You are on page 1of 2

Contract ID: 21DL0173

Contract Name: CONVERGENCE AND SPECIAL SUPPORT PROGRAM – CONSTRUCTION/ REHABILITATION OF WATER SUPPLY/ SEPTAGE
AND SEWERAGE/ RAINWATER COLLECTOR SYSTEM – RAINWATER COLLECTOR SYSTEM
A. DOÑA MARTA HOSPITAL, ATIMONAN, QUEZON
B. SOUTHERN LUZON STATE UNIVERSITY (SLSU) CALAUAG EXTENSION CAMPUS, CALAUAG, QUEZON
C. GUINAYANGAN EVACUATION CENTER, GUINAYANGAN, QUEZON
D. GUINAYANGAN MEDICARE COMMUNITY HOSPITAL, GUINAYANGAN, QUEZON
E. GUMACA EVACUATION CENTER, GUMACA, QUEZON
F. SOUTHERN LUZON STATE UNIVERSITY (SLSU) GUMACA CAMPUS, GUMACA, QUEZON
G. LAGUNA STATE POLYTECHNIC UNIVERSITY (LSPU) LOPEZ SATELLITE CAMPUS, LOPEZ, QUEZON
H. MAGSAYSAY MEMORIAL DISTRICT HOSPITAL, LOPEZ, QUEZON
I. TECHNOLOGICAL UNIVERSITY OF THE PHILIPPINES (TUP) LOPEZ, QUEZON EXTENSION, LOPEZ, QUEZON
J. PLARIDEL EVACUATION CENTER, PLARIDEL, QUEZON
K. MARIA L. ELEAZAR GENERAL HOSPITAL, TAGKAWAYAN, QUEZON
L. SOUTHERN LUZON STATE UNIVERSITY (SLSU) TAGKAWAYAN CAMPUS, TAGKAWAYAN, QUEZON

Location of the Contract: ATIMONAN, PLARIDEL, GUMACA, LOPEZ, CALAUAG, GUINAYANGAN AND TAGKAWAYAN, QUEZON
Republic of the Philippines
DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS
QUEZON IV
DISTRICT ENGINEERING OFFICE
REGIONAL OFFICE IV-A
Gumaca, Quezon

PRELIMINARY EXAMINATION OF TECHNICAL COMPONENT OF THE BID


Date of Submission/Opening of Bids September 26, 2022
Name of Contractor
Approved Budget for the Contract (ABC) PHP 4,438,999.96

TOTAL AMOUNT OF BID

ANDREW FERNAN S. MARQUEZ


MARIA CRISELLE M. ARINTOC
Tab. No.

YOLANDA F. HOLGADO
MELINDA R. ABANILLA
BAC Member (Provisional)
LUCILA L. MASCARDO

PAUL NIKKI D. AREJA


BAC Member (Regular)

BAC Member (Regular)

BAC Vice-Chairperson

BAC Chairperson
(End-User)
1 PhilGEPS Certificate of Registration and Membership
2 a. If not enrolled in CWR: following Class A and B Documents not covered by PhilGEPS Certificate.
(1) PCAB License and Registration
(2) Statement of All Ongoing Government and Private Projects
(3) SLCC
(4) NFCC Computation and Statement of Total Assets and Liabiliities
(5) JVA, if applicable
b. If enrolled in CWR: Class A and B Documents in CWR, if any, to be updated.
3 Bid Security in the prescibed form, amount and validity period.
a. Acceptable Forms: Cash, Cashier's Check, Bank Draft/Guarantee, or Surety Bond callable upon Bid Securing Declaration
Manager's Check, issued Irrevocable Letter of Credit demand issued by a surety or
by a Universal or issued by a Universal or insurance company duly
Commercial Bank (2% of Commercial Bank (If issued certified by the Insurance
ABC) by a Foreign Bank, confirmed Commission as authorized to
or authenticated by a issue such security (5% of
Universal or Commercial ABC)
Bank (2% of ABC)

Form Submitted by Contractor:


b. Amount Required:

Amount Submitted by Contractor: ( ) Sufficient ( ) Insufficient

c. Validity Period:

d. Issuing Company/Bank:
e. Official Receipt No.:
f. Callable on Demand:
g. Certificate from Insurance
Commision
ANDREW FERNAN S. MARQUEZ
MARIA CRISELLE M. ARINTOC

YOLANDA F. HOLGADO
MELINDA R. ABANILLA
Tab. No.

BAC Member (Provisional)


LUCILA L. MASCARDO

PAUL NIKKI D. AREJA


BAC Member (Regular)

BAC Member (Regular)

BAC Vice-Chairperson

BAC Chairperson
(End-User)

Bid Security in Prescibed Form, Amount and Validity Period.

4 Project Requirements:

a. Organizational Chart for the contract to be bid.


b. List of Contractor's Key Personnel, (see Clause 14.2a(3)(b), BDS) to be assigned to the contract,
with their complete qualification data.
c. List of Contractor's Major Const and Lab Equipment Units owned, leased and/or under purchase
agreements, supported by proof of ownership/lease/purchase and certification of availability of
eqpt from lessor/vendor for project duration. (see Clause 14.2a(3)(c), BDS)
4. Omnibus Sworn Statement in the form prescribed by GPPB - 8 items
Note : Any missing, incomplete or patently insufficient document in the above-mentioned checklist is a
ground for outright rejection of the bid.

Overall Rating : ( ) Passed ( ) Failed

DPWH-INFR-29-2016
Contract ID: 21DL0173
Contract Name: CONVERGENCE AND SPECIAL SUPPORT PROGRAM – CONSTRUCTION/ REHABILITATION OF WATER SUPPLY/
SEPTAGE AND SEWERAGE/ RAINWATER COLLECTOR SYSTEM – RAINWATER COLLECTOR SYSTEM
A. DOÑA MARTA HOSPITAL, ATIMONAN, QUEZON
B. SOUTHERN LUZON STATE UNIVERSITY (SLSU) CALAUAG EXTENSION CAMPUS, CALAUAG, QUEZON
C. GUINAYANGAN EVACUATION CENTER, GUINAYANGAN, QUEZON
D. GUINAYANGAN MEDICARE COMMUNITY HOSPITAL, GUINAYANGAN, QUEZON
E. GUMACA EVACUATION CENTER, GUMACA, QUEZON
F. SOUTHERN LUZON STATE UNIVERSITY (SLSU) GUMACA CAMPUS, GUMACA, QUEZON
G. LAGUNA STATE POLYTECHNIC UNIVERSITY (LSPU) LOPEZ SATELLITE CAMPUS, LOPEZ, QUEZON
H. MAGSAYSAY MEMORIAL DISTRICT HOSPITAL, LOPEZ, QUEZON
I. TECHNOLOGICAL UNIVERSITY OF THE PHILIPPINES (TUP) LOPEZ, QUEZON EXTENSION, LOPEZ, QUEZON
J. PLARIDEL EVACUATION CENTER, PLARIDEL, QUEZON
K. MARIA L. ELEAZAR GENERAL HOSPITAL, TAGKAWAYAN, QUEZON
L. SOUTHERN LUZON STATE UNIVERSITY (SLSU) TAGKAWAYAN CAMPUS, TAGKAWAYAN, QUEZON

Location of the Contract: ATIMONAN, PLARIDEL, GUMACA, LOPEZ, CALAUAG, GUINAYANGAN AND TAGKAWAYAN, QUEZON
Republic of the Philippines
DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS
QUEZON IV
DISTRICT ENGINEERING OFFICE
REGIONAL OFFICE IV-A
Gumaca, Quezon

PRELIMINARY EXAMINATION OF FINANCIAL COMPONENT OF THE BID


Date of Submission/Opening of Bids September 26, 2022
Name of Contractor :
Approved Budget for the Contract (ABC) PHP 4,438,999.96

TOTAL AMOUNT OF BID AS READ

ANDREW FERNAN S. MARQUEZ


MARIA CRISELLE M. ARINTOC

BAC Member (Provisional)

YOLANDA F. HOLGADO
MELINDA R. ABANILLA
LUCILA L. MASCARDO
Tab. No.

PAUL NIKKI D. AREJA


BAC Member (Regular)

BAC Member (Regular)

BAC Vice-Chairperson

BAC Chairperson
(End-User)

1. Bid Form

2. Bid Prices in the Bill of Quantities


\
Detailed Estimates including a Summary sheet indicating the unit prices of construction materials,
3.
labor rates and equipment rentals used in coming up with the bid;

4. Quarterly/Monthly Cash Flow and Payment Schedule

Note : Any missing, incomplete or patently insufficient document in the above-mentioned checklist is a
ground for outright rejection of the bid.

Overall Rating: ( ) Passed ( ) Failed