Professional Documents
Culture Documents
- GENERAL CONTENTS
- 4 ELECTRICAL SYSTEM
CD II -
-
5 INSTRUMENTATION AND CONTROL
6 CONTROL MONITORING
- 7 CIVIL WORKS
CONTRACT N°020.PJP/922/1995/M
CONTRACT N°020.PJP/922/1995/M
NUMEROTATION OF VOLUMES
TOTAL 97
ABCD
0 -UNIT OPERATION
VOLUME
OPERATION MANUAL
MAINTENANCE MANUAL
1 - STEAM TURBINE
VOLUME
2 - GENERATOR
VOLUME
01. STARTING UP
02. FAULT DETECTION
03. INSULATION RESISTANCE
04. PERSONAL SAFETY
05. TIGHTENING TORQUE
4 DRAWINGS M03
2 - GENERATOR
VOLUME
EXCITATION REGULATION CUBICLE
1 DESCRIPTION D01/B
01. COMPOSITION OF THE MODULE
02. EXCITATION REGULATION PROTECTION CUBICLE
03. LINE SIDE MEDIUM VOLTAGE CUBICLE
04. NEUTRAL SIDE MEDIUM VOLTAGE CUBICLE
2 OPERATION O02/B
01. GENERAL
02. CONTROL SIGNALLING AND MEASUREMENT
03. NORMAL OPERATION
04. PARTICULAR OPERATION
05. SAFETY
3 MAINTENANCE M06
01. CUSTOMER SUPPORT
02. PACKING AND STORAGE
03. GENERAL MAINTENANCE
04. TESTS
05. TROUBLES SHOOTING
06. PARTS REPLACEMENT
07. SUPPLIERS DOCUMENTATION
4 DRAWINGS M07
01. LIST OF DRAWINGS
02. DRAWINGS
6 SPECIFICATIONS M08
ABCD
3 - BALANCE OF PLANT
DESIGN MANUAL
VOLUME
3 - BALANCE OF PLANT
OPERATION MANUAL
VOLUME
4 - ELECTRICAL SYSTEM
DESIGN MANUAL
VOLUME
4 - ELECTRICAL SYSTEM
OPERATION MANUAL
VOLUME
VOLUME
6 – CONTROL MONITORING
OPERATION MANUAL
VOLUME
6 – CONTROL MONITORING
MAINTENANCE MANUAL
VOLUME
7 CIVIL WORK
DESIGN MANUAL
GENERAL CONTENT
Volume Index
Insert CD N° 1
REPUBLIC OF INDONESIA
MINISTRY OF MINES AND ENERGY
PT.PLN[PERSERO]
CHAPTER 4
ELECTRICAL SYSTEM
CONTRACT N°020.PJP/922/1995/M
SPIE ENERTRANS PT.PR1AMANAYA
Spie Enertrans 95 861 CERGY-PONTOISE JAKARTA 10320
FRANCE INDONESIA
4 - ELECTRICAL SYSTEM
DESIGN MANUAL
VOLUME
DESIGN MANUAL
N° E 300 878 Rev.B
CHAPTER 4
ELECTRICAL SYSTEM
VOLUME : D 01
CONTRACT N°020.PJP/922/1995/M
01
abcd
02
LAHENDONG GEOTHERMAL POWER PLANT - 1 ~ 2 0 M W MANUAL No E300878
ELECTRICAL SYSTEM REV. A
TRANSFORMERS DESIGN MANUAL PAGE : 2 /2
2.1. DESCRIPTION
Design iç based on the attached specifications.
No DESCRIPTION
UNINDO specification for 30 MVA transformer
UNINDO specification for 2500 kVA transformer
UNINDO specification for 1250 kVA transformer
.
abcd
03
abcd
04
abcd
05
LAHENDONG GEOTHERMAL POWER PLANT - 1 ~ 2 0 M W MANUAL NoE300878
ELECTRICAL SYSTEM REV. A
EMERGENCY SERVICE SYSTEM DESIGN MANUAL 1 PAGE : 1 /2
4 ELECTRICAL SYSTEM
. .. . .
abcd
06
abcd
07
abcd
08
REPUBLIC OF INDONESIA
MINISTRY OF MINES AND ENERGY
PT.PLN[PERSERO]
OPERATION MANUAL
N° E 300 878 Rev.B
CHAPTER 4
ELECTRICAL SYSTEM
VOLUME : O 02
CONTRACT N°020.PJP/922/1995/M
Rateau La Courneuve SPIE ENERTRANS PT.PR1AMANAYA
FRANCE Spie Enertrans 95 861 CERGY-PONTOISE JAKARTA 10320
FRANCE
INDONESIA
4 - ELECTRICAL SYSTEM
OPERATION MANUAL
VOLUME
01
abcd
02
REPUBLIC OF INDONESIA
MINISTRY OF MINES AND ENERGY
PT.PLN[PERSERO]
OPERATION MANUAL
CHAPTER 4
ELECTRICAL SYSTEM
VOLUME : O 03
CONTRACT N°020.PJP/922/1995/M
Rateau La Courneuve SPIE ENERTRANS PT.PR1AMANAYA
FRANCE Spie Enertrans 95 861 CERGY-PONTOISE JAKARTA 10320
FRANCE
INDONESIA
03
REPUBLIC OF INDONESIA
MINISTRY OF MINES AND ENERGY
PT.PLN[PERSERO]
OPERATION MANUAL
CHAPTER 4
ELECTRICAL SYSTEM
VOLUME : O 03
CONTRACT N°020.PJP/922/1995/M
Rateau La Courneuve SPIE ENERTRANS PT.PR1AMANAYA
FRANCE Spie Enertrans 95 861 CERGY-PONTOISE JAKARTA 10320
FRANCE
INDONESIA
04
REPUBLIC OF INDONESIA
MINISTRY OF MINES AND ENERGY
PT.PLN[PERSERO]
OPERATION MANUAL
CHAPTER 4
ELECTRICAL SYSTEM
VOLUME : O 05
CONTRACT N°020.PJP/922/1995/M
Rateau La Courneuve SPIE ENERTRANS PT.PR1AMANAYA
FRANCE Spie Enertrans 95 861 CERGY-PONTOISE JAKARTA 10320
FRANCE
INDONESIA
05
LAHENDONG GEOTHERMAL POWER PLANT - 1 ~ 2 0 M W MANUAL NoE300878
ELECTRICAL SY STEM REV. A
EMERGENCY SERVICE SYSTEM OPERATING MANUAL PAGE : 2 /2
No DESCRIPTION VOLUME
EB-CHL-1O0 125V dc charger and UPS system. Electriacal diagram 1 0 0 8
ED-CHL-1O0 125V dc charger and UPS system. General arrangement 1
EA-CHL-1O0 Charger. test procedure 1 9
EA-CHL-1O1 Inverter. Test procedure 1 //
Battery charger. User's manual and test report. 1 Y
1;
Inverter. User's manual and test report. 1
Installation of lead batteries. 1 p
EB-EGS-002 Diesel Emergency generator. Electrical control panel 2 009
EB-EGS-003 Diesel Emergency generator.General Lay out 2 v
Diesel Emergency generator. Test report 2 y
Perkins AMF Synchro panel 2 v
_____ Perkins User's Handbook 2 "
OPERATION MANUAL
CHAPTER 4
ELECTRICAL SYSTEM
VOLUME : O 08
CONTRACT N°020.PJP/922/1995/M
Rateau La Courneuve SPIE ENERTRANS PT.PR1AMANAYA
FRANCE Spie Enertrans 95 861 CERGY-PONTOISE JAKARTA 10320
FRANCE
INDONESIA
06
REPUBLIC OF INDONESIA
MINISTRY OF MINES AND ENERGY
PT.PLN[PERSERO]
OPERATION MANUAL
CHAPTER 4
ELECTRICAL SYSTEM
VOLUME : O 10
CONTRACT N°020.PJP/922/1995/M
Rateau La Courneuve SPIE ENERTRANS PT.PR1AMANAYA
FRANCE Spie Enertrans 95 861 CERGY-PONTOISE JAKARTA 10320
FRANCE
INDONESIA
07
REPUBLIC OF INDONESIA
MINISTRY OF MINES AND ENERGY
PT.PLN[PERSERO]
OPERATION MANUAL
CHAPTER 4
ELECTRICAL SYSTEM
VOLUME : O 12
CONTRACT N°020.PJP/922/1995/M
Rateau La Courneuve SPIE ENERTRANS PT.PR1AMANAYA
FRANCE Spie Enertrans 95 861 CERGY-PONTOISE JAKARTA 10320
FRANCE
INDONESIA
CONTENT
1.1 - HV EQUIPMENT
1.2 - LV EQUIPMENT
1.2.2 - Transducer
MAINTENANCE REQUIREMENTS
1.1 - HV EQUIPMENT
-
Note : First check al1 inspection points and
make condition monitoring which can be
carried out while the circuit-breaker is in
operation, and thereafter judge the need
for possible further measures which will
require taking the circuit-breaker out of
operation.
operation 1
Or
alternatively,
1 . damper regarding leakage
after
repeatedly - Condition monitoring consisting of :
switching off
short circuit - alarm function of density monitors
currents
- moisture content of SF6 gas
i
- resistance in main circuit
- contact burn off
- measurement of function values
ajor inspection can take place outdoors
irectly at the circuit-breaker site and
equires only limited dismounting.
LAHENDONG GEOTHERMAL POWER PLANT 1~20MW - MANUAL NoE300878
ELECTRICAL SYSTEM REV. A
SWITCHGEAR 156 kV OPERATING MANUAL PAGE : 7 /22
-
MAINTENANCE REQUIREMENTS
DOCUMENT
ITEM FREQUEN MAINTENANCE REQUIREMENTS
CY REFERENCE
>urrent 1 year - Check bellows position See HAEFELY -
ransformer document
iervice
Check bellows position
Examine for traces of oil
nspect that the terminal box is clean and
vell sealed
nspect porcelain insulator and clean if
iecessary
Perform overall corrosion check on metal
)arts
Check oit
F
i
LAHENDONG GEOTHERMAL POWER PLANT 1~20MW - MANUAL NoE300878
ELECTRICAL SYSTEM REV. A
SWITCHGEAR 150 kV OPERATING MANUAL PAGE : 8 122
MAINTENANCE REQUIREMENTS
~ -~
MAINTENANCE REQUIREMENTS
~ ~ _ _ _
Caution :
Paint other than that supplied by HAEFELY
TRENCH is not to be used. For line traps
nstalled in heavily polluted environments,
Dlease contact HAEFELY TRENCH for
c specific maintenance recommendations.
i
LAHENDONG GEOTHERMAL POWER PLANT 1~20MW - MANUAL NoE300878
ELECTRICAL SYSTEM REV. A
SWITCHGEAR 156 kV OPERATING MANUAL PAGE : 10/22
MAINTENANCE REQUIREMENTS
REFERENCE
MAINTENANCE REQUIREMENTS
F
)perating 2kears Visual inspection See ABB document
iechanism Manual Operating
Mechanism -
Type HA 31-80 -
Publication no GPDM
Q69611 E-Rev B
LAHENDONG GEOTHERMAL POWER PLANT 1~20MW - MANUAL NoE300878
ELECTRICAL SYSTEM ~ REV. A
SWITCHGEAR 15û kV OPERATING MANUAL PAGE : 11 /22
-
MAINTENANCE REQUIREMENTS
IV 2-3 years Check the tightness of the screws and bolts See CARIBONI
:onnectors For al1 details, see the drawings. drawings
IO 48888 E 148889F 1
1889OFl
18892F/40401/1F/
10415/1F / 021235/aF
MAINTENANCE REQUIREMENTS
1.2 - LVltem
DOCUMENT
ITEM FREQUENC MAINTENANCE OPERATION REFERENCE
Y
AVTP 31 1 year Periodic Inspection and test See GEC ALSTHOM
(See document of reference for more doc.R8023B
details) Service manual-Type
MVTP
Supervision relay for
high impedance - Type
Busbar protection
scheme - Page 6
(section 3)
:CEG 140 1 year Periodic Inspection and test See GEC ALSTHOM
( See document of reference for more doc.R8501E
details) Service manual- Type K
series - Overcurrent and
jirectionai overcurrent
?elays
'age 129 (section 6.3)
F
'age 7( section 3)
i
-
LAHENDONG GEOTHERMAL POWER PLANT 1~20MW MANUAL N" E300878
ELECTRICAL SYSTEM REV. A
SWITCHGEAR 150 kV OPERATING MANUAL PAGE : 13/22
-
I
MAINTENANCE REQUIREMENTS
DOCUMENT
ITEM FREQUENC MAINTENANCE REQUIREMENTS REFERENCE
Y
~
I
1
~~~
MFAC
High impedance
differential relays -
Page 12 (section 3)
,FZP 111 1 year Periodic Inspection and test See GEC ALSTHOM
(see document of reference for more
Doc. R5911
details) Service manual - Chaptei
4
-FAAlO1 1 year Periodic inspection and test See GEC ALSTHOM
Doc.R5920
(see document of reference for more
details) Service manual - Auto-
reclose relay
Shapter 9 - Section 1
F
i
LAHENDONG GEOTHERMAL POWER PLANT - 1~20MW MANUAL NoE300878
ELECTRICAL SYSTEM - REV. A
SWITCHGEAR 159 kV OPERATING MANUAL PAGE : 16 /22
-
MAINTENANCE REQUIREMENTS
1.2.2 Transducer
DOCUMENT
ITEM FREQUENC MAINTENANCE REQUIREMENTS REFERENCE
Y
i
MAINTENANCE REQUIREMENTS
DOCUMENT
ITEM FREQUENC MAINTENANCE REQUIREMENTS REFERENCE
Y
EPMF No specific maintenance See GEC ALSTHOM
doc.
no62 O1O 03W1E
Reference Manual
F
i
LAHENDONG GEOTHERMAL POWER PLANT - 1 ~ 2 0 M W MANUAL NoE300878
ELECTRICAL SYSTEM REV. A
SWITCHGEAR 1!$ kV OPERATING MANUAL PAGE : 18 /22
MAINTENANCE REQUIREMENTS
DOCUMENT
ITEM FREQUENC MAINTENANCE REQUIREMENTS REFERENCE
Y
SPECTRA inspection & test (see document See SCHLUMBERGER
ineter reference for more detaiis) Electricity Document
Polyphase Meter A12E -
Version 3
Technical guide
Ref : FDEE 10014982 -
07/96
Page 69 - Section E
F
i
LAHENDONG GEOTHERMAL POWER PLANT - 1 ~ 2 0 M W MANUAL NoE300878
ELECTRICAL SYSTEM REV. A
SWITCHGEAR 150 kV OPERATING MANUAL PAGE : 19 /22
MAINTENANCE REQUIREMENTS
DOCUMENT
ITEM FREQUENC MAINTENANCE REQUIREMENTS REFERENCE
Y
~~~ ~ ~
i
LAHENDONG GEOTHERMAL POWER PLANT 1~20MW - MANUAL NoE300878
ELECTRICAL SYSTEM REV. A
SWITCHGEAR 15p kV OPERATING MANUAL PAGE :20 /22
-
MAINTENANCE REQUIREMENTS
'OLUME 0128
OLUME 043
2.3.2 - Protective relays
L
DLUME
3LUME 021
2.3.3 - Transducer
2.3.7 - LV cables
F
i
____-____E_
IOLUME Q15
‘OLUME 016
VOLUME 047
2.2.6 - Disconnector switch
2.2.9 - HV connectors
2.2.1O - Miscellaneous
~
VOLUME 029
2.3.2 - Protective relays
IVOLUME 020
2.3.2- Protective relays (contn'd)
2.3.3 - Transducer
2.3.7 - LV cables
CONTENT
'OLUME 046
2.2.5 - Surge arrester
'OLUME 047
2.2.6- Disconnector switc h
2.2.9 - HV connectors
F
i
2.2.10 - Miscellaneous
REPUBLIC OF INDONESIA
MINISTRY OF MINES AND ENERGY
PT.PLN[PERSERO]
OPERATION MANUAL
CHAPTER 4
ELECTRICAL SYSTEM
VOLUME : O 15
CONTRACT N°020.PJP/922/1995/M
Rateau La Courneuve SPIE ENERTRANS PT.PR1AMANAYA
FRANCE Spie Enertrans 95 861 CERGY-PONTOISE JAKARTA 10320
FRANCE
INDONESIA
2.1
abcd
2.2
abcd
2.2.1
abcd
2.2.2
abcd
2.2.3
abcd
2.2.4
abcd
2.2.5
abcd
2.2.6
abcd
2.2.7
abcd
2.2.8
abcd
2.2.9
abcd
2.2.10
abcd
SANS OBJET
abcd
2.3
abcd
2.3.1
LFZP 11X R-5911U
SERVICE MANUAL CONTENTS
CHAPTER 4 COMMISSIONING
(R5228 Included)
01
abcd
02
abcd
03
abcd
04
abcd
05
abcd
2.3.2
LFA4101 R-5920B
SERVICEMANUAL CONTENTS
PUBLICATION R4076
CHAPTER 1 GENERAL DESCRIPTION ISSUE A
01
abcd
02
abcd
03
abcd
04
abcd
05
abcd
06
abcd
07
abcd
08
abcd
09
abcd
10
abcd
2.3.2
abcd
2.3.3
abcd
2.3.4
abcd
2.3.5
abcd
2.3.6
abcd
2.3.7
abcd
2.3.8
abcd
2.3.9
abcd
08
LAHENDONG GEOTHERMAL POWER PLANT - 1 ~ 2 0 M W MANUAL No E300878
ELECTRICAL SYSTEM REV. A
CABLING AND WlRlNG OPERATING MANUAL PAGE : 1 /2
4 ELECTRICAL SYSTEM
8.1. DESCRIPTION
The attached technical documentation include cable and cable trays suppliers
documentations.
No DESCRIPTION VOLUME
PT. SUMl INDO KABEL. Factory tests reports and packing.
PT. NOBl technical documentation.
EE-CPE-002 Power cable list
EL-CPE-002 Cable ways detailled design. Electrical building and power
house. Plan view
EL-CPE-004 Cable ways detailled design. Condenser area & cooling tower.
Plan view & sections.
EL-CPE-005 Cable ways detailled design. Pumping stations. Plan view &
sections.
EL-CPE-008 Cable ways. Mounting standard booklet
EL-CPE-O15 Outdoor Cable raceways. Main routing
REPUBLIC OF INDONESIA
MINISTRY OF MINES AND ENERGY
PT.PLN[PERSERO]
OPERATION MANUAL
CHAPTER 4
ELECTRICAL SYSTEM
VOLUME : O 22
CONTRACT N°020.PJP/922/1995/M
Rateau La Courneuve SPIE ENERTRANS PT.PR1AMANAYA
FRANCE Spie Enertrans 95 861 CERGY-PONTOISE JAKARTA 10320
FRANCE
INDONESIA
CHAPTER 5
CONTRACT N°020.PJP/922/1995/M
SPIE ENERTRANS PT.PR1AMANAYA
Spie Enertrans 95 861 CERGY-PONTOISE JAKARTA 10320
FRANCE INDONESIA
VOLUME
MAINTENANCE MANUAL
CHAPTER 5
VOLUME : M 01
CONTRACT N°020.PJP/922/1995/M
8 LIST OF SUPPLIERS
BOURDON MO2 2
ENDRESS
- + HAUSER MO2 3
GEORGIN MO2 4
KHRONE MO2 5
MAGNETROL MO3 6
MORBREY MO3 7
ROSEMOUNT MO3 8
MAINTENANCE MANUAL
CHAPTER 5
VOLUME : M 02
CONTRACT N°020.PJP/922/1995/M
01
abcd
02
abcd
03
abcd
04
abcd
05
abcd
06
abcd
07
abcd
08
abcd
09
abcd
A
abcd
B
abcd
C
abcd
D
REPUBLIC OF INDONESIA
MINISTRY OF MINES AND ENERGY
PT.PLN[PERSERO]
CHAPTER 6
CONTROL MONITORING
CONTRACT N°020.PJP/922/1995/M
SPIE ENERTRANS PT.PR1AMANAYA
Spie Enertrans 95 861 CERGY-PONTOISE JAKARTA 10320
FRANCE INDONESIA
OPERATION MANUAL
CHAPTER 6
CONTROL MONITORING
VOLUME : O 01
CONTRACT N°020.PJP/922/1995/M
6 – CONTROL MONITORING
OPERATION MANUAL
VOLUME
00
abcd
01
abcd
02
abcd
03
REPUBLIC OF INDONESIA
MINISTRY OF MINES AND ENERGY
PT.PLN[PERSERO]
MAINTENANCE MANUAL
CHAPTER 6
CONTROL MONITORING
VOLUME : M 02
CONTRACT N°020.PJP/922/1995/M
6 – CONTROL MONITORING
MAINTENANCE MANUAL
VOLUME
00
abcd
01
abcd
02
abcd
03
abcd
04
LAHENDONG GEOTHERMAL POWER PLANT - lX2OMW MANUAL NoE300878
CONTROL MONITORING REV. A
MAINTENANCE MANUAL PAGE : 1 /2
I
REPUBLIC OF INDONESIA
MINISTRY OF MINES AND ENERGY
PT.PLN[PERSERO]
MAINTENANCE MANUAL
CHAPTER 6
CONTROL MONITORING
VOLUME : M 03
CONTRACT N°020.PJP/922/1995/M
01
abcd
02
abcd
03
abcd
04
abcd
05
abcd
06
abcd
07
abcd
08
REPUBLIC OF INDONESIA
MINISTRY OF MINES AND ENERGY
PT.PLN[PERSERO]
MAINTENANCE MANUAL
CHAPTER 6
CONTROL MONITORING
VOLUME : M 04
CONTRACT N°020.PJP/922/1995/M
01
abcd
01
abcd
02
abcd
03
abcd
04
abcd
05
abcd
06
abcd
07
abcd
08
abcd
09
abcd
01
abcd
02
abcd
03
abcd
04
abcd
05
abcd
06
abcd
07
abcd
08
abcd
09
abcd
10
abcd
01
abcd
02
abcd
03
abcd
01
abcd
02
abcd
03
abcd
01
abcd
02
abcd
01
abcd
02
REPUBLIC OF INDONESIA
MINISTRY OF MINES AND ENERGY
PT.PLN[PERSERO]
CHAPTER 7
CIVIL WORKS
CONTRACT N°020.PJP/922/1995/M
SPIE ENERTRANS PT.PR1AMANAYA
Spie Enertrans 95 861 CERGY-PONTOISE JAKARTA 10320
FRANCE INDONESIA
7 CIVIL WORK
DESIGN MANUAL
GENERAL CONTENT
Volume Index
01 FOREWORD
2. The equipment supplied shall be operated under the exclusive responsibility of the
owner/user, which is assumed to have the understanding of all factors required for
reliability and safe operation and maintenance.
3. The equipment supplied is a complex set of machinery which is intended for use
only by professionally trained operators.
The follow of the instructions set out in this manual assume that operators already
have received a professional training and have an adequate competence
regarding the safety and salubrity requirements for operation of mechanical and
electrical equipment in potentially hazardous environments, such as those
incurred by solid and liquid fluids and fuels used at the site concerned.
The owner/user should therefore ensure that all operators have been properly
trained for the operation of the equipment assigned to them, that they have the
accurate qualification level regarding to their job and that they have one copy of
this manual.
The instructions given in the manual should be interpreted and applied in
conjunction with the safety and salubrity rules applicable at the site and, if any,
the particular requirements for operation of other equipment at the site.
4. The whole of the manuals should be kept by the owner/user for the life of the
equipment supplied and should be kept at any time at the users disposal.
Updates issued by ALSTOM in the form of specific Amendments or more generally
published Service Bulletins should be incorporated by the owner/user without
delay for future reference by the operator.
5. The information set out in this Manual has been developed from ALSTOM
standard equipment build specifications.
Where possible at the time of publication, information has been included in
respect of modifications to that equipment which are specific to the contact and
for additional equipment supplied by ALSTOM which has been manufactured by
others.
LAHENDONG GEOTHERMAL POWER PLANT – 1x20MW MANUAL N° E300878
CIVIL WORK REV. B
DESIGN MANUAL PAGE : 2 /4
The timing of publication and the ongoing nature of design improvements may
mean, however, that features of the equipment supplied will be different from
those shown in this publication, without it would incur any ALSTOM liability against
the owner/user.
LAHENDONG GEOTHERMAL POWER PLANT – 1x20MW MANUAL N° E300878
CIVIL WORK REV. B
DESIGN MANUAL PAGE : 3 /4
7. The data, sketchs, drawings and other informations contained in this manual have
a confidential character and are and remain the property of their respective
owner : ALSTOM, its subcontractors and licence owners.
The informations given in the manual are disclosed in confidence to the
owner/user and the operators of the equipment supplied by ALSTOM under the
contract referenced on the manual front page solely for their use in the scope of
operation and maintenance.
The contents of the manual shall not be copied, reproduced or disclosed to third
parties without written authorisation of ALSTOM.
No licence is granted to the owner/user neither the third parties for the
manufacture of any replacement equipment or components or other purposes.
02 AMENDMENT RECORD
Checked
Rev. Date Author Detail of amendment
by
A 05/01 JP. ALBARET First issue
B 11/02 JP. ALBARET Up to date
LAHENDONG GEOTHERMAL POWER PLANT – 1x20MW MANUAL N° E300878
CIVIL WORK REV. B
DESIGN MANUAL PAGE : 5 /4
SAFETY
Persons responsible for the equipment covered in this manual must ensure that it is
properly and safety installed and maintained, and operated at the specified
conditions. Only appropriately qualified staff, applying acceptable standards of
engineering practice and the recommendations contained in this manual, must be
employed in these activities.
Any similar instructions for the overall plant in which the equipment is to be
incorporated, which have an influence on the equipment application, must be
strictly followed.
Statutory and local requirements concerning work practices, safety and/or health
precautions must be observed.
Where appropriate, warnings, cautions and notes are included in the manual, and
are defined as follows :
OPERATING CONDITIONS
If the equipment application or operating conditions differ from those for which the
equipment was supplied, the equipment and the operating recommendations
contained in this manual may be inappropriate. In such circumstances verification of
the suitability of the equipment and of the operating and maintenance manual must
be obtained in writing from ALSTHOM.
LAHENDONG POWER PLANT MANUAL N° E300878
CIVIL WORK REV. A
LIST OF DRAWINGS AND SPECIFICATIONS – DESIGN MANUAL PAGE : 1/16
1. LIST OF DRAWINGS
CONTRACTOR'S
PLN' DRAWING
DRAWING DRAWING TITLE VOLUME
NUMBER
NUMBER
1303-01-S-01TA-001 GA-CPE-001 CIVIL WORK DESIGN CRITERIA D01
UNDERGROUND NETWORKS
1303-01-S-58MI-003 GA-CPE-008 D01
COORDINATION GENERAL PLAN VIEW
UNDERGROUND NETWORKS DETAIL NOTE
1303-01-S-62MI-002 GA-CPE-009 D01
BOOK TRENCHES MANHOLES, SLEEVES
ADMINISTRATION BUILDING
1303-01-S-55MA-002 GA-CPE-301 D01
ARCHITECTURAL
ADMINISTRATION BUILDING
1303-01-S-55MA-002 GA-CPE-302 D01
ARCHITECTURAL SECTION
1303-01-S-55MM-001 GB-CPE-401 WORKSHOP & STORE ARCHITECTURAL D01
WORKSHOP & STORE ARCHITECTURAL
1303-01-S-55MM-004 GB-CPE-402 D01
SECTION
POWER HOUSE-ELECTRICAL BUILDING-
1303-01-S-55NB-001 GB-CPE-101 D01
PLANT ARCHITECTURAL
POWER HOUSE-ELECTRICAL BUILDING
1303-01-S-55NB-002 GB-CPE-102 D01
PLANTS ARCHITECTURAL 1st FLOOR
POWER HOUSE-ELECTRICAL BUILDING
1303-01-S-55NB-003 GB-CPE-103 PLANTS FRONT & REAR ELEVATIONS D01
ARCHITECTURAL
POWER HOUSE-ELECTRICAL BUILDING
1303-01-S-55NB-004 GB-CPE-104 PLANTS S-E AND M-W ELEVATIONS D01
ARCHITECTURAL
POWER HOUSE-ELECTRICAL BUILDING
1303-01-S-55NB-005 GB-CPE-105 PLANTS SECTIONS A-A, B-B AND C-C D02
ARCHITECTURAL
1303-01-S-55NB-006 GB-CPE-106 LEGEND DEFINITION ARCHITECTURAL D02
1303-01-S-55MM-002 GB-CPE-501 GARAGE ARCHITECTURAL D02
1303-01-S-55MM-005 GB-CPE-502 GARAGE ARCHITECTURAL SECTION D02
REINJECTION PUMP STATION & CHEMICAL
1303-01-S-55MM-003 GB-CPE-601 D02
ROOM ARCHITECTURAL
REINJECTION PUMP HOUSE & CHEMICAL
1303-01-S-55MM-006 GB-CPE-602 D02
ROOM ARCHITECTURAL SECTION
WATER TREATMENT & PUMPING STATION
1303-01-S-55MH-001 GB-CPE-701 D02
ARCHITECTURAL
WATER TREATMENT & PUMPING STATION
1303-01-S-55MH-002 GB-CPE-702 D02
ARCHITECTURAL SECTION
LAHENDONG POWER PLANT MANUAL N° E300878
CIVIL WORK REV. A
LIST OF DRAWINGS AND SPECIFICATIONS – DESIGN MANUAL PAGE : 2/16
1. LIST OF DRAWINGS
CONTRACTOR'S
PLN' DRAWING
DRAWING DRAWING TITLE VOLUME
NUMBER
NUMBER
1303-01-S-55FK-001 GC-CPE-911 HV SWITCHYARD LAYOUT OF CIVIL WORKS D02
TURBO GENERATOR CALCULATION NOTE
1303-01-S-55NM-006 GC-GRB-005 D02
FOUNDATION BLOCK
ELECTRICAL BUILDING & TURBINE HOUSE
1303-01-S-55MM-055 GS-CPE-141 D02
PLAN VIEW GROUND LEVEL
ELECTRICAL BUILDING & TURBINE HOUSE
1303-01-S-55MM-056 GS-CPE-142 STEEL STRUCTURE PLAN VIEW FIRST D02
FLOOR AND CRANE LEVELS
ELECTRICAL BUILDING & TURBINE HOUSE
1303-01-S-55MM-057 GS-CPE-143 STEEL STRUCTURE PLAN VIEW PURLINS D02
LEVELS
ELECTRICAL BUILDING & TURBINE HOUSE
1303-01-S-55MM-058 GS-CPE-144 STEEL STRUCTURE ELEVATIONS A-A, C-C, D02
D-D & G-G
ELECTRICAL BUILDING & TURBINE HOUSE
1303-01-S-55MM-059 GS-CPE-145 D02
STEEL STRUCTURE ELEVATIONS E-E & F-F
ELECTRICAL BUILDING & TURBINE HOUSE
1303-01-S-55MM-060 GS-CPE-146 D03
STEEL STRUCTURE ELEVATIONS B-B & H-H
SHELTER STEEL STRUCTURAL VIEW CRANE
1303-01-S-55MM-061 GS-CPE-147 D03
LEVEL
SHELTER STEEL STRUCTURAL VIEW
1303-01-S-55MM-062 GS-CPE-148 D03
PURLINS LEVEL
SHELTER STEEL STRUCTURAL ELEVATIONS
1303-01-S-55MM-063 GS-CPE-149 D03
A-A & B-B
ELECTRICAL BUILDING & TURBINE HOUSE
1303-01-S-02MM-065 GS-CPE-191 STEELWORK STRUCTURE CALCULATION D03
NOTE
WATER TREATMENT AND PUMPING STATION
1303-01-S-54MH-003 MD-CPE-006 D04
CIVIL WORK GUIDE DRAWING
REINJECTION PUMPING STATION AND
1303-01-S-54MM-016 MD-CPE-007 CHEMICAL ROOM CIVIL WORK GUIDE D04
DRAWING
ADMINISTRATION BUILDING CIVIL WORK D04
1303-01-S-54MM-003 MD-CPE-910
GUIDE DRAWING
WORKSHOP AND STORE CIVIL WORKS D04
1303-01-S-54MM-017 MD-CPE-911
GUIDE DRAWING
1303-01-S-54MM-018 MD-CPE-912 GARAGE CIVIL WORK GUIDE DRAWING D04
LAHENDONG POWER PLANT MANUAL N° E300878
CIVIL WORK REV. A
LIST OF DRAWINGS AND SPECIFICATIONS – DESIGN MANUAL PAGE : 3/16
1. LIST OF DRAWINGS
CONTRACTOR'S
PLN' DRAWING
DRAWING DRAWING TITLE VOLUME
NUMBER
NUMBER
RAW WATER STORAGE & FIRE FIGHTING D04
1303-01-S-69KP-001 MD-CPE-997
CIVIL WORK GUIDE DRAWING
CONDENSER ASSEMBLY SHELTER
1303-01-S-02MM-064 GS-CPE-291 D04
STEELWORK CALCULATION NOTE
ELECTRICAL BUILDING & TURBIN HOUSE
GS-ALI-101 D05
STEEL STRUCTURE RUNWAY
ELECTRICAL BUILDING & TURBIN HOUSE
GS-ALI-102 D05
STEEL STRUCTURE RUNWAY
ELECTRICAL BUILDING & TURBIN HOUSE
GS-ALI-103 D05
STEEL STRUCTURE RUNWAY
ELECTRICAL BUILDING & TURBIN HOUSE
GS-ALI-104 D05
STEEL STRUCTURE VERTICAL BRACE
ELECTRICAL BUILDING & TURBIN HOUSE
GS-ALI-105 D05
STEEL STRUCTURE HORISONTAL BRACE
ELECTRICAL BUILDING & TURBIN HOUSE
GS-ALI-106 D05
STEEL STRUCTURE BEAM DETAIL
ELECTRICAL BUILDING & TURBIN HOUSE
GS-ALI-107 D05
STEEL STRUCTURE GIRDER DETAIL
ELECTRICAL BUILDING & TURBIN HOUSE
GS-ALI-108 D05
STEEL STRUCTURE POST DETAIL
ELECTRICAL BUILDING & TURBINE HOUSE
GS-ALI-109 D05
STEEL STRUCTURE COLUMN DETAIL F/2.A/2
ELECTRICAL BUILDING & TURBINE HOUSE
GS-ALI-110 D05
STEEL STRUCTURE COLUMN DETAIL F/3.A/3
ELECTRICAL BUILDING & TURBINE HOUSE
GS-ALI-111 D05
STEEL STRUCTURE COLUMN DETAIL E/2.B/2
ELECTRICAL BUILDING & TURBINE HOUSE
GS-ALI-112 D05
STEEL STRUCTURE COLUMN DETAIL D/2.C/2
ELECTRICAL BUILDING & TURBINE HOUSE
GS-ALI-113 D05
STEEL STRUCTURE COLUMN DETAIL E/3.B/3
ELECTRICAL BUILDING & TURBINE HOUSE
GS-ALI-114 D05
STEEL STRUCTURE COLUMN DETAIL D/3.C/3
ELECTRICAL BUILDING & TURBINE HOUSE
GS-ALI-115 D05
STEEL STRUCTURE COLUMN DETAIL F/1.A/1
ELECTRICAL BUILDING & TURBINE HOUSE
GS-ALI-116 D05
STEEL STRUCTURE COLUMN DETAIL E/1.D/1
LAHENDONG POWER PLANT MANUAL N° E300878
CIVIL WORK REV. A
LIST OF DRAWINGS AND SPECIFICATIONS – DESIGN MANUAL PAGE : 4/16
1. LIST OF DRAWINGS
CONTRACTOR'S
PLN' DRAWING
DRAWING DRAWING TITLE VOLUME
NUMBER
NUMBER
ELECTRICAL BUILDING & TURBINE HOUSE
GS-ALI-117 D05
STEEL STRUCTURE COLUMN DETAIL C/1.B/1
ELECTRICAL BUILDING & TURBINE HOUSE
GS-ALI-119 D05
STEEL STRUCTURE RAFTER LINE D & C
ELECTRICAL BUILDING & TURBINE HOUSE
GS-ALI-120 D05
STEEL STRUCTURE RAFTER LINE B & E
ELECTRICAL BUILDING & TURBINE HOUSE
GS-ALI-121 D05
STEEL STRUCTURE RAFTER LINE C & D
ELECTRICAL BUILDING & TURBINE HOUSE
GS-ALI-122 D05
STEEL STRUCTURE RAFTER
COOLING TOWER FORMWORK
GC-HMN-001 D06
BASSIN LAYOUT AND SECTIONS
COOLING TOWER FORMWORK
GC-HMN-002 LEVEL +6.98-LAYOUT H3 D06
AND SECTIONS L3-T3
COOLING TOWER FORMWORK
GC-HMN-003 LEVEL +11.66-LAYOUT H2 D06
AND SECTIONS L2-T2
COOLING TOWER FORMWORK
GC-HMN-004 ROOF LEVEL +13.79-LAYOUT H1 D06
AND SECTIONS L1-T1
COOLING TOWER FORMWORK
GC-HMN-005 LEVEL +3.30-LAYOUT H4 D06
AND SECTIONS L4-T4
COOLING TOWER BASIN
GC-HMN-006 D06
REINFORCING SCHEDULE - LIST OF BARS
COOLING TOWER BASSIN
GC-HMN-007 D06
BOTTOM AND TOP REINFORCEMENT
COOLING TOWER BASIN
GC-HMN-008 WALLS W1-W2-W2’-W3-W9 SLAB NIV.+3.30 D06
REINFORCEMENT
COOLING TOWER BASIN
GC-HMN-009 D06
WALLS W5-W6-W7-W8 REINFORCEMENT
COOLING TOWER BASIN
GC-HMN-010 WALLS W5-W6-W7-W8 D06
REINFORCING SCHEDULE- LISTOF BARS
LAHENDONG POWER PLANT MANUAL N° E300878
CIVIL WORK REV. A
LIST OF DRAWINGS AND SPECIFICATIONS – DESIGN MANUAL PAGE : 5/16
1. LIST OF DRAWINGS
CONTRACTOR'S
PLN' DRAWING
DRAWING DRAWING TITLE VOLUME
NUMBER
NUMBER
COOLING TOWER BASIN
GC-HMN-011 WALLS W1-W2-W2’-W3-W9 SLAB NIV.+3.30 D06
REINFORCING SCHEDULE - LISTOF BARS
COOLING TOWER
GC-HMN-012 WALLS W4 AND W5 CHANNEL SLAB D06
REINFORCEMENT
COOLING TOWER
GC-HMN-013 WALLS W6 ANDW7 BEAM B9 AND B10 D06
REINFORCEMENT
COOLING TOWER
GC-HMN-014 D06
COLUMNS C1-C2-C3-C4 REINFORCEMENT
COOLING TOWER
GC-HMN-015 ROOF LEVEL +13.79 - BEAMS B1 TO B8 D06
REINFORCEMENT
COOLING TOWER
GC-HMN-016 PRECAST BEAMS P1-P1’ D06
REINFORCEMENT
COOLING TOWER
GC-HMN-017 PRECAST SHUTTER P2 D06
REINFORCED CONCRETE STRUCTURE
COOLING TOWER
GC-HMN-018 PRECAST COVER SLAB P3-P4 D06
REINFORCEMENT
COOLING TOWER
GC-HMN-019 D06
STAIRS SLAB REINFORCEMENT
COOLING TOWER REINFORCEMENT
GC-HMN-020 WALLS W1-W2-W2’-W3 D06
REINFORCING SCHEDULE- LISTOF BARS
COOLING TOWER REINFORCEMENT
GC-HMN-021 WALLS W4 AND W5 CHANNEL SLAB D06
REINFORCING SCHEDULE- LISTOF BARS
COOLING TOWER REINFORCEMENT
GC-HMN-022 WALLS W6 AND W7 BEAMS B9 AND B10 D06
REINFORCING SCHEDULE- LISTOF BARS
COOLING TOWER REINFORCEMENT
GC-HMN-023 COLUMNS C1-C2-C3-C4 D06
REINFORCING SCHEDULE- LISTOF BARS
LAHENDONG POWER PLANT MANUAL N° E300878
CIVIL WORK REV. A
LIST OF DRAWINGS AND SPECIFICATIONS – DESIGN MANUAL PAGE : 6/16
1. LIST OF DRAWINGS
CONTRACTOR'S
PLN' DRAWING
DRAWING DRAWING TITLE VOLUME
NUMBER
NUMBER
COOLING TOWER REINFORCEMENT
GC-HMN-024 ROOF LEVEL +13.79 - BEAMS B1 TO B8 D06
REINFORCING SCHEDULE- LISTOF BARS
COOLING TOWER
GC-HMN-026 D06
WALLS W1-W2-W2’-W3 REINFORCEMENT
REINFORCED CONCRETE STRUCTURE
GC-HMN-050 D06
CALCULATION NOTE
LAHENDONG POWER PLANT MANUAL N° E300878
CIVIL WORK REV. A
LIST OF DRAWINGS AND SPECIFICATIONS – DESIGN MANUAL PAGE : 7/16
1. LIST OF DRAWINGS
CONTRACTOR'S
PLN' DRAWING
DRAWING DRAWING TITLE VOLUME
NUMBER
NUMBER
ADMINISTRATION BUILDING
1303-01-S-55MA-003 GC-BRT-308 PLAN VIEW D07
1304-01-S-55MA-004 GC-BRT-309 CROSS SECTION AND LONGITUDINAL SECTION D07
1305-01-S-55MA-004 GC-BRT-311 FOUNDATIONS PLAN VIEW-SECTION AND DETAILS D07
1306-01-S-55MA-0006 GC-BRT-312 FOUNDATIONS–REINFORCEMENT D07
1307-01-S-55MA-016 GC-BRT-314 GROUND SLAB–REINFORCEMENT D07
R.C. SUPERSTUCTURE–PLAN VIEW DETAILS AND
1308-01-S-55MA-006 GC-BRT-315 D07
REINFORCEMENT
1309-01-S-55MA- GM-BRT-331 BRICKWORK D07
1310-01-S-55MA-008 GT-BRT-341 ROOF SUPPORTING TIMBERWORK STRUCTURE D07
ROOFING-CORRUGATED SHEETS-LAYOUT AND
1311-01-S-55MA-015 GS-BRT-342 D07
DETAILS
1312-01-S-55MA-013 GF-BRT-381 DOORS AND WINDOWS D07
1312-01-S-55MA-013 GF-BRT-382 CEILING-LAYOUT AND DETAILS D07
1312-01-S-55MA-014 GF-BRT-383 PLUMBING LAYOUT AND DETAILS D07
1. LIST OF DRAWINGS
CONTRACTOR'S
PLN' DRAWING
DRAWING DRAWING TITLE VOLUME
NUMBER
NUMBER
GARAGE
1303-01-S-55MM-094 GC-BRT-508 PLAN VIEW D07
1304-01-S-55MM-007 GC-BRT-509 CROSS SECTION AND LONGITUDINAL SECTION D07
1305-01-S-55MM-095 GC-BRT-511 FOUNDATIONS PLAN VIEW-SECTION AND DETAILS D07
1306-01-S-55MM-007 GC-BRT-512 FOUNDATIONS–REINFORCEMENT D07
1307-01-S-55MM-031 GC-BRT-513 GROUND SLAB–FORMWORK D07
1308-01-S-55MM-032 GC-BRT-514 GROUND SLAB–REINFORCEMENT D07
R.C. SUPERSTUCTURE–PLAN VIEW DETAILS AND
1308-01-S-55MM-008 GC-BRT-515 D07
REINFORCEMENT
1309-01-S-55MM- GM-BRT-531 BRICKWORK D07
1310-01-S-55MM-025 GT-BRT-541 ROOF SUPPORTING TIMBERWORK STRUCTURE D07
ROOFING-CORRUGATED SHEETS-LAYOUT AND
1311-01-S-55MM-096 GS-BRT-542 D07
DETAILS
1312-01-S-55MM-077 GF-BRT-582 CEILING-LAYOUT AND DETAILS D07
LAHENDONG POWER PLANT MANUAL N° E300878
CIVIL WORK REV. A
LIST OF DRAWINGS AND SPECIFICATIONS – DESIGN MANUAL PAGE : 9/16
1. LIST OF DRAWINGS
CONTRACTOR'S
PLN' DRAWING
DRAWING DRAWING TITLE VOLUME
NUMBER
NUMBER
GUARD HOUSE
1303-01-S-55MM-009 GC-BRT-908 PLAN VIEW D08
1304-01-S-55MM-010 GC-BRT-909 CROSS SECTION AND LONGITUDINAL SECTION D08
1305-01-S-55MM-001 GC-BRT-911 FOUNDATIONS PLAN VIEW-SECTION AND DETAILS D08
R.C. SUPERSTUCTURE–PLAN VIEW DETAILS AND
1306-01-S-55MM-012 GC-BRT-912 D08
REINFORCEMENT
1307-01-S-55MM-84 GM-BRT-931 BRICKWORK D08
1308-01-S-55MM-026 GT-BRT-941 ROOF SUPPORTING TIMBERWORK STRUCTURE D08
LAHENDONG POWER PLANT MANUAL N° E300878
CIVIL WORK REV. A
LIST OF DRAWINGS AND SPECIFICATIONS – DESIGN MANUAL PAGE : 10/16
1. LIST OF DRAWINGS
CONTRACTOR'S
PLN' DRAWING
DRAWING DRAWING TITLE VOLUME
NUMBER
NUMBER
SETTLING BASIN
1303-01-S-55MM- GC-BRT-620 PLAN VIEW AND LEVELS D09
1303-01-S-55MM- GC-BRT-621 CROSS SECTION AND LONGITUDINAL SECTION D09
1304-01-S-55MM- GC-BRT-622 FORWORK RAFT, WALL AND DETAILS D09
1305-01-S-55MM-087 GC-BRT-623 REINFORCEMENT OF FLOOR D09
1306-01-S-55MM- GC-BRT-624 OVER FLOW DETAILS D09
REINFORCEMENT OF GROUND BEAM AND
1307-01-S-55MM-089 GC-BRT-626 D09
COLUMNS
1308-01-S-55MM- GC-BRT-631 FORWORK GROUND, BEAM AND DETAILS D09
1309-01-S-55MM-090 GC-BRT-632 REINFORCEMENT OF WALL D09
LAHENDONG POWER PLANT MANUAL N° E300878
CIVIL WORK REV. A
LIST OF DRAWINGS AND SPECIFICATIONS – DESIGN MANUAL PAGE : 11/16
1. LIST OF DRAWINGS
CONTRACTOR'S
PLN' DRAWING
DRAWING DRAWING TITLE VOLUME
NUMBER
NUMBER
SEWAGE SYSTEM
1303-01-S-55MM-7008 GR-BRT-045 LAYOUT AND LEVELS D09
1304-01-S-55MM-8330 GR-BRT-046 SEPTIC TANK AND FILTRATION TANK D09
1. LIST OF DRAWINGS
CONTRACTOR'S
PLN' DRAWING
DRAWING DRAWING TITLE VOLUME
NUMBER
NUMBER
POWER HOUSE-ZONE 1 AND 2-OPEN CANALS-
GC-CPE-260-B MODIFICATIONS DEMOLITION AND D10
RECONSTRUCTION
PIPES SUPPORTS CONCRETE BLOCKS
GA-CPE-010-C D10
COORDINATION
PIPES SUPPORTS-DETAIL NOTE BOOK-CONCRETE
GA-CPE-011-D D10
FOUNDATION BLOCKS
POWER HOUSE-ELECTRICAL BUILDING-PLANT
GB-CPE-101-D D10
ARCHITECTURAL-GROUND LEVEL
POWER HOUSE-ELECTRICAL BUILDING-PLANT
GB-CPE-102-C D10
ARCHITECTURAL-FIRST FLOOR
POWER HOUSE-ELECTRICAL BUILDING-PLANT
GB-CPE-103-D D10
ARCHITECTURAL-FRONT AND REAR ELEVATIONS
POWER HOUSE-ELECTRICAL BUILDING-PLANT
GB-CPE-104-C ARCHITECTURAL- D10
S-E & N-W ELEVATIONS
POWER HOUSE-ELECTRICAL BUILDING-PLANT
GB-CPE-105-D D10
ARCHITECTURAL-SECTION A-A, B-B AND C-C
GB-CPE-106-B ARCHITECTURAL-LEGEND DEFINITION D10
UNDERGROUND NETWORKS-DETAIL NOTE BOOK-
GA-CPE-009-D D10
TRENCHES MANHOLES, SLEEVES
INDUSTRIAL WATER TANK 450M3 –FOUNDATIONS-
GC-CPE-015-C D10
FORMWORK AND REINFORCEMENT
GC-CPE-016-B EXTERNAL WORKS-MANHOLE MH 01-FORMWORK D10
EXTERNAL WORKS-MANHOLE MH 01-
GC-CPE-017-B D10
REINFORCEMENT
GC-CPE-018-B EXTERNAL WORKS-MANHOLE MH 02-FORMWORK D10
EXTERNAL WORKS-MANHOLE MH 02-
GC-CPE-019-B D10
REINFORCEMENT
PIPES SUPPORTS FOUNDATION BLOCKS-
GC-CPE-091-B D10
CALCULATION NOTE
FRP PIPE-UNDERGROUND ROAD CROSSING-
GC-CPE-092-B D10
CALCULATION NOTE
LAHENDONG POWER PLANT MANUAL N° E300878
CIVIL WORK REV. A
LIST OF DRAWINGS AND SPECIFICATIONS – DESIGN MANUAL PAGE : 13/16
1. LIST OF DRAWINGS
CONTRACTOR'S
PLN' DRAWING
DRAWING DRAWING TITLE VOLUME
NUMBER
NUMBER
EXTERNAL WORKS-MANHOLE MH 01-
GC-CPE-093-B D10
CALCULATION NOTE
EXTERNAL WORKS-MANHOLE MH 02-
GC-CPE-094-B D10
CALCULATION NOTE
PIPES SUPPORT PCB 25 FOUNDATION-
GC-CPE-095-B D10
CALCULATION NOTE
PIPES SUPPORT PCB 24 FOUNDATION-
GC-CPE-096-B D10
CALCULATION NOTE
ELECTRICAL BUILDING-DISTRIBUTION
GC-CPE-121-B TRANSFORMERS-2500/1250KVA- FOUNDATION D11
LAYOUT
ELECTRICAL BUILDING-DISTRIBUTION
GC-CPE-122-B TRANSFORMERS-2500/1250KVA- FOUNDATIONS D11
FORMWORK
ELECTRICAL BUILDING-DISTRIBUTION
GC-CPE-123-B TRANSFORMERS-2500/1250KVA- FOUNDATIONS D11
REINFORCEMENT
GC-CPE-911-D HV SWITCHYARD-LAYOUT OF CIVIL WORKS D11
HV SWITCHYARD-DETAIL NOTE BOOK-CONCRETE
GC-CPE-912-D D11
BLOCKS AND MANHOLES
TRANSFORMER 30MVA-FOUNDATION AND PIT-
GC-CPE-913-C D11
LAYOUT AND SECTIONS
TRANSFORMER 30MVA-FOUNDATION AND PIT-
GC-CPE-914-C D11
FORMWORK
TRANSFORMER 30MVA-FOUNDATION AND PIT-
GC-CPE-915-C D11
REINFORCEMENT
TRANSFORMER 30MVA-FOUNDATION AND PIT-
GC-CPE-916-C D11
GRATING SUPPORTING-STEELWORK STRUCTURE
TRANSFORMER 30MVA-FOUNDATION AND PIT-
GC-CPE-917-C D11
GRATING DEFINITION
TRANSFORMER 30MVA-FOUNDATION –
GC-CPE-991-C D11
CALCULTION NOTE
1250KVA TRANSFORMER-FOUNDATION –
GC-CPE-992-B D11
CALCULTION NOTE
2500KVA TRANSFORMER-FOUNDATION –
GC-CPE-993-B D11
CALCULTION NOTE
LAHENDONG POWER PLANT MANUAL N° E300878
CIVIL WORK REV. A
LIST OF DRAWINGS AND SPECIFICATIONS – DESIGN MANUAL PAGE : 14/16
1. LIST OF DRAWINGS
CONTRACTOR'S
PLN' DRAWING
DRAWING DRAWING TITLE VOLUME
NUMBER
NUMBER
HV SWITCHYARD-FOUNDATION BLOCKS–
GC-CPE-994-C D11
CALCULTION NOTE
TURBO GENERATOR-FOUNDATION BLOCK
GC-GRB-001-E D11
FORMWORK DRAWING
TURBO GENERATOR-FOUNDATION BLOCK
GC-GRB-002-C D11
SECTION A-A-REINFORCEMENT DRAWING
TURBO GENERATOR-FOUNDATION BLOCK
GC-GRB-003-C D11
SECTION B-B & C-C-REINFORCEMENT DRAWING
TURBO GENERATOR-FOUNDATION BLOCK
GC-GRB-004-C D11
PLAN VIEW-REINFORCEMENT DRAWING
TURBO GENERATOR-CALCULATION NOTE-
GC-GRB-005-C D11
FOUNDATION BLOCKS
POWER HOUSE-ZONE 1 TO 3-SLAB ON GRADE-
GC-EBI-215-D +30 LEVEL FORMWORK AND REINFORCEMENT D12
DETAILS
POWER HOUSE-ZONE 3-CONDENSER PIT-
GC-EBI-240-C D12
STRUCTURAL ELEMENTS DESIGNATED
POWER HOUSE-ZONE 3-LOWER RAFT R3
GC-EBI-241-C D12
REINFORCEMENT DETAILS
POWER HOUSE-ZONE 3-UPPER RAFT R1 AND R2
GC-EBI-242-C D12
REINFORCEMENT DETAILS
POWER HOUSE-ZONE 3-WALLS V1, V3, V5
GC-EBI-243-C D12
REINFORCEMENT DETAILS
POWER HOUSE-ZONE 3-WALLS V7, V9, V11
GC-EBI-244-C D12
REINFORCEMENT DETAILS
POWER HOUSE-ZONE 3-WALLS V2, V10, V12
GC-EBI-245-C D12
REINFORCEMENT DETAILS
POWER HOUSE-ZONE 3-WALLS V6
GC-EBI-246-C D12
REINFORCEMENT DETAILS
POWER HOUSE-ZONE 3-WALLS V4, V8
GC-EBI-247-C D12
REINFORCEMENT DETAILS
POWER HOUSE-ZONE 2-OIL RESERVE PIT
GC-EBI-248-C D12
REINFORCEMENT DETAILS
POWER HOUSE-ZONE 1-STAIRCASE STRUCTURES
GC-EBI-249-C D12
REINFORCEMENT DETAILS
LAHENDONG POWER PLANT MANUAL N° E300878
CIVIL WORK REV. A
LIST OF DRAWINGS AND SPECIFICATIONS – DESIGN MANUAL PAGE : 15/16
1. LIST OF DRAWINGS
CONTRACTOR'S
PLN' DRAWING
DRAWING DRAWING TITLE VOLUME
NUMBER
NUMBER
POWER PLANT-ZONE 1 TO 3-FOUNDATIONS
GC-EBI-250-C D12
REINFORCEMENT DETAILS
POWER PLANT-GROUND SLAB-BORDER BEAMS
GC-EBI-251-C D12
REINFORCEMENT DETAILS
POWER HOUSE-ZONE 1 AND 2-OPEN CANALS
GC-EBI-252-C D12
SYSTEM REINFORCEMENT DETAILS
POWER HOUSE-ZONE 1 TO 3-DETAILS 1TO 5
GC-EBI-253-C D12
REINFORCEMENT
POWER HOUSE-ZONE 3-UPPER SLABS D1-D2
GC-EBI-254-C D12
REINFORCEMENT DETAILS
POWER HOUSE-ZONE 1 TO 3-GENERAL LAYOUT
GC-EBI-203-C D12
FOUNDATIONS LEVEL FORMWORK
POWER HOUSE-ZONE 1 TO 3-GENERAL LAYOUT
GC-EBI-204-C D12
+30 LEVEL FORMWORK
POWER HOUSE-ZONE 1 AND 2-PLAN VIEW AT
GC-EBI-205-C D12
FOUNDATIONS LEVEL FORMWORK
POWER HOUSE-ZONE 3-PLAN VIEW AT
GC-EBI-206-C D12
FOUNDATIONS LEVEL FORMWORK
POWER HOUSE-ZONE 1 AND 2-PLAN VIEW AT +30
GC-EBI-207-C D12
LEVEL FORMWORK
POWER HOUSE-ZONE 3-PLAN VIEW AT +30 LEVEL
GC-EBI-208-C D12
FORMWORK
POWER HOUSE-ZONE 3-LONGITUDINAL SECTIONS
GC-EBI-209-C D12
A-A AND B-B FORMWORK
POWER HOUSE-ZONE 3-TRANSVERSAL SECTIONS
GC-EBI-210-C D12
C-C AND D-D FORMWORK
POWER HOUSE-ZONE 1 AND 2-TRANSVERSAL
GC-EBI-211-C D12
AND LONGITUDINAL SECTIONS E TO I
FORMWORK
POWER HOUSE-ZONE 1 TO 3-FOUNDATIONS
GC-EBI-212-C D12
DETAILS FORMWORK
POWER HOUSE-ZONE 1 TO 3-DETAILS 1 TO 9
GC-EBI-213-C D12
FORMWORK
POWER HOUSE-ZONE 1-STAIRCASE STRUCTURES-
GC-EBI-214-C D12
PLAN VIEW AND VERTICAL SECTIONS
FORMWORK
LAHENDONG POWER PLANT MANUAL N° E300878
CIVIL WORK REV. A
LIST OF DRAWINGS AND SPECIFICATIONS – DESIGN MANUAL PAGE : 16/16
1. LIST OF DRAWINGS
CONTRACTOR'S
PLN' DRAWING
DRAWING DRAWING TITLE VOLUME
NUMBER
NUMBER
PCB 24 AND PCB 25-FOUNDATIONS-FORWORK
GC-CPE-012-B D12
AND REINFORCEMENT
POWER HOUSE-ZONE 3-DETAIL «A»
GC-EBI-255-B D12
REINFORCEMENT DETAILS
POWER HOUSE-ZONE 3-DETAIL «B»
GC-EBI-256-B D12
REINFORCEMENT DETAILS
POWER HOUSE AND CONDENSER AREA
GC-EBI-293-B D12
SUBSTRUCURE-ADDITIONAL CALCULATION NOTE
POWER HOUSE-ZONE 1 AND 2-OPEN CANALS
GC-CPE-261-B D12
MODIFICATION REINFORCEMENT DETAILS
REPUBLIC OF INDONESIA
MINISTRY OF MINES AND ENERGY
PT.PLN[PERSERO]
DESIGN MANUAL
CHAPTER 7
CIVIL WORKS
VOLUME : D 01
CONTRACT N°020.PJP/922/1995/M