02 DATE: 16-06-01
EQUIPMENT TYPE FIRE DOOR
INTERVAL 6 MONTHLY
PRECAUTIONS
Note: Tick boxes to indicate completion.
PREPARATION/ISOLATION
2. Check that the equipment tags are as detailed on work order sheet/work permit.
INSPECTION ACTIVITY
3. Clean and inspect the latch system test all screws and nuts are tight
4. Test all screws and nuts on the panic bar are tight (if fitted).
5. Inspect the door for damage to paintwork
6. Sign off work permit.
REPAIR WORK
REFERENCE INFORMATION
Instruction for Installation, Commissioning and Maintenance of Rapp Bomek Fire doors
5-92017-900224-A-013