GROUND FLOOR
S/N DESCRIPTION UNIT COST QTY AMOUNT
1. Drums of gray silk 60,000 4 240,000
2. Drum of white silk for wall’s 60,000 3 180,000
3. Bucket matt for pop 35,000 3 105,000
FIRST FLOOR
1. Drums of gray silk 60,000 4 240,000
2. Bucket of white silk 60,000 3 180,000
3. Bucket matt for pop 35,000 3 105,000
SECOND FLOOR
1. Drum of silk 60,000 4 240,000
2. White Silk 60,000 3 180,000
3. Bucket of matt for pop 35,000 3 105,000
4. Drums of silk for nil staircase 60,000 7 420,000
5. Bucket matt 35,000 3 105,000
MATERIAL TOTAL N2,100,000
Labour 400,000
GRAND TOTAL N2,500,000
QUOTATION FOR SKILL ACQUISITION
SECOND FLOOR
Labour 400,000