You are on page 1of 20

SITE PROJECT PHOTO

(PROGRESS IN JULY 2016)


CONSTRUCTION OF POINT 8
CONSTRUCTION OF POINT 8
CONSTRUCTION OF POINT 8
PROJECT PROFILES
PROJECT PROFILES
BALINESE GARDEN
Tropical garden with a distinctive Balinese architectural style that
will provide Balinese atmosphere for Apartment Resident
SWIMMING POOL
Swimming pool with Balinese Architectural style that can be
used by Apartment Resident for relaxing after daily activities
GAZEBO
Balinese nuance garden with Gazebo, plants and trees and
Balinese ornament as a relaxing spot for Apartment Resident
PROJECT PROFILES

TECHNICAL DATA

DEVELOPER : PT. CAKRAWALA BUMI SEJAHTERA


ADDRESS : JL. DAAN MOGOT KM 14, JAKARTA BARAT
AREA : 1.8 Ha (Apartment) + 1.2 Ha (Business Park)
TOTAL UNIT : 1,624 UNIT (STUDIO: 369 UNIT ; 2BR: 1255 UNIT)
- Tower ABC (North): STUDIO: 81 UNIT ; 2BR: 391 UNIT
- Tower DE (South): STUDIO: 264 UNIT ; 2BR: 800 UNIT
- 2 TOWER Divided into 5 Blocks (A,B,C,D,E)
- 25 FLOOR on each tower.
PARKING : 700 UNIT (RATIO 1 : 2.32)
PERMIT : IMB NO. 101/8.1A/31/-1.785.51/2016
PROJECT PROFILES

IZIN MENDIRIKAN BANGUNAN (IMB) (PERMIT FOR CONSTRUCTION)


NO. 101/8.1A/31/-1.785.51/2016
PROJECT PROFILES

SITE PLAN
PROJECT PROFILES

BUSINESS PARK
EXECUTIVE LOUNGE
Executive Lounge as a meeting point for aircrew community
specially designed for aircrew member
AIR CREW TOWER

ROUTE TO
THE AIRPORT
14 MINUTES
Through toll road Sedyatmo
16 MINUTES
Through regular road
AWARD

POINT 8 APARTMENT
ACHIEVED AN AWARD AS
THE BEST VALUE ADDED AFFORDABLE
APARTMENT WITH INTERGRATED FACILITIES
ON CATEGORY
APARTMENT AND CONDOTEL
ON PROPERTY AND BANK AWARD 2016
AWARD
POINT 8 – SKEMA KERJASAMA STAKEHOLDER
Japan Airline
Park Carlton Korean Airline
(Operator Hotel) Other Airlines
Umrah & Hajj
Dompet
Dhuafa (DD)
Sales : 1.7 T CBS
Kontraktor
Syarikat Islam
(SI) Wakaf Saham 30% Sisa RAB = Rp 592.3 M

• CBS sebagai pengelola mewakafkan saham agar DD dan SI memiliki saham sebagai Developer,
• Pada akhir bulan ke 24 (setelah konstruksi selesai), SI dan DD akan melunasi pembayaran unit
untuk menutup SKBDN sebesar 592.3 M karena masa berlaku SKBDN harus ditutup/diakhiri,
• SKBDN dibutuhkan untuk diberikan kepada kontraktor, sesuai RAB penuntasan proyek
Apartment senilai 592.3 M include PPN dengan jaminan unit tower DE,
• Unit-unit yang dibeli oleh DD dan SI setelah dioperasikan oleh operator hotel, akan
direfinancing oleh pihak bank untuk menutupi pembayaran SKBDN.

You might also like