Professional Documents
Culture Documents
ABB Switzerland Ltd.
For Information
21-Apr-2022
IAPI-OE6 M. Keller
P172
CONSULTANT
Contents
1. General ......................................................................................................................................... 3
2. Additional information............................................................................................................... 3
2.1. Listing of related documents....................................................................................................3
3. Revisions ...................................................................................................................................... 3
1. General
This document contains manuals of pump station unit in English and Spanish.
2. Additional information
3. Revisions
Rev. Page (P) Description Date Dept./Init.
Chapt. (C)
0 ALL First issue 21.04.2022
PI-OE6/MK
Operating Instructions
PS 50
Table 1: Contact details
Manufacturer
ait-deutschland GmbH
Industriestraße 3
95359 Kasendorf
Germany
T +49 9228 9977 0
F +49 9228 9977 149
E info@kkt-chillers.com
W www.kkt-chillers.com
Service
ait-deutschland GmbH
Industriestraße 3
95359 Kasendorf
Germany
T +49 9228 9977 7190 *
F +49 9228 9977 7474
E service@kkt-chillers.com
W www.kkt-chillers.com *
Service USA
IK 10270 / 01 / 21 2 / 25 83004702.Ka
Introduction
These operating instructions have been drawn up by KKT chillers on the basis of the Machinery Directive 2006/42/EC.
They contain all important information and instructions for the installation and safe operation of the refill station. It also
contains suggestions on how to prevent or correct faults.
Please take enough time to carefully read this instruction manual and to process all the information that it contains. For
further questions, please contact the KKT chillers Service Team by means of the aforementioned contact details.
If properly used for its intended use and correctly maintained, the refill station ensures sustained, fault-free operation.
The methods and procedures described in this manual were designed to help you identify problems at an early state
and to initiate corresponding countermeasures.
By observing the described maintenance program, you ensure that the reliability and safety of the machine is
maintained. Plus this keeps operating costs low and increases the service life of the components.
To ensure that the performance of your refill station is not impaired, we recommend that you only use original spare
parts from KKT chillers. By doing so, you ensure the reliability and quality of the machine.
KKT chillers reserves the right to change technical data without prior announcement. Illustrations in this document are
not set to scale!
IK 10270 / 01 / 21 3 / 25 83004702.Ka
Table of contents
Introduction............................................................................................................................................. 3
1 Product description ................................................................................................................... 6
1.1 Intended use ...................................................................................................................... 6
1.2 Explanation of terms .......................................................................................................... 7
2 Function and main components ............................................................................................... 8
2.1 Pump................................................................................................................................... 8
2.2 Pressure sensors ............................................................................................................... 8
2.3 Control cabinet ................................................................................................................... 8
2.4 Tank .................................................................................................................................... 8
2.5 Floating switch ................................................................................................................... 8
2.6 Remote control................................................................................................................... 8
2.7 Group fault alarm ............................................................................................................... 8
2.8 Water quality ...................................................................................................................... 9
2.9 Permitted coolant media ................................................................................................... 9
3 Safety........................................................................................................................................ 10
3.1 General information ......................................................................................................... 10
3.2 Hazard warnings .............................................................................................................. 10
3.3 Residual energy................................................................................................................12
3.4 Safety devices and guards .............................................................................................. 12
3.4.1 Personal protective equipment when operating the machine ..............................12
3.5 Personal protective equipment for servicing work ........................................................ 12
3.6 Notes on reducing noise and vibration........................................................................... 12
3.6.1 Noise ......................................................................................................................... 12
3.7 Residual risks ...................................................................................................................13
3.7.1 Electrical ................................................................................................................... 13
3.8 Reasonably foreseeable misuse ..................................................................................... 13
3.9 Information for emergencies ........................................................................................... 13
4 Handling and storage .............................................................................................................. 13
4.1 Transport .......................................................................................................................... 13
4.2 Unpacking......................................................................................................................... 14
4.3 Storage ............................................................................................................................. 14
5 Setup and installation ............................................................................................................. 15
5.1 Overview ...........................................................................................................................15
5.2 Installation site ................................................................................................................. 15
5.2.1 Minimum clearances ............................................................................................... 15
5.2.2 Process level............................................................................................................. 15
5.2.3 Surface and foundation ........................................................................................... 15
5.2.4 Stability ..................................................................................................................... 15
5.2.5 Levelling .................................................................................................................... 15
5.2.6 Vibration isolation .................................................................................................... 15
5.2.7 Installation ................................................................................................................ 15
5.2.8 Hydraulic installation ............................................................................................... 16
5.2.9 Frost protection measures ...................................................................................... 16
IK 10270 / 01 / 21 4 / 25 83004702.Ka
5.2.10 Flushing the cold water circuit ................................................................................ 16
5.2.11 Filling ......................................................................................................................... 16
5.2.12 Electrical installation ................................................................................................ 18
6 Commissioning ........................................................................................................................19
6.1 Installation checklist ........................................................................................................ 19
7 Cleaning ................................................................................................................................... 20
7.1 Complete cleaning of the cold water circuit ................................................................... 20
8 Service ...................................................................................................................................... 20
8.1 Maintenance .................................................................................................................... 20
8.2 Fault elimination .............................................................................................................. 20
8.3 Troubleshooting ............................................................................................................... 21
8.4 Spare parts ....................................................................................................................... 21
9 Decommissioning/taking out of service ................................................................................ 22
9.1 Draining ............................................................................................................................ 22
10 Recycling .................................................................................................................................. 23
11 Products, solutions and services ............................................................................................ 23
I. Maintenance intervals in accordance with the VDMA........................................................... 24
II. Product registration ................................................................................................................. 25
IK 10270 / 01 / 21 5 / 25 83004702.Ka
Project Data
1 Product description
Please read all the points in these operating instructions before starting up the machine. You should pay particular
attention to the points on safety, commissioning/start-up and operation. Should you have any further questions
concerning your machine, please contact the KKT chillers Service Team (see Contact details).
Table 2 contains the general safety instructions for the refill station. These instructions are attached to the machine in
a clear and readily visible position. A complete description of all hazard warnings is given in Chapter 5.2 Hazard
warnings.
Before opening the machine, disconnect the machine from the power supply. After disconnecting
the machine from the power supply, always wait for at least 5 minutes before opening it.
Beware of dangerous electrical voltage! If the machine is only turned off by means of the main
switch, some of the terminals in the control cabinet will still be under dangerous voltage.
IK 10270 / 01 / 21 6 / 25 83004702.Ka
Table 3: Technical data
Water circuit 1
IK 10270 / 01 / 21 7 / 25 83004702.Ka
2 Function and main components
2.1 Pump
The pump(s) (see cover sheet and / or pump characteristic curve) pump the liquid to the consumer and thus ensure the
circulation in the system.
2.4 Tank
For size, see "Technical data"
Always fill to max. Drainage via the level indicator and, if present, an additional filling and emptying tap.
IK 10270 / 01 / 21 8 / 25 83004702.Ka
2.8 Water quality
The following limit values must be adhered to to ensure the safe operation of the devices:
To prevent clogging of the system, the prescribed limit values must be observed.
ATTENTION! Do not use mixtures of different anti-freeze products. This can lead to undesired
chemical reactions as well as silting.
The media and mix ratios specified in the Technical Data must be complied with.
IK 10270 / 01 / 21 9 / 25 83004702.Ka
3 Safety
The refill station, within the sense of its intentional use, is designed to operate safely. Provided also that the
instructions concerning transport, installation, commissioning/start-up and maintenance given in these operating
instructions are complied with. The machine conforms to the safety standards in accordance with the EC Declaration of
Conformity.
Before opening the machine, disconnect the machine from the power supply. The machine may
only be opened 5 minutes after it has been disconnected from the power supply.
Beware of dangerous electrical voltage! If the machine is only turned off by means of the main
switch, some of the terminals in the control cabinet will still be under dangerous voltage.
IK 10270 / 01 / 21 10 / 25 83004702.Ka
ATTENTION!
ATTENTION! Work on the refill station must be carried out by properly qualified, competent
personnel!
ATTENTION! The unit frame and housing are not designed for additional loads, therefore, it is
not permitted to walk on them or to subject them to additional loads!
IK 10270 / 01 / 21 11 / 25 83004702.Ka
3.3 Residual energy
Even if all the hazard warnings in Chapter 4.2 are taken into account, the following residual energy situations can result
in a hazard:
Dangerous electrical voltage in the control cabinet despite the switched off main switch
o If the machine is only switched off at its main switch, dangerous electrical voltage is nonetheless still
present at several terminals in the control cabinet. In particular, these are the main supply terminal
and the input terminals of the main switch.
.
Note:
After switching off the unit at the main switch, if you wait for 5 minutes before opening the unit risks due to rotational
energy and electrical power can be reduced. In this case only the residual thermal energy must be considered.
3.6.1 Noise
To reduce noise pollution caused by airborne sound emissions it is advisable to install the pump station out of the
range of workplaces.
IK 10270 / 01 / 21 12 / 25 83004702.Ka
3.7 Residual risks
3.7.1 Electrical
ATTENTION! The mains voltage must meet the quality characteristics of EN 50160 and the
defined standard voltages of IEC 60038.
The operator is responsible for the electrical connection on the building side.
The operator must ensure that the permissible limit values in DIN EN 60204-1 (occurrence of a
leakage current to earth at any mains connection of more than 10 mA AC or DC) are complied
with, and that measures are implemented to reduce them to non-critical values in the event
that they are exceeded.
4.1 Transport
The refill station may only be transported using a fork lift truck or crane with sufficient rated capacity. The net weight of
your machine is given in the technical data. Please note that if a machine has already been in operation, it can contain
residual fluids, which increase the transport weight.
The machine may only be transported when drained.
ATTENTION! The refill station must not be tilted by more than 10° from the perpendicular
position.
IK 10270 / 01 / 21 13 / 25 83004702.Ka
4.2 Unpacking
ATTENTION! Packing straps are mechanically stressed and can snap back when cut. Risk of
injuries!
Remove all straps, films, corner protectors and spacers carefully. Optional accessories may be located under the film.
Ensure that they are not damaged.
The packaging can be recycled according to the local regulations. Refer to the following table for details of the
packaging materials used:
4.3 Storage
If the refill station is stored for more than one month, it should remain in the transport packaging or be repacked.
To avoid frost damage the cold water circuit must be completely drained before the chiller is placed in storage and then
flushed with a mixture of water and anti-freeze (see 11.1 Draining).
IK 10270 / 01 / 21 14 / 25 83004702.Ka
5 Setup and installation
5.1 Overview
Several tasks are necessary to install the refill station. The following work schedule shows the order in which they are
carried out:
Prepare the installation site
Install the machine
Flush the cold water circuit
Hydraulic installation
Fill the whole system
Vent the whole system
Electrical installation
5.2.4 Stability
The normal situation is for the machine and the baseplate to be stood firmly on the ground. It is not necessary to
anchor the machine to the ground. However, if this is necessary due to the surrounding conditions, the machine can be
equipped with the optionally available levelling feet (4.2 Levelling feet ). The levelling feet provide very good resistance
to slipping. If this is not sufficient for your application the machine can also be bolted to the ground. Holes are provided
in the machine baseplate for precisely this purpose. These are shown in Appendix III. The system designer is
responsible for choosing suitable fixing elements.
5.2.5 Levelling
If it is necessary to level the refill station on the ground or floor, this can be done using the optionally available levelling
feet.
5.2.7 Installation
The device-specific connections are shown in the flow diagram enclosed with the refill station.
IK 10270 / 01 / 21 15 / 25 83004702.Ka
Filling and refilling
Draining
For hydraulic installation, it must also be noted that the device connections on the refill station do not offer a fixed
point. In order to prevent damage to the pipes and the refill station, the hydraulic connections must be supported on
site close to the device connections.
For refill stations equipped with an internal tank, the cold water circuit must be hydraulically closed.
ATTENTION! Galvanised pipes must not be used if water-glycol mixtures are used! Formation
of decomposition products, which result in silting up of the system!
5.2.11 Filling
Once the hydraulic installation of the overall system has been completed, the chiller can be filled. All shut-off valves in
the cold water circuit must be opened.
IK 10270 / 01 / 21 16 / 25 83004702.Ka
ATTENTION! Only use approved refrigerants see Chapter 2.14 and 2.15! If there is a risk of
frost, note Chapter 7.2.10!
All operating liquids must be mixed before they are added to the system!
Remove the cover plate and fill your system via the internal filling connection mounted on the tank.
It is also possible to fill directly into the tank by using a hose.
All filling and replenishment connections are marked with the following pictogram:
ATTENTION! Please note and observe local installation regulations and provisions, especially the
Ordinance on handling water pollutant substances and BGR500.
IK 10270 / 01 / 21 17 / 25 83004702.Ka
5.2.12 Electrical installation
ATTENTION! The electrical installation, testing and commissioning may only be carried out by
qualified personnel. Note and follow the local regulations.
ATTENTION! Do not switch on the refill station until the hydraulic installation is completed and
the machine has been filled as specified in Chapter 7.2.12. Otherwise the machine could be
damaged.
The refill station is connected electrically to its main supply terminal in the control cabinet. (see Figure 4 Main supply).
A corresponding circuit diagram is included with the device.
The dimensioning of the load cable and the fusing must be in accordance with the machine's technical data and the
local regulations of the power supply company.
Never switch on the refill station immediately if the machine is moved from a cold into a warm room. The condensing
moisture can damage electronic components. For the initial startup or following a lengthy period out of use all the
electronic components must have become acclimatised.
Use an external control cable to set the refill station's release (see Chapter 8.3 External release) this cable is laid
separately from the supply cable and is wired at the corresponding terminals in the control cabinet. (Refer to the circuit
diagram included with the device)
Once the electrical installation has been completed the phase sequence must be tested. This is done by checking the
rotational direction of the pump. This has a rotational direction arrow on it. If the direction of rotation is not correct, it
must be corrected by a qualified electrician.
IK 10270 / 01 / 21 18 / 25 83004702.Ka
6 Commissioning
Before commissioning the refill station the checklist must be used to check whether all the necessary work in
7 Setup and installation has been carried out properly.
IK 10270 / 01 / 21 19 / 25 83004702.Ka
7 Cleaning
8 Service
All service work may only be carried out by properly trained, competent personnel.
8.1 Maintenance
Reliable operation and a long service life for the entire system can be guaranteed by proper maintenance.
An overview of the maintenance intervals as recommended by the VDMA is given in Appendix II. In addition, the
national regulations of the respective installation site must be followed.
Please note that the points listed represent the minimum maintenance required. By increased monitoring, system
reliability can be enhanced. Our service department is at your disposal at any time with regard to maintenance offers /
maintenance contracts.
IK 10270 / 01 / 21 20 / 25 83004702.Ka
8.3 Troubleshooting
ATTENTION! Work on the refill station must be carried out by properly qualified, competent
personnel!
W www.kkt-chillersusa.com
IK 10270 / 01 / 21 21 / 25 83004702.Ka
9 Decommissioning/taking out of service
For safety-relevant instructions regarding possible residual energy, please refer to Chapter 5.3 Residual energy.
9.1 Draining
If the system is filled and there is a risk of frost, suitable measures must be taken to protect the liquid from frost. The
complete cold water circuit must be fully drained before any lengthy stoppage of the unit. Do this as follows:
The drain cock is identified by the symbol in the instrument shown in Figure 5.
Drain plug
(Allen key 10 mm)
To prevent frost damage the cold water circuit must then be flushed with a mixture of water and 40 % by vol Antifrogen-
N (or equivalent).
IK 10270 / 01 / 21 22 / 25 83004702.Ka
10 Recycling
All parts (e.g. refrigerant, oil, glycol, metal, electronics, battery etc.) must be recycled, reused or disposed of. Please
note and follow all local and national regulations and if necessary contact your local waste management agency.
A specialised disposal company must be contracted to dispose of these wastes. They issue a proof of disposal which
must be archived. The cross beam can be returned to KKT refill station for disposal. Please contact our KKT chillers
Service Team for details (Contact details).
IK 10270 / 01 / 21 23 / 25 83004702.Ka
Explanation Annual Six- As required Comment
monthly
Pump and piping
60 Visual inspection for dirt, damage and corrosion x
61 Check fixings and bearings x
62 Check the safety function of the safety switching x
63 Check pump/mechanical seal for leaks x x
Water filter
70 Visual inspection for dirt, damage and corrosion x x
71 Clean filters x x
72 Check filters for damage x
Tank/Water tank
80 Check for any external contamination, damage and x
corrosion
81 Check fastening x
82 Check the filling level x
Control cabinet
90 Check for any external contamination, damage and x x
corrosion
91 Check fastening x
92 Check all screw connections x
93 All indicators and error messages must be checked x
94 Check temperature and pressure sensors for proper x
function
95 Check motor protection switch function x
96 Check 24VDC and supply voltage x x
97 Check switch cabinet heating x
99 Check switch cabinet filter and replace/clean if necessary x
Documents and signage
110 All documents, such as operating instructions, schematic, x x
circuit diagram, system protocol are available
111 Type plate and labeling are clearly legible x x
Battery - time/date
120 Battery x Every 5
years
IK 10270 / 01 / 21 24 / 25 83004702.Ka
II. Product registration
PDF download at: www.kkt-chillers.com/downloads/produktregistrierung
IK 10270 / 01 / 21 25 / 25 83004702.Ka
Estación de recarga
PS 50
Tabla 1: Información de contacto
2 / 28 83004704.Ka
Introducción
Estas instrucciones de funcionamiento fueron redactadas por Enfriadores KKT basándose en la
Directiva de dispositivos 2006/42/EC. Contienen toda la información importante y las
instrucciones para la instalación y el funcionamiento seguro de la estación de recarga. También
contiene sugerencias acerca de cómo prevenir o corregir errores.
Tómese el tiempo necesario para leer detenidamente este manual de instrucciones y procesar
toda la información que contiene. Si tiene más preguntas, contacte al equipo de servicio técnico
de Enfriadores KKT a través de los datos de contacto mencionados anteriormente.
Si usa la estación de recarga adecuadamente para el uso para el que está predestinada y se le
realiza el mantenimiento correctamente, la unidad asegura un funcionamiento prolongado y sin
errores. Los métodos y procedimientos descritos en este manual fueron concebidos para ayudarle
a identificar los problemas en un estado temprano e iniciar las correspondientes contramedidas.
Al observar el programa de mantenimiento descrito, se asegura de mantener la fiabilidad y la
seguridad de la máquina. Además, esto mantiene los costos de funcionamiento bajos y aumenta
la vida útil de los componentes.
3 / 28 83004704.Ka
Índice
Introducción ............................................................................................................................................ 3
1 Descripción del producto .......................................................................................................... 6
1.1 Uso previsto........................................................................................................................ 6
1.2 Explicación de los términos............................................................................................... 7
2 Función y componentes principales ......................................................................................... 8
2.1 Bomba ................................................................................................................................ 8
2.2 Sensores de presión .......................................................................................................... 8
2.3 Armario de control ............................................................................................................. 8
2.4 Depósito ............................................................................................................................. 8
2.5 Interruptor flotante ............................................................................................................ 8
2.6 Control remoto ................................................................................................................... 8
2.7 Alarma de avería grupal .................................................................................................... 8
2.8 Calidad del agua ................................................................................................................ 9
2.9 Medios refrigerantes permitidos....................................................................................... 9
3 Seguridad ................................................................................................................................. 10
3.1 Información general......................................................................................................... 10
3.2 Advertencias de peligro ................................................................................................... 10
3.3 Energía residual ............................................................................................................... 12
3.4 Dispositivos de seguridad y protecciones ...................................................................... 12
3.4.1 Equipo de protección personal durante el funcionamiento de la máquina ......... 12
3.5 Equipo de protección personal para los trabajos de servicio. ...................................... 12
3.6 Notas acerca de la reducción del ruido y la vibración ................................................... 13
3.6.1 Ruido ......................................................................................................................... 13
3.7 Riesgos residuales ...........................................................................................................13
3.7.1 Eléctricos .................................................................................................................. 13
3.8 Mal uso razonablemente previsible................................................................................ 13
3.9 Información en caso de emergencias ............................................................................ 13
4 Manipulación y almacenamiento ........................................................................................... 14
4.1 Transporte ........................................................................................................................ 14
4.2 Desembalaje .................................................................................................................... 14
4.3 Almacenamiento .............................................................................................................. 15
5 Puesta en marcha e instalación ............................................................................................. 16
5.1 Información general......................................................................................................... 16
5.2 Lugar de la instalación .................................................................................................... 16
5.2.1 Distancias mínimas.................................................................................................. 16
5.2.2 Nivel de proceso ....................................................................................................... 16
5.2.3 Superficie y base ......................................................................................................16
5.2.4 Estabilidad ................................................................................................................ 16
5.2.5 Etiquetado ................................................................................................................ 17
5.2.6 Aislamiento por vibración ........................................................................................ 17
5.2.7 Instalación ................................................................................................................ 17
5.2.8 Realizar la instalación hidráulica ............................................................................ 17
5.2.9 Medidas de protección contra heladas .................................................................. 18
4 / 28 83004704.Ka
5.2.10 Purga del circuito de agua fría ................................................................................ 18
5.2.11 Llenado ..................................................................................................................... 18
5.2.12 Realizar la instalación eléctrica .............................................................................. 19
6 Puesta en marcha ................................................................................................................... 21
6.1 Lista de comprobación de la instalación........................................................................ 21
7 Limpieza ................................................................................................................................... 21
7.1 Limpieza completa del circuito de agua fría .................................................................. 21
8 Servicio ..................................................................................................................................... 21
8.1 Mantenimiento ................................................................................................................. 21
8.2 Eliminación de averías..................................................................................................... 22
8.3 Resolución de problemas ................................................................................................ 22
8.4 Repuestos ........................................................................................................................ 23
9 Puesta fuera de servicio.......................................................................................................... 24
9.1 Drenado ............................................................................................................................ 24
10 Reciclaje ...................................................................................................................................25
11 Productos, soluciones y servicios ........................................................................................... 25
I. Intervalos de mantenimiento según la VDMA ....................................................................... 26
II. Registro del producto .............................................................................................................. 28
5 / 28 83004704.Ka
Datos del proyecto
La tabla 2 contiene las instrucciones generales de seguridad para la estación de recarga. Estas
instrucciones están adjuntas en la máquina en un lugar perfectamente visible y claro. Ofrece una
descripción completa de todas las advertencias de peligro en el Capítulo 5.2 Advertencias de
peligro.
6 / 28 83004704.Ka
Tabla 3: Datos técnicos
7 / 28 83004704.Ka
2 Función y componentes principales
2.1 Bomba
La(s) bomba(s) (vea la portada o la curva característica de la bomba) bombea(n) el líquido al
consumidor y asegura(n) así la circulación en el sistema.
2.4 Depósito
Para el tamaño, vea "Datos técnicos"
Llenar siempre hasta el máximo. Drene a través del indicador de nivel y, si existe, un grifo adicional
de llenado y vaciado.
8 / 28 83004704.Ka
2.8 Calidad del agua
Los siguientes valores límite deben ser respetados para garantizar el funcionamiento seguro de
los dispositivos:
Para evitar la obstrucción del sistema, se deben respetar los valores límite prescritos.
9 / 28 83004704.Ka
3 Seguridad
La estación de recarga, dentro del sentido de su uso indicado, está diseñada para funcionar con
seguridad. Siempre y cuando se respeten las instrucciones para el transporte, la instalación, la
puesta en marcha y el mantenimiento que figuran en este manual de instrucciones. La máquina
cumple con las normas de seguridad de acuerdo con la Declaración de conformidad de la CE
10 / 28 83004704.Ka
¡Use ropa de protección!
¡ATENCIÓN!
No caminar en No cargar
11 / 28 83004704.Ka
3.3 Energía residual
Aunque se tengan en cuenta todas las advertencias de peligro del capítulo 4.2, las siguientes
situaciones de energía residual pueden ser peligrosas:
El armario de control puede tener tensión eléctrica peligrosa a pesar de que el interruptor
general esté desconectado
o Si la máquina solo está desconectada en el interruptor general, aun así puede
haber tensión eléctrica peligrosa en varias terminales del armario de control. Estas
son los terminales de la conexión eléctrica y de los terminales de entrada del
interruptor general.
Nota:
Después de apagar la unidad en el interruptor general, si se espera 5 minutos antes de abrir la
unidad se pueden reducir los riesgos debidos a la energía de rotación y a la energía eléctrica. En
este caso solo se debe considerar la energía térmica residual.
12 / 28 83004704.Ka
3.6 Notas acerca de la reducción del ruido y la vibración
3.6.1Ruido
Para reducir la contaminación acústica causada por las emisiones sonoras, es aconsejable instalar
la estación de recarga fuera del alcance de los lugares de trabajo.
3.7.1Eléctricos
¡ATENCIÓN! La tensión de red debe cumplir las características de calidad de la
norma EN 50160 y las tensiones estándar definidas en la norma IEC 60038.
13 / 28 83004704.Ka
4 Manipulación y almacenamiento
La estación de recarga está fijada en un palé de madera en la fábrica para su entrega. La máquina
se protege además contra los daños mediante protectores de esquinas de poliestireno y película
extensible. Por lo tanto, debe retirar el embalaje lo más tarde posible.
4.1 Transporte
La estación de recarga solo se puede transportar con una carretilla elevadora o una grúa con
suficiente capacidad nominal. El peso neto de la máquina aparece en los datos técnicos. Tenga en
cuenta que si la máquina ya estuvo en funcionamiento, puede contener líquidos residuales que
aumentan el peso del transporte.
La máquina solo se puede transportar cuando esté drenada.
4.2 Desembalaje
Retire todas las correas, films, protectores de esquinas y espaciadores con cuidado. Se pueden
colocar accesorios opcionales debajo del film. Asegúrese de que no estén dañados.
El embalaje se puede reciclar de acuerdo con las regulaciones locales. Consulte en la siguiente
tabla los datos de los materiales de embalaje utilizados:
14 / 28 83004704.Ka
Tabla 9: Material de embalaje
Protectores de esquina/protección de
Cartón
los bordes
4.3 Almacenamiento
Si la estación de recarga se almacena durante más de un mes, debería permanecer en el embalaje
de transporte o volver a empaquetarse.
Para evitar daños por heladas, el circuito de agua fría se debe vaciar por completo antes de
almacenar el enfriador y luego purgado con una mezcla de agua y anticongelante (ver 11.1
Drenado).
15 / 28 83004704.Ka
5 Puesta en marcha e instalación
5.2.4Estabilidad
La situación normal para la máquina y la placa base esté firmemente sobre el suelo. No es
necesario anclar la máquina al piso. Sin embargo, si es necesario debido a las condiciones del
entorno, la máquina se puede equipar con los pies de nivelación disponibles opcionalmente (4.2
Pies de nivelación). Las patas niveladoras ofrecen una gran resistencia al deslizamiento. Si esto
no es suficiente para su aplicación, la máquina también puede atornillarse al suelo. Para ello, la
placa base de la máquina dispone de orificios. Estos se muestran en el Apéndice III. El diseñador
del sistema es responsable de la elección de los elementos de fijación adecuados.
16 / 28 83004704.Ka
5.2.5Etiquetado
Si es necesario nivelar la estación de recarga en el suelo o en el piso, se lo puede hacer con patas
de nivelación disponibles opcionalmente.
5.2.7Instalación
Las conexiones específicas del dispositivo se muestran en el diagrama de flujo adjunto a la
estación de recarga.
Llenado y relleno
Drenado
En el caso de la instalación hidráulica, también hay que tener en cuenta que las conexiones del
dispositivo en la estación de recarga no ofrecen un punto fijo. Para evitar daños en las tuberías y
en la estación de recarga, las conexiones hidráulicas se deben apoyar en un lugar cercano al de
las conexiones del dispositivo.
En las estaciones de bombeo equipadas con un depósito interno, el circuito de agua fría debe estar
cerrado hidráulicamente.
17 / 28 83004704.Ka
¡ATENCIÓN! ¡No se deben utilizar tubos galvanizados si se usan mezclas de
agua con glicol! ¡Formación de los productos de descomposición que
producen sedimentación en el sistema!
5.2.11 Llenado
Se puede llenar el enfriador una vez que se haya terminado la instalación hidráulica del sistema
en general. Se deben abrir todas las válvulas de cierre en el circuito de agua fría.
¡ATENCIÓN! ¡Utilice únicamente refrigerantes autorizados, vea el capítulo
2.14 y 2.15! ¡En caso de riesgo de congelación, tenga en cuenta el capítulo
7.2.10!
¡Se debe mezclar todos los líquidos de funcionamiento antes de agregarlos
al sistema!
Retire la placa de cubierta y llene su sistema a través de la conexión de llenado interna montada
en el depósito.
También es posible llenar directamente en el depósito con una manguera.
Todas las conexiones de llenado y reposición están marcadas con el siguiente pictograma:
18 / 28 83004704.Ka
Figura 2: Conexión de llenado y reposición de agua
Las dimensiones del cable de carga y la fusión se debe realizar de acuerdo con los datos técnicos
de la máquina y las regulaciones locales de la empresa de suministro eléctrico.
19 / 28 83004704.Ka
Nunca encienda la estación de recarga inmediatamente si la máquina se mueve de una habitación
fría a una caliente. La humedad de condensación puede dañar los componentes eléctricos. Para
el arranque inicial o después de un largo período sin utilizar, se deben aclimatar todos los
componentes eléctricos.
Utilice un cable de control externo para ajustar el desbloqueo de la estación de recarga (vea el
capítulo 8.3 Desbloqueo externo) este cable se tiende por separado del cable de alimentación y se
cablea en los terminales correspondientes del armario de control. (Consulte el diagrama del
circuito incluido con el dispositivo)
Una vez que se termine la instalación eléctrica, se debe revisar la secuencia de fases. Esto se hace
comprobando el sentido de giro de la bomba. Esta tiene una flecha de sentido de giro. Si el sentido
de giro no es correcto, debe ser corregido por un electricista calificado.
20 / 28 83004704.Ka
6 Puesta en marcha
Antes de la puesta en marcha de la estación de recarga, se debe utilizar la lista de comprobación
para verificar si se han realizado correctamente todos los trabajos necesarios en 7 Puesta en
marcha y la instalación.
7 Limpieza
8 Servicio
Todos los trabajos de mantenimiento deben ser realizados únicamente por personal competente
y debidamente formado.
8.1 Mantenimiento
Un funcionamiento fiable y una larga vida útil de todo el sistema pueden garantizarse con un
mantenimiento adecuado.
Tenga en cuenta que los puntos enumerados representan el mantenimiento mínimo necesario.
Con un mayor control, se puede aumentar la fiabilidad del sistema. Nuestro departamento de
21 / 28 83004704.Ka
servicio técnico está a su disposición en todo momento con respecto a las ofertas de
mantenimiento/contratos de mantenimiento.
La bomba no funciona
¿Se ha disparado el interruptor del Volver a llenar el líquido
flotador?
¿Se ha disparado el relé de ¿Cable suelto? Apriete los terminales
sobrecorriente? Mida el consumo de corriente
22 / 28 83004704.Ka
8.4 Repuestos
Para asegurarse de que no se deteriore el rendimiento de la estación de recarga, le recomendamos
que utilice solamente piezas de repuesto originales compradas a Enfriadores KKT. De este modo,
se asegura de mantener la fiabilidad y la seguridad de la máquina. Si tiene más dudas acerca de
los repuestos, contacte al equipo del servicio de Enfriadores KKT spareparts@kkt-chillers.com o
(información de contacto).
W www.kkt-chillersusa.com
23 / 28 83004704.Ka
9 Puesta fuera de servicio
En el Capítulo 5.3 “Energía residual” encontrará las indicaciones de seguridad relativas a la posible
energía residual.
9.1 Drenado
Si la instalación está llena y hay riesgo de heladas, deben tomarse las medidas adecuadas para
proteger el líquido de las heladas. El circuito completo de agua fría se debe drenar por completo
antes de cualquier parada prolongada de la unidad. Realícelo de la siguiente manera:
Tapón de drenaje
(Llave Allen 10 mm)
Para evitar que se produzcan daños por heladas, el circuito de agua fría debe lavarse con una
mezcla de agua y Antifrogen-N al 40% en volumen (o equivalente).
24 / 28 83004704.Ka
10 Reciclaje
Todas las partes (por ejemplo, el refrigerante, el aceite, el glicol, el metal, la electrónica, la batería,
etc.) se deben reciclar, reutilizar o eliminar. Tenga en cuenta y respete todas las normativas locales
y nacionales y, si es necesario, contacte a su organismo local de gestión de residuos.
25 / 28 83004704.Ka
I. Intervalos de mantenimiento según la VDMA
Explicación Anual Semes– Como Comen-
tral– sea tario
mente nece-
sario
Bomba y tubería
60 Inspección visual si hay suciedad, daños y x
corrosión
61 Revisar las fijaciones y los rodamientos x
62 Revisar la función de seguridad de la x
conmutación de seguridad
63 Revisar la estanqueidad de la bomba/junta x x
mecánica
Filtro de agua
70 Inspección visual si hay suciedad, daños y x x
corrosión
71 Limpiar los filtros x x
72 Revisar si los filtros están dañados x
26 / 28 83004704.Ka
Tanque/depósito de agua
80 Revisar si hay contaminación externa, daños y x
corrosión
81 Revisar la fijación x
82 Revisar el nivel de llenado x
Armario de control
90 Revisar si hay contaminación externa, daños y x x
corrosión
91 Revisar la fijación x
92 Revisar todas las uniones atornilladas x
93 Revisar todos los indicadores y mensajes de x
error
94 Revisar el funcionamiento de los sensores de x
temperatura y presión
95 Revisar el funcionamiento del interruptor de x
protección del motor
96 Revisar la tensión de alimentación de 24 V CC x x
97 Revisar la calefacción del armario de x
conmutación
99 Revisar el filtro del armario de conmutación y x
reemplazar/limpiar si es necesario
Documentos y señalización
110 Todos los documentos, como las instrucciones x x
de funcionamiento, el esquema, el diagrama del
circuito, el protocolo del sistema están
disponibles
111 La placa de características y el etiquetado son x x
claramente legibles
Batería - hora/fecha
120 Batería x Cada 50
años
27 / 28 83004704.Ka
II. Registro del producto
Descarga PDF en: www.kkt-chillers.com/downloads/produktregistrierung
28 / 28 83004704.Ka