ITEM I: FORMWORKS/SCAFFOLDINGS
Quantity: 1 Lot
A. Materials:
B. Direct Labor:
30% of Material Cost
A. Materials:
B. Direct Labor:
A. Materials:
B. Direct Labor:
30% of Material Cost
A. Materials:
B. Direct Labor:
A. Materials:
B. Direct Labor:
A. Materials:
B. Direct Labor:
A. Materials:
B. Direct Labor:
A. Materials:
B. Direct Labor:
A. Materials:
B. Direct Labor:
30% of Material Cost
A. Materials:
B. Direct Labor:
SUMMARY
ITEM I: FORMWORKS/SCAFFOLDINGS
ITEM II: CONCRETE WORKS
ITEM III: STEEL WORKS
ITEM IV: MASONRY WORKS
ITEM V: ROOFING WORKS
ITEM VI: DOORS & WINDOWS
ITEM VII: TILE WORKS
ITEM VIII: ELECTRICAL WORKS
ITEM IX: PLUMBING WORKS
ITEM X: PAINTING WORKS
TOTAL PROJECT COST . . . . . . . . . . . . . . . . . .
Prepared by:
8,412.00
36,452.00
35,000.00
10,200.00
28,800.00
74,000.00
22,200.00
96,200.00
26,600.00
31,500.00
3,600.00
61,700.00
18,510.00
80,210.00
19,200.00
21,000.00
9,880.00
1,600.00
15,300.00
66,980.00
20,094.00
87,074.00
38,220.00
31,920.00
40,800.00
4,500.00
18,000.00
800.00
9,000.00
3,000.00
4,500.00
3,200.00
320.00
320.00
400.00
480.00
155,460.00
46,638.00
202,098.00
8,000.00
6,000.00
15,000.00
36,000.00
7,000.00
10,000.00
82,000.00
24,600.00
106,600.00
30,000.00
9,000.00
600.00
280.00
39,880.00
11,964.00
51,844.00
3,500.00
600.00
1,350.00
300.00
300.00
900.00
280.00
1,680.00
500.00
2,500.00
3,500.00
3,000.00
1,900.00
250.00
70.00
550.00
250.00
140.00
21,570.00
6,471.00
28,041.00
10,000.00
2,000.00
370.00
240.00
2,080.00
425.00
275.00
170.00
385.00
330.00
330.00
765.00
220.00
120.00
120.00
105.00
270.00
3,900.00
210.00
140.00
250.00
270.00
250.00
160.00
23,385.00
7,015.50
30,400.50
6,500.00
9,800.00
1,300.00
2,800.00
1,400.00
160.00
120.00
120.00
90.00
22,290.00
6,687.00
28,977.00
36,452.00
96,200.00
80,210.00
87,074.00
202,098.00
106,600.00
51,844.00
28,041.00
30,400.50
28,977.00
747,896.50