CONSTRUCTION-NOTES AND DETAILS FOR ISOMETRIC PIPING
INSULATION DETAILS FOR HOT PIPING
AD-036627
AA-036911
2. PIPING DETAILS SHALL BE CUT AT ALL POINTS MARKED F.W. (FIELD WELD).
1 PIPE , CS API 5L-B-PSL2 , SMLS , BE , 10 PPPCPVSMBESTD5F 33.3 M 3. EACH FABRICATED SECTION SHALL BE CLEARLY MARKED WITH ITS CODE NUMBER.
STD , B36.10M , FBE INT COATED 4. UNLESS OTHERWISE NOTED. (A) ALL DIMENSIONS ARE TO C OR FACE OF FLANGES.
(B) BOLT HOLES ON FLANGES STRADDLE C . (C) WELDING ELBOWS ARE LONG RADIUS.
7. PIPING MATERIAL IS
2 WELDOLET , CS A105N , STD , BE , HDR/BRN 10X2 PLWC1B00STDB20K 1
, SP-97 , FBE INT COATED PIPE SIZE SCHEDULE SPECIFICATION
3 90 LR ELBOW , CS A234-WPB , SMLS , BE , 10 P9LC34SMBESTDE5 1 REFER MTO REFER MTO REFER MTO
FLANGES
4 WN FLG , CS A105N , CL150 , FF , STD , 10 PFWC1B15FFSTD5V 8 8. WELDING STRESS RELIEF - YES NO
X
B16.5 , FBE INT COATED RADIOGRAPHY % 100% X-RAY SPOT X-RAY 01-SAMSS-10 SHOP FIELD
5 WN FLG , CS A105N , CL150 , FF , STD , 2 PFWC1B15FFSTD5V 1 9. TESTING SHOP HYDROSTATIC TEST - YES
THE SHOP HYDROSTATIC TEST SHALL BE CARRIED OUT ON PIECES HAVING ALL ENDS
NO
10. ALL PIPING MATERIAL IS IN ACCORDANCE WITH SAUDI ARAMCO ENGINEERING SPECIFICATION
SAES-L-105 CLASS 1LE0U . ALL EXCEPTIONS ARE NOTED ON THE ISOMETRIC.
PT N.B. 15. FOR INTERNAL LINED PIPE, LINING SHALL BE DONE AFTER SPOOL FABRICATION & COMPLETION OF ALL HOT WORKS.
16. TIE-IN POINTS CO-ORDINATES TO BE VERIFIED BY CONTRACTOR IN FIELD.
FOR CONT. SEE NO DESCRIPTION (INS) STOCK CODE QTY 17. PAINTING / COATING SHALL BE IN ACCORDANCE WITH SAES-H-001/002 AND PROJECT APPROVED COATING MAP.
18. SEAL WELDING REQUIREMENT OF THREADED JOINTS SHALL BE AS PER CL.NO.9 OF SAES-L-110.
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL, OR IN PART, SHALL BE OBTAINED FROM THIS DRAWING WITHOUT THE WRITTEN CONSENT OF SAUDI ARAMCO.
AS PER SAES-W-011 (FOR LINES WITH DESIGN CODE ASME B31.3).
E 30329871 20. CONSTRUCTION OF PLANT PIPING SHALL BE IN ACCORDANCE WITH SAES-L-350.
N 31000472 6 GASKET , SYNTHETIC W/ CENTERING RING , 10 PGGNSC20115BL02 4 21. ALL INTERFACE CONNECTIONS WITH OTHER PROJECT (WHEREVER APPLICABLE), CO-ORDINATES AND ELEVATIONS
SHALL BE VERIFIED BY CONTRACTOR IN FIELD.
22. INTERNAL FBE LINING CONTRACTOR TO VERIFY AND CONFIRM THE BREAK UP FLANGES PRIOR TO THE SPOOL FABRICATION
EL +100869 FULL FACE , 1/16" (1.6 MM) THK , 23. PLANT COORDINATE SYSTEM HAS BEEN FOLLOWED AS PART OF BI-10-00930.
CL150 , B16.5 , B16.21 HIGH POINT OF PLANT DATUM ELEVATION 100.000m WHICH EQUALS 2.05m ABOVE MEAN SEA LEVEL
FLG4 GAS6 BLT8 3 7 GASKET , SYNTHETIC W/ CENTERING RING , 2 PGGNSC20115BL02 2 SPOOLS TO BE FABRICATED BY VENDOR
EL +100387 FULL FACE , 1/16" (1.6 MM) THK ,
NO.
PIECES
MARK NO. SIZE
WEIGHT
LBS
NO.
PIECES
MARK NO. SIZE
WEIGHT
LBS
REVISION VALIDATION
10-00930-0002-001
ENGG./DATE
(DESIGN AGENCY)
CERTIFIED BY/DATE
REVIEW FOR KEY DRAWINGS
REQUIRED
CONST. AGENCY/DATE
(SAUDI ARAMCO)
OPERATIONS/DATE BY/DATE
OTHER
NO 150 262 120 49 NOTE-12 WATER NOTE-19 NOTE-19 0 mm NO NOTE-17 SYS-02 OW-5063
060 L RB-901085 029 00