1)Ras Tanks
Compone Est. picture of
Sr. no. nt Qty. cost/Qty Total cost component
metal
wire
mesh
(13.5x1.5
1 mtr) 2 4000 8000
Tarpulin1
5mtr×1.5
mtr;650gs
2m 2 9000 18000
tarpulin
protectio
3 n sheet 2 1500 3000
Nylon
4 rope 60mtr 10 500
suction
pipe for
top
mount on
5 mesh 30mtr 100 3000
PVC(75m
m pipes 40 Feet
and pipe
'L','T',cap, 3
valve, valve,8joi
6 Joints etc nts 5000
37500
2)Aeration
Compone Est. Pic of
Sr.no. nt Qty Cost/Qty Total cost component
Air Pump
1 125LPM 1 15000 15000
silicon air
pipe, air 500mtr;
stones,co 30 nos;
ntroler 16 nos
2 valve 2000
17000
3) Filtration unit
Compone Est. picture of
Sr.no. nt Qty Cost/Qty Total cost component
Filter
vessale,M
ultiport
valve,
1 riser pipe 1 8000 8000
Sand
Media;Ca
rbon
2 iv600 80kg+20kg17₹;30₹ 2000
20feetpip
e,Lbow-
U-PVC 5;T-
pipes and 5,reducer
connector -2,
,cap,valve coupling-
,nipple 2
3 etc joint5,etc 400₹;20₹ 2500
1hp water
4 pump 1 5000₹ 5000
17500
4) Uv water Disinfection system
compone Est. components
Sr.no. nt Qty cost/qty Total cost pic
uv
1 500lpm 1 5000 5000
green
1 shade 100mtr 30 3000
bamboo,
wood 300₹;150
2 structure 8;6 ₹ 3500
plastic
3 shade 30sq mtr 1500
8000
6) Components for Pond
Compone Est. Components
Sr. no. nts Qty cost/qty Total cost pic
Pond
Filter(50k
1 LPH) 1 50000 50000
pipeline
from river
2 to pond 1 1 10000
2hp water
3 pump 2 7500 15000
8)Other
1 Labour 10000
Transport
ation of
2 material 20000
other
contingen
3 cy 20000