Professional Documents
Culture Documents
101
B
3157 (+20/-0)
1000
1000 1000
100
Y
T
490
C
1050
100 View A
17
Anti-climb barrier
64
94
5
2250
617
1000(+/-50)
D Z
1000
35.0
X
°
.
1050
1150
45151870 45151871
6722626_2_1 6722626_2_2
50 37
E 1510 1510
End View
Side Elevation
Note:
1. All dimensions are in millimeters.
2. Access opening 2500mm wide and 3300mm high into and through the building is required.
3. EN115-1, GB 16899 requirement for the minimum free clearance. Checking is required to
F ensure that the shown building layout is in compliance. Indication of the code requirement in
the drawing does not confirm that this requirement is fulfilled.
4. It is forbidden to drill any holes on escalator truss. As the truss integrity will be impacted.
200 Min. 1150 Power supply 5. The precision of weight within 0%~+7%, the section weight without disassembly component.
(By Customer) 6. FF, DD and EE should be +33mm in seismic cases.
200
C KONE Corporation
32
Prior To Installation
Clean Site & Storage
Ensure the working and storage areas are clean, dry and protected from the weather.
3-Phase Power Supply
Ensure permanent 3-phase power is available for the assembly and testing of the escalator,
1547
3157 (+20/-0)
(during the whole project).
X
G
.
1787
- 4/21/2023 Ankit Mishra Ankit Mishra
1547
R2z:53kN R1z:59kN
Version Date Description Designed by Checked by Approved by
240
Project name
Amrapali Corp Hub - Krishna Constructions
Site address
32