Villa Checklist

Date: CASE ID:


Consumer Name:
Area: Plot:
Building Description:
Contractor: Contractor number:

(Official Use Only) ‫لالستعمال الرسمي فقط‬

Document present: Status Min. Maj. Earthling System Status Min. Maj.

Drawing approval Manhole + Inspection Cover:

Switchgear approval Earth cable size:


Inspection documents Earth resistance:
Thermal documents Graze + Tape over connection:
Pit identification if required:

Meter cabinet

1. Direct meter: Status Min. Maj. Status Min. Maj.


Location & mounting Size of enclosure:

Breaker rating: Cable Size & termination:


View glass: Plywood + Asbestoses Sheet

Earthing. Door/Gland Duct size (Incoming cable) 4inch


Locking facility Duct size (outgoing cable) 4inch

2. CT type: Status Min. Maj. Status Min. Maj.

Location & mounting Size of enclosure:

MCCB rating: Plywood + Asbestoses Sheet

MCCB locking facility CT on removable Bus bar link:


View glass: Cable size & termination:

Segregation: Duct size (Incoming cable) 4inch


Duct size (outgoing cable) 4inch
Earthing. Door/Gland
MDB Status Min. Maj. Status Min. Maj.
Incomer Rating(A): Breaking Capacity (KA):
Outgoing Rating(A): Breaking Capacity (KA):
Clearance for main cable: Clearance for outgoing cables:
Main BB size Outgoing BB size
Labeling Shrouding and Phase barrier
Earthing Door/Cable gland Copy of as built drawing

Final DB Status Min. Maj. Status Min. Maj.

Location & mounting: Main isolator rating:


RCCB rating MCB rating:
Wire sizes: Color coding:
Main earth termination: DB dressing:
Section numbering: Circuit Numbering:
Labeling As built load schedule

Wiring accessories,
Status Min. Maj. Status Min. Maj.
cabling, & earthing: -
W/H body earthing W/P wiring access. for wet area:
Switch & Socket earthing: Location of cooker outlet:
Water pump body earth: Location of W/machine outlet:
Isolator labeling: Location of Ex. Fan in the B/room:

Fan coil unit outlet: Armored cable for C. wall lighting:

General Comments: - (Each comment shall be followed with note, minor or major) Note

Inspection Engineer Name: Date:


‫فحص العزل الحراري‬
Thermal Insulation Inspection
(Official Use Only) ‫لالستعمال الرسمي فقط‬

(NON-COMPLY) ‫غير مطابق‬ )COMPLY( ‫مطابق‬


)DOORS( ‫األبواب‬

)WINDOWS( ‫النوافذ‬
(NON-COMPLY) ‫غير مطابق‬ )COMPLY( ‫مطابق‬

‫شهادات العزل الحراري‬


(NON-COMPLY) ‫غير مطابق‬ )COMPLY( ‫مطابق‬
)THERMAL INSULATION CERTIFICTES(

Note: All Certificates is being checked before issue the NOC ‫ يتم التدقيق على الشهادات قبل طباعة شهادات الفحص املبدئي‬:‫مالحظة‬

: )NOTES( ‫مالحظات‬

)Inspection Engineer( ‫مهندس التفتيش‬