AFTER O.G.

MEETING Mumbai Port Authority Wednesday, 12/07/2023


DKS/OPN/FO/08 INDIRA DOCK : DAILY VESSEL LIST
Berth PRG.Total Balance Sail
Vessel LEN BEAM GRT Nature of cargo Date Gangs Tons / Teus Agent
Name Berthed Tons / Teus Tons/Cont Date Name
Group (Dis + Load)
(Feet) (Feet) I/E (Dis + Load) (Dis + Load) Time

1ID HAI DUONG 68 397.31 59.71 7243 IRON & STEEL 09/07 6 3151 0 6832 0 6288 14/07 SAMSARA
SHIPPING PVT
VI ( 2307009 ) 0 0 0 0 0 0 00:00
LTD
96 Hrs. BH--->Y
2ID L J JOHNSON 194.23 49.21 1831 SUPPLY VESSEL 10/07 0 0 0 0 0 0 30/07 ATLANTIC
GLOBAL
# ( 2307024 ) 0 0 0 0 0 0 23:59
SHIPPING PVT.
96 Hrs. BH--->Y LTD
3ID CHANDRA 104.99 30.18 296 SUPPLY VESSEL 07/07 0 0 0 0 0 0 12/07 SHREE SAMARTH
NEPTUNE KRUPA SHIPPING
# ( 2306427 ) 0 0 0 0 0 0 07:30
& LOGISTIC CO.
BH--->Y
48 Hrs.
3ID TRANSTAR 82.02 26.25 177 SUPPLY VESSEL 08/07 0 0 0 0 0 0 30/07 SIMRAN
SHIPPING
# ( 2306561 ) 0 0 0 0 0 0 23:59
AGENCY &
48 Hrs. BH--->Y LOGISTICS
3ID MARIA 160.76 43.31 1079 SUPPLY VESSEL 10/07 0 0 0 0 0 0 12/07 FALCON
OFFSHORE
# ( 2305559 ) 0 0 0 0 0 0 07:30
SERVICES(I)PVT.L
96 Hrs. BH--->Y TD.
4ID INS IMPHAL 533.92 58.07 8103 NAVAL 02/07 0 0 0 0 0 0 31/12 MAZAGON DOCK
SHIPBUILDERS
$$ ( 2306171 ) 0 0 0 0 0 0 12:02
LIMITED
BH--->Y
5ID VACANT
6ID INS ADITYA 564.3 75.46 20000 NAVAL 20/04 0 0 0 0 0 0 12/07 COCHIN
SHIPYARD
$$ ( 2209473 ) 0 0 0 0 0 0 07:30
LIMITED
BH--->Y
6ID (05) CUSTOM CUSTOM 0 0 0 0 0 0 CUSTOM
BOATS ( ) 0 0 0 0
0 0

7ID INS TARASA NAVAL 0 0 0 0 0 0 COCHIN


SHIPYARD
$$ ( ) 0 0 0 0 0 0
7ID INS KARUVA NAVAL 0 0 0 0 0 0 COCHIN
SHIPYARD
$$ ( ) 0 0 0 0 0 0
8ID VACANT
9ID CREST ARGUS 255.9 61.02 3535 SUPPLY VESSEL 24/05 0 0 0 0 0 0 30/07 SHRI CHANDRA
2 BULK CARGO
# ( 2212436 ) 0 0 0 0 0 0 23:59
SERVICES
BH--->Y PRIVATE LIMITED
720 Hrs.
J/EN OFFSHORE 231.95 52.49 2569 03/07 0 0 0 0 0 0 30/07 RAJ SHIPPING
WARRIOR AGENCIES LTD.
# ( 2306336 ) 0 0 0 0 0 0 23:59
BH--->Y
144 Hrs.
10ID SEA MELODY SUPPLY VESSEL 0 0 0 0 0 0 HIND OFFSHORE
# ( 2305654 ) 0 0 0 0 0 0
11ID GREATSHIP 229.66 52.49 2179 SUPPLY VESSEL 13/05 0 0 0 0 0 0 30/07 GAC SHIPPING
DHRITI (INDIA) PVT LTD
# ( 2305358 ) 0 0 0 0 0 0 23:59

12ID ANTAREJA 154.76 36.75 482 SUPPLY VESSEL 22/06 0 0 0 0 0 0 30/07 ATLANTIC
GLOBAL
# ( 2306201 ) 0 0 0 0 0 0 23:59
SHIPPING PVT.
720 Hrs. BH--->Y LTD
12AID AJAY 108.27 35.1 446 SUPPLY VESSEL 17/05 0 0 0 0 0 0 30/07 A.K. SHIP
MANAGEMENT &
# ( 2211723 ) 0 0 0 0 0 0 23:59
SERVICES
BH--->Y
12AID ALLEGRA 77.69 19.68 84 SUPPLY VESSEL 01/06 0 0 0 0 0 0 30/07 SEA WAIF
# ( 2111237 ) 0 0 0 0 0 0 23:59
240 Hrs. BH--->Y

IPOS Page 1 of 9
AFTER O.G. MEETING Mumbai Port Authority Wednesday, 12/07/2023

Berth PRG.Total Balance Sail


Vessel LEN BEAM GRT Nature of cargo Date Gangs Tons / Teus Agent
Name Berthed Tons / Teus Tons/Cont Date Name
Group (Dis + Load)
(Feet) (Feet) I/E (Dis + Load) (Dis + Load) Time

12AID ASHENA 149.28 30.51 484 SUPPLY VESSEL 08/06 0 0 0 0 0 0 30/07 SEA WAIF
# ( 2304381 ) 0 0 0 0 0 0 23:59
BH--->Y
12AID BLUE BIRD 37.73 10.5 10 SUPPLY VESSEL 08/06 0 0 0 0 0 0 30/07 SEA WAIF
# ( 2104654 ) 0 0 0 0 0 0 23:59
BH--->Y
12AID TAIKLI 385.17 67.26 9984 GENERAL 11/07 4 594 0 594 0 5062 13/07 SEAWORLD
SHIPPING &
VI ( 2307007 ) 0 0 0 0 0 0 10:00
LOGISTICS PVT
48 Hrs. BH--->Y LTD.
12AID AK SHIP 9 SUPPLY VESSEL 0 0 0 0 0 0 AK SHIP MANT
# ( ) 0 0 0 0 0 0
12BID Angriya 429.79 56.43 6865 REPAIR 02/01 0 0 0 0 0 0 31/07 BEN LINE
AGENCIES (INDIA)
** ( 2205800 ) 0 0 0 0 0 0 23:59
PVT LTD.
13BID SUMAI 100.07 21 142 SUPPLY VESSEL 17/05 0 0 0 0 0 0 30/07 HIND OFFSHORE
TANGKAS PVT.LTD
# ( 2305477 ) 0 0 0 0 0 0 23:59
BH--->Y
1063 Hrs.
13BID GOMTI 108.92 24.02 140 SUPPLY VESSEL 05/07 0 0 0 0 0 0 30/07 AMAZE MARITIME
SERVICES P LTD
# ( 2305478 ) 0 0 0 0 0 0 23:59
BH--->Y
13BID MAHI 102.69 25.79 163 SUPPLY VESSEL 05/07 0 0 0 0 0 0 30/07 CREATIVE
MARITIME
# ( 2306084 ) 0 0 0 0 0 0 23:59
SERVICES LLP
96 Hrs. BH--->Y
13BID TRITON 204.07 49.21 1579 SUPPLY VESSEL 05/07 0 0 0 0 0 0 30/07 PAREKH MARINE
HARMONY SERVICES PVT.
# ( 2306130 ) 0 0 0 0 0 0 23:59
LTD.
BH--->Y
480 Hrs.
13BID KPS SHIVALI 104.99 21 127 SUPPLY VESSEL 05/07 0 0 0 0 0 0 30/07 SEIG MARINE
SERVICES (OPC)
# ( 2305410 ) 0 0 0 0 0 0 23:59
PVT. LTD.
Hrs. BH--->Y
13BID VMS 3 104.66 23.39 140 SUPPLY VESSEL 05/07 0 0 0 0 0 0 30/07 CREATIVE
MARITIME
# ( 2305525 ) 0 0 0 0 0 0 23:59
SERVICES LLP
BH--->Y
13BID VICTORIA I 88.58 24.74 71 SUPPLY VESSEL 05/07 0 0 0 0 0 0 30/07 SHRI CHANDRA
BULK CARGO
# ( 2304518 ) 0 0 0 0 0 0 23:59
SERVICES
BH--->Y PRIVATE LIMITED
13BID VMS 6 87.89 24.61 162 SUPPLY VESSEL 05/07 0 0 0 0 0 0 30/07 CREATIVE
MARITIME
# ( 2305361 ) 0 0 0 0 0 0 23:59
SERVICES LLP
BH--->Y
13BID VMS 21 104.99 25.33 154 SUPPLY VESSEL 05/07 0 0 0 0 0 0 30/07 CREATIVE
MARITIME
# ( 2306099 ) 0 0 0 0 0 0 23:59
SERVICES LLP
BH--->Y
13BID MEENAKSHI 124.7 26.57 199 SUPPLY VESSEL 05/07 0 0 0 0 0 0 30/07 CREATIVE
MARITIME
# ( 2305535 ) 0 0 0 0 0 0 23:59
SERVICES LLP
BH--->Y
13BID TRINIDAD I 88.58 24.74 71 SUPPLY VESSEL 05/07 0 0 0 0 0 0 30/07 SHRI CHANDRA
BULK CARGO
# ( 2303119 ) 0 0 0 0 0 0 23:59
SERVICES
720 Hrs. BH--->Y PRIVATE LIMITED
13BID CHENAB 104.99 22.01 129 SUPPLY VESSEL 05/07 0 0 0 0 0 0 30/07 SEIG MARINE
SERVICES (OPC)
# ( 2304716 ) 0 0 0 0 0 0 23:59
PVT. LTD.
24 Hrs. BH--->Y

IPOS Page 2 of 9
AFTER O.G. MEETING Mumbai Port Authority Wednesday, 12/07/2023

Berth PRG.Total Balance Sail


Vessel LEN BEAM GRT Nature of cargo Date Gangs Tons / Teus Agent
Name Berthed Tons / Teus Tons/Cont Date Name
Group (Dis + Load)
(Feet) (Feet) I/E (Dis + Load) (Dis + Load) Time

13BID DUKE SPRINT 85.3 21.98 115 SUPPLY VESSEL 05/07 0 0 0 0 0 0 30/07 CREATIVE
MARITIME
# ( 2306107 ) 0 0 0 0 0 0 23:59
SERVICES LLP
BH--->Y
13BID KPS 98.42 24.61 183 SUPPLY VESSEL 0 0 0 0 0 0 12/07 CREATIVE
MARITIME
# ( 2306129 ) 0 0 0 0 0 0 07:30
SERVICES LLP
13AID ERIN 237.53 60.37 3583 SUPPLY VESSEL 08/07 0 0 0 0 0 0 30/07 BEN LINE
AGENCIES (INDIA)
# ( 2305512 ) 0 0 0 0 0 0 23:59
PVT LTD.
1080 Hrs. BH--->Y
13AID SANGITA SUPPLY VESSEL 0 0 0 0 0 0 AK SHIP MAGNT
# ( ) 0 0 0 0 0 0
13ID VACANT
14ID ICGS SAMUDRA COAST GUARD 0 0 0 0 0 0 COMMANDER,
PRAHARI COAST GUARD
$$ ( 2307130 ) 0 0 0 0 0 0

15ID SAMUDRA 263.78 59.05 2995 SUPPLY VESSEL 10/07 0 0 0 0 0 0 30/07 SHIPPING
NIDHI CORPORATION
# ( 2306558 ) 0 0 0 0 0 0 23:59
OF INDIA LTD
BH--->Y
240 Hrs.
15ID TAG 10 223.1 53.81 2430 SUPPLY VESSEL 10/07 0 0 0 0 0 0 30/07 GLOBOTRANS
PROLOGISTIX
# ( 2306488 ) 0 0 0 0 0 0 23:59
PRIVATE LTD.
48 Hrs. BH--->Y
16ID SAMARTH 186.38 49.21 1579 SUPPLY VESSEL 07/07 0 0 0 0 0 0 30/07 GAC SHIPPING
(INDIA) PVT LTD
# ( 2307075 ) 0 0 0 0 0 0 23:59
288 Hrs. BH--->Y
17ID VACANT
18ID SAFINAH 623.03 105.84 30847 IRON & STEEL 11/07 12 8974 0 8974 0 28725 14/07 SHREE SAMARTH
KRUPA SHIPPING
VI ( 2307082 ) 0 0 0 0 0 0 12:00
& LOGISTIC CO.
48 Hrs. BH--->Y
19ID PROPEL 646.32 105.84 33084 IRON & STEEL 01/07 0 0 0 0 0 0 15/07 ACT INFRAPORT
SUCCESS LTD.
VI ( 2306359 ) 10 3365 0 19766 0 0 16:00
BH--->Y
208 Hrs.
20ID VACANT
21ID SEASTAR 590.55 98.42 24341 IRON & STEEL 01/07 0 0 0 0 0 27 14/07 SAI MARITIME &
VICTORY MANAGEMENT (P)
VI ( 2306346 ) 8 801 0 17582 0 0 14:00
LTD.
BH--->Y
480 Hrs.
22ID VACANT
23ID SEA MASTER 1 235.89 45.93 1343 BASE OIL 08/07 0 0 0 0 0 0 12/07 KAINAAZ
ASSOCIATES
III ( 2305019 ) 0 0 0 0 0 0 07:30
CARGO MOVERS
PVT .LTD
23ID SEA MASTER 2 236.22 52.49 1792 BASE OIL 10/07 0 0 0 0 0 0 12/07 KAINAAZ
ASSOCIATES
III ( 2112149 ) 0 0 0 0 0 0 07:30
CARGO MOVERS
PVT .LTD
BPS FENG DE HAI 655.84 105.84 36378 IRON & STEEL 11/07 9 1433 0 1433 0 8607 15/07 J M BAXI & CO
VI ( 2307077 ) 0 0 0 0 0 0 00:00
96 Hrs. BH--->Y
BPX SCHUYLER 590.22 98.42 23405 FERTILIZER 0 0 0 0 0 0 25/07 MNK& CO.
TRADER ( 2307047 ) 0 0 0 0 01:00
IV 0 0

OCT1 EGRET BULKER 623.32 105.84 33064 IRON & STEEL 0 0 0 0 0 0 17/07 MARCONS SHIP
MANAGEMENT
VI ( 2307017 ) 4 186 0 186 0 0 00:00
PVT. L
OCT2 VACANT

IPOS Page 3 of 9
AFTER O.G. MEETING Mumbai Port Authority Wednesday, 12/07/2023

Berth PRG.Total Balance Sail


Vessel LEN BEAM GRT Nature of cargo Date Gangs Tons / Teus Agent
Name Berthed Tons / Teus Tons/Cont Date Name
Group (Dis + Load)
(Feet) (Feet) I/E (Dis + Load) (Dis + Load) Time

OCT VACANT
BY

GROUP WISE NORM FOR VESSEL PER DAY -


*: REPAIRING VESSEL #: SERVICE VESSEL **: PASSENGER VESSEL
$$: NAVAL VESSEL GROUP I = CONTAINER(GEARLES VESSEL) = 280 CONT
TONNS TEUS GROUP II = (CONTAINER GEAREDVESSEL) = 160 CONT
16676 GROUP III = LIQUID BULK - BY TANKERS = 2000 TONS
TOTAL DISCHARGED ON PREVIOUS DAY
- BY PIPE = 2500 TONS
TOTAL LOADED ON PREVIOUS DAY 4352 GROUP IV = DIRECT DELIVERY CARGO (#SCRAP ETC) = 1600 TONS
GROUP V = FERTILISER & FERTILISER RAW MATERIALS = 1600 TONS
TOTAL DISCHARGED/LOADED - IMP 115245
GROUP VI = GEN CARGO OTHER THAN MENTIONED BELOW = 800 TONS
FROM 01-JUL-23 To 11-JUL-23 EXP 85099 a) FULL LOAD OF STEEL COILS = 3500 TONS
b) FULL LOAD OF PLATES,RAILS,PIPES & OTH STEEL = 1000 TONS
TOTAL DISCHARGED /LOADED - IMP 988283 c) FULL LOAD OF BAGGED CARGO,WOOD PULP IMP/EXP = 1500 TONS
d) EXPORT CUBIC CARGO = 500 TONS
FROM 01-APR-23 To 11-JUL-23 EXP 552141

( . )
FOR SR.DY.TRAFFIC
MANAGER

Service Naval Group


I II III IV V VI Repair Occupied Vaccant
Supply Passenger I to VI

ID 9 1 30 24 8 9

IPOS Page 4 of 9
AFTER O.G. MEETING Mumbai Port Authority Wednesday, 12/07/2023

DKS/OPN/FO/09
I. Waiting Vessels

Reason for Non Dock/


Berthing/Delay Group
Status Vessel Name VCN ATA Draft Len Beam Discharge Load
in Berthing
(Mtr.) (Feet) (Feet)

1 S/-/-/Z// NAVIOS LYRA 2307137 12.07.2023 10:54 9.1 591 98 27800 MT HRC COILS/SLAB,
TM INTERNATIONAL LOGISTICS LTD. COASTAL CARGO ( LAST
PORT OF CALL- PARADIP)(
0% HAZ CARGO DECL NOT
72 Hrs. RECD)( REQUIRE OPEN
BERTH FOR MOBILE CRANE
OPERATION FOR HEAVY
COIL, ANY SIDE , DEPT
DRAFT- 6.5 NEED MOBILE
CRA

K. Dis./Loading in stream, P. Advance payment not made, E. Vsl. not ready to dis./ load, H. IGM not lodged, F. Cargo documents not ready,
Z. Haz. cargo declaration not lodged, S. Stevedoring charges not paid.

II Berthing Vessels
Operation
Sr. Vessel Name VCN Draft Len Beam Arrival Date & Time Discharge Load Group/Berth
(Mtr.) (Feet) (Feet)

III Vessel Expected to Berth after Accumulation of Sufficient Cargo/Containers Operation


Sr. Vessel Name VCN Draft Lth Beam Arrival Date & Time Discharge Load Carting at
(Mtr.) (Feet) (Feet)

IV Vessel which have not approached/applied for Carting/for Discharging at Berth


VCN Draft Len Beam
Sr. Vessel Name Arrival Time Operation
(Mtr.) (Feet) (Feet) Discharge Load

Vacant Berths 6ID, 7ID, 8ID, 10ID, 12BID, 13ID, 14ID, 17ID, 20ID, 22ID, 23ID, BPX, OCT2, OCT BY TOTAL 14

V Vessels Berthed in the last 24 Hrs.

Sr. Vessel Name VCN Arrival Time in port Time of readiness Berth Time Pilot Boarde Dkg Time at L/Gate Actual Time of Bthg

1 SAFINAH 2307082 11.07.2023 12:06 11.07.2023 12:06 18ID 11.07.2023 12:06 11.07.2023 13:12

2 TAIKLI 2307007 11.07.2023 11:00 11.07.2023 11:00 12ID 11.07.2023 11:00 11.07.2023 11:45 11.07.2023 13:12

3 EGRET BULKER 2307017 11.07.2023 14:30 11.07.2023 14:30 OCT1 11.07.2023 14:30 11.07.2023 15:54

NOTE :-
(1) APPLICATION FOR BERTH SHOULD BE MADE AT LEAST SEVEN DAYS PRIOR TO ETA. CONFIRMED ETA MAY BE GIVEN THREE DAYS
PRIOR TO ACTUAL ETA.

(2) WEF 1ST JUNE 2023 TO 30TH SEPT 2023. INDIRA DOCK STORM GATE WILL BE CLOSED 3HRS BEFORE HIGH WATER AND WILL OPEN ONE
HOUR AFTER HIGH WATER. THUS STORM GATE WILL REMAIN CLOSED AT EACH HIGH-WATER FOR FOUR HOURS.
(3) W.E.F 01/06/23 TILL 30/09/23 KINDLY NOTE THAT ALL VESSELS BERTHING AT 19,20 & 21 HW WILL HAVE A DRAFT RESTRICTION OF 8.5 MTR
MAXI SINCE VESSEL WILL BE BERTHED SBAS. BERTHING AT 18 HW MAY BE PSAS DEPENDING ON WEATHER & TIDAL CONDITION.NO
IMMOBILIZATION WILL BE ALLOWED DURING ENTIRE MONSOON PERIOD
(4) MIN 60% EXPORT CARGO SHOULD BE AVAILABLE ON HAND AND EXPORT DOCUMENTS SHOULD BE READY BEFORE ALLOTMENT OF
BERTH TO THE VESSEL FOR LOADING.
(5) STORM GATE WILL UNDERGO MAINT, HENCE SHPG. MOVMNT WILLBE REGULATED ACCORDINGLY EVERYDAY FOR 4 TO 5 HRS., AS AND
WHEN REQD. DURING DAY HRS, FOR NEXT 5 DAYS.

VI Vessels expected to arrive as declared by Shipping Agents Operation

Vessel Name GRP VCN Draft Len Beam Expected To Discharge To Load Agent
(Mtr.) (Feet) (Feet) Time/ date
1 HARAR V 2307159 9.2 546.26 89.89 14:00/10.07.2023 20000 MT (MOP) LAST PORT OF SHRI CHANDRA BULK
CALL- AQABA)( HAZ CARGO CARGO SERVICES
S/H/P/Z DECL NOT GIVEN) REQ. PRIVATE LIMITED
Berth indicated :- ID/BPS/BPX.

( Application Recd - 07.07.2023 23:35 )

IPOS Page 5 of 9
AFTER O.G. MEETING Mumbai Port Authority Wednesday, 12/07/2023

VI Vessels expected to arrive as declared by Shipping Agents Operation

Vessel Name GRP VCN Draft Len Beam Expected To Discharge To Load Agent
(Mtr.) (Feet) (Feet) Time/ date
2 ATALANTE VI 2307123 9.5 493.86 85.3 07:00/15.07.2023 20000 MT OF STEEL SLABS ( SD:7. GAC SHIPPING (INDIA)
LAST PORT OF CALL- PVT LTD
S/-/P/Z ISTANBUL, RUSSIA)( NO HAZ
Berth indicated : CARGO ON BOARD). FRESH
NOTICE. REQ. BPS/BPX.. REQ.
OCT.
UNDER PRIORITY
( Application Recd - 28.06.2023 15:58 )
Priority Readiness 01:00 16.07.2023
3 MEREL D VI 2307108 10.4 590.55 98.42 10:00/22.07.2023 26000 MT STEEL CARGO ( LAST PAREKH MARINE
PORT OF CALL- SINGAPORE)( SERVICES PVT. LTD.
S/H/P/- NO HAZ CARGO ON BOARD)
Berth indicated :
UNDER PRIORITY
( Application Recd - 10.07.2023 10:22 )
Priority Readiness 01:00 27.07.2023

Berthing Application without voyage registration / VCN (For next 25 days)

Operation
Draft Len Beam
Vessel Name GRP Expected To Discharge
To Load Agent
(Mtr.) (Feet) (Feet) Time/ date

1 MARIMAN VI 7 656 106 00:01/17.07.2023 38500 MTS STEEL CARGO ( SHAAN MARINE
LAST PORT OF CALL- NIL)( NO SERVICES PVT. LTD.
HAZ CARGO ON BOARD)(
Application Recd - 09.07.2023 13:28 Piority Readiness-
NEED BPS/BPX FOR
00:01 27.07.2023
TOPPING UP ON
DEPARTURE) SD: 10.1 MTR.

2 CHRISTINA VI 10.4 590 93 17:00/17.07.2023 32000 MT STEEL CARGO 2000 MT STEEL CARGO ( LAST MITSUTOR SHIPPING
PORT OF CALL- SINGAPORE)( AGENCY PVT.LTD.
NO HAZ CARGO ON BOARD).
Application Recd - 01.07.2023 09:59 Piority Readiness-
REQ. OCT BERTH. (UNDER PRIORITY)
00:01 21.07.2023

3 KUWANA VI 8.7 572 92 00:01/19.07.2023 4000 MT STEEL & MACHINERY NYK INDIA PRIVATE
CARGO ( NO HAZ CARGO ON LIMITED
BOARD)( LAST PORT OF CALL-
Application Recd - 21.06.2023 14:44 Piority Readiness-
MUNDRA) (UNDER PRIORITY)
00:01 22.07.2023

4 DIONYSOS VI 8.9 656 106 00:01/19.07.2023 600 VEHICLES. LAST PORT NYK INDIA PRIVATE
LEADER OF CALL : PIPAVAV. ( NO LIMITED
HAZ. CARGO ON BOARD.)
Application Recd - 04.07.2023 16:29
PCC. SSAS. (UNDER PRIORITY)

5 SUNNY HONG VI 8.1 594 98 10:00/19.07.2023 14850 MT STEEL & PROJECT 1000 MT PROJECT CARGO ( J M BAXI & CO
CARGO LAST PORT OF CALL-
SINGAPORE)( NO HAZ (UNDER PRIORITY)
Application Recd - 26.06.2023 16:39 Piority Readiness-
CARGO ON BOARD)(
00:01 22.07.2023
REQUIRE BPS/18HW BERTH
ON ARRIVAL AS WE SHALL
USE PVT MOBILE CRANE
FOR DISCHARGING ALL THE
HEAVY LIFT. REQ PSAS.

IPOS Page 6 of 9
AFTER O.G. MEETING Mumbai Port Authority Wednesday, 12/07/2023

Berthing Application without voyage registration / VCN (For next 25 days)

Operation
Draft Len Beam
Vessel Name GRP Expected To Discharge
To Load Agent
(Mtr.) (Feet) (Feet) Time/ date

6 ST. ANDREW VI 10.1 590 93 15:00/21.07.2023 25400MT STEEL CARGO. LAST PAREKH MARINE
PORT OF CALL: SINGAPORE. SERVICES PVT. LTD.
(NO HAZ. CARGO ON BOARD.)
Application Recd - 03.07.2023 11:16 Piority Readiness-
17DAYS NOTICE FOR P.R. (UNDER PRIORITY)
00:01 27.07.2023

7 PIONEER VI 8.3 556 89 12:00/22.07.2023 20000 MT CALCITE CHIPS IN M.DINSHAW & CO.
FORTUNE BERTH. . LAST PORT OF CALL: PRIVATE LTD.
LUMUT (MALAYSIA). NO
Application Recd - 10.07.2023 15:17
HAZ.CARGO ON BOARD..
NEED 16ID BERTH.
8 OPTIMAX II VI 6.6 393 67 23:00/22.07.2023 508MT MACHINERY & 1000 MT MACHINERY CARGO. MITSUTOR SHIPPING
EQUIPMENTS. LAST PORTOF AGENCY PVT.LTD.
CALL: SINGAPORE. (NO
Application Recd - 10.07.2023 15:06
HAZ.CARGO ON BOARD.)

9 HOEGH JEDDAH VI 656 106 00:01/25.07.2023 100 RORO UNITS & 200 MT 2000 RORO UNITS & 1000 MT MERCHANT SHIPPING
PROJECT CARGO PROJECT CARGO ( LAST SERVICES PVT LTD
PORT OF CALL- JEBEL ALI(
Application Recd - 02.07.2023 12:05
NO HAZ CARGO ON BOARD) (UNDER PRIORITY)

10 CATTLEYA ACE VI 8 656 106 06:00/25.07.2023 1200 UNITS BUS ,CAR, MOL SHIPPING (INDIA)
MACHINERY CARGO ( LAST PVT LTD.
PORT OF CALL- MUNDRA)(
Application Recd - 05.07.2023 16:53
NO HAZ CARGO ON BOARD) (UNDER PRIORITY)

11 HAN ZHI VI 7 353 65 17:00/25.07.2023 813 MT EQUIPMENT & 1000 MT MACHINERY( LAST MITSUTOR SHIPPING
MACHINERY. REQ. PSAS. PORT OF CALL-SINGAPORE)( AGENCY PVT.LTD.
REQ. OPEN BERTH. NO HAZ CARGO ON BOARD)
Application Recd - 04.07.2023 11:38
(UNDER PRIORITY)

12 ELEGANT ACE VI 8.2 656 105 06:00/28.07.2023 1200 UNITS (BUS, CARS, MOL SHIPPING (INDIA)
TRUCKS & MACH. CARGO.) PVT LTD.
LAST PORT OF CALL :
Application Recd - 06.07.2023 15:14
MUNDRA. ( NO HAZ. CARGO (UNDER PRIORITY)
ON BOARD.) PURE CAR
CARRIER. REQ. OCT.

13 HOSEI CROWN VI 7.4 367 70 00:01/31.07.2023 940 PKGS /7500 MT STEEL & SEAWORLD SHIPPING
PROJECT CARGO & LOGISTICS PVT LTD.
Application Recd - 07.07.2023 17:07
(UNDER PRIORITY)

14 MORNING CALM VI 8.5 656 106 01:00/02.08.2023 750 UNITS( 650 HIGH END 2000 CARS + 2000 MT PAREKH MARINE
CARS & 100 PKGS PROJECT CARGO. SERVICES PVT. LTD.
MACHINERY/STATIC/MAFI).
Application Recd - 07.07.2023 14:43
LAST PORTOF CALL : (UNDER PRIORITY)
BAHARAIN. ( NO HAZ. CARGO
ON BOARD.)

IPOS Page 7 of 9
AFTER O.G. MEETING Mumbai Port Authority Wednesday, 12/07/2023

Details of vessels expected to arrive in next 30 days as per berthing application received till 08:00 hrs of 12.07.2023
VESSELS OF GROUP ==> VI

Vessel Name Appln Recd on Excpected Dt of Arrvl Draft Length Beam Commodity Vessel Agent

1 HAI DUONG 68 11.07.2023 16:44 13/07/2023 06:00:00 5.2 397 60 To Load 8500 MT HR COIL. PAREKH MARINE SERVICES
Berth indicate - 1ID PVT. LTD.
Priority Readiness
( VCN = 2307185 )
Due on 13.07.2023@22:00 Hrs.

Berthing Application without voyage registration / VCN VESSELS OF GROUP ==> VI

Vessel Name Appln Recd on Excpected Dt of Arrvl Draft Length Beam Commodity Vessel Agent

1 LADY D 11/07/2023 15:08 17/07/2023 00:01 6.2 454 69 To Disch. 200 MT GENERAL MARCONS SHIP
CARGO ( LAST PORT OF MANAGEMENT PVT. L
CALL-
NOVOROSSIYSK/RUSSIA)
2 HARMONY 11/07/2023 18:05 18/07/2023 01:00 4.6 385 67 To Load PAREKH MARINE
GLORY To Disch. 30 MT. (4 PKGS) SERVICES PVT. LTD.
PROJECT CARGO. LAST
PORT OF CALL: HAZIRA. ( NO
HAZ. CARGO ON BOARD.)
3 PERTH I 11/07/2023 15:09 20/07/2023 00:01 623 106 To Load 15500 MT STEEL WILHELMSEN MARITIME
Priority Readiness 28.07.2023 00:01 (LAST PORT OF CALL-NIL)HAZ SERVICES PVT. LTD.
CARGO DECL NOT GIVEN.
4 JENS 11/07/2023 15:52 20/07/2023 00:01 656 106 To Load 12500 MT STEEL WILHELMSEN MARITIME
OLDENDORFF CARGO. LAST PORT NOT SERVICES PVT. LTD.
Priority Readiness 28.07.2023 00:01 DECL. (HAZ. CARGO DECL.
NOT RECD.)
5 JABAL ALI 9 11/07/2023 10:21 28/07/2023 06:00 6.7 509 82 To Load 170 BUSES AND 10 SHREE SAMARTH
EXCAVATORS, 300 MT KRUPA SHIPPING &
MACHINERY AND STEEL , LOGISTIC CO.
TOTAL 2000MT ( LAST PORT
OF CALL- JEBEL ALI)( HAZ
CARGO DECL NOT GIVEN)
6 NOWOWIEJSKI 11/07/2023 13:10 03/08/2023 00:05 10.5 623 92 To Load APPROX. 8500 MT SAMSARA SHIPPING
STEEL & PROJECT CARGO. PVT LTD
( Under Priority = NP )
LAST PORT OF CALL: HAZIRA.
(NO HAZ. CARGO ON
BOARD.) To Disch. APPROX.
500 MT PROJECT.
DOCKING / UNDOCKING OF VESSELS PLANNED IN OG MEETING
Expected/Declared Time Of Berth Berth Alloted Time Of
Sr. Vessel Name
Arrival/Readiness By the V/ Agent From To Docking/Undocking
No.

* Vessel movements are subject to availability of Pilots and Tugs.

IPOS Page 8 of 9
AFTER O.G. MEETING Mumbai Port Authority Wednesday, 12/07/2023

IPOS Page 9 of 9