PAINTING AND MAINTENANCE QUOTATION FOR LIBRARY

GROUND FLOOR
S/N DESCRIPTION UNIT COST QTY AMOUNT
1. Drums of gray silk 60,000 4 240,000
2. Drum of white silk for wall’s 60,000 3 180,000
3. Bucket matt for pop 35,000 3 105,000
FIRST FLOOR
1. Drums of gray silk 60,000 4 240,000
2. Bucket of white silk 60,000 3 180,000
3. Bucket matt for pop 35,000 3 105,000
SECOND FLOOR
1. Drum of silk 60,000 4 240,000
2. White Silk 60,000 3 180,000
3. Bucket of matt for pop 35,000 3 105,000
4. Drums of silk for nil staircase 60,000 7 420,000
5. Bucket matt 35,000 3 105,000
MATERIAL TOTAL N2,100,000
Labour 400,000
GRAND TOTAL N2,500,000
QUOTATION FOR SKILL ACQUISITION

S/N NARRATION QTY COST SUM


1. Silk for lab one 2 57,000 114,000
2. Matt 1 38,500 77,000
3. Potty for maintainer & design 2 16,500 33,000
4. Passage 2 57,000 114,000
FIRST FLOOR

1. Silk for labs 3 57,000 171,000

2. Matt 2 38,500 77,000

3. Passage stick 3 57,000 171,000

4. Matt for passage 2 38,500 115,500

5. Potty for maintenance 2 16,500 33,000

SECOND FLOOR

1. Silk for lab 3 57,000 114,000

2. Matt for lab 2 38,500 77,000

3. Passage silk 2 57,000 114,000

4. Matt for passage 2 38,500 77,000

5. Potty for maintenance 2 16,500 33,000

6. Stair case, silk 6 57,000 342,000

7. Transformation Centre silk 2 57,500 114,000

8. Transformation of items 35,000 35,000

Material Cost 1,776,500

Labour 400,000

SUM TOTAL N2,176,500