Project Description : COCS Clean Up Minas 3B-76B

SR/WI No. : 1283692 O1 04770 000


SR Start: 24-Jun-19
SR Finish 28-Nov-19
Site 3B-76B
CS PT. PP

Productivity/ Productivities Resources Resources


No WBS & Task Description Unit Volume Remaining unit Trip/day (Resource/day) Name Load (DT) Duration Contingency Remarks
1 Earthworks Fill from Company Designated Location, Haul & Compacted, EXC, DT, DZ,
Cu. Meter 540.00 540.00 280.00 1 280 1 2 0
Balanced Cut/Fill (with hauling distance <0.5 KM) SD,
2
Soil/Dirt Hauling, distance 0-10 KM (without compaction) (site prep) Cu. Meter 826.00 826.00 150.00 1 300 EXC, DT, DZ, 2 3 0
2
Soil/Dirt Hauling, distance 0-10 KM (without compaction) ((Backfill) Cu. Meter 16,548.50 16,548.50 150.00 1 1050 EXC, DT, DZ, 7 16 0
3 Earthworks Clearing Sq. Meter 70,674.50 70,674.50 4000.00 1 8000 EXC, DZ 2 9 0
4 Construct New Canal width <= 5 M Cu. Meter 450.00 450.00 250.00 1 250 EXC 1 2 0
5 Install Steel Pipe Culvert size >= 24" diameter Meter 24.00 24.00 12.00 1 12 EXC, FT 1 2 0
6 Install Steel Pipe Culvert size >= 24" diameter (Syphon) Meter 48.00 48.00 12.00 1 12 EXC, FT 1 4 0
7 Supply Oil Absorbent boom Meter 6.00 6.00 0
8 Install Oil absorbent boom Meter 6.00 6.00 12.00 12 1 0
9 Earthwork Cut/Excavation Cu.Meter 1,384.00 1,384.00 300.00 1 300 EXC 5 0
10 EXC, DT, DZ,
Haul & Compacted (with hauling distance from 0.5 KM to 15 KM) (AR) Cu. Meter 23,426.00 23,426.00 48.00 5 336 SD, PF 7 70
11 Earthworks Removal of: HIS soil on surface and Surgical or discreet EXC, DT, DZ,
Cu. Meter 20,306.00 20,306.00 200.00 400 SD, PF 2 51
excavation of HIS or Non-HIS soil
12 EXC, DT, DZ,
HIS Hauling distance 0-10 km (using KLH/BLHs certified truck) Cu. Meter 3,757.50 3,757.50 42.00 1 126 3 30 0
SD
13 EXC, DT, DZ,
Haul & Compacted (with hauling distance from 0.5 KM to 15 KM)(Backfill) Cu. Meter 3,757.50 3,757.50 48.00 5 336 7 11 0
SD