Professional Documents
Culture Documents
Roger Hedding
Roger graduated from Marquette University and joined
Westinghouse Electric Corp. After receiving a Masters
degree in Electrical Engineering from the University of
Pittsburgh, Roger became a District Engineer, and
eventually moved to Milwaukee where he currently
resides. As a Relay Development Consultant he guides
the development of relay products for the North
American market. Roger is a IEEE senior member, and
Vice Chair of the IEEE Power Systems Relay
Committee. Roger has authored or co authored many
papers in power systems protection
© ABB Group
21-Sep-11 | Slide 4
Learning objectives
© ABB Group
21-Sep-11 | Slide 5
Line Differential Protection
Introduction
Differential Relay
Line Current
Differential Relay
Application Issues
Communications
Summary
© ABB Group
21-Sep-11 | Slide 6
Simple Line Differential Protection Application
© ABB Group
21-Sep-11 | Slide 7
Multi-terminal Differential Protection
Unit Protection
Task – To Determine if fault is within protected zone or outside the protected zone
Protected Zone
Transmission Line Terminals
Power Transformer Terminals
Measures Currents at the terminals of the protected circuit
Transmits information about the currents to the remote end(s)
Compares the currents using classical current differential principles
Supplemented by additional criteria
High Dependability – Operates for all faults which it is designed to operate
Highly Security – Doesn’t operate for faults for which it should not operate
Good performance during evolving faults, and cross country faults
Immune to power swings, mutual coupling, and series impedance unbalances
With sample data its easy to calculate
Sequence components
Harmonic Currents
© ABB Group
21-Sep-11 | Slide 8
Line Current Differential Basics
© ABB Group
21-Sep-11 | Slide 9
Current Only Scheme
© ABB Group
21-Sep-11 | Slide 10
Types of Current Only Schemes
Current Differential
Analog
Digital
Phase Comparison
Segregated
Combined Sequence
Not used much anymore
© ABB Group
21-Sep-11 | Slide 11
Current Differential Relay
IL IR
Local end Protected Remote end
Equipment
IL Relay IL + IR IR
© ABB Group
21-Sep-11 | Slide 12
Normal Operations or External Faults
IL = -I R
IL + I R = 0 ⇒ Should NOT TRIP!
© ABB Group
21-Sep-11 | Slide 13
Internal Faults
IL + I R ≠ 0
⇒ Should TRIP!
© ABB Group
21-Sep-11 | Slide 14
Operating & Restraint Regions
IL
= x + j y = −1
IR y
Restraint point
x
-1
© ABB Group
21-Sep-11 | Slide 15
Operating & Restraint Regions
© ABB Group
21-Sep-11 | Slide 16
Operating & Restraint Regions
IL IR
Local end Protected Remote end
Equipment
IL Relay IL + IR IR
© ABB Group
21-Sep-11 | Slide 17
Operating (Trip) Condition
IL IR
Local end Protected Remote end
Equipment
IL Relay IL +IR IR
I L + I R ≥ K( I L + I R )
or I L + I R ≥ K( I L − I R )
or I +I ≥KI
L R max
© ABB Group
21-Sep-11 | Slide 18
Operating & Restraint Regions
© ABB Group
21-Sep-11 | Slide 19
Line Current Differential Relays
© ABB Group
21-Sep-11 | Slide 20
Line Current Differential Relays
IL IR
Protected
Line
IL IR
1 1
(I L + I R ) (I L + I R )
2 2
© ABB Group
21-Sep-11 | Slide 21
Normal Conditions or External Faults
© ABB Group
21-Sep-11 | Slide 22
Internal Faults
© ABB Group
21-Sep-11 | Slide 23
Line Differential Protection Characteristic
© ABB Group
21-Sep-11 | Slide 24
First Generation Line Current Differential Relays
© ABB Group
21-Sep-11 | Slide 25
HCB Pilot Wire Relay
© ABB Group
21-Sep-11 | Slide 26
Problems With Pilot Wire Relays
© ABB Group
21-Sep-11 | Slide 27
Solutions for Problems With Pilot Wire Relays
© ABB Group
21-Sep-11 | Slide 28
Issues with Non-metallic Communications
© ABB Group
21-Sep-11 | Slide 29
Numerical Relay
© ABB Group
21-Sep-11 | Slide 30
Channel Requirement
© ABB Group
21-Sep-11 | Slide 31
Channel Options
Direct Fiber
Short Range 1 – 3 Km
Medium Range 3 – 50 Km
Long Range 51 – 160 Km
G.703
Fiber to Multiplexer
© ABB Group
21-Sep-11 | Slide 32
Line Termination
Single Breaker
Ring Bus
Breaker and One Half
Transformer
© ABB Group
21-Sep-11 | Slide 33
Single Breaker
© ABB Group
21-Sep-11 | Slide 34
Ring Bus or Breaker and 1/2
© ABB Group
21-Sep-11 | Slide 35
Classical Current Transformer Connection
© ABB Group
21-Sep-11 | Slide 36
Problems with Classical Connection
© ABB Group
21-Sep-11 | Slide 37
Differential Characteristic
© ABB Group
21-Sep-11 | Slide 38
Preferred Dual Breaker Connection
IH
IL
Line
Differential
Relay
IL-IH
© ABB Group
21-Sep-11 | Slide 39
Transformer Terminated Line
© ABB Group
21-Sep-11 | Slide 40
Transformer Inrush
© ABB Group
21-Sep-11 | Slide 41
Classical Differential Operation
© ABB Group
21-Sep-11 | Slide 42
Inrush Characteristic
2nd Harmonic
Over 7% of Fundamental (60 HZ) Current
© ABB Group
21-Sep-11 | Slide 43
External Ground Fault on Delta Wye Transformer
© ABB Group
21-Sep-11 | Slide 44
Transformer Terminated Line Concerns
© ABB Group
21-Sep-11 | Slide 45
Tapped Line
© ABB Group
21-Sep-11 | Slide 46
Secondary Fault
© ABB Group
21-Sep-11 | Slide 47
Relative Fault Currents
Current
Magnitude
© ABB Group
21-Sep-11 | Slide 48
Small Power Transformer Tapped Line
© ABB Group
21-Sep-11 | Slide 49
Tapped Line
© ABB Group
21-Sep-11 | Slide 50
Differential Protection – Tap to Small Transformer
© ABB Group
21-Sep-11 | Slide 51
High Impedance Fault
© ABB Group
21-Sep-11 | Slide 52
Negative Sequence Fault Discriminator
© ABB Group
21-Sep-11 | Slide 53
Negative Sequence Current Fault Discriminator
90
120 60
150 30
If the two currents flow in the
same direction, the fault is
internal. External Fault Zone Internal Fault Zone
ROA
180
If the two currents flow in
opposite directions, the fault is
external. Minimum Operation I- Local I- : Reference
210
330
240 300
270
© ABB Group
21-Sep-11 | Slide 54
Capacitive Current Compensation
© ABB Group
21-Sep-11 | Slide 55
Charging Current Compensation
© ABB Group
21-Sep-11 | Slide 56
Three Terminal Line Application
© ABB Group
21-Sep-11 | Slide 57
Five Terminal Line Application
© ABB Group
21-Sep-11 | Slide 58
Practical Use of 4 Communications Modules
© ABB Group
21-Sep-11 | Slide 59
Route Switched Networks with Delay Symmetry
A B
© ABB Group
21-Sep-11 | Slide 61
Route Switched Network without Delay Symmetry
D
GPS
clock
GPS GPS
clock clock
A C
B
GPS
clock
© ABB Group
21-Sep-11 | Slide 62
Redundant Communication Channels
Telecom. Network
Telecom. Network
Primary channel
Secondary redundant channel
© ABB Group
21-Sep-11 | Slide 63
5-Terminal Line with Master-Master System
© ABB Group
21-Sep-11 | Slide 64
5-Terminal Line with Master-Slave System
© ABB Group
21-Sep-11 | Slide 65
Application Example of Master-Slave
© ABB Group
21-Sep-11 | Slide 66
Multifunction Line Current Differential Relay
© ABB Group
21-Sep-11 | Slide 67
Relion® RED670 - Maximum Power System Reliability
Efficient substation automation for the protection, monitoring and control of
high voltage overhead lines and cables
© ABB Group
21-Sep-11 | Slide 68
Thank you for your participation
Shortly, you will receive a link to an archive of this presentation.
To view a schedule of remaining webinars in this series, or for more
information on ABB’s protection and control solutions, visit:
www.abb.com/relion