TABLE OF CONTENTS
Item No Title
1.0 OBJECTIVE
2.0 SCOPE
1.0 OBJECTIVE
To outline work method for demolition & general works are carried out at the project site.
2.0 SCOPES
To dismantle and remove the existing equipment and furniture all
.
3.0 HANDLING AND STORAGE
3.1 All existing ornamental fixtures, frames, etc. shall become the property of the owner
after demolition. The construction team shall exercise care and take necessary
precautions during removal of the above said items from the building and delivered
them to designated locations before the demolition.
3.3 The Logistic Team shall arrange for the removal of debris from site to the approval
dumping site. On no account shall debris or other materials be deposited under filled
areas. Burning of debris on site shall not be permitted.
5.1 The Logistic Team shall provide adequate signboards at all strategic positions warning the
public to keep away from the work site and erect temporary fencing and barriers where necessary
around the site to prevent unauthorized trespassing during works.
5.2 The HSSE Team shall be responsible to take necessary measures to ensure that noise and
air pollutions are orderly controlled to satisfy the full requirements of the relevant authorities.
5.3 HSSE Team shall also ensure that disturbance due to noise and air pollutions caused by the
works to the neighbor hoods and public are kept to an absolute minimum.
5.4 In particular, the HSSE Team shall ensure that the existing driveway areas are constantly wet
to prevent excessive dust / air pollution during the demolition work