= 1800mm; volume per meter height, expressed in m3 = 2.545 m3 = 2.54469*2880 = 7,328.7
[Ref. 2.1.1]
A2. C40/50 Pile Cap main span, expressed in m3 [Ref. 2.2.1] = 14,872.6
A4. C40/50 Cast in Place Piles for Approach Bridge expressed in m3 [Ref. 3.1.1] = 22,291.5
A5. C40/50 Pile Cap for Approach Bridge expressed in m3 [Ref. 3.2.1&3.2.2] = 8,028.2
A6. C40/50 Superstructure Box Girder for Approach Bridge expressed in m3 [Ref. 3.4.2] =4201.9
A7. C40/50 Cocnrete finishes for Approach Bridge expressed in m3 [Ref. 3.6.1] = 1,366.9
====================================================================
SUB-TOTAL (A) = 58,699 m3
B1. C50/60 Superstructure Box Girder for Approach Bridge expressed in m3 [Ref. 3.4.1] = 6,080
B2. C50/60 Concrete Pier in main span, expressed in m3 [Ref. 2.2.3] = 394.2
B3. C50/60 Concrete Pylon in main span, expressed in m 3 [Ref. 2.2.5] = 18,655.7
B4. C50/60 Concrete Box Guarder in main span, expressed in m3 [Ref. 2.3.1] = 11,164.5
B5. C50/60 Pier for Approach Bridge expressed in m3 [Ref. 3.3.1] = 850.2
B6. C50/60 Accessible Pier for Approach Bridge expressed in m 3 [Ref. 3.3.2] = 3,613.7
B7. C50/60 Precast concrete Beam for approach Bridge, expressed TT in m3 = 66400000 Ta for 6640 m
===========================================================================
SUB TOTAL (B) = 40,758 m3
TOTAL: 99,457 m3 (excluding the quantity for T-Beam in the approach bridge)
[A] Concrete for superstructures and substructures
V = 99,457 m3
REF. ESTIMATION:
A. Concrete Class – 45 MPa
REF. ESTIMATION
B. Concrete Class – 20 MPa