Demolition of Civil Services
Company Doc. No. Contractor Ref. No. Date Revision
HSE DOCS-CIVIL-00-000 HSE-DOCS-MST-0000 00-00-0000 00

METHOD STATEMENT FOR DEMOLITION OF CIVIL SERVICES

Project No:

REVISION
ISSUE DATE DESCRIPTION REVIEW / STATUS
HISTORY
00

PREPARED BY: REVIEWED & APPROVED BY:

QA QC ENGINEER PROJECT ENGINEER

HSE Documents-Method Statement for Demolition of Civil Services


METHOD STATEMENT
Page 2 of 5
Demolition of Civil Services
Company Doc. No. Contractor Ref. No. Date Revision
HSE DOCS-CIVIL-00-000 HSE-DOCS-MST-0000 00-00-0000 00

Table of Contents
1. Introduction...................................................................................................................................3
2. Scope.............................................................................................................................................3
2.1. Pre-demolition Planning:.......................................................................................................3
2.2. Site Assessment:....................................................................................................................3
2.3. Utility Disconnect:..................................................................................................................3
2.4. Safety Measures:...................................................................................................................3
3. Equipment and Resources:............................................................................................................3
3.1. Excavators:.............................................................................................................................3
3.2. Hydraulic Breakers:................................................................................................................3
3.3. Cutting Tools:.........................................................................................................................3
3.4. Crane or Lifting Equipment:...................................................................................................4
3.5. Dump Trucks:.........................................................................................................................4
3.6. Personal Protective Equipment (PPE):...................................................................................4
3.7. Safety Barriers:......................................................................................................................4
4. Demolition Procedures:.................................................................................................................4
4.1. Excavation and Trenching:.....................................................................................................4
4.2. Disconnection:.......................................................................................................................4
4.3. Removal:................................................................................................................................4
4.4. Demolition of Aboveground Components:............................................................................4
4.5. Waste Management:.............................................................................................................4
5. Environmental Considerations:.....................................................................................................4
6. Emergency Response and Communication:...................................................................................5
7. Quality Assurance and Documentation:........................................................................................5
8. Conclusion:....................................................................................................................................5

HSE Documents-Method Statement for Demolition of Civil Services


METHOD STATEMENT
Page 3 of 5
Demolition of Civil Services
Company Doc. No. Contractor Ref. No. Date Revision
HSE DOCS-CIVIL-00-000 HSE-DOCS-MST-0000 00-00-0000 00

1. Introduction
This method statement provides a detailed plan for the safe and efficient demolition of civil
services. Various Civil Services (VCS) include infrastructure elements such as water supply
networks, sewage/drainage systems, electrical/power conduits, and telecommunication
networks. The objective of this method statement is to highlight the step-by-step
procedures, safety measures, and equipment requirements necessary to carry out
demolition activities.

2. Scope
The scope of this method statement covers the demolition of civil services within a specified
area. It includes the removal of underground and aboveground components, disconnection
of utilities, and the safe disposal of demolished materials.

2.1. Pre-demolition Planning:


Before commencing any demolition work, thorough planning is essential. The following
steps will be undertaken:

2.2. Site Assessment:


A detailed assessment of the site will be conducted to identify the location of existing civil
services, their condition, and potential hazards.

2.3. Utility Disconnect:


Proper coordination will be made with relevant utility providers to disconnect and isolate
the services. Permits and approvals will be obtained, and temporary utility services will be
arranged if necessary.

2.4. Safety Measures:


Safety plans and risk assessments will be prepared to identify potential hazards and
implement necessary control measures. This includes ensuring proper personal protective
equipment (PPE) for workers, establishing safety barriers, and implementing traffic
management plans if required.

3. Equipment and Resources:


The following equipment and resources will be required for the demolition of civil services:

3.1. Excavators:
Appropriate sizes and types of excavators will be used for digging trenches and removing
underground components.

HSE Documents-Method Statement for Demolition of Civil Services


METHOD STATEMENT
Page 4 of 5
Demolition of Civil Services
Company Doc. No. Contractor Ref. No. Date Revision
HSE DOCS-CIVIL-00-000 HSE-DOCS-MST-0000 00-00-0000 00

3.2. Hydraulic Breakers:


Hydraulic breakers will be utilized to break up concrete and other rigid structures.

3.3. Cutting Tools:


Cutting tools such as saws, grinders, and shears will be used for cutting pipes, cables, and
conduits.

3.4. Crane or Lifting Equipment:


If necessary, a crane or other lifting equipment will be employed for the safe removal of
heavy components.

3.5. Dump Trucks:


Dump trucks will be used for the transportation and disposal of demolished materials.

3.6. Personal Protective Equipment (PPE):


All personnel involved in the demolition activities will be provided with appropriate PPE,
including hard hats, safety goggles, gloves, and safety boots.

3.7. Safety Barriers:


Temporary safety barriers will be installed to secure the work area and prevent
unauthorized access.

4. Demolition Procedures:
The following steps will be followed during the demolition process:

4.1. Excavation and Trenching:


Excavators will be used to excavate trenches and expose underground civil services. Care
will be taken to avoid damaging existing services or nearby structures.

4.2. Disconnection:
After exposing the services, disconnection will be carried out as per the relevant utility
provider's guidelines. This includes shutting off the water supply, disconnecting electrical
lines, and cutting telecommunications cables.

4.3. Removal:
Once the services are disconnected, they will be removed using appropriate cutting tools
and lifting equipment. Care will be taken to prevent any damage to nearby structures or
services that need to remain intact.

4.4. Demolition of Aboveground Components:


Aboveground components such as pump houses, metering stations, or control rooms will be
demolished following safe demolition practices. This may involve the use of hydraulic
breakers, cutting tools, or other appropriate equipment.

HSE Documents-Method Statement for Demolition of Civil Services


METHOD STATEMENT
Page 5 of 5
Demolition of Civil Services
Company Doc. No. Contractor Ref. No. Date Revision
HSE DOCS-CIVIL-00-000 HSE-DOCS-MST-0000 00-00-0000 00

4.5. Waste Management:


Demolished materials will be sorted and appropriately disposed of. Recyclable materials will
be segregated for recycling, while non-recyclable materials will be disposed of following
country/state’s international or local regulations.

5. Environmental Considerations
Environmental considerations will be taken into account throughout the demolition process.
Measures will be implemented to minimize noise, dust, and other potential pollutants. Spill
containment measures will be in place, and proper disposal of hazardous substances will be
ensured.

6. Emergency Response and Communication


Emergency Response Plans (ERP) will be developed, and all people involved will be
appropriately briefed on emergency procedures. Communication channels will be
established to enable prompt response and coordination in case of any incidents or
emergencies.

7. Quality Assurance and Documentation


Routine and frequent, planned or unplanned inspections will be carried out to make sure
compliance with occupational health safety and environmental standards and the quality of
work. Proper and essential documentation, including daily progress reports, photographs,
and any relevant certificates or permits, will be maintained to ensure traceability and
recordkeeping.

8. Conclusion
This method statement outlines a systematic approach to the demolition of civil services,
emphasizing safety, efficiency, and environmental considerations. By following the outlined
procedures, utilizing the appropriate equipment, and implementing necessary safety
measures, demolition activities can be carried out successfully with minimal risks and
disruption to the surrounding environment.