You are on page 1of 10
WATER HANDLING & DEBOTTLENECKING PROJECT ISA FOR SCAFFOLD ERECTION /DISMANTLING & MODIFICATION REV.01 ease Nesma, lous Partners Nef) alia CLIENT a ‘CONTRACTOR = SAUDI ARAMCO. _| esa AND PARTNERS He PRONECT: "ADDRESS: | ALIHOBAR, KSA a IARC WATER HANDLING AND DEBOTTLENECKING PROJECT. aR 12,12, 13, &Laydown 0-007 | Page TOF | TY Rew 1ST] Revaed | DATE :23 august 2022 APPROVAL/REVIEW NeSMA NESMWA Esa ] | Construction Menager HSE Manager Project Manager Pwr Pyar SAE | | i oe Iph Farhat Mocled | Name: Said Rahim a August 2021 | Date Datel 04 August | sepfosfrey | a oF eat Sit, fe Name: Galileo Cortez | Date: 24 August 2021 Page 1 0f 8 Classification | SAUDI ARAMCO Classification | SAUDI ARAMCO_ Nesma, & Partner pant lou WATER HANDLING & DEBOTTLENECKING PROJECT >] aspqaul gSol lig JSA FOR SCAFFOLD ERECTION/DISMANTLING & MODIFICATION REV.O1 ‘Saudi Aramco Activity / Task: ‘SCAFFOLD ERECTION/DISMANTLING & MODIFICATION Date: | 24.8.2021 Work Location: U-GOSP-4, 8, 9, 10, 11, 12, 13 &Laydown Company: | NESMA AND PARTNERS FM/Supervisor: JSA No: | NP-JSA-WHD-007 lease tick (v) appropriate boxes - (A new JSA is required if the job scope or work conditions changes) O. confined Space Cold Work Bi others 1.0. | Permit(s) Required: O Hot Work O cow aHiard Hat Bi Safety Glasses TI Chemical Gogsies 0 Cutting Goasies Dust Mask Face Shield 1 Welding Hood 1D Welding Aprons) Welding Leggings Bar Plugs Ol Earmutts 1D Cartridge Respirator 1D Escape Respirator © SCBA 2.0 | PPE Required: Cotton Gloves @ Leather Gloves I Rubber Gloves Rubberized Cotton Ccoverall 1 Disposable Coverall Full Body Harness Clliviz Vest / Jacket GiSafety Shoes 1D Curt resistant gloves 0 Nitrile gloves 1 Elect insulated gloves ClArm Sleeves 1 Dielectrie footwear Air supplied respirator re resistant coverall Rain Suit 1D Multi-Gas Monitor 1D Light Meter DI Anemometer 3,0 | Special Tools and 1D Thermometer Q 1 Fire Extinguisher -0 | Equipment Required: 1D Retrieval Line Q Z Cl Whistle o oO gi | Coeceneal Noise Air Pollution (dust) Qo oe 1D Soil erosion _ Spills (to ground) 1D Hazards to Flora & Fauna Hazardous Materials 5.0 | [lesen msoay 1 Carcinogen Cl Irritant 0 Highly Flammable 1 Toxie 0 Explosive 6.0 | Other Potential | Ci Electrical 1D Pressure (air, water, ges) [1 Mechanical (crush points) © Ergonomics Temperature (2) | Hazards Clight /Dark Ignition Sources Dust / Vapor Suffocation 1 Other Trades Foreman / Supervisors to secure work permit before commencing activity and conduct brief safety talk (Eg. toolbox meeting, topics shall include heat stress awareness) TOF eee Wear mandatory PPE’s (hard hats, safety glass, safety shoes, visibility vest, coveral Ensure availability of sufficient hydration and rest shade area. Maintain adequate supervision. Page 2 of 8 Classification | SAUDI ARAMCO Nesma low WATER HANDLING & DEBOTTLENECKING PROJECT & Partners Wem) aml} JSA FOR SCAFFOLD ERECTION/DISMANTLING & MODIFICATION REV.01 pgnmullgSo! Dangerous occurrence, near miss and other related incident shall be reported accordingly. 3 Resi Activity, Seal BS Control Measures dual | Responsible Person sn. Rating Risk 1 | Erection of Scaffold ‘© Materialfelldown | | © Donot place loose material near to the edge of the | L | * Construction + Poor ground /Floor scaffolding Manager base + Keep all tools closer to user’s body by using tool ‘+ Site Engineer lanyard. Permit Receiver Barricade work area and provide warning signs. © Scaffold inspector ‘= Secure the materials over the Platform: do not leave + Scaffold Supervisor material on top if the wind speed increase. © HSE Supervisor ‘Provide guardrail & toe board to prevent falling of L tools /objects. © Fallof workforce from | A] imbing on ladder, do not carry things on | | » Construction| scaffold three point contact with ladder, one Manager + Sub standard eon the ladder. # Site Engineer scaffolding + Provide proper access when erecting the scaffold: do, Permit Receiver . not climb through brace or standard. . + Follow fll protection plan . . + Provide RED tag on the scaffold while erecting + HSE Supervisor + Only scaffold erector shall work on red tag . * Hook up the retracting arrestor before start climbing the ladder ifthe height is more than 3 meters. © Unstable + Carty tools by tool belt or employ rope and material sround/sandy basket. High wind + _Erect the scaffold in even ground and compacted soil | Improper method of | H | + Provide RED tag on the scaffold while erecting T erection + Only scaffold erector shall work on red tag : tand on double planks with clamping, not planks. > Erection near| 4 | id shall be erected with UPD | electrical lines tion under the supervision of competent pperson approved by Saudi Aramco. id shall not be near to any high tension Page 3 0f8 Classification | SAUDI ARAMCO. Nesma, low WATER HANDLING & DEBOTTLENECKING PROJECT & Partners aalSyiig JSA FOR SCAFFOLD ERECTION/DISMANTLING & MODIFICATION REV.01 The distance between the line and scat minimum 10 feet (3 meters) and metal ladder shall not be used near high tension lines. 2 | Leveling on ground area Uneven ground Soft ground Ensure the ground is level and compacted soil. The ground or floor on which a scaffold stands shall Construction Manager be carefully examined under at least two posts Site Engineer (standards), unless that is not feasible because of © Permit Receiver uneven or sloping ground. In this case, sills under © Scaffold inspector individual posts (standards) shall be at least 765 mm Scaffold Supervisor (30 inch) long. HSE Supervisor Lay out of base plate for base jack ‘Manual handling © Correct procedure of manual lifting > cM 3 Improper method of © Only competent person can do the task © Site Engineer erection © Handle material with care, use leather gloves, and © Permit Receiver follow manual handling procedures. © Scaffold inspector ‘© Provide RED tag on the scaffold while erecting ‘© Scaffold Supervisor ‘© _ Only scaffold erector shall work on red tag. 2 _HSE Supervisor 4 | Put scaffolding jack on bases ‘Manual handling = Kinetic handling training for scaffolding 7 ™ Injuries operatives. Site Engineer © Correct procedure of manual iting. © Permit Receiver ‘© Appropriate PPE, s on specific activity. ‘© Scaffold inspector ‘* Warning sign to be displayed in the area to make © Scaffold Supervisor people aware lifting operation are ongoing, 2 HSE Supervisor ‘5 | Installation of uprights Fall of _ materials "= Post warning signs and work within the isolated area. © Construction Jpersonne! ‘© llraising and lowering of materials to be carried out Manager Loose of parts ina controlled manner by hand to hand or fitting bag. © Site Engineer Impact injuries, '* Provide proper access when erecting the scaffold: do © Permit Receiver fatality rot climb through brace or standard. © Scaffold inspector © Follow fall protection plan, © Scaffold Supervisor Long tube to be used/stored horizontally and only © HSE Supervisor positioned upright for immediate use. | Installation of ledger (knee rail and | » Fall of materials = Do not place loose material near to the edge of the > rand rails) Manual handling scaffolding. Site Engineer injuries ‘= Post warning signs and work within the isolated area. © Permit Receiver © Correct procedure of manual lifting © Scaffold inspector ‘*__Appropriate PPEs on specific activity. 2 _ Scaffold Supervisor Page 4of 8 Classification | SAUDI ARAMCO_ | Nesma, lows WATER HANDLING & DEBOTTLENECKING PROJECT cgay Ml & Partners palSylig JSA FOR SCAFFOLD ERECTION/DISMANTLING & MODIFICATION REV.01 es ‘Saudi Aramco Warning sign to be posted in the area to make people © HSE Supervisor aware of lifting operation are ongoing 7 _ | installation of floor base © Substandard scaffold © Post warning signs and work within the isolated area. | t | + CM plank © Correct procedure of manual lifting. + Site Engineer Manual handling © Each LVL scaffold plank shall be permanently ‘© Permit Receiver Injuries stamped or embossed along at least one edge with © Scaffold Inspector the following: © Scaffold Supervisor > Registered product mark or brand that = HSE Supervisor conjunction clearly identi span. > The words “PROOF TESTED,” “SCAFFOLD PLANK” and “OSHA” > Month and year of manufacture, @ | Installation of kickboards ‘© Fall of materials "> Donot place loose material near to the edge of the| L | * CM [personnel scaffolding, © Site Engineer © Substandard . ing signs and work within the isolated area. + Permit Receiver ‘components . fall protection plan © Scaffold Inspector © Wooden toe boards shall be at least 25 mm (1 in) © Scaffold Supervisor ‘thick & shall not be nailed to the scaffold. © HSE Supervisor ‘© Toe boards shall be securely fastened in place along the outermost edge(s) of the platform and have not more than 6 mm (2/4 in) clearance above the walking/working surfaced. 9 | Installation of bracing /ties © Falling mat ° ing signs and work within the isolated area. | L | © CM personnel . rotection plan © Site Engineer © Tipping of base ‘© Only scaffold erector shall work on red tag . Receiver ‘© Hook up the retracting arrestor before start climbing . Inspector the ladder ifthe height is more than 3 meters. . Id Supervisor = Carry tools by tool belt or employ rope and material ¢ HSE Supervisor basket. 10 ‘© Manual handling * Workers to use the correct manual handling} L | © CM ries techniques. © Site Engineer © Positioning of the © Warning sign to be erected in the area to make = Permit Receiver ider people aware lifting operation are ongoing. © Scaffold inspector «Falling of personnel © _ Straight ladders shall be placed at a slope of 4:1 . Scaffold Supervisor Page 5 of 8 Classification | SAUDI ARAMCO. Nesma. low WATER HANDLING & DEBOTTLENECKING PROJECT & Partners aalSyiig JSA FOR SCAFFOLD ERECTION/ DISMANTLING & MODIFICATION REV.01 pgm gSoyt Px] ‘Saudi Aramco Ladders shall extend at least 1 meter (3 ft) above the landing surface to'which he ladder is used to gain access. Ladders shall not be used on slippery surfaces unless secured or provided When climbing up and down of a ladder, face the ladder and maintain 3 points of contact with hand free of materials. HSE Supervisor r Ti_| Inspection of Scaffolding, tagging of | » Improper tagging and The scaffold st cted as per SA Standard - scaffold use the G1, 8.001 shall be followed for inspection and * Site Engineer Use poorly erected tagging Permit Receiver scaffolding © In case of rain or storm, the scaffold shall be re- Scaffold inspector Working on inspected for the condition and signed by scaffolding «Scaffold Supervisor unsafe/none inspector on same day /next shift. # HSE Supervisor approved/inspected Scaffold users shall not change the tag or work scaffolding improperly over the scaffold 12 | Scaffold modification Unauthorized Scaffold + The modification shall be done only by certified om handling erectors. + site Engineer Unauthorized + No other crafts are authorized to alter or modify any + Permit Receiver modification of scaffold and remove any portion of scaffold. + Scaffold inspector scaffold +The Scaffold supervisor and scaffold inspector shal + Scaffold Supervisor keep the records of modification and re-inspect the HSE Supervisor scaffold before allowing works. * Do not take support from scaffold such as carpentry jacks, chain puller or chain hoists. 13 | Dismanting Throwing materials +The scaffold materials shall be lowered by hand to > from heights hand or through gin wheel or crane. + Site Engineer Material sipping off + Find sufficient place to neatly stack or store the Permit Receiver hand during lowering components. + Scaffold inspector material from + Scaffold Supervisor heights + _ HSE Supervisor 14 | Access the top platform by ladder ‘rip, Fal + Unsafe condition due to poor housekeeping shall be * cM eliminated from workplaces © Permit Receiver # Scattered scrap materials shall be removed from ‘© Scaffold inspector work area + Scaffold Supervisor + Always use full body harness and 100 % tie oft. + HSE Supervisor Page 6 of 8 Classification | SAUDI ARAMCO. 1 Nesma, low WATER HANDLING & DEBOTTLENECKING PROJECT fay riners Ne 01g JSA FOR SCAFFOLD ERECTION/ DISMANTLING & MODIFICATION REV.01 pgnull gSol! ‘Saudi Aramco [15 | Dismantling of post, top rail, mid rail Falling of materials M Inspect the scaffold for its stability & support before | L °* CM and toe board oersonnel removing in sequence + Site Engineer Manual Handling Remove safely the load from the scaffold before + Permit Recelver Injuries dismantling the scaffold. + Scaffold inspector Damage components Inspect the scaffold before for any damage before 2 Seaffld supervisor dismanting + HSE Supervisor Do not place loose material near to the edge of the scaffolding Post waring sigs and work within the scated area. Follow fall protection plan Lower al components to the ground by rope, hoi corman to man. Never throw the parts to the grou The area beneath the work should be kept clear at times, 76] Dismanting of platform planks Fall of —materiais | Mt Take proper care while dsmanting the scaffod to| | + cw /ersonnel/icals prevent fall of scaffold parts and personnel + site Engineer and tools to be tied with permanent siructure or : Receiver enon 7 Inspector workers shall use fll body harness with double © scafold Supervisor Ianyard & 100 ti of +) HSE Supervisor fostriet acces to authorized personnel only 37 _| Dismantling of bracing and ties Fall of materia | Mt and tools to be tied with permanent structure or | L |» CM Tpersonnel/toals person + site Engineer Damage components All workers shall usefull body hammess with double + Permit Receiver lanyard & 100%, + Seaffld inspector Examine the scaffold components to ensure if there | + Scafold Supervisor are any damage components + HSE Supervisor Don't remove scaffold tes until the scaffold above tie has been completely disassemble tothe tle level Hand tools to be tied with permanent structure or | use tool belt/leash. | 38] Dismanting of standard, runner, |» Fall of materia | Take proper care while dsmanting the scaffold to| |» eM and bearer Toersonnel/tools prevent fall of scatfold parts and personnel + Site Engineer Hand injury All workers shall usefull body harness with double © Permit Receiver lanyard & 100%. * Scaffold Inspector Scaffold Supervisor Page 7 of & Classification | SAUDI ARAMCO Nesma low WATER HANDLING & DEBOTTLENECKING PROJECT ea & Partners’ ALS pig JSA FOR SCAFFOLD ERECTION/ DISMANTLING & MODIFICATION REV.01 Engowl gSoljl ‘Saudi Aramco Don't store the disassembled scaffold components * HSE Supervisor ‘on the scaffold: | * Don’t throw scaffold components to the ground. 19 | Removal of base life + Tip, sl M | © Arrange the dismantled parts of the scaffold and | t | + CM + Scattered scaffold stack properly. # site Engineer materials + Segregate different parts of scaffold and store it + Permit Receiver Defective Parts separately. + Scaffold inspector +. Remove and disregard the defective parts / + Scaffold Supervisor attachment from the scaffold storage. + HSE Supervisor + Use appropriate PPE's for the specific task. 20 | Removal of base plate & sole board |» Handinjury M | © Kinetic handling training for al scaffolding workers. [| L | + CM + Slip, Tis + Use appropriate PPE’s for specifi activity. Site Engineer + Scattered Materials + Take extreme care while removing the components + Permit Receiver + Arrange the dismantled parts of the scaffold and © Scaffold inspector stack it properiy + Scaffold Supervisor + Segregate different parts of scaffold and store it HSE Supervisor separately manual handling techniques. Hee «Remove and discard the defective parts 21 | Housekeeping © Untidy and Messy M | * Unsafe condition due to poor housekeeping shallbe | t | + | workplaces eliminated from workplaces. . = Improper ™ | © Scattered scrap materials shall be removed from | L | ® Permit Receiver | housekeeping work area, © Scaffold Inspector © Scaffold Supervisor | + _HSE Supervisor '* Foreman / Supervisors to secure work permit before commencing activity and conduct brief safety talk (E.g. toolbox meeting, topics shall include heat stress awareness}. = Wear mandatory PPE’s (hard hats, safety shoes, safety vest, safety glass) Ensure availability of sufficient hydration and rest shade area, © Maintain adequate supervision. © Dangerous occurrence, near miss and other related incident shall be reported accordingly. Page 8 of 8 ATEVANE CASS 50 ASTM AS CIVEUN BOY 8 OSE FLEE EDC cowe! 2 | wowye | cei | or ceva 2 ‘ATE VANE, AS 9 ser ADELE BOY FHE TENN, 8,058, FE cone] 2 | eam | resoims | aos csvevaie | winse mses usres suman ra menererreneoseseuacenforyeraime | 12 suomss OCW OF, 7 Si oaseNSeUsSDeSANSSCL ‘ATE VAC, GAS AIEDLG TA RAT ATER WED 8 OB, BEDE a an corms] 2 | owes | sein | oo comevase » ssn Case | ma

You might also like