You are on page 1of 15265

REPUBLIC OF INDONESIA

MINISTRY OF MINES AND ENERGY


PT.PLN[PERSERO]

LAHENDONG GEOTHERMAL POWER PLANT


1 X 20MW

N° E 300 878 Rev.B


DESIGN, OPERATION AND MANTENANCE MANUAL.

- GENERAL CONTENTS
- 4 ELECTRICAL SYSTEM

CD II -
-
5 INSTRUMENTATION AND CONTROL
6 CONTROL MONITORING
- 7 CIVIL WORKS

CONTRACT N°020.PJP/922/1995/M

Rateau La Courneuve SPIE ENERTRANS PT.PR1AMANAYA


FRANCE Spie Enertrans 95 861 CERGY-PONTOISE JAKARTA 10320
FRANCE
INDONESIA
Internal ref. : T.2938.0 / S3027.0 Date of issue : Nov.00
REPUBLIC OF INDONESIA
MINISTRY OF MINES AND ENERGY
PT.PLN[PERSERO]

LAHENDONG GEOTHERMAL POWER PLANT


1 X 20MW

DESIGN, OPERATION AND MAINTENANCE MANUAL.

N° E 300 878 Rev.B

CONTRACT N°020.PJP/922/1995/M

Rateau La Courneuve SPIE ENERTRANS PT.PR1AMANAYA


FRANCE Spie Enertrans 95 861 CERGY-PONTOISE JAKARTA 10320
FRANCE
INDONESIA

Internal ref. : T.29.38.0 / S 3027 .0 Date of issue : Nov.00


ABCD

LAHENDONG GEOTHERMAL POWER PLANT – 1x20MW MANUAL N° E300878


REV. B
GENERAL CONTENTS PAGE : 1/14

NUMEROTATION OF VOLUMES

CHAPTER DESCRIPTION DM OM MM TOTAL

0 UNIT OPERATION / O01 M02 2

1 STEAM TURBINE D01 O02 M03 to M05 5

2 GENERATOR D01 O02 M03 to M08 8

3 BALANCE OF PLANT D01 to D03/D O04/A to O04/J M05 to M20 32

4 ELECTRICAL SYSTEM D01 O02 to O22 / 22

5 INSTRUM. AND CONTROL / / M01 and M03 3

6 CONTROL MONITORING / O01 M02 to M13 13

7 CIVIL WORKS D01 to D12 / / 12

TOTAL 97
ABCD

LAHENDONG GEOTHERMAL POWER PLANT – 1x20MW MANUAL N° E300878


REV. B
GENERAL CONTENTS PAGE : 2/14

0 -UNIT OPERATION

VOLUME
OPERATION MANUAL

1 LIST OF SPECIFICATIONS O01

MAINTENANCE MANUAL

1 LIST OF SPECIFICATIONS M02


ABCD

LAHENDONG GEOTHERMAL POWER PLANT – 1x20MW MANUAL N° E300878


REV. B
GENERAL CONTENTS PAGE : 3/14

1 - STEAM TURBINE
VOLUME

CONDENSING STEAM TURBINE - DESIGN MANUAL D01


01. FOREWORD
02. AMENDEMENT RECORD SHEET
1 STEAM TURBINE DESCRIPTION
2 TECHNICAL DATA
3 DEFINITION OF OPERATION CASES
4 DRAWINGS

CONDENSING STEAM TURBINE - OPERATION MANUAL O02


01. FOREWORD
02. AMENDEMENT RECORD SHEET
03. HEALTH AND SAFETY
04. GENERAL SITE OPERATI NG CONDITIONS
1 STEAM TURBINE OPERATING INSTRUMENTS
1.1. PURPOSE OF THE CHAPTER
1.2. STEAM TURBINE IN THE GEOTHERMAL PLANT – OPERATION CASES
1.3. STEAM TURBINE COLD START-UP PROCEDURE
1.4. STEAM TURBINE HOT START-UP PROCEDURE
1.5. STEAM TURBINE SHUTDOWN PROCEDURE
1.6. STEAM TURBINE MONITORING IN OPERATION OR AT REST
1.7. TROUBLE SHOOTING
1.8. STEAM TURBINE SAFETY TESTS
1.9. STEAM TURBINE OPERATION UNDER ABNORMAL CONDITIONS
1.10. DRAWINGS AND SPECIFICATIONS

CONDENSING STEAM TURBINE - MAINTENANCE MANUAL M03


01. FOREWORD
02. AMENDEMENT RECORD SHEET
1 GENERAL STATEMENTS ON MAINTENANCE
2 HEALTH AND SAFETY
3 PREVENTIVE MAINTENANCE
4 CORRECTIVE MAINTENANCE
5 DISMANTLING AND ASSEMBLY PROCEDURES
6 LUBRICATION SCHEDULE
7 SPART PARTS LIST
8 DRAWINGS AND SPECIFICATIONS
9 LIST OF ACCESSORIES M04 / M05
ABCD

LAHENDONG GEOTHERMAL POWER PLANT – 1x20MW MANUAL N° E300878


REV. B
GENERAL CONTENTS PAGE : 4/14

2 - GENERATOR
VOLUME

1 ELECTRICAL GENERATOR-DESIGN MANUAL D01/A

01. GENERATOR GENERAL CHARACTERISTICS


02. GENERATOR COOLING SYSTEM
03. GENERATOR STATOR
04. GENERATOR ROTOR
05. GENERATOR BEARING
06. GENERATOR MISCELLANEOUS
07. GENERATOR OIL CIRCULATION
08. GENERATOR CABLING
09. EXCITER
10. GENERATOR INSTRUMENTATION

2 ELECTRICAL GENERATOR-OPERATING MANUAL O02/A

01. STARTING UP
02. FAULT DETECTION
03. INSULATION RESISTANCE
04. PERSONAL SAFETY
05. TIGHTENING TORQUE

3 ELECTRICAL GENERATOR-MAINTENANCE MANUAL M03

01. GENERATOR INSPECTIONS AND REPLACEMENTS


02. GENERATOR ROTOR DISASSEMBLY AND ASSEMBLY
03. BEARING INSTRUCTIONS FOR INSTAL., MAINTENANCE AND OPERATION
04. EXCITER INSPECTIONS AND REPLACEMENTS
05. EXCITER DISASSEMBLY AND ASSEMBLY

4 DRAWINGS M03

01. DRAWING LIST


02. DRAWING PARTS LIST
03. DRAWINGS AND SPECIFICATIONS ( SUITE ) M04 / M05
ABCD

LAHENDONG GEOTHERMAL POWER PLANT – 1x20MW MANUAL N° E300878


REV. B
GENERAL CONTENTS PAGE : 5/14

2 - GENERATOR

VOLUME
EXCITATION REGULATION CUBICLE

1 DESCRIPTION D01/B
01. COMPOSITION OF THE MODULE
02. EXCITATION REGULATION PROTECTION CUBICLE
03. LINE SIDE MEDIUM VOLTAGE CUBICLE
04. NEUTRAL SIDE MEDIUM VOLTAGE CUBICLE

2 OPERATION O02/B
01. GENERAL
02. CONTROL SIGNALLING AND MEASUREMENT
03. NORMAL OPERATION
04. PARTICULAR OPERATION
05. SAFETY

3 MAINTENANCE M06
01. CUSTOMER SUPPORT
02. PACKING AND STORAGE
03. GENERAL MAINTENANCE
04. TESTS
05. TROUBLES SHOOTING
06. PARTS REPLACEMENT
07. SUPPLIERS DOCUMENTATION

4 DRAWINGS M07
01. LIST OF DRAWINGS
02. DRAWINGS

5 PARTS CATALOG M07


01. PARTS CATALOG SUMMARY
02. PARTS LISTS

6 SPECIFICATIONS M08
ABCD

LAHENDONG GEOTHERMAL POWER PLANT – 1x20MW MANUAL N° E300878


REV. B
GENERAL CONTENTS PAGE : 6/14

3 - BALANCE OF PLANT
DESIGN MANUAL

VOLUME

01. FOREWORD D01


02. AMENDEMENT RECORD D01
03. HEALTH AND SAFETY D01

1 MAIN STEAM SUPPLY SYSTEM D01


2 NON CONDENSABLE GASES SYSTEM D01
3 MAIN COOLING WATER SYSTEM D01
4 PRIMARY AUXILIARY COOLING WATER SYSTEM D01
5 SECONDARY AUXILIARY COOLING WATER SYSTEM D01
6 REINJECTION SYSTEM D01
7 SERVICE WATER SUPPLYING SYSTEM D01
8 COMPRESSED AIR SYSTEM D01
9 FIRE DETECTION AND FIGHTING SYSTEM D01
10 HANDLING EQUIPMENT D01
11 LABORATORY AND ENVIRONMENT EQUIPMENT D01
12 WORKSHOP MAINTENANCE EQUIPMENT D01
13 VENTILATION AND AIR CONDITIONNING SYSTEM D01
14 TELEPHONE SYSTEM AND CLOCK SYSTEM D01
15 LIST OF DRAWINGS AND SPECIFICATIONS D01
16 DRAWINGS AND SPECIFICATIONS D01/02/03/A to 03/D
ABCD

LAHENDONG GEOTHERMAL POWER PLANT – 1x20MW MANUAL N° E300878


REV. B
GENERAL CONTENTS PAGE : 7/14

3 - BALANCE OF PLANT
OPERATION MANUAL

VOLUME

01. FOREWORD O04/A


02. AMENDEMENT RECORD O04/A
03. HEALTH AND SAFETY O04/A

1 MAIN STEAM SUPPLY SYSTEM O04/A


2 NON CONDENSABLE GASES SYSTEM O04/A
3 MAIN COOLING WATER SYSTEM O04/A
4 PRIMARY AUXILIARY COOLING WATER SYSTEM O04/A
5 SECONDARY AUXILIARY COOLING WATER SYSTEM O04/A
6 REINJECTION SYSTEM O04/A
7 SERVICE WATER SUPPLYING SYSTEM O04/B
8 COMPRESSED AIR SYSTEM O04/C
9 FIRE DETECTION AND FIGHTING SYSTEM O04/D/E
10 HANDLING EQUIPMENT O04/F/G
11 LABORATORY AND ENVIRONMENT EQUIPMENT O04/H
12 WORKSHOP MAINTENANCE EQUIPMENT O04/H
13 VENTILATION AND AIR CONDITIONNING SYSTEM O04/H
14 TELEPHONE SYSTEM AND CLOCK SYSTEM O04/I
15 LIST OF DRAWINGS AND SPECIFICATIONS O04/J
16 DRAWINGS AND SPECIFICATIONS O04/J
ABCD

LAHENDONG GEOTHERMAL POWER PLANT – 1x20MW MANUAL N° E300878


REV. B
GENERAL CONTENTS PAGE : 9/14

4 - ELECTRICAL SYSTEM
DESIGN MANUAL

VOLUME

1 GENERATOR ELECTRICAL OUTPUT SYSTEM D01


2 TRANSFORMERS D01
3 MEDIUM VOLTAGE SERVICE SYSTEM D01
4 LOW VOLTAGE SERVICE SYSTEM D01
5 EMERGENCY SERVICE SYSTEM D01
6 LIGHTING AND EARTHING D01
7 SWITCHGEAR 150 Kv D01
8 CABLING AND WIRING D01
ABCD

LAHENDONG GEOTHERMAL POWER PLANT – 1x20MW MANUAL N° E300878


REV. B
GENERAL CONTENTS PAGE : 10/14

4 - ELECTRICAL SYSTEM
OPERATION MANUAL

VOLUME

1 GENERATOR ELECTRICAL OUTPUT SYSTEM O02


2 TRANSFORMERS O03
3 MEDIUM VOLTAGE SERVICE SYSTEM O04
4 LOW VOLTAGE SERVICE SYSTEM O05 to O07
5 EMERGENCY SERVICE SYSTEM O08/O09
6 LIGHTING AND EARTHING O10/O11
7 SWITCHGEAR 150 Kv O12 to O21
8 CABLING AND WIRING O22
ABCD

LAHENDONG GEOTHERMAL POWER PLANT – 1x20MW MANUAL N° E300878


REV. B
GENERAL CONTENTS PAGE : 11/14

5 – INSTRUMENTATION AND CONTROL


MAINTENANCE MANUAL

VOLUME

01. FOREWORD M01


02. AMENDEMENT RECORD M01
03. HEALTH AND SAFETY M01

1 MAIN STEAM SUPPLY SYSTEM M01


2 NON CONDENSABLE GASES SYSTEM M01
3 MAIN COOLING WATER SYSTEM M01
4 PRIMARY AUXILIARY COOLING WATER SYSTEM M01
5 SECONDARY AUXILIARY COOLING WATER SYSTEM M01
6 REINJECTION SYSTEM M01
7 LIST OF DRAWINGS AND SPECIFICATIONS M01
8 LIST OF SUPPLIERS AND DOCUMENTATION M02 / M03
ABCD

LAHENDONG GEOTHERMAL POWER PLANT – 1x20MW MANUAL N° E300878


REV. B
GENERAL CONTENTS PAGE : 12/14

6 – CONTROL MONITORING
OPERATION MANUAL

VOLUME

01. FOREWORD O01


02. AMENDEMENT RECORD O01
03. HEALTH AND SAFETY O01

1 DIGITAL CONTROL SYSTEM O01

2 BACK-UP DESK / VERTICAL PANEL O01

3 STEAM TURBINE CONTROL AND SAFETY SYSTEM O01


ABCD

LAHENDONG GEOTHERMAL POWER PLANT – 1x20MW MANUAL N° E300878


REV. B
GENERAL CONTENTS PAGE : 13/14

6 – CONTROL MONITORING
MAINTENANCE MANUAL

VOLUME

01. FOREWORD M02


02. AMENDEMENT RECORD M02
03. HEALTH AND SAFETY M02

1 DIGITAL CONTROL SYSTEM M02

2 BACK-UP DESK / VERTICAL PANEL M02

3 DRAWINGS AND SPECIFICATIONS M02

4 LIST OF SUPPLIERS AND DOCUMENTATION M03 to M13


LAHENDONG GEOTHERMAL POWER PLANT – 1x20MW MANUAL N° E300878
CIVIL WORK REV. B
DESIGN MANUAL PAGE : 14 /14

7 CIVIL WORK
DESIGN MANUAL
GENERAL CONTENT

Volume Index

01. FOREWORD D01 0


02. AMENDEMENT RECORD D01 0
03. HEALTH AND SAFETY D01 0

1. LIST OF DRAWINGS D01/D12 1


abcd

Insert CD N° 1
REPUBLIC OF INDONESIA
MINISTRY OF MINES AND ENERGY
PT.PLN[PERSERO]

LAHENDONG GEOTHERMAL POWER PLANT


1 X 20MW

N° E 300 878 Rev.B

CHAPTER 4

ELECTRICAL SYSTEM

CONTRACT N°020.PJP/922/1995/M
SPIE ENERTRANS PT.PR1AMANAYA
Spie Enertrans 95 861 CERGY-PONTOISE JAKARTA 10320
FRANCE INDONESIA

Internal ref. : T.29.38.0 / S 3027 .0 Date of issue : Nov.00


ABCD

LAHENDONG GEOTHERMAL POWER PLANT – 1x20MW MANUAL N° E300878


REV. B
GENERAL CONTENTS PAGE : 9/14

4 - ELECTRICAL SYSTEM
DESIGN MANUAL

VOLUME

1 GENERATOR ELECTRICAL OUTPUT SYSTEM D01


2 TRANSFORMERS D01
3 MEDIUM VOLTAGE SERVICE SYSTEM D01
4 LOW VOLTAGE SERVICE SYSTEM D01
5 EMERGENCY SERVICE SYSTEM D01
6 LIGHTING AND EARTHING D01
7 SWITCHGEAR 150 Kv D01
8 CABLING AND WIRING D01
REPUBLIC OF INDONESIA
MINISTRY OF MINES AND ENERGY
PT.PLN[PERSERO]

LAHENDONG GEOTHERMAL POWER PLANT


1 X 20MW

DESIGN MANUAL
N° E 300 878 Rev.B

CHAPTER 4

ELECTRICAL SYSTEM

VOLUME : D 01

CONTRACT N°020.PJP/922/1995/M

Rateau La Courneuve SPIE ENERTRANS PT.PR1AMANAYA


FRANCE Spie Enertrans 95 861 CERGY-PONTOISE JAKARTA 10320
FRANCE
INDONESIA

Internal ref. : T.29.38.0 / S 3027 .0 Date of issue : Nov.00


abcd

01
abcd

02
LAHENDONG GEOTHERMAL POWER PLANT - 1 ~ 2 0 M W MANUAL No E300878
ELECTRICAL SYSTEM REV. A
TRANSFORMERS DESIGN MANUAL PAGE : 2 /2

2.1. DESCRIPTION
Design iç based on the attached specifications.

2.2. LIST OF DRAWINGS AND SPEClFlCATlONS

No DESCRIPTION
UNINDO specification for 30 MVA transformer
UNINDO specification for 2500 kVA transformer
UNINDO specification for 1250 kVA transformer

.
abcd

03
abcd

04
abcd

05
LAHENDONG GEOTHERMAL POWER PLANT - 1 ~ 2 0 M W MANUAL NoE300878
ELECTRICAL SYSTEM REV. A
EMERGENCY SERVICE SYSTEM DESIGN MANUAL 1 PAGE : 1 /2

4 ELECTRICAL SYSTEM

5. EMERGENCY SERVICE SYSTEM

Chapter Title Page

5. EMERGENCY SERVICE SYSTEM .......................................................................... 1


5.1. DESCRIPTION DC -UPS SYSTEM .......................................................................... 2
5.2. DESCRIPTION EMERGENCY DIESEL GENERATOR ............................................ 2
5.3. LIST OF DRAWINGS AND SPEClFlCATlONS ........................................................ 2

. .. . .
abcd

06
abcd

07
abcd

08
REPUBLIC OF INDONESIA
MINISTRY OF MINES AND ENERGY
PT.PLN[PERSERO]

LAHENDONG GEOTHERMAL POWER PLANT


1 X 20MW

OPERATION MANUAL
N° E 300 878 Rev.B

CHAPTER 4

ELECTRICAL SYSTEM

VOLUME : O 02

CONTRACT N°020.PJP/922/1995/M
Rateau La Courneuve SPIE ENERTRANS PT.PR1AMANAYA
FRANCE Spie Enertrans 95 861 CERGY-PONTOISE JAKARTA 10320
FRANCE
INDONESIA

Internal ref. : T.29.38.0 / S 3027 .0 Date of issue : Nov.00


ABCD

LAHENDONG GEOTHERMAL POWER PLANT – 1x20MW MANUAL N° E300878


REV. B
GENERAL CONTENTS PAGE : 10/14

4 - ELECTRICAL SYSTEM
OPERATION MANUAL

VOLUME

1 GENERATOR ELECTRICAL OUTPUT SYSTEM O02


2 TRANSFORMERS O03
3 MEDIUM VOLTAGE SERVICE SYSTEM O04
4 LOW VOLTAGE SERVICE SYSTEM O05 to O07
5 EMERGENCY SERVICE SYSTEM O08/O09
6 LIGHTING AND EARTHING O10/O11
7 SWITCHGEAR 150 Kv O12 to O21
8 CABLING AND WIRING O22
abcd

01
abcd

02
REPUBLIC OF INDONESIA
MINISTRY OF MINES AND ENERGY
PT.PLN[PERSERO]

LAHENENDONG GEOTHERMAL POWER PLANT


1 X 20MW

OPERATION MANUAL

N° E 300 878 Rev.B

CHAPTER 4

ELECTRICAL SYSTEM

VOLUME : O 03

CONTRACT N°020.PJP/922/1995/M
Rateau La Courneuve SPIE ENERTRANS PT.PR1AMANAYA
FRANCE Spie Enertrans 95 861 CERGY-PONTOISE JAKARTA 10320
FRANCE
INDONESIA

Internal ref. : T.29.38.0 / S 3027 .0 Date of issue : Nov.00


abcd

03
REPUBLIC OF INDONESIA
MINISTRY OF MINES AND ENERGY
PT.PLN[PERSERO]

LAHENDONG GEOTHERMAL POWER PLANT


1 X 20MW

OPERATION MANUAL

N° E 300 878 Rev.B

CHAPTER 4

ELECTRICAL SYSTEM

VOLUME : O 03

CONTRACT N°020.PJP/922/1995/M
Rateau La Courneuve SPIE ENERTRANS PT.PR1AMANAYA
FRANCE Spie Enertrans 95 861 CERGY-PONTOISE JAKARTA 10320
FRANCE
INDONESIA

Internal ref. : T.29.38.0 / S 3027 .0 Date of issue : Nov.00


abcd

04
REPUBLIC OF INDONESIA
MINISTRY OF MINES AND ENERGY
PT.PLN[PERSERO]

LAHENDONG GEOTHERMAL POWER PLANT


1 X 20MW

OPERATION MANUAL

N° E 300 878 Rev.B

CHAPTER 4

ELECTRICAL SYSTEM

VOLUME : O 05

CONTRACT N°020.PJP/922/1995/M
Rateau La Courneuve SPIE ENERTRANS PT.PR1AMANAYA
FRANCE Spie Enertrans 95 861 CERGY-PONTOISE JAKARTA 10320
FRANCE
INDONESIA

Internal ref. : T.29.38.0 / S 3027 .0 Date of issue : Nov.00


abcd

05
LAHENDONG GEOTHERMAL POWER PLANT - 1 ~ 2 0 M W MANUAL NoE300878
ELECTRICAL SY STEM REV. A
EMERGENCY SERVICE SYSTEM OPERATING MANUAL PAGE : 2 /2

5.1. DESCRIPTION DC-UPS SYSTEMS


See attached document.
5.2. DESCRIPTION EMERGENCY DIESEL GENERATOR
See attached document.
5.3. LIST OF DRAWINGS AND SPEClFlCATlONS

No DESCRIPTION VOLUME
EB-CHL-1O0 125V dc charger and UPS system. Electriacal diagram 1 0 0 8
ED-CHL-1O0 125V dc charger and UPS system. General arrangement 1
EA-CHL-1O0 Charger. test procedure 1 9
EA-CHL-1O1 Inverter. Test procedure 1 //
Battery charger. User's manual and test report. 1 Y
1;
Inverter. User's manual and test report. 1
Installation of lead batteries. 1 p
EB-EGS-002 Diesel Emergency generator. Electrical control panel 2 009
EB-EGS-003 Diesel Emergency generator.General Lay out 2 v
Diesel Emergency generator. Test report 2 y
Perkins AMF Synchro panel 2 v
_____ Perkins User's Handbook 2 "

Perkins Spare parts book 2 Y


REPUBLIC OF INDONESIA
MINISTRY OF MINES AND ENERGY
PT.PLN[PERSERO]

LAHENDONG GEOTHERMAL POWER PLANT


1 X 20MW

OPERATION MANUAL

N° E 300 878 Rev.B

CHAPTER 4

ELECTRICAL SYSTEM

VOLUME : O 08

CONTRACT N°020.PJP/922/1995/M
Rateau La Courneuve SPIE ENERTRANS PT.PR1AMANAYA
FRANCE Spie Enertrans 95 861 CERGY-PONTOISE JAKARTA 10320
FRANCE
INDONESIA

Internal ref. : T.29.38.0 / S 3027 .0 Date of issue : Nov.00


abcd

06
REPUBLIC OF INDONESIA
MINISTRY OF MINES AND ENERGY
PT.PLN[PERSERO]

LAHENDONG GEOTHERMAL POWER PLANT


1 X 20MW

OPERATION MANUAL

N° E 300 878 Rev.B

CHAPTER 4

ELECTRICAL SYSTEM

VOLUME : O 10

CONTRACT N°020.PJP/922/1995/M
Rateau La Courneuve SPIE ENERTRANS PT.PR1AMANAYA
FRANCE Spie Enertrans 95 861 CERGY-PONTOISE JAKARTA 10320
FRANCE
INDONESIA

Internal ref. : T.29.38.0 / S 3027 .0 Date of issue : Nov.00


abcd

07
REPUBLIC OF INDONESIA
MINISTRY OF MINES AND ENERGY
PT.PLN[PERSERO]

LAHENDONG GEOTHERMAL POWER PLANT


1 X 20MW

OPERATION MANUAL

N° E 300 878 Rev.B

CHAPTER 4

ELECTRICAL SYSTEM

VOLUME : O 12

CONTRACT N°020.PJP/922/1995/M
Rateau La Courneuve SPIE ENERTRANS PT.PR1AMANAYA
FRANCE Spie Enertrans 95 861 CERGY-PONTOISE JAKARTA 10320
FRANCE
INDONESIA

Internal ref. : T.29.38.0 / S 3027 .0 Date of issue : Nov.00


*
LAHENDONG GEOTHERMAL POWER PLANT - 1~20MW MANUAL NoE300878
ELECTRICAL SYSTEM - REV. A
SWITCHGEAR l @ kV OPERATING MANUAL PAGE :4 /22

I CHAPTER 1 - MAINTENANCE REQUIREMENTS I

CONTENT

1.1 - HV EQUIPMENT

1.1.1 - Circuit breaker

1.1.2 - Current transformer

1.1.3 - Capacitive voltage transformer

1.1.4 - Line traps

1.1.5 - Surge arrester

1.1.6 - Disconnector switch

1.1.7 - Outdoor equipment

1.2 - LV EQUIPMENT

1.2.1 - Protective relays

1.2.2 - Transducer

1.2.3 - Disturbance recorder EPMF

1.2.4 - A12E Rack SPECTRA meter

1.2.5 - 66 kV (150 kV) relay panels


F
i
1.2.6 - External lightning
LAHENDONG GEOTHERMAL POWER PLANT lx20MW - MANUAL NaE300878
ELECTRICAL SYSTEM . REV. A
SWITCHGEAR 150 k V OPERATING MANUAL PAGE : 5 122
c

MAINTENANCE REQUIREMENTS

1.1 - HV EQUIPMENT

1.1.1 CIRCUIT BREAKER

ITEM FREQUENCY MAINTENANCE REQUIREMENTS DOCUMENT-


REFERENCE
2-4 years See ABB
switchgear
document
5409 719 E-4 - Rev
2 on the document
- Visual inspection of : product information
. porcelain insulators regarding dirt and 5452 106 E-R -
damage Rev 2
. outer metal parts regarding corrosion
. operating device cubicle regarding
I eakage
screw joints (only at first inspection)

- Condition monitoring consisting of :


. checking gas density
. reading operations counter
. checking heater

Minor inspections can take place


outdoors, directly at the circuit-breaker
site, without the need for dismounting and
with the circuit-breaker in operation.

-
Note : First check al1 inspection points and
make condition monitoring which can be
carried out while the circuit-breaker is in
operation, and thereafter judge the need
for possible further measures which will
require taking the circuit-breaker out of
operation.

14-1gyears 'oints stated above, and in addition :


or &en
circuit breaker '. Examination of :
has carried
out 5000 . mechanical parts in link system and
operations operating device regarding corrosion,
during normal Wear and loose parts.
LAHENDONG GEOTHERMAL POWER PLANT - 1 ~ 2 0 M W MANUAL Ne E300878
ELECTRICAL SYSTEM ~ REV. A
SWITCHGEAR lG kV OPERATING MANUAL PAGE :6 /22
-

operation 1
Or
alternatively,
1 . damper regarding leakage
after
repeatedly - Condition monitoring consisting of :
switching off
short circuit - alarm function of density monitors
currents
- moisture content of SF6 gas

i
- resistance in main circuit
- contact burn off
- measurement of function values
ajor inspection can take place outdoors
irectly at the circuit-breaker site and
equires only limited dismounting.
LAHENDONG GEOTHERMAL POWER PLANT 1~20MW - MANUAL NoE300878
ELECTRICAL SYSTEM REV. A
SWITCHGEAR 156 kV OPERATING MANUAL PAGE : 7 /22
-

MAINTENANCE REQUIREMENTS

1.1.2 CURRENT TRANSFORMER

DOCUMENT
ITEM FREQUEN MAINTENANCE REQUIREMENTS
CY REFERENCE
>urrent 1 year - Check bellows position See HAEFELY -
ransformer document

Examine for traces of oil NoE 8217.6


- lnspect porcelain insulator and clean if Current
necessary transformes
72,5550kW IOSK
and IOSK SR
Operating
Instructions page
10 to 14

lfter every ' Verify correct grounding


10 years in ' Verify that al1 connections are sound

iervice
Check bellows position
Examine for traces of oil
nspect that the terminal box is clean and
vell sealed
nspect porcelain insulator and clean if
iecessary
Perform overall corrosion check on metal
)arts
Check oit

Particular case : to refer to the Operating Instructions from page 10 to 14

F
i
LAHENDONG GEOTHERMAL POWER PLANT 1~20MW - MANUAL NoE300878
ELECTRICAL SYSTEM REV. A
SWITCHGEAR 150 kV OPERATING MANUAL PAGE : 8 122

MAINTENANCE REQUIREMENTS

1.1.3 CAPACITIVE VOLTAGE TRANSFORMER

~ -~

ITEM FREQUENC MAINTENANCE REQUIREMENTS


Y DOCUMENT
REFERENCE
Capacitive 1 year . Check the oit level of the base box by See HAEFELY
voltage means of the oil level sight glass, check documentation
transformer oil color Instruction Manual for
. Check the protective gap coupling capacitor
voltage transformers
. lnspect for signs of oil leaks
bulletin 209505 (page
. Check the porcelain insulator (clean if 6)
necessary)
. Secondary voltage : check with regard to
the rated value

After 10 The same, and :


years
. Check of grounding : tank, high voltage
capacitor, intermediate transformer.
. Secondary voltage : check with regard to
be rated value
. Connections : check for firmness of
connections. Check for corrosion.
. Terminal box : check for highness and
cleanliness
. Metal parts : check for corrosion
. Inspection of oil in electromagnetic unit
. Capacitor : check of capacitance

Nhen oil is . Secondary voltalge : check with regard to


lark the rated value
. Temperature rise : check of the tank
temperature
. Inspection of oil electromagnetic unit
5
i
LAHENDONG GEOTHERMAL POWER PLANT 1~20MW - MANUAL N" E300878
ELECTRICAL SYSTEM REV. A
SWITCHGEAR 1@ kV OPERATING MANUAL PAGE : 9 /22

MAINTENANCE REQUIREMENTS

1.1.4 LlNE TRAPS

~ ~ _ _ _

FREQUENCY MAINTENANCE REQUIREMENTS DOCUMENT


ITEM REFERENCE
,ine traps 1 year See HAEFELY
document ref. 109505
(page 69 7)
- Check torque of hardware connections
- Check surface finish of line trap for
deterioration (due to prolonged exposure to
severe environmental conditions).
- Ensure that line trap and insulators are
clean
- Check units for broken wire terminations or
damaged fiberglass ties
- Check tuning packs and lightning arrester
for physical damage

If required, the following field procedures may


be performed :
- Line trap/insulators rnay be washed with
clean water at low pressure
- In case of touch-up requirements :
. lightly sand (Iso Grit) the bare area(s)
. clean and degrease the area(s) with
naphtha or chloronated solvent
. repaint the area(s) with touch-up paint
çupplied by HAEFELY TRENCH

Caution :
Paint other than that supplied by HAEFELY
TRENCH is not to be used. For line traps
nstalled in heavily polluted environments,
Dlease contact HAEFELY TRENCH for
c specific maintenance recommendations.
i
LAHENDONG GEOTHERMAL POWER PLANT 1~20MW - MANUAL NoE300878
ELECTRICAL SYSTEM REV. A
SWITCHGEAR 156 kV OPERATING MANUAL PAGE : 10/22

MAINTENANCE REQUIREMENTS

1.1.5 SURGE ARRESTER

ITEM FREQUENCY MAINTENANCE OPERATION DOCUMENT .

REFERENCE

iurge 1 year Visual Inspection of the insulators See ABBHV


irrester switchgear
document SESWWA-
2370 E Maintenance
and checking of
EXLIM arresters

MAINTENANCE REQUIREMENTS

1.1.6 DISCONNECTOR SWITCH

ITEM FREQUENCY MAINTENANCE REQUIREMENTS DOCUMENT


REFERENCE
iisconnect See ABB document -
Ir switch Services
Instructions
GPDT 069622aE -
chapter 17 (page 80-
84)
2,5 years - a contact surfaces cleaning and greasing
- a contact fingers and support insulators
cleaning
- a porcelain cleaning

F
)perating 2kears Visual inspection See ABB document
iechanism Manual Operating
Mechanism -
Type HA 31-80 -
Publication no GPDM
Q69611 E-Rev B
LAHENDONG GEOTHERMAL POWER PLANT 1~20MW - MANUAL NoE300878
ELECTRICAL SYSTEM ~ REV. A
SWITCHGEAR 15û kV OPERATING MANUAL PAGE : 11 /22
-

MAINTENANCE REQUIREMENTS

1.1.7 OUTDOOR EQUIPMENT

ITEM FREQUENCY MAINTENANCE REQUIREMENTS DOCUMENT


REFERENCE
The recommended maintenance operation
intervals (on the O&M Manual) for the
insulators, must be adjusted with respect to
the climate and the polluted atmosphere of
the site.

iteel 1 year Visual inspection


itructure

'ost 1 year Visual inspection


nsulator

'ension 1 year Visual inspection


nsulators

IV 2-3 years Check the tightness of the screws and bolts See CARIBONI
:onnectors For al1 details, see the drawings. drawings
IO 48888 E 148889F 1

1889OFl
18892F/40401/1F/
10415/1F / 021235/aF

,2/6 kV 1 year Visual inspection See SADTEM


istrument jocument
fansformer Maintenance manual
item 5 )
r
F.
LAHENDONG GEOTHERMAL POWER PLANT - 1 ~ 2 0 M W MANUAL NDE300878
ELECTRICAL SYSTEM REV. A
SWITCHGEAR 150 kV OPERATING MANUAL PAGE : 12 /22
-

MAINTENANCE REQUIREMENTS

1.2 - LVltem

1.2.1 PROTECTIVE RELAYS

DOCUMENT
ITEM FREQUENC MAINTENANCE OPERATION REFERENCE
Y
AVTP 31 1 year Periodic Inspection and test See GEC ALSTHOM
(See document of reference for more doc.R8023B
details) Service manual-Type
MVTP
Supervision relay for
high impedance - Type
Busbar protection
scheme - Page 6
(section 3)
:CEG 140 1 year Periodic Inspection and test See GEC ALSTHOM
( See document of reference for more doc.R8501E
details) Service manual- Type K
series - Overcurrent and
jirectionai overcurrent
?elays
'age 129 (section 6.3)

IVAJ 23 I year Periodic inspection and test See GEC ALSTHOM


IVAJ 53 ( See document of reference for more bc.R8015D
details) service manual- Type
WAJ
rripping and control
elays

F
'age 7( section 3)
i
-
LAHENDONG GEOTHERMAL POWER PLANT 1~20MW MANUAL N" E300878
ELECTRICAL SYSTEM REV. A
SWITCHGEAR 150 kV OPERATING MANUAL PAGE : 13/22
-
I

MVrr 14 1 year Periodic Inspection and test See GEC ALSTHOM


( See document of reference for more doc.R8012F
details) service manual - Type
MVTT
Static digital time delay
relays
Page 7(section 5)

MCTl39 1 year Periodic Inspection and test See GEC ALSTHOM


MCTl40 ( See document of reference for more doc.R8037B i

details) Service manual-Type


MCTl
Local breaker back-up
.elays
Dage G(section 4)

WFVU 14 1 year Periodic Inspection and test 5ee GEC ALSTHOM


( See document of reference for more ioc.R8118A
details) Service manual - Type
JlVFU
lefinite time delayed
Indedover frequency
elay
'age
~~

I LAHËNDONGGEOTHERMAL POWER PLANT - lx20MW MANUAL No E300878


ELECTRICAL SYSTEM REV. A
SWITCHGEAR 1541kV OPERATING MANUAL PAGE : 14/22
-
I

MAINTENANCE REQUIREMENTS

1.2 - L V Item [contn'dl

1.2.1 PROTECTIVE RELAYS {contn'd)

DOCUMENT
ITEM FREQUENC MAINTENANCE REQUIREMENTS REFERENCE
Y
~

AAVS O1 1 year Periodic Inspection and test See GEC ALSTHOM


( See document of reference for more
Doc.R8045B
details) Service manual - Type
MAVS
Check synchronising
relay
Page 17 (section 4)

ilCGG 22 1 year Periodic Inspection and test See GEC ALSTHOM


( See document of reference for more
Doc.R8054F
ACGG 82
details) Service manual - Type
MCGG
Overcurrent relays for
phase and earth faults -
Page 1G(section 5) i
il

I
1

IVTU 11 1 year Periodic Inspection and test See GEC ALSTHOM


IVTU 12 [ See document of reference for more Doc.R8041G
jetai 1s) Service manual - MVTU
Definite time delayed
relays
F
i Page 15 ( section 5)

~~~

VlFAC 34 1 year 3eriodic Inspection and test See GEC ALSTHOM


:sec document of reference for more Doc R8007C
jetails) Service manual - TvDe
LAHENDONG GEOTHERMAL POWER PLANT - 1~20MW MANUAL NoE300878
ELECTRICAL SYSTEM ~ REV. A
SWITCHGEAR 154 kV OPERATING MANUAL PAGE : 15/22
-

MFAC
High impedance
differential relays -
Page 12 (section 3)

MBCH 13 1 year Periodic Inspection and test See GEC ALSTHOM


( See document of reference for more
Doc.R8017 C
details) Service manual - Type
MBCH
Biased differential reiay
page 16 (section 6)

,FZP 111 1 year Periodic Inspection and test See GEC ALSTHOM
(see document of reference for more
Doc. R5911
details) Service manual - Chaptei
4
-FAAlO1 1 year Periodic inspection and test See GEC ALSTHOM
Doc.R5920
(see document of reference for more
details) Service manual - Auto-
reclose relay
Shapter 9 - Section 1

F
i
LAHENDONG GEOTHERMAL POWER PLANT - 1~20MW MANUAL NoE300878
ELECTRICAL SYSTEM - REV. A
SWITCHGEAR 159 kV OPERATING MANUAL PAGE : 16 /22
-

MAINTENANCE REQUIREMENTS

1.2 - L V Item [contn'd)

1.2.2 Transducer

DOCUMENT
ITEM FREQUENC MAINTENANCE REQUIREMENTS REFERENCE
Y
i

STAT 300 1 year Periodic inspection See GEC ALSTHOM


'Tecision (removal of accumulation of dust and documentation
requency checking the tightness of al1 connections) ISTAT 300 - Precision
(see documents of reference for more frequency - Operation &
details Maintenance manual
19-070 PD - 10/95
Page 7 - section 5

STAT 300 1 year Periodic inspection See GEC ALSTHOM


'ower (removal of accumulation of dust and doc.ISTAT300
ransducers checking the tightness of al1 connections) Power transducers
(see documents of reference for more Operation & Maintenance
details manual 19-071 PD - 06/9(
Page 10 - Section 5

ÇTAT 300 1 year Periodic inspection See GEC ALSTHOM


IMS current rremoval of accumulation of dust and Documentation
oltage :hecking the tightness of al1 connections) ISTAT 300 - RMS currenl
:sec documents of reference for more ! voltage
i
Jetails 3peration and
maintenance manual
19-077PE - 10/96
Dage 10 - Section 5
~~

3TAT 300 1 year 'eriodic inspection 3ee GEC ALSTHOM


leactive removal of accumulation of dust and Documentation
ower :hecking the tightness of al1 connections) STAT 300 - Reactive
F
i
see documents of reference for more iower
ietails 3peration & Maintenance
nanual
9 - 079PB - 01/92
Section 5
LAHENDONG GEOTHERMAL POWER PLANT - 1 ~ 2 0 M W MANUAL NoE300878
ELECTRICAL SYSTEM REV. A
SWITCHGEAR 150 kV OPERATING MANUAL PAGE : 17/22
-

MAINTENANCE REQUIREMENTS

1.2 - L V Item fcontn'd)

1.2.3 Disturbance recorder EPMF

DOCUMENT
ITEM FREQUENC MAINTENANCE REQUIREMENTS REFERENCE
Y
EPMF No specific maintenance See GEC ALSTHOM
doc.
no62 O1O 03W1E
Reference Manual

+inter Daper-low 'aper quantity to be checked


3larm

F
i
LAHENDONG GEOTHERMAL POWER PLANT - 1 ~ 2 0 M W MANUAL NoE300878
ELECTRICAL SYSTEM REV. A
SWITCHGEAR 1!$ kV OPERATING MANUAL PAGE : 18 /22

MAINTENANCE REQUIREMENTS

1.2 - L V Item Icontn'd)

1.2.4 Al 2E Rack SPECTRA Meter

DOCUMENT
ITEM FREQUENC MAINTENANCE REQUIREMENTS REFERENCE
Y
SPECTRA inspection & test (see document See SCHLUMBERGER
ineter reference for more detaiis) Electricity Document
Polyphase Meter A12E -
Version 3
Technical guide
Ref : FDEE 10014982 -
07/96
Page 69 - Section E

F
i
LAHENDONG GEOTHERMAL POWER PLANT - 1 ~ 2 0 M W MANUAL NoE300878
ELECTRICAL SYSTEM REV. A
SWITCHGEAR 150 kV OPERATING MANUAL PAGE : 19 /22

MAINTENANCE REQUIREMENTS

1.2 - L V Item Icontn'd)

1.2.5 66 kV (150 kV) Relav panels

DOCUMENT
ITEM FREQUENC MAINTENANCE REQUIREMENTS REFERENCE
Y
~~~ ~ ~

hxiliary No specific maintenance


elays

nternal 1 year Replacement of lamps


ighting

i
LAHENDONG GEOTHERMAL POWER PLANT 1~20MW - MANUAL NoE300878
ELECTRICAL SYSTEM REV. A
SWITCHGEAR 15p kV OPERATING MANUAL PAGE :20 /22
-

MAINTENANCE REQUIREMENTS

1.2 - L V Item lcontn'd]

1.2.6 External liahtinq

SEE O & M MANUAL FOR ITEM 87


LAHENDONG GEOTHERMAL POWER PLANT 1 ~ 2 0 M W - MANUAL NoE300878
ELECTRICAL SYSTEM ~ REV. A
SWITCHGEAR l$O kV OPERATING MANUAL PAGE : 22 /22
-
1

'OLUME 0128

2.3 - LV Item DOCUMENTATION

2.3.1 - Static distance protection relay OPTIMHO

OLUME 043
2.3.2 - Protective relays
L

DLUME

2.3.2- Protective relays (contn'd)

3LUME 021
2.3.3 - Transducer

2.3.4 - Disturbance recorder EPMF

2.3.5 - Ancillary equipment for relay panel

2.3.6 - External lighting

2.3.7 - LV cables

2.3.8 - A12E Rack SPECTRA Meter

2.3.9 - Current transformer

F
i
____-____E_

LAHENDONG GEOTHERMAL POWER PLANT - 1 ~ 2 0 M W MANUAL No E300878


ELECTRICAL SYSTEM REV. A
SWITCHGEAR 154 kV OPERATING MANUAL PAGE : 21 /22
-

CHAPTER 2 - MANUFACTURER’S DOCUMENTATION l


CONTENT

IOLUME Q15

2.1 - MANUFACTURER’S DOCUMENTATION LIST

2.2 - HV Item DOCUMENTATION

2.2.1 - Circuit breaker

2.2.2 - Current transformer

2.2.3 - Capacitive voltage transformer

2.2.4 - Line traps

‘OLUME 016

2.2.5 - Surge arrester


II__

VOLUME 047
2.2.6 - Disconnector switch

2.2.7 - Porcelain post insulators

2.2.8 - Tension insulators

2.2.9 - HV connectors

2.2.1O - Miscellaneous
~

LAHENDONG GEOTHERMAL POWER PLANT - 1 ~ 2 0 M W MANUAL NoE300878


ELECTRICAL SYSTEM REV. A
SWITCHGEAR 1
. kV OPERATING MANUAL PAGE : 22 /22
-

2.3 - LV Item DOCUMENTATION

2.3.1 - Static distance protection relay OPTiMHO

VOLUME 029
2.3.2 - Protective relays

IVOLUME 020
2.3.2- Protective relays (contn'd)

2.3.3 - Transducer

2.3.4 - Disturbance recorder EPMF

2.3.5 - Ancillary equipment for relay panel

2.3.6 - External lighting

2.3.7 - LV cables

2.3.8 - A12E Rack SPECTRA Meter

2.3.9 - Current transformer


LAHENDONG GEOTHERMAL POWER PLANT 1~20MW - MANUAL NoE300878
ELECTRICAL SYSTEM ~ R N .A
SWITCHGEAR l$P kV OPERATING MANUAL PAGE :21 /22
-

CHAPTER 2 - MANUFACTURER'S DOCUMENTATION

CONTENT

2.1 - MANUFACTURER'S DOCUMENTATION LIST

2.2 - HV Item DOCUMENTATION

2.2.1 - Circuit breaker

2.2.2 - Current transformer

2.2.3 - Capacitive voltage transformer

2.2.4 - Line traps

'OLUME 046
2.2.5 - Surge arrester

'OLUME 047
2.2.6- Disconnector switc h

2.2.7 - Porcelain post insulators

2.2.8 - Tension insulators

2.2.9 - HV connectors
F
i
2.2.10 - Miscellaneous
REPUBLIC OF INDONESIA
MINISTRY OF MINES AND ENERGY
PT.PLN[PERSERO]

LAHENDONG GEOTHERMAL POWER PLANT


1 X 20MW

OPERATION MANUAL

N° E 300 878 Rev.B

CHAPTER 4

ELECTRICAL SYSTEM

VOLUME : O 15

CONTRACT N°020.PJP/922/1995/M
Rateau La Courneuve SPIE ENERTRANS PT.PR1AMANAYA
FRANCE Spie Enertrans 95 861 CERGY-PONTOISE JAKARTA 10320
FRANCE
INDONESIA

Internal ref. : T.29.38.0 / S 3027 .0 Date of issue : Nov.00


abcd

2.1
abcd

2.2
abcd

2.2.1
abcd

2.2.2
abcd

2.2.3
abcd

2.2.4
abcd

2.2.5
abcd

2.2.6
abcd

2.2.7
abcd

2.2.8
abcd

2.2.9
abcd

2.2.10
abcd

SANS OBJET
abcd

2.3
abcd

2.3.1
LFZP 11X R-5911U
SERVICE MANUAL CONTENTS

CHAPTER 1 APPLICATION NOTES


(R4056KIncluded) (Issue C)

CHAPTER 2 DESCRIPTION TECHNICAL DATA


(Issue C)

CHAPTER 3 INSTALLATION AND HANDLING


(Issue B)

CHAPTER 4 COMMISSIONING
(R5228 Included)

CHAPTER 5 CUSTOMER VARIANTS


(Issue ü)
abcd

01
abcd

02
abcd

03
abcd

04
abcd

05
abcd

2.3.2
LFA4101 R-5920B
SERVICEMANUAL CONTENTS

PUBLICATION R4076
CHAPTER 1 GENERAL DESCRIPTION ISSUE A

CHAPTER 2 APPLICATION NOTES ISSUE A


cHAPTER3 INSTALLATION AND HANDLING ISSUE A
CHAPTER 4 HARDWARE DESCRIPTION ISSUE A
CHAPTER 5 FLTNCI'IONALDESCRIPTION ISSUE A

îHAPTER 6 SOFIWARE DESCiUPTION ISSUE A


CHAPTER 7 OPERATING INSTRUCTIONS ISSUE A

CHAPTER 8 COMMISSIONING INSTRUCTIONS ISSUE B


CHAPTER 9 FAULT FINDTNG ISSUE A
CHAPTER 10 APPENDIX ISSUE A
abcd

01
abcd

02
abcd

03
abcd

04
abcd

05
abcd

06
abcd

07
abcd

08
abcd

09
abcd

10
abcd

2.3.2
abcd

2.3.3
abcd

2.3.4
abcd

2.3.5
abcd

2.3.6
abcd

2.3.7
abcd

2.3.8
abcd

2.3.9
abcd

08
LAHENDONG GEOTHERMAL POWER PLANT - 1 ~ 2 0 M W MANUAL No E300878
ELECTRICAL SYSTEM REV. A
CABLING AND WlRlNG OPERATING MANUAL PAGE : 1 /2

4 ELECTRICAL SYSTEM

8. CABLING AND WlRlNG

Chapter Title Page

8. CABLING AND WIRING ........................................................................................... 1


8.1. DESCRIPTION......................................................................................................... 2
8.2. LIST OF DRAWINGS AND SPECIFICATIONS ................................................. ......2
LAHENDONG GEOTHERMAL POWER PLANT - 1 ~ 2 0 M W MANUAL NoE300878
ELECTRICAL SYSTEM REV. A
CABLING AND WlRlNG OPERATING MANUAL PAGE : 2 /2

8.1. DESCRIPTION
The attached technical documentation include cable and cable trays suppliers
documentations.

8.2. LIST OF DRAWINGS AND SPEClFlCATlONS

No DESCRIPTION VOLUME
PT. SUMl INDO KABEL. Factory tests reports and packing.
PT. NOBl technical documentation.
EE-CPE-002 Power cable list
EL-CPE-002 Cable ways detailled design. Electrical building and power
house. Plan view
EL-CPE-004 Cable ways detailled design. Condenser area & cooling tower.
Plan view & sections.
EL-CPE-005 Cable ways detailled design. Pumping stations. Plan view &
sections.
EL-CPE-008 Cable ways. Mounting standard booklet
EL-CPE-O15 Outdoor Cable raceways. Main routing
REPUBLIC OF INDONESIA
MINISTRY OF MINES AND ENERGY
PT.PLN[PERSERO]

LAHENDONG GEOTHERMAL POWER PLANT


1 X 20MW

OPERATION MANUAL

N° E 300 878 Rev.B

CHAPTER 4

ELECTRICAL SYSTEM

VOLUME : O 22

CONTRACT N°020.PJP/922/1995/M
Rateau La Courneuve SPIE ENERTRANS PT.PR1AMANAYA
FRANCE Spie Enertrans 95 861 CERGY-PONTOISE JAKARTA 10320
FRANCE
INDONESIA

Internal ref. : T.29.38.0 / S 3027 .0 Date of issue : Nov.00


REPUBLIC OF INDONESIA
MINISTRY OF MINES AND ENERGY
PT.PLN[PERSERO]

LAHENDONG GEOTHERMAL POWER PLANT


1 X 20MW

N° E 300 878 Rev.B

CHAPTER 5

INSTRUMENTATION AND CONTROL

CONTRACT N°020.PJP/922/1995/M
SPIE ENERTRANS PT.PR1AMANAYA
Spie Enertrans 95 861 CERGY-PONTOISE JAKARTA 10320
FRANCE INDONESIA

Internal ref. : T.29.38.0 / S 3027 .0 Date of issue : Nov.00


ABCD

LAHENDONG GEOTHERMAL POWER PLANT – 1x20MW MANUAL N° E300878


REV. B
GENERAL CONTENTS PAGE : 11/14

5 – INSTRUMENTATION AND CONTROL


MAINTENANCE MANUAL

VOLUME

01. FOREWORD M01


02. AMENDEMENT RECORD M01
03. HEALTH AND SAFETY M01

1 MAIN STEAM SUPPLY SYSTEM M01


2 NON CONDENSABLE GASES SYSTEM M01
3 MAIN COOLING WATER SYSTEM M01
4 PRIMARY AUXILIARY COOLING WATER SYSTEM M01
5 SECONDARY AUXILIARY COOLING WATER SYSTEM M01
6 REINJECTION SYSTEM M01
7 LIST OF DRAWINGS AND SPECIFICATIONS M01
8 LIST OF SUPPLIERS AND DOCUMENTATION M02 / M03
REPUBLIC OF INDONESIA
MINISTRY OF MINES AND ENERGY
PT.PLN[PERSERO]

LAHENDONG GEOTHERMAL POWER PLANT


1 X 20MW

MAINTENANCE MANUAL

N° E 300 878 Rev.B

CHAPTER 5

INSTRUMENTATION AND CONTROL

VOLUME : M 01

CONTRACT N°020.PJP/922/1995/M

Rateau La Courneuve SPIE ENERTRANS PT.PR1AMANAYA


FRANCE Spie Enertrans 95 861 CERGY-PONTOISE JAKARTA 10320
FRANCE
INDONESIA

Internal ref. : T.29.38.0 / S 3027 .0 Date of issue : Nov.00


LAHENDONG GEOTHERMAL POWER PLANT - lX2OMW MANUAL NoE300878
INSTRUMENTATION A N D CONTROL REV. B
MAINTENANCE MANUAL PAGE : 10 /10

8 LIST OF SUPPLIERS

SUPPLlER BOOK INDEX


AG 3 S MO2 1

BENTLY NEVADA - A C power supply 3300/12 MO2 1


BENTLY NEVADA - dual thrust position monitor 3300/20 MO2 1
BENTLY NEVADA - dual vibration monitor 3300/16 MO2 1
BENTLY NEVADA - rack 3300/05 MO2 1
BENTLY NEVADA - system monitor 3300/03 MO2 1

BOURDON MO2 2

ENDRESS
- + HAUSER MO2 3

GEORGIN MO2 4

KHRONE MO2 5

LOREME - configurable indicator / controller 95200 MO2 1


LOREME - configurable indicator / controller INLSOL, 95000L MO2 1
LOREME - galvanic isolator multi-outputs CAL 4/1 O0 IG MO2 1
LOREME - programable numeric converter CNL 45 MO2 1
LOREME - programable power converter CPL 1O1 MO2 1

MAGNETROL MO3 6
MORBREY MO3 7

OMRON- I/O terminal G70D MO2 1


OMRON- link terminals B7A MO2 1

ROSEMOUNT MO3 8

T HE RMO- EST MO3 9


REPUBLIC OF INDONESIA
MINISTRY OF MINES AND ENERGY
PT.PLN[PERSERO]

LAHENDONG GEOTHERMAL POWER PLANT


1 X 20MW

MAINTENANCE MANUAL

N° E 300 878 Rev.B

CHAPTER 5

INSTRUMENTATION AND CONTROL

VOLUME : M 02

CONTRACT N°020.PJP/922/1995/M

Rateau La Courneuve SPIE ENERTRANS PT.PR1AMANAYA


FRANCE Spie Enertrans 95 861 CERGY-PONTOISE JAKARTA 10320
FRANCE
INDONESIA

Internal ref. : T.29.38.0 / S 3027 .0 Date of issue : Nov.00


abcd

01
abcd

02
abcd

03
abcd

04
abcd

05
abcd

06
abcd

07
abcd

08
abcd

09
abcd

A
abcd

B
abcd

C
abcd

D
REPUBLIC OF INDONESIA
MINISTRY OF MINES AND ENERGY
PT.PLN[PERSERO]

LAHENDONG GEOTHERMAL POWER PLANT


1 X 20MW

N° E 300 878 Rev.B

CHAPTER 6

CONTROL MONITORING

CONTRACT N°020.PJP/922/1995/M
SPIE ENERTRANS PT.PR1AMANAYA
Spie Enertrans 95 861 CERGY-PONTOISE JAKARTA 10320
FRANCE INDONESIA

Internal ref. : T.29.38.0 / S 3027 .0 Date of issue : Nov.00


REPUBLIC OF INDONESIA
MINISTRY OF MINES AND ENERGY
PT.PLN[PERSERO]

LAHENENDONG GEOTHERMAL POWER PLANT


1 X 20MW

OPERATION MANUAL

N° E 300 878 Rev.B

CHAPTER 6

CONTROL MONITORING

VOLUME : O 01

CONTRACT N°020.PJP/922/1995/M

Rateau La Courneuve SPIE ENERTRANS PT.PR1AMANAYA


FRANCE Spie Enertrans 95 861 CERGY-PONTOISE JAKARTA 10320
FRANCE
INDONESIA

Internal ref. : T.29.38.0 / S 3027 .0 Date of issue : Nov.00


ABCD

LAHENDONG GEOTHERMAL POWER PLANT – 1x20MW MANUAL N° E300878


REV. B
GENERAL CONTENTS PAGE : 12/14

6 – CONTROL MONITORING
OPERATION MANUAL

VOLUME

01. FOREWORD O01


02. AMENDEMENT RECORD O01
03. HEALTH AND SAFETY O01

1 DIGITAL CONTROL SYSTEM O01

2 BACK-UP DESK / VERTICAL PANEL O01

3 STEAM TURBINE CONTROL AND SAFETY SYSTEM O01


abcd

00
abcd

01
abcd

02
abcd

03
REPUBLIC OF INDONESIA
MINISTRY OF MINES AND ENERGY
PT.PLN[PERSERO]

LAHENDONG GEOTHERMAL POWER PLANT


1 X 20MW

MAINTENANCE MANUAL

N° E 300 878 Rev.B

CHAPTER 6

CONTROL MONITORING

VOLUME : M 02

CONTRACT N°020.PJP/922/1995/M

Rateau La Courneuve SPIE ENERTRANS PT.PR1AMANAYA


FRANCE Spie Enertrans 95 861 CERGY-PONTOISE JAKARTA 10320
FRANCE
INDONESIA

Internal ref. : T.29.38.0 / S 3027 .0 Date of issue : Nov.00


ABCD

LAHENDONG GEOTHERMAL POWER PLANT – 1x20MW MANUAL N° E300878


REV. B
GENERAL CONTENTS PAGE : 13/14

6 – CONTROL MONITORING
MAINTENANCE MANUAL

VOLUME

01. FOREWORD M02


02. AMENDEMENT RECORD M02
03. HEALTH AND SAFETY M02

1 DIGITAL CONTROL SYSTEM M02

2 BACK-UP DESK / VERTICAL PANEL M02

3 DRAWINGS AND SPECIFICATIONS M02

4 LIST OF SUPPLIERS AND DOCUMENTATION M03 to M13


abcd

00
abcd

01
abcd

02
abcd

03
abcd

04
LAHENDONG GEOTHERMAL POWER PLANT - lX2OMW MANUAL NoE300878
CONTROL MONITORING REV. A
MAINTENANCE MANUAL PAGE : 1 /2

4. LIST OF SUPPLIERS AND DOCUMENTATION

SUPPLIER 1 VOLUME 1 INDEX


BAILEY E96-500 - Site planning and preparation MO3 1
BAILEY E96-506 - AC modular power system MO3 2
BAILEY E96-601 - Neiwork interface slave module (INNISO1) / MO3 3
Network processing module (INNPMOl)
BAILEY E96-610 - INFINI-NETto computer interfaces (INIC101/03) MO3 4
BAILEY I-E97-462-A - Conditionning termination unit ITCTU02 MO3 5
BAILEY LE97-463-AE - Conditionning termination unit ITCTU03 MO3 6
BAILEY LE97-464-A - Conditionnina termination unit ITCTUO4 MO3 7
BAILEY I-E97-494-A - Conditionning termination unit ITCTU11 MO3 8
BAILEY E96-200 - Function code application manual M04/M05 1
BAILEY E96-117 - Analog control station (IISACOl) MO6 1
BAILEY E96-202 - Multi-function processor module (IMMFPO2) MO6 2
BAILEY E96-304 - Analog slave input module (IMAS102) MO6 3
BAILEY E96-306 - Control 1/0 slave module (IMCIS02) MO6 4
BAILEY E96-307 - Digital slave input module (IMDS102) MO6 5
BAILEY E96-313 - Digital slave output module (IMDS004) MO6 6
BAILEY E96-408 - Communication termination module (NICL01) MO6 7
BAILEY E96-413 - Multi-function controller termination modules MO6 a
(NIMFO1and NIMF02)
BAILEY E96-428 - Multi-function Drocessor termination unit (NTMPOl) MO6 9
BAILEY - inspection report cabinet 1 MO7 1
BAILEY - inspection report cabinet 2 MO7 2
BAILEY - infi 90 open, general specifications MO7 3
BAILEY - detailled mecification of réalisation MO7 4
BAILEY - configuration drawings, MFP address 1O1 02 MO7 5
BAILEY - configuration drawings, MFP address 1O1 04 MO8 6
BAILEY - configuration drawings, MFP address 1O1 08 MO8 7
BAILEY - configuration drawings, MFP address 10202 MO8 8
BAILEY - configuration drawings, MFP address 10204 MO8 9
BAILEY - configuration drawings, MFP address 10206 MO8 10
LAHENDONG GEOTHERMAL POWER PLANT - 1X20MW M A N U A L NoE 3 0 0 8 7 8
CONTROL M O N I T O R I N G RN. A
MAINTENANCE M A N U A L PAGE : 2 /2

4. LIST OF SUPPLIERS AND DOCUMENTATION ( SUITE )

SUPPLIER VOLUME INDEX


BAILEY - LAN-90PCV LAN 90 process control view operation MO9 1
( sofware release 5.3A )
BAILEY - BCS- 1003-6 general purpose interface ( GP102 ) to externat M10 1
devices with RTU ( modbus ) protocol for sofware release 3.x
BAILEY - BCS- 1003-6-1 general purpose interface ( GP102 ) to externa1 M10 2
devices with modbus slave ( RTU ) protocol ( sofware release 3.2 )
( addentum to BCS-1003-6 )
BAILEY - LAN-9OPCV LAN 90 process control view installation M10 3
( sofware release 5.3A )
BAILEY - E97-81 1- 1 LAN-90 process control view installation M11 1
( sofware release 5.2 )
BAILEY - E97-81 1-2.1 LAN-90 process control view configuration M11 2
[ sofware release 5.2 )
BAILEY - E97-81 1-2.2 LAN-90 process control view operation M11 3
[ sofware release 5.2 )
BAILEY - WLDGO1 console configuration tools ( release 2.0 ) M12 1
BAILEY - WCADOl module configuration tools ( release 2.0 ) M12 2

HELWETT PACKARD - HP 2500C/C+/CM professional series color printer M13 1


getting starter guide
TALLY - T2 155 matrix printer operator's rnanual M13 2
I
I

I
REPUBLIC OF INDONESIA
MINISTRY OF MINES AND ENERGY
PT.PLN[PERSERO]

LAHENDONG GEOTHERMAL POWER PLANT


1 X 20MW

MAINTENANCE MANUAL

N° E 300 878 Rev.B

CHAPTER 6

CONTROL MONITORING

VOLUME : M 03

CONTRACT N°020.PJP/922/1995/M

Rateau La Courneuve SPIE ENERTRANS PT.PR1AMANAYA


FRANCE Spie Enertrans 95 861 CERGY-PONTOISE JAKARTA 10320
FRANCE
INDONESIA

Internal ref. : T.29.38.0 / S 3027 .0 Date of issue : Nov.00


abcd

01
abcd

02
abcd

03
abcd

04
abcd

05
abcd

06
abcd

07
abcd

08
REPUBLIC OF INDONESIA
MINISTRY OF MINES AND ENERGY
PT.PLN[PERSERO]

LAHENDONG GEOTHERMAL POWER PLANT


1 X 20MW

MAINTENANCE MANUAL

N° E 300 878 Rev.B

CHAPTER 6

CONTROL MONITORING

VOLUME : M 04

CONTRACT N°020.PJP/922/1995/M

Rateau La Courneuve SPIE ENERTRANS PT.PR1AMANAYA


FRANCE Spie Enertrans 95 861 CERGY-PONTOISE JAKARTA 10320
FRANCE
INDONESIA

Internal ref. : T.29.38.0 / S 3027 .0 Date of issue : Nov.00


abcd

01
abcd

01
abcd

02
abcd

03
abcd

04
abcd

05
abcd

06
abcd

07
abcd

08
abcd

09
abcd

01
abcd

02
abcd

03
abcd

04
abcd

05
abcd

06
abcd

07
abcd

08
abcd

09
abcd

10
abcd

01
abcd

02
abcd

03
abcd

01
abcd

02
abcd

03
abcd

01
abcd

02
abcd

01
abcd

02
REPUBLIC OF INDONESIA
MINISTRY OF MINES AND ENERGY
PT.PLN[PERSERO]

LAHENDONG GEOTHERMAL POWER PLANT


1 X 20MW

N° E 300 878 Rev.B

CHAPTER 7

CIVIL WORKS

CONTRACT N°020.PJP/922/1995/M
SPIE ENERTRANS PT.PR1AMANAYA
Spie Enertrans 95 861 CERGY-PONTOISE JAKARTA 10320
FRANCE INDONESIA

Internal ref. : T.29.38.0 / S 3027 .0 Date of issue : Nov.00


LAHENDONG GEOTHERMAL POWER PLANT – 1x20MW MANUAL N° E300878
CIVIL WORK REV. B
DESIGN MANUAL PAGE : 1 /1

7 CIVIL WORK
DESIGN MANUAL
GENERAL CONTENT

Volume Index

01. FOREWORD D01 0


02. AMENDEMENT RECORD D01 0
03. HEALTH AND SAFETY D01 0

1. LIST OF DRAWINGS D01 1


LAHENDONG GEOTHERMAL POWER PLANT – 1x20MW MANUAL N° E300878
CIVIL WORK REV. B
DESIGN MANUAL PAGE : 1 /4

01 FOREWORD

1. This manual is provided in support of equipment supplied under the contract


referenced at the front.
It is designed to provide information, advice and guidance to the owner/user of
the equipment on the operation and routine maintenance of the equipment.
Detailed advice on the installation, assembly, dismantling, adjustment and repair
of the equipment which do not belong to the scope of operation and
maintenance is not contained in this publication. The « customer assistance »
department of ALSTOM could be inquired to for any eventual help concerning
these activities.

2. The equipment supplied shall be operated under the exclusive responsibility of the
owner/user, which is assumed to have the understanding of all factors required for
reliability and safe operation and maintenance.

3. The equipment supplied is a complex set of machinery which is intended for use
only by professionally trained operators.
The follow of the instructions set out in this manual assume that operators already
have received a professional training and have an adequate competence
regarding the safety and salubrity requirements for operation of mechanical and
electrical equipment in potentially hazardous environments, such as those
incurred by solid and liquid fluids and fuels used at the site concerned.
The owner/user should therefore ensure that all operators have been properly
trained for the operation of the equipment assigned to them, that they have the
accurate qualification level regarding to their job and that they have one copy of
this manual.
The instructions given in the manual should be interpreted and applied in
conjunction with the safety and salubrity rules applicable at the site and, if any,
the particular requirements for operation of other equipment at the site.

4. The whole of the manuals should be kept by the owner/user for the life of the
equipment supplied and should be kept at any time at the users disposal.
Updates issued by ALSTOM in the form of specific Amendments or more generally
published Service Bulletins should be incorporated by the owner/user without
delay for future reference by the operator.

5. The information set out in this Manual has been developed from ALSTOM
standard equipment build specifications.
Where possible at the time of publication, information has been included in
respect of modifications to that equipment which are specific to the contact and
for additional equipment supplied by ALSTOM which has been manufactured by
others.
LAHENDONG GEOTHERMAL POWER PLANT – 1x20MW MANUAL N° E300878
CIVIL WORK REV. B
DESIGN MANUAL PAGE : 2 /4

The timing of publication and the ongoing nature of design improvements may
mean, however, that features of the equipment supplied will be different from
those shown in this publication, without it would incur any ALSTOM liability against
the owner/user.
LAHENDONG GEOTHERMAL POWER PLANT – 1x20MW MANUAL N° E300878
CIVIL WORK REV. B
DESIGN MANUAL PAGE : 3 /4

6. Because of variations in equipment build, it is important that the owner/user


should only replace components with spare parts which are identical to the
original or contain modifications approved by ALSTOM.
When ordering spare parts always quote the functional code, the model and
serial number of the unit of equipment concerned.
ALSTOM accepts no responsibility under its warranty or otherwise for defects or
damage which result from the use of repair or replacement parts not approved
by ALSTOM.

7. The data, sketchs, drawings and other informations contained in this manual have
a confidential character and are and remain the property of their respective
owner : ALSTOM, its subcontractors and licence owners.
The informations given in the manual are disclosed in confidence to the
owner/user and the operators of the equipment supplied by ALSTOM under the
contract referenced on the manual front page solely for their use in the scope of
operation and maintenance.
The contents of the manual shall not be copied, reproduced or disclosed to third
parties without written authorisation of ALSTOM.
No licence is granted to the owner/user neither the third parties for the
manufacture of any replacement equipment or components or other purposes.

8. No direct or implied responsibility of ALSTOM can be involved by the issue of this


manual to the owner/user.
The application of the manual instructions is under the only responsibility of the
owner/user which renounces to any claim against ALSTOM and assume the
consequences of any damages and losses involved by fault, careless or operators
fail in using the manual.
Confidentiality of the publication :
No part of this publication may be reproduced or copied in any form or manner
(including electronic, mechanical, photocopying, recording translating or other
information retrieval system) without prior written authority of ALSTOM the
copyright owner.

© Copyright ALSTOM 2000


LAHENDONG GEOTHERMAL POWER PLANT – 1x20MW MANUAL N° E300878
CIVIL WORK REV. B
DESIGN MANUAL PAGE : 4 /4

02 AMENDMENT RECORD

Checked
Rev. Date Author Detail of amendment
by
A 05/01 JP. ALBARET First issue
B 11/02 JP. ALBARET Up to date
LAHENDONG GEOTHERMAL POWER PLANT – 1x20MW MANUAL N° E300878
CIVIL WORK REV. B
DESIGN MANUAL PAGE : 5 /4

03 HEALTH AND SAFETY

SAFETY

Persons responsible for the equipment covered in this manual must ensure that it is
properly and safety installed and maintained, and operated at the specified
conditions. Only appropriately qualified staff, applying acceptable standards of
engineering practice and the recommendations contained in this manual, must be
employed in these activities.
Any similar instructions for the overall plant in which the equipment is to be
incorporated, which have an influence on the equipment application, must be
strictly followed.
Statutory and local requirements concerning work practices, safety and/or health
precautions must be observed.
Where appropriate, warnings, cautions and notes are included in the manual, and
are defined as follows :

WARNING : A WARNING CALLS ATTENTION TO INSTRUCTIONS WHICH MUST BE


FOLLOWED TO AVOID DANGER TO PERSONNEL.

CAUTION : A caution calls attention to instructions which must be followed to avoid


damaging the equipment of its surroundings.

Note : A note gives supplementary information where considered necessary.

OPERATING CONDITIONS

If the equipment application or operating conditions differ from those for which the
equipment was supplied, the equipment and the operating recommendations
contained in this manual may be inappropriate. In such circumstances verification of
the suitability of the equipment and of the operating and maintenance manual must
be obtained in writing from ALSTHOM.
LAHENDONG POWER PLANT MANUAL N° E300878
CIVIL WORK REV. A
LIST OF DRAWINGS AND SPECIFICATIONS – DESIGN MANUAL PAGE : 1/16

1. LIST OF DRAWINGS
CONTRACTOR'S
PLN' DRAWING
DRAWING DRAWING TITLE VOLUME
NUMBER
NUMBER
1303-01-S-01TA-001 GA-CPE-001 CIVIL WORK DESIGN CRITERIA D01
UNDERGROUND NETWORKS
1303-01-S-58MI-003 GA-CPE-008 D01
COORDINATION GENERAL PLAN VIEW
UNDERGROUND NETWORKS DETAIL NOTE
1303-01-S-62MI-002 GA-CPE-009 D01
BOOK TRENCHES MANHOLES, SLEEVES
ADMINISTRATION BUILDING
1303-01-S-55MA-002 GA-CPE-301 D01
ARCHITECTURAL
ADMINISTRATION BUILDING
1303-01-S-55MA-002 GA-CPE-302 D01
ARCHITECTURAL SECTION
1303-01-S-55MM-001 GB-CPE-401 WORKSHOP & STORE ARCHITECTURAL D01
WORKSHOP & STORE ARCHITECTURAL
1303-01-S-55MM-004 GB-CPE-402 D01
SECTION
POWER HOUSE-ELECTRICAL BUILDING-
1303-01-S-55NB-001 GB-CPE-101 D01
PLANT ARCHITECTURAL
POWER HOUSE-ELECTRICAL BUILDING
1303-01-S-55NB-002 GB-CPE-102 D01
PLANTS ARCHITECTURAL 1st FLOOR
POWER HOUSE-ELECTRICAL BUILDING
1303-01-S-55NB-003 GB-CPE-103 PLANTS FRONT & REAR ELEVATIONS D01
ARCHITECTURAL
POWER HOUSE-ELECTRICAL BUILDING
1303-01-S-55NB-004 GB-CPE-104 PLANTS S-E AND M-W ELEVATIONS D01
ARCHITECTURAL
POWER HOUSE-ELECTRICAL BUILDING
1303-01-S-55NB-005 GB-CPE-105 PLANTS SECTIONS A-A, B-B AND C-C D02
ARCHITECTURAL
1303-01-S-55NB-006 GB-CPE-106 LEGEND DEFINITION ARCHITECTURAL D02
1303-01-S-55MM-002 GB-CPE-501 GARAGE ARCHITECTURAL D02
1303-01-S-55MM-005 GB-CPE-502 GARAGE ARCHITECTURAL SECTION D02
REINJECTION PUMP STATION & CHEMICAL
1303-01-S-55MM-003 GB-CPE-601 D02
ROOM ARCHITECTURAL
REINJECTION PUMP HOUSE & CHEMICAL
1303-01-S-55MM-006 GB-CPE-602 D02
ROOM ARCHITECTURAL SECTION
WATER TREATMENT & PUMPING STATION
1303-01-S-55MH-001 GB-CPE-701 D02
ARCHITECTURAL
WATER TREATMENT & PUMPING STATION
1303-01-S-55MH-002 GB-CPE-702 D02
ARCHITECTURAL SECTION
LAHENDONG POWER PLANT MANUAL N° E300878
CIVIL WORK REV. A
LIST OF DRAWINGS AND SPECIFICATIONS – DESIGN MANUAL PAGE : 2/16

1. LIST OF DRAWINGS
CONTRACTOR'S
PLN' DRAWING
DRAWING DRAWING TITLE VOLUME
NUMBER
NUMBER
1303-01-S-55FK-001 GC-CPE-911 HV SWITCHYARD LAYOUT OF CIVIL WORKS D02
TURBO GENERATOR CALCULATION NOTE
1303-01-S-55NM-006 GC-GRB-005 D02
FOUNDATION BLOCK
ELECTRICAL BUILDING & TURBINE HOUSE
1303-01-S-55MM-055 GS-CPE-141 D02
PLAN VIEW GROUND LEVEL
ELECTRICAL BUILDING & TURBINE HOUSE
1303-01-S-55MM-056 GS-CPE-142 STEEL STRUCTURE PLAN VIEW FIRST D02
FLOOR AND CRANE LEVELS
ELECTRICAL BUILDING & TURBINE HOUSE
1303-01-S-55MM-057 GS-CPE-143 STEEL STRUCTURE PLAN VIEW PURLINS D02
LEVELS
ELECTRICAL BUILDING & TURBINE HOUSE
1303-01-S-55MM-058 GS-CPE-144 STEEL STRUCTURE ELEVATIONS A-A, C-C, D02
D-D & G-G
ELECTRICAL BUILDING & TURBINE HOUSE
1303-01-S-55MM-059 GS-CPE-145 D02
STEEL STRUCTURE ELEVATIONS E-E & F-F
ELECTRICAL BUILDING & TURBINE HOUSE
1303-01-S-55MM-060 GS-CPE-146 D03
STEEL STRUCTURE ELEVATIONS B-B & H-H
SHELTER STEEL STRUCTURAL VIEW CRANE
1303-01-S-55MM-061 GS-CPE-147 D03
LEVEL
SHELTER STEEL STRUCTURAL VIEW
1303-01-S-55MM-062 GS-CPE-148 D03
PURLINS LEVEL
SHELTER STEEL STRUCTURAL ELEVATIONS
1303-01-S-55MM-063 GS-CPE-149 D03
A-A & B-B
ELECTRICAL BUILDING & TURBINE HOUSE
1303-01-S-02MM-065 GS-CPE-191 STEELWORK STRUCTURE CALCULATION D03
NOTE
WATER TREATMENT AND PUMPING STATION
1303-01-S-54MH-003 MD-CPE-006 D04
CIVIL WORK GUIDE DRAWING
REINJECTION PUMPING STATION AND
1303-01-S-54MM-016 MD-CPE-007 CHEMICAL ROOM CIVIL WORK GUIDE D04
DRAWING
ADMINISTRATION BUILDING CIVIL WORK D04
1303-01-S-54MM-003 MD-CPE-910
GUIDE DRAWING
WORKSHOP AND STORE CIVIL WORKS D04
1303-01-S-54MM-017 MD-CPE-911
GUIDE DRAWING
1303-01-S-54MM-018 MD-CPE-912 GARAGE CIVIL WORK GUIDE DRAWING D04
LAHENDONG POWER PLANT MANUAL N° E300878
CIVIL WORK REV. A
LIST OF DRAWINGS AND SPECIFICATIONS – DESIGN MANUAL PAGE : 3/16

1. LIST OF DRAWINGS
CONTRACTOR'S
PLN' DRAWING
DRAWING DRAWING TITLE VOLUME
NUMBER
NUMBER
RAW WATER STORAGE & FIRE FIGHTING D04
1303-01-S-69KP-001 MD-CPE-997
CIVIL WORK GUIDE DRAWING
CONDENSER ASSEMBLY SHELTER
1303-01-S-02MM-064 GS-CPE-291 D04
STEELWORK CALCULATION NOTE
ELECTRICAL BUILDING & TURBIN HOUSE
GS-ALI-101 D05
STEEL STRUCTURE RUNWAY
ELECTRICAL BUILDING & TURBIN HOUSE
GS-ALI-102 D05
STEEL STRUCTURE RUNWAY
ELECTRICAL BUILDING & TURBIN HOUSE
GS-ALI-103 D05
STEEL STRUCTURE RUNWAY
ELECTRICAL BUILDING & TURBIN HOUSE
GS-ALI-104 D05
STEEL STRUCTURE VERTICAL BRACE
ELECTRICAL BUILDING & TURBIN HOUSE
GS-ALI-105 D05
STEEL STRUCTURE HORISONTAL BRACE
ELECTRICAL BUILDING & TURBIN HOUSE
GS-ALI-106 D05
STEEL STRUCTURE BEAM DETAIL
ELECTRICAL BUILDING & TURBIN HOUSE
GS-ALI-107 D05
STEEL STRUCTURE GIRDER DETAIL
ELECTRICAL BUILDING & TURBIN HOUSE
GS-ALI-108 D05
STEEL STRUCTURE POST DETAIL
ELECTRICAL BUILDING & TURBINE HOUSE
GS-ALI-109 D05
STEEL STRUCTURE COLUMN DETAIL F/2.A/2
ELECTRICAL BUILDING & TURBINE HOUSE
GS-ALI-110 D05
STEEL STRUCTURE COLUMN DETAIL F/3.A/3
ELECTRICAL BUILDING & TURBINE HOUSE
GS-ALI-111 D05
STEEL STRUCTURE COLUMN DETAIL E/2.B/2
ELECTRICAL BUILDING & TURBINE HOUSE
GS-ALI-112 D05
STEEL STRUCTURE COLUMN DETAIL D/2.C/2
ELECTRICAL BUILDING & TURBINE HOUSE
GS-ALI-113 D05
STEEL STRUCTURE COLUMN DETAIL E/3.B/3
ELECTRICAL BUILDING & TURBINE HOUSE
GS-ALI-114 D05
STEEL STRUCTURE COLUMN DETAIL D/3.C/3
ELECTRICAL BUILDING & TURBINE HOUSE
GS-ALI-115 D05
STEEL STRUCTURE COLUMN DETAIL F/1.A/1
ELECTRICAL BUILDING & TURBINE HOUSE
GS-ALI-116 D05
STEEL STRUCTURE COLUMN DETAIL E/1.D/1
LAHENDONG POWER PLANT MANUAL N° E300878
CIVIL WORK REV. A
LIST OF DRAWINGS AND SPECIFICATIONS – DESIGN MANUAL PAGE : 4/16

1. LIST OF DRAWINGS
CONTRACTOR'S
PLN' DRAWING
DRAWING DRAWING TITLE VOLUME
NUMBER
NUMBER
ELECTRICAL BUILDING & TURBINE HOUSE
GS-ALI-117 D05
STEEL STRUCTURE COLUMN DETAIL C/1.B/1
ELECTRICAL BUILDING & TURBINE HOUSE
GS-ALI-119 D05
STEEL STRUCTURE RAFTER LINE D & C
ELECTRICAL BUILDING & TURBINE HOUSE
GS-ALI-120 D05
STEEL STRUCTURE RAFTER LINE B & E
ELECTRICAL BUILDING & TURBINE HOUSE
GS-ALI-121 D05
STEEL STRUCTURE RAFTER LINE C & D
ELECTRICAL BUILDING & TURBINE HOUSE
GS-ALI-122 D05
STEEL STRUCTURE RAFTER
COOLING TOWER FORMWORK
GC-HMN-001 D06
BASSIN LAYOUT AND SECTIONS
COOLING TOWER FORMWORK
GC-HMN-002 LEVEL +6.98-LAYOUT H3 D06
AND SECTIONS L3-T3
COOLING TOWER FORMWORK
GC-HMN-003 LEVEL +11.66-LAYOUT H2 D06
AND SECTIONS L2-T2
COOLING TOWER FORMWORK
GC-HMN-004 ROOF LEVEL +13.79-LAYOUT H1 D06
AND SECTIONS L1-T1
COOLING TOWER FORMWORK
GC-HMN-005 LEVEL +3.30-LAYOUT H4 D06
AND SECTIONS L4-T4
COOLING TOWER BASIN
GC-HMN-006 D06
REINFORCING SCHEDULE - LIST OF BARS
COOLING TOWER BASSIN
GC-HMN-007 D06
BOTTOM AND TOP REINFORCEMENT
COOLING TOWER BASIN
GC-HMN-008 WALLS W1-W2-W2’-W3-W9 SLAB NIV.+3.30 D06
REINFORCEMENT
COOLING TOWER BASIN
GC-HMN-009 D06
WALLS W5-W6-W7-W8 REINFORCEMENT
COOLING TOWER BASIN
GC-HMN-010 WALLS W5-W6-W7-W8 D06
REINFORCING SCHEDULE- LISTOF BARS
LAHENDONG POWER PLANT MANUAL N° E300878
CIVIL WORK REV. A
LIST OF DRAWINGS AND SPECIFICATIONS – DESIGN MANUAL PAGE : 5/16

1. LIST OF DRAWINGS

CONTRACTOR'S
PLN' DRAWING
DRAWING DRAWING TITLE VOLUME
NUMBER
NUMBER
COOLING TOWER BASIN
GC-HMN-011 WALLS W1-W2-W2’-W3-W9 SLAB NIV.+3.30 D06
REINFORCING SCHEDULE - LISTOF BARS
COOLING TOWER
GC-HMN-012 WALLS W4 AND W5 CHANNEL SLAB D06
REINFORCEMENT
COOLING TOWER
GC-HMN-013 WALLS W6 ANDW7 BEAM B9 AND B10 D06
REINFORCEMENT
COOLING TOWER
GC-HMN-014 D06
COLUMNS C1-C2-C3-C4 REINFORCEMENT
COOLING TOWER
GC-HMN-015 ROOF LEVEL +13.79 - BEAMS B1 TO B8 D06
REINFORCEMENT
COOLING TOWER
GC-HMN-016 PRECAST BEAMS P1-P1’ D06
REINFORCEMENT
COOLING TOWER
GC-HMN-017 PRECAST SHUTTER P2 D06
REINFORCED CONCRETE STRUCTURE
COOLING TOWER
GC-HMN-018 PRECAST COVER SLAB P3-P4 D06
REINFORCEMENT
COOLING TOWER
GC-HMN-019 D06
STAIRS SLAB REINFORCEMENT
COOLING TOWER REINFORCEMENT
GC-HMN-020 WALLS W1-W2-W2’-W3 D06
REINFORCING SCHEDULE- LISTOF BARS
COOLING TOWER REINFORCEMENT
GC-HMN-021 WALLS W4 AND W5 CHANNEL SLAB D06
REINFORCING SCHEDULE- LISTOF BARS
COOLING TOWER REINFORCEMENT
GC-HMN-022 WALLS W6 AND W7 BEAMS B9 AND B10 D06
REINFORCING SCHEDULE- LISTOF BARS
COOLING TOWER REINFORCEMENT
GC-HMN-023 COLUMNS C1-C2-C3-C4 D06
REINFORCING SCHEDULE- LISTOF BARS
LAHENDONG POWER PLANT MANUAL N° E300878
CIVIL WORK REV. A
LIST OF DRAWINGS AND SPECIFICATIONS – DESIGN MANUAL PAGE : 6/16

1. LIST OF DRAWINGS
CONTRACTOR'S
PLN' DRAWING
DRAWING DRAWING TITLE VOLUME
NUMBER
NUMBER
COOLING TOWER REINFORCEMENT
GC-HMN-024 ROOF LEVEL +13.79 - BEAMS B1 TO B8 D06
REINFORCING SCHEDULE- LISTOF BARS
COOLING TOWER
GC-HMN-026 D06
WALLS W1-W2-W2’-W3 REINFORCEMENT
REINFORCED CONCRETE STRUCTURE
GC-HMN-050 D06
CALCULATION NOTE
LAHENDONG POWER PLANT MANUAL N° E300878
CIVIL WORK REV. A
LIST OF DRAWINGS AND SPECIFICATIONS – DESIGN MANUAL PAGE : 7/16

1. LIST OF DRAWINGS

CONTRACTOR'S
PLN' DRAWING
DRAWING DRAWING TITLE VOLUME
NUMBER
NUMBER

ADMINISTRATION BUILDING
1303-01-S-55MA-003 GC-BRT-308 PLAN VIEW D07
1304-01-S-55MA-004 GC-BRT-309 CROSS SECTION AND LONGITUDINAL SECTION D07
1305-01-S-55MA-004 GC-BRT-311 FOUNDATIONS PLAN VIEW-SECTION AND DETAILS D07
1306-01-S-55MA-0006 GC-BRT-312 FOUNDATIONS–REINFORCEMENT D07
1307-01-S-55MA-016 GC-BRT-314 GROUND SLAB–REINFORCEMENT D07
R.C. SUPERSTUCTURE–PLAN VIEW DETAILS AND
1308-01-S-55MA-006 GC-BRT-315 D07
REINFORCEMENT
1309-01-S-55MA- GM-BRT-331 BRICKWORK D07
1310-01-S-55MA-008 GT-BRT-341 ROOF SUPPORTING TIMBERWORK STRUCTURE D07
ROOFING-CORRUGATED SHEETS-LAYOUT AND
1311-01-S-55MA-015 GS-BRT-342 D07
DETAILS
1312-01-S-55MA-013 GF-BRT-381 DOORS AND WINDOWS D07
1312-01-S-55MA-013 GF-BRT-382 CEILING-LAYOUT AND DETAILS D07
1312-01-S-55MA-014 GF-BRT-383 PLUMBING LAYOUT AND DETAILS D07

WORKSHOP AND STORE


1303-01-S-55MM-047 GC-BRT-408 PLAN VIEW D07
1304-01-S-55MM-049 GC-BRT-409 CROSS SECTION AND LONGITUDINAL SECTION D07
1305-01-S-55MM-050 GC-BRT-411 FOUNDATIONS PLAN VIEW-SECTION AND DETAILS D07
1306-01-S-55MM-013 GC-BRT-412 FOUNDATIONS–REINFORCEMENT D07
1307-01-S-55MM-033 GC-BRT-413 GROUND SLAB–FORMWORK D07
1308-01-S-55MM-034 GC-BRT-414 GROUND SLAB–REINFORCEMENT D07
R.C. SUPERSTUCTURE–PLAN VIEW DETAILS AND
1308-01-S-55MM-052 GC-BRT-415 D07
REINFORCEMENT
1309-01-S-55MM- GM-BRT-431 BRICKWORK D07
1310-01-S-55MM-034 GT-BRT-441 ROOF SUPPORTING TIMBERWORK STRUCTURE D07
ROOFING-CORRUGATED SHEETS-LAYOUT AND
1311-01-S-55MM-028 GS-BRT-442 D07
DETAILS
LAHENDONG POWER PLANT MANUAL N° E300878
CIVIL WORK REV. A
LIST OF DRAWINGS AND SPECIFICATIONS – DESIGN MANUAL PAGE : 8/16

1. LIST OF DRAWINGS

CONTRACTOR'S
PLN' DRAWING
DRAWING DRAWING TITLE VOLUME
NUMBER
NUMBER

WORKSHOP AND STORE (suite)


1312-01-S-55MM-051 GF-BRT-481 DOORS AND WINDOWS D07
1312-01-S-55MM-076 GF-BRT-482 CEILING-LAYOUT AND DETAILS D07
1312-01-S-55MM-093 GFBRT-483 PLUMBING LAYOUT AND DETAILS D07
METALLIC DOORS PLAN VIEW-SECTION AND
1312-01-S-55MM-053 GF-BRT-484 D07
DETAILS

GARAGE
1303-01-S-55MM-094 GC-BRT-508 PLAN VIEW D07
1304-01-S-55MM-007 GC-BRT-509 CROSS SECTION AND LONGITUDINAL SECTION D07
1305-01-S-55MM-095 GC-BRT-511 FOUNDATIONS PLAN VIEW-SECTION AND DETAILS D07
1306-01-S-55MM-007 GC-BRT-512 FOUNDATIONS–REINFORCEMENT D07
1307-01-S-55MM-031 GC-BRT-513 GROUND SLAB–FORMWORK D07
1308-01-S-55MM-032 GC-BRT-514 GROUND SLAB–REINFORCEMENT D07
R.C. SUPERSTUCTURE–PLAN VIEW DETAILS AND
1308-01-S-55MM-008 GC-BRT-515 D07
REINFORCEMENT
1309-01-S-55MM- GM-BRT-531 BRICKWORK D07
1310-01-S-55MM-025 GT-BRT-541 ROOF SUPPORTING TIMBERWORK STRUCTURE D07
ROOFING-CORRUGATED SHEETS-LAYOUT AND
1311-01-S-55MM-096 GS-BRT-542 D07
DETAILS
1312-01-S-55MM-077 GF-BRT-582 CEILING-LAYOUT AND DETAILS D07
LAHENDONG POWER PLANT MANUAL N° E300878
CIVIL WORK REV. A
LIST OF DRAWINGS AND SPECIFICATIONS – DESIGN MANUAL PAGE : 9/16

1. LIST OF DRAWINGS

CONTRACTOR'S
PLN' DRAWING
DRAWING DRAWING TITLE VOLUME
NUMBER
NUMBER

REINJECTION PUMPING STATION AND CHEMICAL ROOM


1303-01-S-55MM-036 GC-BRT-608 PLAN VIEW D08
1304-01-S-55MM-106 GC-BRT-609 CROSS SECTION AND LONGITUDINAL SECTION D08
1305-01-S-55MM-036 GC-BRT-611 FOUNDATIONS PLAN VIEW-SECTION AND DETAILS D08
1306-01-S-55MM-079 GC-BRT-612 FOUNDATIONS–REINFORCEMENT D08
1307-01-S-55MM-029 GC-BRT-613 GROUND SLAB–FORMWORK D08
1307-01-S-55MM-030 GC-BRT-614 GROUND SLAB–REINFORCEMENT D08
R.C. SUPERSTUCTURE–PLAN VIEW DETAILS AND
1308-01-S-55MM-080 GC-BRT-615 D08
SECTIONS
1309-01-S-55MM-008 GM-BRT-631 BRICKWORK D08
1310-01-S-55MM-098 GT-BRT-641 ROOF SUPPORTING TIMBERWORK STRUCTURE D08
ROOFING-CORRUGATED SHEETS-LAYOUT AND
1311-01-S-55MM-040 GS-BRT-642 D08
DETAILS
1312-01-S-55MM-3009 GF-BRT-681 DOORS AND WINDOWS D08
1313-01-S-55MM-109 GF-BRT-682 CEILING-LAYOUT AND DETAILS D08

GUARD HOUSE
1303-01-S-55MM-009 GC-BRT-908 PLAN VIEW D08
1304-01-S-55MM-010 GC-BRT-909 CROSS SECTION AND LONGITUDINAL SECTION D08
1305-01-S-55MM-001 GC-BRT-911 FOUNDATIONS PLAN VIEW-SECTION AND DETAILS D08
R.C. SUPERSTUCTURE–PLAN VIEW DETAILS AND
1306-01-S-55MM-012 GC-BRT-912 D08
REINFORCEMENT
1307-01-S-55MM-84 GM-BRT-931 BRICKWORK D08
1308-01-S-55MM-026 GT-BRT-941 ROOF SUPPORTING TIMBERWORK STRUCTURE D08
LAHENDONG POWER PLANT MANUAL N° E300878
CIVIL WORK REV. A
LIST OF DRAWINGS AND SPECIFICATIONS – DESIGN MANUAL PAGE : 10/16

1. LIST OF DRAWINGS

CONTRACTOR'S
PLN' DRAWING
DRAWING DRAWING TITLE VOLUME
NUMBER
NUMBER

WATER TREATMENT AND PUMPING STATION


1303-01-S-55MM-037 GC-BRT-708 PLAN VIEW D08
1304-01-S-55MM-007 GC-BRT-709 CROSS SECTION AND LONGITUDINAL SECTION D08
1305-01-S-55MM-038 GC-BRT-711 FOUNDATIONS PLAN VIEW-SECTION AND DETAILS D08
1306-01-S-55MH-004 GC-BRT-712 FOUNDATIONS–REINFORCEMENT D08
1307-01-S-55MH-008 GC-BRT-714 GROUND SLAB–REINFORCEMENT D08
R.C. SUPERSTUCTURE–PLAN VIEW DETAILS AND
1308-01-S-55MM-081 GC-BRT-715 D08
REINFORCEMENT
1309-01-S-55MH- GM-BRT-731 BRICKWORK D08
1310-01-S-55MH-005 GT-BRT-741 ROOF SUPPORTING TIMBERWORK STRUCTURE D08
ROOFING-CORRUGATED SHEETS-LAYOUT AND
1311-01-S-55MH-006 GS-BRT-742 D08
DETAILS
1312-01-S-55MH-082 GF-BRT-782 CEILING-LAYOUT AND DETAILS D08

SETTLING BASIN
1303-01-S-55MM- GC-BRT-620 PLAN VIEW AND LEVELS D09
1303-01-S-55MM- GC-BRT-621 CROSS SECTION AND LONGITUDINAL SECTION D09
1304-01-S-55MM- GC-BRT-622 FORWORK RAFT, WALL AND DETAILS D09
1305-01-S-55MM-087 GC-BRT-623 REINFORCEMENT OF FLOOR D09
1306-01-S-55MM- GC-BRT-624 OVER FLOW DETAILS D09
REINFORCEMENT OF GROUND BEAM AND
1307-01-S-55MM-089 GC-BRT-626 D09
COLUMNS
1308-01-S-55MM- GC-BRT-631 FORWORK GROUND, BEAM AND DETAILS D09
1309-01-S-55MM-090 GC-BRT-632 REINFORCEMENT OF WALL D09
LAHENDONG POWER PLANT MANUAL N° E300878
CIVIL WORK REV. A
LIST OF DRAWINGS AND SPECIFICATIONS – DESIGN MANUAL PAGE : 11/16

1. LIST OF DRAWINGS

CONTRACTOR'S
PLN' DRAWING
DRAWING DRAWING TITLE VOLUME
NUMBER
NUMBER

FIRE FIGHTING AND RAW WATER RESERVOIR


1303-01-S-55MM-039 GC-BRT-720 PLAN VIEW AND LEVELS D09
1304-01-S-55MM-040 GC-BRT-721 CROSS SECTION AND LONGITUDINAL SECTION D09
1305-01-S-55MM- GC-BRT-722 FORWORK RAFT, WALL AND DETAILS D09
1305-01-S-55MM-048 GC-BRT-723 REINFORCEMENT OF FLOOR D09
1306-01-S-55MM-100 GC-BRT-724 OVER FLOW DETAILS D09
1307-01-S-55MM-070 GC-BRT-725 REINFORCEMENT OF WALL D09
REINFORCEMENT OF GROUND BEAM AND
1308-01-S-55MM-071 GC-BRT-726 D09
COLUMNS
1309-01-S-55MM- GC-BRT-793 FORWORK GROUND, BEAM AND DETAILS D09

INTERNAL ROADS AND UNDERGROUND CROSSINGS


1303-01-S-55MM-017 GR-BRT-031 LAYOUT-LEVELS AND DETAILS D09
1304-01-S-55MM-018 GR-BRT-032 ROAD LONGITUDINAL SECTIONS D09
1305-01-S-55MM-019 GR-BRT-033 ROAD CROSSING SECTIONS AND DETAILS D09

BOUNDARY AND INTERNAL FENCING


1303-01-S-55MM-020 GR-BRT-035 PLAN VIEW AND DETAILS D09
1304-01-S-55MM-021 GR-BRT-036 ENTRANCE GATES AND DETAILS D09
REMOVABLE FENCING
1305-01-S-55MM-042 GR-BRT-037 D09
PLAN VIEW AND DETAILS

SEWAGE SYSTEM
1303-01-S-55MM-7008 GR-BRT-045 LAYOUT AND LEVELS D09
1304-01-S-55MM-8330 GR-BRT-046 SEPTIC TANK AND FILTRATION TANK D09

RAIN WATER DRAINAGE SYSTEM


MAIN NETWORK AND BUILDING DRAINAGE
1303-01-S-55MM-022 GR-BRT-041 D09
LAYOUT
MAIN NETWORK AND BUILDING DRAINAGE
1304-01-S-55MM-032 GR-BRT-042 D09
SECTIONS AND DETAILS
LAHENDONG POWER PLANT MANUAL N° E300878
CIVIL WORK REV. A
LIST OF DRAWINGS AND SPECIFICATIONS – DESIGN MANUAL PAGE : 12/16

1. LIST OF DRAWINGS

CONTRACTOR'S
PLN' DRAWING
DRAWING DRAWING TITLE VOLUME
NUMBER
NUMBER
POWER HOUSE-ZONE 1 AND 2-OPEN CANALS-
GC-CPE-260-B MODIFICATIONS DEMOLITION AND D10
RECONSTRUCTION
PIPES SUPPORTS CONCRETE BLOCKS
GA-CPE-010-C D10
COORDINATION
PIPES SUPPORTS-DETAIL NOTE BOOK-CONCRETE
GA-CPE-011-D D10
FOUNDATION BLOCKS
POWER HOUSE-ELECTRICAL BUILDING-PLANT
GB-CPE-101-D D10
ARCHITECTURAL-GROUND LEVEL
POWER HOUSE-ELECTRICAL BUILDING-PLANT
GB-CPE-102-C D10
ARCHITECTURAL-FIRST FLOOR
POWER HOUSE-ELECTRICAL BUILDING-PLANT
GB-CPE-103-D D10
ARCHITECTURAL-FRONT AND REAR ELEVATIONS
POWER HOUSE-ELECTRICAL BUILDING-PLANT
GB-CPE-104-C ARCHITECTURAL- D10
S-E & N-W ELEVATIONS
POWER HOUSE-ELECTRICAL BUILDING-PLANT
GB-CPE-105-D D10
ARCHITECTURAL-SECTION A-A, B-B AND C-C
GB-CPE-106-B ARCHITECTURAL-LEGEND DEFINITION D10
UNDERGROUND NETWORKS-DETAIL NOTE BOOK-
GA-CPE-009-D D10
TRENCHES MANHOLES, SLEEVES
INDUSTRIAL WATER TANK 450M3 –FOUNDATIONS-
GC-CPE-015-C D10
FORMWORK AND REINFORCEMENT
GC-CPE-016-B EXTERNAL WORKS-MANHOLE MH 01-FORMWORK D10
EXTERNAL WORKS-MANHOLE MH 01-
GC-CPE-017-B D10
REINFORCEMENT
GC-CPE-018-B EXTERNAL WORKS-MANHOLE MH 02-FORMWORK D10
EXTERNAL WORKS-MANHOLE MH 02-
GC-CPE-019-B D10
REINFORCEMENT
PIPES SUPPORTS FOUNDATION BLOCKS-
GC-CPE-091-B D10
CALCULATION NOTE
FRP PIPE-UNDERGROUND ROAD CROSSING-
GC-CPE-092-B D10
CALCULATION NOTE
LAHENDONG POWER PLANT MANUAL N° E300878
CIVIL WORK REV. A
LIST OF DRAWINGS AND SPECIFICATIONS – DESIGN MANUAL PAGE : 13/16

1. LIST OF DRAWINGS
CONTRACTOR'S
PLN' DRAWING
DRAWING DRAWING TITLE VOLUME
NUMBER
NUMBER
EXTERNAL WORKS-MANHOLE MH 01-
GC-CPE-093-B D10
CALCULATION NOTE
EXTERNAL WORKS-MANHOLE MH 02-
GC-CPE-094-B D10
CALCULATION NOTE
PIPES SUPPORT PCB 25 FOUNDATION-
GC-CPE-095-B D10
CALCULATION NOTE
PIPES SUPPORT PCB 24 FOUNDATION-
GC-CPE-096-B D10
CALCULATION NOTE
ELECTRICAL BUILDING-DISTRIBUTION
GC-CPE-121-B TRANSFORMERS-2500/1250KVA- FOUNDATION D11
LAYOUT
ELECTRICAL BUILDING-DISTRIBUTION
GC-CPE-122-B TRANSFORMERS-2500/1250KVA- FOUNDATIONS D11
FORMWORK
ELECTRICAL BUILDING-DISTRIBUTION
GC-CPE-123-B TRANSFORMERS-2500/1250KVA- FOUNDATIONS D11
REINFORCEMENT
GC-CPE-911-D HV SWITCHYARD-LAYOUT OF CIVIL WORKS D11
HV SWITCHYARD-DETAIL NOTE BOOK-CONCRETE
GC-CPE-912-D D11
BLOCKS AND MANHOLES
TRANSFORMER 30MVA-FOUNDATION AND PIT-
GC-CPE-913-C D11
LAYOUT AND SECTIONS
TRANSFORMER 30MVA-FOUNDATION AND PIT-
GC-CPE-914-C D11
FORMWORK
TRANSFORMER 30MVA-FOUNDATION AND PIT-
GC-CPE-915-C D11
REINFORCEMENT
TRANSFORMER 30MVA-FOUNDATION AND PIT-
GC-CPE-916-C D11
GRATING SUPPORTING-STEELWORK STRUCTURE
TRANSFORMER 30MVA-FOUNDATION AND PIT-
GC-CPE-917-C D11
GRATING DEFINITION
TRANSFORMER 30MVA-FOUNDATION –
GC-CPE-991-C D11
CALCULTION NOTE
1250KVA TRANSFORMER-FOUNDATION –
GC-CPE-992-B D11
CALCULTION NOTE
2500KVA TRANSFORMER-FOUNDATION –
GC-CPE-993-B D11
CALCULTION NOTE
LAHENDONG POWER PLANT MANUAL N° E300878
CIVIL WORK REV. A
LIST OF DRAWINGS AND SPECIFICATIONS – DESIGN MANUAL PAGE : 14/16

1. LIST OF DRAWINGS
CONTRACTOR'S
PLN' DRAWING
DRAWING DRAWING TITLE VOLUME
NUMBER
NUMBER
HV SWITCHYARD-FOUNDATION BLOCKS–
GC-CPE-994-C D11
CALCULTION NOTE
TURBO GENERATOR-FOUNDATION BLOCK
GC-GRB-001-E D11
FORMWORK DRAWING
TURBO GENERATOR-FOUNDATION BLOCK
GC-GRB-002-C D11
SECTION A-A-REINFORCEMENT DRAWING
TURBO GENERATOR-FOUNDATION BLOCK
GC-GRB-003-C D11
SECTION B-B & C-C-REINFORCEMENT DRAWING
TURBO GENERATOR-FOUNDATION BLOCK
GC-GRB-004-C D11
PLAN VIEW-REINFORCEMENT DRAWING
TURBO GENERATOR-CALCULATION NOTE-
GC-GRB-005-C D11
FOUNDATION BLOCKS
POWER HOUSE-ZONE 1 TO 3-SLAB ON GRADE-
GC-EBI-215-D +30 LEVEL FORMWORK AND REINFORCEMENT D12
DETAILS
POWER HOUSE-ZONE 3-CONDENSER PIT-
GC-EBI-240-C D12
STRUCTURAL ELEMENTS DESIGNATED
POWER HOUSE-ZONE 3-LOWER RAFT R3
GC-EBI-241-C D12
REINFORCEMENT DETAILS
POWER HOUSE-ZONE 3-UPPER RAFT R1 AND R2
GC-EBI-242-C D12
REINFORCEMENT DETAILS
POWER HOUSE-ZONE 3-WALLS V1, V3, V5
GC-EBI-243-C D12
REINFORCEMENT DETAILS
POWER HOUSE-ZONE 3-WALLS V7, V9, V11
GC-EBI-244-C D12
REINFORCEMENT DETAILS
POWER HOUSE-ZONE 3-WALLS V2, V10, V12
GC-EBI-245-C D12
REINFORCEMENT DETAILS
POWER HOUSE-ZONE 3-WALLS V6
GC-EBI-246-C D12
REINFORCEMENT DETAILS
POWER HOUSE-ZONE 3-WALLS V4, V8
GC-EBI-247-C D12
REINFORCEMENT DETAILS
POWER HOUSE-ZONE 2-OIL RESERVE PIT
GC-EBI-248-C D12
REINFORCEMENT DETAILS
POWER HOUSE-ZONE 1-STAIRCASE STRUCTURES
GC-EBI-249-C D12
REINFORCEMENT DETAILS
LAHENDONG POWER PLANT MANUAL N° E300878
CIVIL WORK REV. A
LIST OF DRAWINGS AND SPECIFICATIONS – DESIGN MANUAL PAGE : 15/16

1. LIST OF DRAWINGS

CONTRACTOR'S
PLN' DRAWING
DRAWING DRAWING TITLE VOLUME
NUMBER
NUMBER
POWER PLANT-ZONE 1 TO 3-FOUNDATIONS
GC-EBI-250-C D12
REINFORCEMENT DETAILS
POWER PLANT-GROUND SLAB-BORDER BEAMS
GC-EBI-251-C D12
REINFORCEMENT DETAILS
POWER HOUSE-ZONE 1 AND 2-OPEN CANALS
GC-EBI-252-C D12
SYSTEM REINFORCEMENT DETAILS
POWER HOUSE-ZONE 1 TO 3-DETAILS 1TO 5
GC-EBI-253-C D12
REINFORCEMENT
POWER HOUSE-ZONE 3-UPPER SLABS D1-D2
GC-EBI-254-C D12
REINFORCEMENT DETAILS
POWER HOUSE-ZONE 1 TO 3-GENERAL LAYOUT
GC-EBI-203-C D12
FOUNDATIONS LEVEL FORMWORK
POWER HOUSE-ZONE 1 TO 3-GENERAL LAYOUT
GC-EBI-204-C D12
+30 LEVEL FORMWORK
POWER HOUSE-ZONE 1 AND 2-PLAN VIEW AT
GC-EBI-205-C D12
FOUNDATIONS LEVEL FORMWORK
POWER HOUSE-ZONE 3-PLAN VIEW AT
GC-EBI-206-C D12
FOUNDATIONS LEVEL FORMWORK
POWER HOUSE-ZONE 1 AND 2-PLAN VIEW AT +30
GC-EBI-207-C D12
LEVEL FORMWORK
POWER HOUSE-ZONE 3-PLAN VIEW AT +30 LEVEL
GC-EBI-208-C D12
FORMWORK
POWER HOUSE-ZONE 3-LONGITUDINAL SECTIONS
GC-EBI-209-C D12
A-A AND B-B FORMWORK
POWER HOUSE-ZONE 3-TRANSVERSAL SECTIONS
GC-EBI-210-C D12
C-C AND D-D FORMWORK
POWER HOUSE-ZONE 1 AND 2-TRANSVERSAL
GC-EBI-211-C D12
AND LONGITUDINAL SECTIONS E TO I
FORMWORK
POWER HOUSE-ZONE 1 TO 3-FOUNDATIONS
GC-EBI-212-C D12
DETAILS FORMWORK
POWER HOUSE-ZONE 1 TO 3-DETAILS 1 TO 9
GC-EBI-213-C D12
FORMWORK
POWER HOUSE-ZONE 1-STAIRCASE STRUCTURES-
GC-EBI-214-C D12
PLAN VIEW AND VERTICAL SECTIONS
FORMWORK
LAHENDONG POWER PLANT MANUAL N° E300878
CIVIL WORK REV. A
LIST OF DRAWINGS AND SPECIFICATIONS – DESIGN MANUAL PAGE : 16/16

1. LIST OF DRAWINGS

CONTRACTOR'S
PLN' DRAWING
DRAWING DRAWING TITLE VOLUME
NUMBER
NUMBER
PCB 24 AND PCB 25-FOUNDATIONS-FORWORK
GC-CPE-012-B D12
AND REINFORCEMENT
POWER HOUSE-ZONE 3-DETAIL «A»
GC-EBI-255-B D12
REINFORCEMENT DETAILS
POWER HOUSE-ZONE 3-DETAIL «B»
GC-EBI-256-B D12
REINFORCEMENT DETAILS
POWER HOUSE AND CONDENSER AREA
GC-EBI-293-B D12
SUBSTRUCURE-ADDITIONAL CALCULATION NOTE
POWER HOUSE-ZONE 1 AND 2-OPEN CANALS
GC-CPE-261-B D12
MODIFICATION REINFORCEMENT DETAILS
REPUBLIC OF INDONESIA
MINISTRY OF MINES AND ENERGY
PT.PLN[PERSERO]

LAHENDONG GEOTHERMAL POWER PLANT


1 X 20MW

DESIGN MANUAL

N° E 300 878 Rev.B

CHAPTER 7

CIVIL WORKS

VOLUME : D 01

CONTRACT N°020.PJP/922/1995/M

Rateau La Courneuve SPIE ENERTRANS PT.PR1AMANAYA


FRANCE Spie Enertrans 95 861 CERGY-PONTOISE JAKARTA 10320
FRANCE
INDONESIA

Internal ref. : T.29.38.0 / S 3027 .0 Date of issue : Nov.00


WATER TREATMENT
AND PUMPING STATION
ELECTRICAL BUILDING AND
TURBIN HOUSE
REINJECTION PUMPING STATION
AND CHEMICAL ROOM
ADMINISTRATION BUILDING
REINJECTION PUMPING STATION
AND CHEMICAL ROOM
GUARD HOUSE
WATER TREATMENT
AND PUMPING STATION
FIRE FIGHTING AND RAW WATER
RESERVOIR
INTERNAL ROADS AND
UNDERGROUND CROSSING
BOUNDARY AND INTERNAL
FENCING
SEWAGE SYSTEM
RAIN WATER DRAINAGE SYSTEM