposal site
No Dimensions in m
Quantity
Length Width Depth Thickness Area m2
1 30 30 900
1 20 20 3.5 1400
1 20 20 5.25 420
2000
Contractor Client
Name: Eng Abiyot Demissie Name:
Signature Signature
Date Date
DESCRIPTION
Unit
m2 Site Clearing of Top Soil up to 20cm Depth
m3 Bulk excavation in normal soil to a depth not exceeding 1.5m
m3 Ditto but in soft rock formation below 1.5m up to 2.5m
m3 Ditto but in hard rock formation 1.5m
Cart away all excavated material, and deposit to circumference of
m3
the pit asprotection embank 2m distance from the pit
m Provide in and out entrance for the solid waste pit
fencing and protection
Mesh wire fencing consists of 2m heigth barbed wire with
m2 horizontal and diagonal member fixed to 2.5m c/c angl iron pole ,
including all necessary material as per the drawing