QUOTATION FOR LIBRARY

GROUND FLOOR
S/N DESCRIPTION UNIT QTY AMOUNT
1. Grey silk 57,000 4 drum 228,000
2. White silk 57,000 3 drum 171,000
3. Matt for pop 38,500 3 bucket 115,500
FIRST FLOOR
1. Grey silk 57,000 4 drums 228,000
2. White silk 57,000 3 bucket 171,000
3. Matt for pop 38,500 3 bucket 115,500
SECOND FLOOR
1. Grey silk 57,000 4 drums 228,000
2. White silk 57,000 3 drums 171,000
3. Matt for pop 38,500 3 bucket 115,500
5. Silk for all staircase 57,000 8 drums 456,000
6. Matt for pop 38,500 3 bucket 115,500
Material cost 2,115,000

Labour 400,0000

Grand total 2, 515,00


QUOTATION FOR SKILL ACQUISITION

S/N NARRATION QTY COST SUM


1. Silk for lab one 2 57,000 114,000
2. Matt 1 38,500 38,500
3. Potty for maintainer & design 2 16,500 33,000
4. Passage 2 57,000 114,000
FIRST FLOOR

1. Silk for labs 3 57,000 171,000

2. Matt 2 38,500 77,000

3. Passage stick 3 57,000 171,000

4. Matt for passage 2 38,500 77,000

5. Potty for maintenance 2 16,500 33,000

SECOND FLOOR

1. Silk for lab 2 57,000 171,000

2. Matt for lab 2 38,500 77,000

3. Passage silk 2 57,000 114,000

4. Matt for passage 2 38,500 77,000

5. Potty for maintenance 2 16,500 33,000

6. Stair case, silk 6 57,000 342,000

7. Transformation Centre silk 2 57,000 114,000

8. Transformation of items 35,000 35,000

Material Cost 1,791,500

Labour 400,000

SUM TOTAL N2,191,500