Power Transmission Lines

Enough transmission lines to circle the globe once

What are power transmission lines?

Power transmission lines are used to connect power stations and substations, and for connections

between substations, in order to efficiently transmit large amounts of electricity at high voltage

without loss, and therefore play a crucial role in providing electricity.

TEPCO Power Grid currently has transmission equipment that mainly ranges from 66,000 V to

500,000 V. This equipment includes ultra-high voltage equipment ranging from 275,000 V and
500,000 V that is used for long-distance transmission of high-capacity electricity from power stations.

The voltage of electricity transmitted by use of ultra-high voltage equipment is reduced to 154,000 V

and then 66,000 V when nearing consuming areas, and then is further reduced to a voltage of 6,600

V at distribution substations, so that it can be used on the power lines hung along utility poles before

finally reaching our customers.

Circuit Lengths of Overhead and Underground


Transmission Lines

The table shown below indicates the amount of equipment in use at the end of FY2016. Overhead

transmission lines consist of a route length of 14,781 km and circuit length of 28,365 km, with 50,369

supports, while underground transmission lines consist of a route length of 6,391 km and circuit

length of 12,325 km.


The combined circuit lengths of overhead and underground transmission lines total approximately

40,000 km, which is equivalent to the circumference of the earth.

As of the end of FY2016

Overhead Underground
Voltage
(kV)
Route Length (km) Circuit Length (km) Number of supports (units) Route Length (km)

500 2,453 4,520 5,281 40

275 1,169 2,320 3,205 404

154 2,953 6,000 10,108 311

66 7,706 14,981 24,852 3,573

Below 55 500 544 6,923 2,064

Total 14,781 28,365 50,369 6,391

(Notes)

1.Route length refers to the total length between two points on a line (horizontal length between supports). Circuit

length refers to the sum of the route length of each circuit on a line.
2.Due to the Accounting Rules for Electricity Business amendment (effective from March 29, 2000), distribution

facilities with voltage over 20 kV have been included in transmission facilities since FY1999.

3.The sum is not equal to a total of breaskdown due to rounding.

The Highest Tower

The height of our highest tower is 149 m off the ground, the same height as a 40-story building.

This transmission tower functions to transmit ultra-high voltage of 500,000 V. In addition to the steel

tower, equipment includes insulators and power lines, it also uses equipment larger than that for

66,000 V used in city centers.

Underground Transmission Cables


It is difficult to obtain the land required for constructing towers in cases where electricity will be

transmitted through city centers, and other areas that are crowded or full of multi-storied buildings

such as densely populated areas and commercial districts. In such areas, underground transmission

lines are used for transmission instead of overhead lines. Underground transmission lines are

different from overhead lines in that the transmission lines have to be installed into extremely narrow

location such as underground service tunnels and manholes, making it necessary to provide the

cables with safe insulation that allows them to be touched.

Rate of Conversion to Underground Transmission Lines

The transmission of electricity in urban centers where high-rise buildings line the streets requires

supply reliability, low-loss transmission, and harmony with the cityscape. To achieve this, TEPCO

Power Grid uses underground transmission lines to transmit electricity at ultra-high voltages, such as
500,000 V and 275,000 V, with more than 90% of the transmission lines within the 23 wards of

Tokyo being underground.

Notes:

1. Underground conversion rate = (Underground power lines (circuit length) / overhead lines (circuit length) +

underground power lines (circuit length)) × 100 (%)

2. Since the accounting regulations for electric power businesses were revised (in effect since March 29, 2000), all

power distribution equipment with a capacity of 20,000 V or more has been classified as power transmission

equipment since FY 1999.

3. For a total of nine companies without the Okinawa Electric Power Company until FY 1985