You are on page 1of 3

VIJAYAKUMAR

MECHANICAL SITE/PROJECT LEAD ENGINEER

CON T A C T PR O F I L E O VER V I E W

+91 8610742404 13 years’ experience as a Project engineer construction and


infrastructure projects EPS companies.
mvijay9686@gmail.com Power plant piping and structure execution engineer.
And work schedule preparation and updating regularly.
Execution engineer and over all site control as lead
engineer. And assign work for as completion with in a
EDUC A TION time period.
Executed planning ,monitoring, and controlling of projects from
BE(Mechanical Engineering) erection.
Directed end to end production and procurement of
Diploma Mechanical
construction materials.
Engineering(D.M.E)
Monitoring the progress of work and ensuring execution of
2005-2009,Dindugal PSNA project with in time period.
COLLEGE,ANNA
Expert in site management activities with follow all safety
UNIVERSITY
measures.
2001-2005,Palani,APP Guiding the contracts team in case of variation orders and
COLLEGE quantity variations.
 All type of inspection materials and field inspections with
piping inspections.

SOFTW ARE
SKILL S PR O F I C I E N C I E S
Auto CAD 2020
Pro-E Excution to all stages of p i p i n g and construction site
Experienced in site control with labor sources.
MS Excel skills. Review the drawings and documentation
Proficient in HTML, MS Maintain daily progress report as well
Word, MS Power Point, monthly reports.
PDF, Microsoft Outlook Re v ie w eve ry m onth s up c on trac tor
etc. in v oic e w or k d one with s c oo p of
wo rk.
Excellent communication skills
W ORK E X P E R I E N C E

LEAD ENGINNER/ PIPING / ARC CONSTRUCTION - / JUNE 2019 ( Current organisation )

 Piping site in charge Piping Site in charge for all execution works with inspection all related mechanical
works with drawings.
 Preparing tender and contract documents, including bill of quantities.
 Measure on the drawings the quantities of the work done by the sub-contractor periodically, in reference to
the B/Q, according to the measurement method of the work provided for in the relevant contract.
 Review and verify the quantities invoiced monthly by the sub-contractor for the work done during the
relevant month, according to the Payment Procedure of project.
 Analyzing outcomes and verifying detailed progress reports.
 DPR and inspections of daily based work completions.

SENIOR PROJECT ENGINEER , MECHANICAL DIVISION/ POLORIS TRADING WLL QATAR LUSAIL
PROJECT / OCT 2015 – May 2019

 PROJECTS (IRRIGATION, POTABLE, DISTRICT COOLING, AND SEWAGE WATER SERVICES.


 SWITCHING SUBSTATION MEPWORKS,11 KV CABLE LAYING WORKS.
 PIPING AND RELATED PIPING ERECTION WORKS
 CHAMPER WORKS
 INSPECTION WORKS FOR UTILITIES
 INSPECTION WORKS FOR SUBSTATION AND MATERIAL INSPECTION FOR ALL RELATED WORKS.
 UNDER GROUND PIPING WORKS.

SENIOR PIPING ENGINEER/PIPING ENGINNER/ SIMPLEX INFRA /SUNIL HI TECH ENGINEERS LTD
JAMNAGAR J3 PROJECT / KUDGI POWER PLANT / JUNE 2013–SEP 2015
 Site project engineer Responsible for monitoring &
 guiding site engineers who are responsible for erection and execution for piping work and chamber and equipment’s.
 Verifying invoice for the work completion and finishing works.
 Monitor AFC drawings and use the shop drawings in work execution.
 Planning and execute the work flow in coordination with the Planning Engineer.
 Monitor & Regular follow up for the Request for inspection (RFI) for the regular activities based on witness point.
 Measure on the drawings the quantities of the work done by the sub-contractor periodically, in reference to the B/Q,
according to the measurement method of the work provided for in the relevant contract.
 Review and verify the quantities invoiced monthly by the sub-contractor for the work done during the relevant month,
according to the Payment Procedure of project.
 Analyzing outcomes and verifying detailed progress reports.
 Pipe fit up and alignment inspection and material inspection
 Welding plan for welders and plan accordingly manage the welders properly.
 Site meeting with site team and planning with progress effectively and execute as well.

PIPING ENGINEER / UB ENGINEERING LTD ENGINEERING / May 2009 – May 2013


ERECTION AND EXECUTION FOR 600 MW POWER PLANT
 CRITICAL PIPING
 BFD LINE ,MS LINE ,CRH ,HRH PIPE LINE
 BFD CONNECT TO SMALL LINES
 TG PIPE LINES
 PRE ASSEMPLY SECTION FOR PIPING
 MATERIAL INSPECTION TEAM
PERSONAL Date of Birth : 09/06/1986 Father’s Name : Mahalingam
DE T A I L S Language : English, Hindi, Tamil Nationality : Indian

You might also like