You are on page 1of 1

RIMP Contract No. : HK.02.03-AT/3.

3/34
Package : LSS-04 Contractor : PT. Nindya Karya
CALCULATION OF EARTH

Contract No. : HK.02.03-AT/3.3/34 Progress Period : MC.0


Structure and Location : Tertiary Canal Flume /BD.5 Contractor : PT. Nindya Karya
Work Item and No. : Ref. DWG No. :

Jarak Luas Rata-rata Luas Rata-rata Luas Rata-rata Volume Volume


Jarak Luas Stripping Luas Galian Luas Timbunan Volume Galian
No. Profil Akumulasi Stripping Galian Timbunan Stripping Timbunan Keterangan
(m) (m2) (m2) (m2) (m³)
(m) (m2) (m2) (m2) (m³) (m³)
6.90
1 A.2 6.90 - - -
17.50 - - - - - -
2 0+00A 24.40 - - -
0.00 0.12 - 0.37 - - -
3 0+00B 24.40 0.24 - 0.73
17.50 0.29 - 1.40 5.08 - 24.58
4 A.3 41.90 0.34 - 2.08
27.90 0.32 - 1.71 8.93 - 47.74
5 A.4 69.80 0.30 - 1.34
30.00 0.43 - 2.23 12.90 - 66.77
6 A.5 99.80 0.56 - 3.11
17.50 0.53 - 2.82 9.28 - 49.33
7 A.6 117.30 0.50 - 2.53
18.40 0.50 - 2.51 9.20 - 46.25
8 T.1 Up Stream 135.70 0.50 - 2.50
0.00 0.59 - 2.56 - - -
9 T.1 Down Stream 135.70 0.68 - 2.63
30.90 0.65 - 2.14 20.09 - 66.22
10 A.7 166.60 0.62 - 1.66
48.50 0.49 - 1.31 23.91 - 63.40
11 A.8 215.10 0.37 - 0.96
50.10 0.47 - 1.32 23.35 - 66.15
12 A.9 265.20 0.57 - 1.68
49.20 0.50 - 1.47 24.40 - 72.33
13 A.10 314.40 0.42 - 1.26
51.80 0.37 - 1.12 19.27 - 58.08
14 A.11 366.20 0.32 - 0.99
49.30 0.36 - 1.24 17.63 - 61.29
15 A.12 415.50 0.40 - 1.50
49.10 0.55 - 1.75 26.85 - 86.13
16 A.13 Up Stream 464.60 0.70 - 2.01
- 0.70 - 2.06 - - -
17 A.13 Down Stream 464.60 0.70 - 2.11
51.60 0.71 - 2.41 36.64 - 124.43
18 A.14 516.20 0.72 - 2.71
48.80 0.68 - 2.31 32.94 - 112.70
19 A.15 565.00 0.63 - 1.91
51.20 0.53 - 1.79 27.21 - 91.83
20 A.16 616.20 0.43 - 1.68
47.10 0.41 - 1.56 19.18 - 73.34
21 A.17 663.30 0.38 - 1.44
51.50 0.35 - 1.16 18.01 - 59.63
22 A.18 714.80 0.32 - 0.88
51.20 0.28 - 0.74 14.38 - 37.75
23 A.19 766.00 0.24 - 0.60
49.60 0.32 - 0.81 15.94 - 40.16
24 A.20 815.60 0.40 - 1.02

Jumlah 815.60 815.60 365.19 - 1,248.11