You are on page 1of 6

Mridul Mahapatra

E-Mail: mahapatramridul2@gmail.com

Mob :+91-7981309818

PROFESSIONAL SYNOPSIS

 A self-motivated professional around 5 years of experience in Electrical Department for the EHV
Substation Projects (Power Sector).
 Presently serving in M/s Techno Electric & Engineering Co. Ltd . as ENGINEER
(ELECTRICAL) successfully handling the scope of Coordinating, Managing, Erection, Testing
and Commissioning for all the electrical activities in our project.
 Effective communicator with excellent relationship management & Vendor to maintain High
Productivity at work place.

OCCUPATIONAL CONTOUR

1. M/s Techno Electric & Engineering Co. Ltd., KOLKATA (W.B), August '20 to till date

Project Area : 220 kV AIS SUB-STATION KSEB, Nallalam (Kozhikode)


Project Name : 220 kV Switchyard of KSEB
Dept. Division : EPC Division.
Designation : Engineer (Electrical )
Reports to : Project Manager

Job Profile environment.


Project Execution and Coordination

 Responsible for all site activities related to the construction, Erection, commissioning of entire
220kV AIS switchyard with all the Switchgears.
 Responsible for planning, monitoring and controlling of allotted site activities including manpower
planning, material planning, and resource planning finalisation of responsibility matrix for site
engineers .
 Preparing the site progress calculation sheet & monitoring the same.
 Attend site coordination meetings on regular basis with Client KSEB for reviewing site progress
and to resolve the problems.
 Responsible for the preparing the RA bill as per work executed and analysing as per scope of work
and also keeping the track with the pending invoices with the immediate Client.
 Ensuring the Electrical safety and healthy working condition during work execution.
 Responsible for Coordinating & liasioning activities from the Govt. Authorities especially TS.
/Local.
 Responsible for contractor’s payment bill certification (measurement sheet) for the work
accomplished.
 Responsible for allocating the bulk material storing and ensuring the security.
 Responsible for monitoring the Joint Inspection along the Client for the Equipment’s which are to
be used in the project.
 Responsible for the Coordination with the Client and our Engineering Team for reviewing the
drawing status, technical support and Material Dispatch planning.
 As per the contract, analyse the scope of work, discussing with various disciplines for criticalities
and strategies for timely completion of site work.
 Attend site coordination meetings on monthly basis with Client TSTRANSCO for reviewing site
progress and to resolve the problems.

2. M/s Techno Electric & Engineering Co. Ltd., KOLKATA (W.B), April '19 to August’20

Project Area : 400/220 kV AIS SUB-STATION, Ramadugu,TSTRANSCO


Project Name : 400/220 kV Switchyard of TSTRANSCO
Dept. Division : EPC Division.
Designation : Engineer (Electrical ).
Reports to : Project Manager

Job Profile environment.


Project Execution and Coordination

 Responsible for all site activities related to the construction, Erection, commissioning of entire 400
& 220 kV AIS switchyard with all the Switchgears.
 Responsible for planning, monitoring and controlling of allotted site activities including manpower
planning, material planning, and resource planning finalisation of responsibility matrix for site
engineers .
 Preparing the site progress calculation sheet & monitoring the same.
 Attend site coordination meetings on regular basis with Client TSTRANSCO for reviewing site
progress and to resolve the problems.
 Responsible for the preparing the RA bill as per work executed and analysing as per scope of work
and also keeping the track with the pending invoices with the immediate Client.
 Ensuring the Electrical safety and healthy working condition during work execution.
 Responsible for Coordinating & liasioning activities from the Govt. Authorities especially TS.
/Local.
 Responsible for contractor’s payment bill certification (measurement sheet) for the work
accomplished.
 Responsible for allocating the bulk material storing and ensuring the security.
 Responsible for monitoring the Joint Inspection along the Client for the equipments which are to
be used in the project.
 Responsible for the Coordination with the Client and our Engineering Team for reviewing the
drawing status, technical support and Material Dispatch planning.
 As per the contract, analyse the scope of work, discussing with various disciplines for criticalities
and strategies for timely completion of site work.
 Attend site coordination meetings on monthly basis with Client TSTRANSCO for reviewing site
progress and to resolve the problems.
3. M/s Techno Electric & Engineering Co. Ltd., KOLKATA (W.B), January '18 to
April’19

Project Area : 765/400 kV AIS SUB-STATION, Vindhyachal, M.P.


Project Name : 765/400 kV Switchyard of POWERGRID ,CORPORATION OF (INDIA) LTD.
Dept. Division : EPC Division.
Designation : Engineer (Electrical).
Reports to : Project Manager

Job Profile environment.


Project Execution and Coordination

 Responsible for all site activities related to the construction, Erection, commissioning of entire 765
KV AIS switchyard with all the Switchgears.
 Responsible for planning, monitoring and controlling of allotted site activities including manpower
planning, material planning, and resource planning finalisation of responsibility matrix for site
engineers .
 Preparing the site progress calculation sheet & monitoring the same.
 Attend site coordination meetings on regular basis with Client PGCIL for reviewing site progress
and to resolve the problems.
 Responsible for the preparing the RA bill as per work executed and analysing as per scope of work
and also keeping the track with the pending invoices with the immediate Client.
 Ensuring the Electrical safety and healthy working condition during work execution.
 Responsible for Coordinating & liasioning activities from the Govt. Authorities especially
M.P./Local.
 Responsible for contractor’s payment bill certification (measurement sheet) for the work
accomplished.
 Responsible for allocating the bulk material storing and ensuring the security.
 Responsible for monitoring the Joint Inspection along the Client for the Equipments which are to
be used in the project.
 Responsible for the Coordination with the Client and our Engineering Team for reviewing the
drawing status, technical support and Material Dispatch planning.
 As per the contract, analyse the scope of work, discussing with various disciplines for criticalities
and strategies for timely completion of site work.
 Attend site coordination meetings on monthly basis with Client PGCIL for reviewing site progress
and to resolve the problems.
4. M/s,Techno Electric & Engineering Co. Ltd. ,KOLKATA (W.B), April 17 to January
'18

Project Area : 765/400 kV AIS SUB-STATION, Jabalpur M.P.


Project Name : 765/400 kV Switchyard of POWERGRID CORPORATION OF (INDIA) LTD.
Dept. Division : EPC Division.
Designation : Electrical Engineer
Reports to : Project Manager

Job Profile environment.


Project Execution and Coordination

 Responsible for all site activities related to the construction, Erection, commissioning of entire 765
kV,AIS switchyard with all the Switchgears.
 Responsible for planning, monitoring and controlling of allotted site activities including manpower
planning, material planning, and resource planning finalisation of responsibility matrix for site
engineers .
 Preparing the site progress calculation sheet & monitoring the same.
 Attend site coordination meetings on regular basis with Client PGCIL for reviewing site progress
and to resolve the problems.
 Responsible for the preparing the RA bill as per work executed and analysing as per scope of work
and also keeping the track with the pending invoices with the immediate Client.
 Ensuring the Electrical safety and healthy working condition during work execution.
 Responsible for Coordinating & liasioning activities from the Govt. Authorities especially
M.P./Local.
 Responsible for contractor’s payment bill certification (measurement sheet) for the work
accomplished.
 Responsible for allocating the bulk material storing and ensuring the security.
 Responsible for monitoring the Joint Inspection along the Client for the Equipments which are to
be used in the project.
 Responsible for the Coordination with the Client and our Engineering Team for reviewing the
drawing status, technical support and Material Dispatch planning.
 As per the contract, analyse the scope of work, discussing with various disciplines for criticalities
and strategies for timely completion of site work.
 Attend site coordination meetings on monthly basis with Client PGCIL for reviewing site progress
and to resolve the problems.

5– M/s Techno Electric & Engineering. Co. Ltd. , KOLKATA (W.B), May’16 to April'17
Project Area : 400/220 kV Sub- Station. Uravakonda (A.P.) Switchyard.
Project Name : 400/220 kV Switchyard of APTRANSCO.
Dept. Division : EPC Division.
Designation : Electrical Engineer.
Reports to : Project Manager

Job Profile environment.


Project Execution and Coordination

 Responsible for all site activities related to the construction, Erection, commissioning of entire 400
kV switchyard, 315MVA Transformer and its Control Room with all the Switchgears.
 Responsible for planning, monitoring and controlling of allotted site activities including manpower
planning, material planning, and resource planning finalisation of responsibility matrix for site
engineers .
 Preparing the site progress calculation sheet & monitoring the same.
 Attend site coordination meetings on regular basis with Client APTRANSCO for reviewing site
progress and to resolve the problems.
 Responsible for the preparing the RA bill as per work executed and analysing as per scope of work
and also keeping the track with the pending invoices with the immediate Client.
 Ensuring the Electrical safety and healthy working condition during work execution.
 Responsible for Coordinating & liasioning activities from the Govt. Authorities especially
A.P./Local.
 Responsible for contractor’s payment bill certification (measurement sheet) for the work
accomplished.
 Responsible for allocating the bulk material storing and ensuring the security.
 Responsible for monitoring the Joint Inspection along the Client for the Equipments which are to
be used in the project.
 Responsible for the Coordination with the Client and our Engineering Team for reviewing the
drawing status, technical support and Material Dispatch planning.
 As per the contract, analyse the scope of work, discussing with various disciplines for criticalities
and strategies for timely completion of site work.
 Attend site coordination meetings on monthly basis with Client APTRANSCO for reviewing site
progress and to resolve the problems.

SCHOLASTICS

Professional Qualification:

 2015, BTECH (Electrical Engineering) from Jalpaiguri Govt. Engineering. College


(W.B.).

 2014, Vocational Training from DVC, Maithon (W.B., Maithon.)

Educational Qualification

 2015, Regular B.Tech from Jalpaiguri Govt. Engineering College (W.B.)

 2010, High school from Howrah Vivekananda Institution (W.B.)


PERSONAL DOSSIER

Date of Birth : 19th December 1991


Father’s Name : Byomkesh Mahapatra
Mother's Name : Nilima Mahapatra
Marital Status : Unmarried
Perm. Address : 7/5, Naskarpara 1st bye lane ,
Pincode : 711104,
Dist. : Howrah
Language Known : English, Hindi ,Bengali

REMUNERATION & FACILITY

Notice Period : 3 Month.

Expected CTC : 7 lakhs per annum + other facilities


(Accommodation, Fooding, Medical, LTA,
Bonus etc.)

Present CTC : 4.12 lakhs per annum + other facilities


(Accommodation, Fooding, Medical, LTA,
Bonus etc.)

Mridul Mahapatra

You might also like