MAINTENANCE PROCEDURE NO. OS-FG-HSD-005-PM REV.

01 DATE: 01-03-00
TITLE/TAG HFC 227 EA SKID
EQUIPMENT TYPE GAS BASED EXTINGUISHING SKID
INTERVAL 5 YEARLY
PRECAUTIONS
Note: Tick boxes to indicate completion.

1. Obtain an approved Work Permit before commencing activities. 


2. Eye protection must be worn when disconnecting or reconnecting charged FM200 bottles. 
Note: This procedure is intended ONLY for fully trained personnel, familiar with the FM200 system.
PREPARATION/ISOLATION

3. Check that the equipment tags are as detailed on work order sheet/work permit. 

MAINTENANCE ACTIVITY

4. Visually inspect all cylinders for corrosion, leakage or damage in accordance with NFPA 2001.

5. Record date of inspection on cylinder tag.
Note: (mark an ‘E’ after the retest date to indicate that the required hydrotest was not carried out
because the cylinder was under pressure and therefore exempt from the hydrotest).  
6. Replace all damaged or corroded cylinders. 
7. Sign off the Work Permit. 

REPAIR WORK

8. Is repair work or corrective action required ? YES  NO 


9. Has a Work Order been raised ?
YES  NO 
REFERENCE INFORMATION
Silvani Anticendi SpA, FM200 System Installation, Operation & Maintenance Manual N. MEM5870009